Integration Central Asia into the World Economy : The Role of Infrastructure and Energy Electrical Energy of Kyrgyzstan ( current situation , problems , prospects ) Doctor of technical sciences prof ., Obozov A . D. October, 22-23, Washington , 2007 . - PowerPoint PPT Presentation
Citation preview
Integration Central Asia into the World Economy: The Role of Infrastructure and Energy
Electrical Energy of Kyrgyzstan(current situation, problems, prospects)
Doctor of technical sciences prof., Obozov A. D.
October, 22-23, Washington, 2007
Brief information on KyrgyzstanBrief information on KyrgyzstanGeographical position – 39-43 d.w.Geographical position – 39-43 d.w. Population – urban 40%Population – urban 40%Territory – 200 thousand sq.km, Territory – 200 thousand sq.km, – rural 60%– rural 60% 95%95% -- mountains mountains Population – 5 millionPopulation – 5 million Borders with:Borders with: Uzbekistan, Uzbekistan, Density of population 20 persons\sq.km Density of population 20 persons\sq.km Tajikistan, Kazakhstan, ChinaTajikistan, Kazakhstan, China
FuelFuel--Energy Complex of Kyrgyz RepublicEnergy Complex of Kyrgyz Republic
StocksStocks ProductionProduction ConsumptionConsumptionCOALCOAL 2317 2317 blnbln..tt 538 538 thth..tt 1250 1250 thth..ttOILOIL 4700 4700 mlnmln.м.м22. . 24.24.mlnmln.м.м22. . 960 960 mlnmln.м.м22. . HYDROHYDRO 162,7 162,7 blnbln..kwkw..hh.. 12,6 12,6 blnbln..kwkw..hh. . 9,085 9,085 blnbln..kwkw..hh..
18 18 power plantspower plants 16 – 16 – HydroHydro 2 – 2 –Thermal power plantsThermal power plants ( (BishkekBishkek, , OshOsh))
Installed capacityInstalled capacity – 3523 – 3523 MWMWTransmission LinesTransmission Lines – 35-500 – 35-500 kWkW OverOver 10 10 thousand kmthousand kmTransmission LinesTransmission Lines – – 10 10 и 0,4 и 0,4 kWkW 2 2 thousand kmthousand km
Output of electrical energyOutput of electrical energy – 13-14 – 13-14 milliard kW/hmilliard kW/hProvision of populationProvision of population – 95% – 95% of electrical energyof electrical energy
Reserve of hydro energyReserve of hydro energyIs used onlyIs used only 10% 10% of hydro potentialof hydro potential
Electrical Energy of Kyrgyzstan:
SCHEME OF THE MAIN ELECTRICAL ENERGY SYSTEM OF THE KYRGYZ REPUBLIC
High – voltage transmission lines
Electrical sub - stations
Dynamics of the level of system losses of electrical energy (1996 - 2007)
50%
40%
30%
20%
10%
0%1996 1997 1998 1999 2000 2001 200 2003 2004 2005 2007 1 п/г
42%43%
28%
32%
34%
37%
41%
40%
42%
43%
43%
42%
Comparison of lagging behind of the real level from the necessary level in the NIS
3,7
2,3
4,1
3,7
2,3
5
3,8
1,2
0
1
2
3
5
4
Армения
Азербайджа
н
Turkish
Kyrgyz
stan
Kyrgyz
stan
Necessary tariff Real tariff
4,1
5
2,1
0,4
4
3,1
3,5
1
Cen
t/kvт
Tajik
istan
Tajik
istan
Укра
инаM
oldo
vaUzb
ekist
an
Uzbek
istan
Growth of debts РЭКов
2500
2000
1500
1000
500
0%
Total debt to 31.12.2006 is 3′354 mln soms
Industrial consumers
PopulationJthers Rural consumers
Mln. somsby 1.07.2001
by 31.12.2006
165,7 166,5178,1
188,9 245,1
712,3
572,8
2286,4
Prospects of electrical energy sector of Kyrgyzstan
It is possible to construct on the river Naryn Hydro Power Plant (HEP) with the power 6450 MW with the output over 22 milliard kW
Kambarata HPP – 2 Power – 360 MW Output – 1,148 milliard kW/h Cost - 240 million $
Kambarata HPP – 1 Power – 1900 MW Output – 5,1 milliard kW/h Cost - 1,7 milliard $
Transmission Line – 500 kW for export Length 1300 km Cost 700 млн. $
Cause of crisis in electrical energy sector of the Kyrgyz Republic
Old equipment
Politically and socially dependent
problem
Low level of payments
KFDHigh level of losses
Weak management
Tariffs are lower of the necessary expenses
KFD exert unfavorable impact on the growth and macroeconomic stability of the
country :- Cause low collection of taxes into the country’s budget because of the inefficient activity of energy companies;
- Accordingly, the state expenses on salary, social expenses and social investments financed from the budget of the country are reduced;
-Misrepresent the relative electrical energy prices , bringing down the stimulus to energy saving;
-Keep impracticable enterprises, so suppressing conducting of restructuring of enterprises and reducing economic growth of efficiency;
-Misrepresent resources distribution by suppressing resources in energy consuming industries;
-Aggravate financial discipline in state structures making weaker efficiency of fiscal policy
Thank you for attentionThank you for attention!!!!!!