Upload
inu-santana
View
222
Download
0
Embed Size (px)
Citation preview
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
1/20
Integrating six sigma methosolid waste managementin DKI Jakarta
Dino Rimantho
Industrial Engineering Department, Pancasila University, Jaka
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
2/20
Introduction
Solid waste management has become an important issue ideveloping countries
Several problem may arise due to Increased rate o uncontgeneration
!hereore, this lead to various problems such as environmepublic health and politics
"aste management is not only mitigate and reduce the imsystems, but also involves the incorporation o the value o
the waste management system has a high important role iservice and have comple# problems$
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
3/20
USEP% noted that the improvement plan to increase new ddone with improved methods o approach
!here are our types o activities as a preventive measuresuch as, prevention, reduction, recycling and reuse
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
4/20
Literature review
Si# Sigma is an organi&ed and systematic method used orprocess improvement and new product and service develo
Si# sigma is a method that applies statistical and other scimethods to minimi&e deect level
Si# sigma method is one o the business strategies that areable to improve and maintain the company(s operational e
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
5/20
)ive phases o D*%I+
Defne % clear statement o the problem to be completed inwill begin
Measure the team collecting data and measuring the actuarelated problems$
Analyze the team will carry out the identi'cation, testing anpriorities map data and processes in order to characteri&e thlevel o deect$
Improve is the implementation o improvements through ope#periments to reduce and eliminate deects$
Control the last phase in order to lock in pro'ts obtained wi
implementation o previous phases$ !his phase is also e#peccertainty or the maintenance o improved perormance$
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
6/20
*aterial and *ethod
!he study conducted in the +leanliness Department o D-I
Province$ !his study begins by analy&ing and identiying the actors
large amount o solid waste generated, causing the solid wland'll distributed in large .uantities every day$
Si# Sigma method was adopted and modi'ed rom US EP% Environmental Proessional(s /uide to 0ean 1 Si# Sigma
!his study uses data ac.uired rom the +entral 2ureau o S
D-I Jakarta in 5667 8 569:
!here are about our people selected as key inormants, suacademics, Jakarta +leanliness %gency and government o;
Jakarta$ People were chosen to assess the ranking actors tproblem by using %
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
7/20
Result and discussion9$ De'ne
!able 9$ SIP=+ diagram o the solid waste management procSupplier Input Process Output C
• ousehol
ds
• Industries
•
Comertial• O!ces
• "arkets
• Roads
• =rganic
waste
• Inorganic
waste• aluable
resource
s
•
+ompost• Residual
•
•
•
•
•
•
In order to get a detailed description o SIP=+ process us• !his helps in determining the direction o the process ?ow
scheme$• SIP=+ an abbreviation o Supplier, Input, Process, =utput
+ustomer$
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
8/20
Dail# $ar%age Production a&ransported at DKI Jakarta
'o (ear Production &ransported
Residua
l
PePr
tra
) 5667 7::@$:A A65B$5B 9:6C$@B
* 5696 756A$7A CA56$:@ 9:AA$:9
+ 5699 7C$AC @7AB$:9 B99$B
, 5695 B:B$AA B66@$5 :5$BA
- 569: B9:$A B:B$7 ACB$7
Source 2PS 3569@4
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
9/20
+onsidering the ratio o waste achieved by the year 569: aor around 9:$F, there are still unserved
!he ratio o waste reduction is re.uired in each periodG it nimplemented so that application o si# sigma methods o wreduction goals can be achieved$
It is assumed that the cleanliness department to improve s
about 5F, which means a reduction in waste o 5$5F was !hus, this target can be e#pected sigma level targets$
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
10/20
"easure
In this phase there are several key steps, such as process collection, and counting o sigma level
!he use o si# sigma maps used to understand in more detprocess o solid waste management and the relationship bactors$
"ith the application o si# sigma maps are e#pected to kno
that can generate waste$ 2y knowing the elements o this process, there are several
that may aHect the rate o waste generation such as, Disp*inimation, +ollecting, !ranser, Recycling and +omposting
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
11/20
Percentage o. $ar%ageComposition
'o/ $ar%age
Composition
*001 *0)0 *0)) *0)* *
) Paper 56$C 56$C 56$C 9@$75 9
* "ood 6$6C 6$6C 6$6C 6$AC
+ +loth 6$B9 6$B9 6$B9 9$99
, Rubber 6$97 6$97 6$97 6$5
- Plastic 9:$5 9:$5 9:$5 9@$65 9
2 *etal 9$6B 9$6B 9$6B 9$A5
3 /lass 9$79 9$79 9$79 5$@4 =rganic $:C $:C $:C :$C
1 2atteray 9$5 9$5 9$5 6$B
)0 =thers $@ $@ $@ 7$7A
Source 2PS 3569@4
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
12/20
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
13/20
!he ield data collected rom 2PS are used to calculate the sigma leve
In 5695 the deective ratio was 9:$F,
!hen ield 9 deHective ration 9 @$5 AB$F !hereore, 6$A
Substituting in e.uation 354, then,
K level L9
36$AB4 M 9$ 9$96:9 M 9$
5$B6:9
DPU 9 8
9 6$AB
6$9:
DP*= DPU N 96B 6$9: N 96B 9:666
%s previously assumed that the e#pected waste ratio target is 5F, the
DPU 6$65 !hus,
ield 9 8 DPU 9 8 6$65 6$7A
!arget K level L9 34 M s
L9 36$7A4 M 9$ :$@
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
14/20
%naly&e
!his stage is to analy&e the root cause o the problem by u)ishbone diagram$
!his diagram will identiy actors such as human, machine,garbage disposal and the environment$
2rainstorming conducted to identiy the actors that causeactors that aHect the solid waste minimi&ation$
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
15/20
6igure )ishbone diagram o actors leading to
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
16/20
"eighted main and subcauses pairwise
"ain Cause 5eight o. main
cause
Su% 7 cause 'ormali
Su"an 6$9:9 0ack o -%P
0ack o awareness
Insu;cient skill o workers
"aterial 6$6@
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
17/20
)igure :$ "eighted main and subcauses pairwE#pert +hoice
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
18/20
Improve
Trafc jam may be done in several ways, such as, avoid locations that occur in road congestion, move or change the time o transport on days there are no bottlenecks$
Organic waste, activities that can be done to reduce the generation o especially organic waste by reducing the purchase o goods that are tailocapacity$
Lack o awareness and lack o KAP, several intervention approachesparties such as governments, nongovernmental organi&ations, and acad
interventions in the community are absolutely necessary to in?uence andpublic mindset towards healthy behavior to reduce waste rom source$
Minimation, Reduction o the .uantity o garbage at the source directlypractical solution and potentially done to address the problem o solid waconsidered the most conducted in order to enable the reduction o the .uwaste is a method @R M 9D$ !his method consists o Reduce, Reuse, Recand Destroy$
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
19/20
Control
!o monitor the overall implementation o the solid waste mactivities
Stakeholders can establish a system that is standardi&ed bmodi'cation o policies, regulations, procedures and other systems$
It aims to provide certainty o continuous improvement$ )ousing statistical control charts being able to control a procewaste minimi&ation$
It will be able to detect whether the process is under contraddition, statistical process control also to be able to obserconsistency o the process and make the process under co
8/16/2019 Integrating Six Sigma Method on Solid Waste Management-7
20/20
!