1
Municipal Solid Waste Biowaste Integrated waste Management Centre Fos sur Mer (France) Client: Communauté Urbaine de Marseille Provence Métropole 58 boulevard Charles Livon 13007 Marseille Treatment capacity: 410 000 t/y solid waste and recoverable products 83 400 t/y municipal solid waste 4 200 t/y sorted municipal waste and biowaste Type of contract: Drawing up of construction project, execution of works, start up, investment financing of the integrated management of waste Realisation: EveRé SAS (80 % Urbaser, 20 % Valorga International) Plant operator: EvéRé SAS Start-up date: 2008/2009 Plant description: * Mechanical sorting * Anaerobic digestion (Valorga) * Incineration of combustible * Aerobic maturation Volume of digesters: 2 x 4 200 m 3 Operation conditions: Mesophilic Gas yield: 162 Nm 3 /t input digestion Gas use: Electricity and heat production Amendment use: Agriculture Address of the plant: Route du Port Minéralier Zone Caban Sud 13210 Fos sur Mer France

Integrated waste Management Centre Fos sur Mer …proxy.siteo.com.s3.amazonaws.com/.../file/100524-fosang15.pdf · Municipal Solid Waste Biowaste Integrated waste Management Centre

  • Upload
    ngoanh

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Integrated waste Management Centre Fos sur Mer …proxy.siteo.com.s3.amazonaws.com/.../file/100524-fosang15.pdf · Municipal Solid Waste Biowaste Integrated waste Management Centre

Municipal Solid Waste Biowaste

Integrated waste Management Centre Fos sur Mer (France)

Client: Communauté Urbaine de Marseille Provence Métropole 58 boulevard Charles Livon 13007 Marseille

Treatment capacity: 410 000 t/y solid waste and

recoverable products 83 400 t/y municipal solid waste 4 200 t/y sorted municipal waste and biowaste

Type of contract: Drawing up of construction project,

execution of works, start up, investment financing of the integrated management of waste

Realisation: EveRé SAS (80 % Urbaser,

20 % Valorga International)

Plant operator: EvéRé SAS

Start-up date: 2008/2009 Plant description: * Mechanical sorting

* Anaerobic digestion (Valorga) * Incineration of combustible * Aerobic maturation

Volume of digesters: 2 x 4 200 m3

Operation conditions: Mesophilic Gas yield: 162 Nm3/t input digestion Gas use: Electricity and heat production Amendment use: Agriculture

Address of the plant:

Route du Port Minéralier Zone Caban Sud 13210 Fos sur Mer France