Integrated Revalidation HAZOP/SIL Study: Lessons Learned

Integrated Revalidation HAZOP/SIL Study: Lessons Learned

Asyad S. Al-SalehJu’aymah NGL Fractionation Plant, Saudi Aramco

1

Page 2: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

OutlineOutline

Background Life Cycle ModelStudy Scope & SchemeLessons Learned Summary

2

Page 3: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

BackgroundBackground

• Process Hazard Analysis:– Hazard evaluation that identifies and analyzes the

significances of hazardous situation associated with a process or activity.

• What is Revalidation?– Updating the results of initial PHA and identify, evaluate

and attempt to control any newly introduced hazards.• Industry Practices:

– Initial PHA is typically performed during design stages.– Recent trends mandates frequent updates.

• Why Revalidation?– Changes on Field, Equipment & Personnel

3

Page 4: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

Design

Construction

Operate & Maintain

Decommissioning

Life Cycle ModelLife Cycle Model

4

Page 5: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

Life Cycle ModelLife Cycle Model

Risk Assessment Asset Integrity “A Process Hazard Analysis shall be

performed on individual process node within a unit and on the entire unit at least every 5 years”

5

Page 6: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

Ju’aymah NGL FractionationJu’aymah NGL Fractionation• Scope & Scheme:

6

Page 7: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

JNGLF Study JNGLF Study

HAZOPHAZARD &

OPERABILITY

HAZOPHAZARD &

OPERABILITY

-Analyzes process deviations on continuous nodes of operations.

SILSAFETY

INTEGRITY LEVEL

-loops and other Safety Instrumented Functions (SIFs) during operational demand.

Evaluates the reliability of ESD system

7

Page 8: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

JNGLF Study JNGLF Study • Consultant: Consultant: ERSG, Australia

• Scope: HAZOP & SIL for 3 Fractionation modules, Rerun units and Auxiliary systems.

• Total Process 35 NodesNodes

• Start: October 3rd, 2009 • Finish: November 5th, 2009 • Venue: JNLGF Training building• Team: 10 full-time & 3 part time• Daily hours: 6-8 hrs

8

Page 9: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

Lessons LearnedLessons Learned

Primary Duplicates

Plant Column Vessel Tank Column Vessel Tank

NGL Fractionation 8 38 1 0 8 0

Rerun 4 16 0 0 2 0

Surge & Injection 0 3 0 0 6 0

Product Handling 0 6 0 0 4 0

Off-shore 0 20 2 0 0 6

Utilities 0 4 0 0 2 0

Prep

arat

ion

Sche

dule

Met

hodo

logy

Trai

ning

RMP

• Revalidation shall be business-driven.• Process nodes estimation defines the roadmap.

45 PFDs200 P&IDs

9

Page 10: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

Lessons LearnedLessons Learned

( 2 ) Control & System Engineers

Prep

arat

ion

Sche

dule

Met

hodo

logy

Trai

ning

RMP

• Revalidation shall be business-driven.• Process nodes estimation defines the roadmap.• Success is determined by teamwork.

Loss Prevention Engineer

Project Manager

Unit Operator

Maintenance Supervisor

( 2 ) Operations Engineers

Instrument Engineer

Sr. Instrument Engineer

( 2 ) Sr. Operations Engineers

Team Leader

10

Page 11: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

Lessons LearnedLessons LearnedPr

epar

atio

nSc

hedu

leM

etho

dolo

gyTr

aini

ngRM

P

• Revalidation shall be business-driven.• Process nodes estimation defines the roadmap.• Success is determined by teamwork.• Key engineering documents shall be available.

11

Page 12: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

Lessons LearnedLessons Learned

• Clear study schedule helps to streamline activities.• Daily plan & objectives supports team to focus.• Spotting concerns engages management support.

Sche

dule

Prep

arat

ion

Met

hodo

logy

Trai

ning

RMP

12

Updates

Accomplishments

Challenges

Page 13: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

Lessons LearnedLessons Learned

• Unit breakdown avoids potential duplicates. • Opportunities for optimization shall be invested.• Visible P&ID for all team sets review unity.• SIL integration minimized 50% of time and efforts.

Met

hodo

logy

Sche

dule

Prep

arat

ion

Trai

ning

RMP

De-ethanizer

De-ethanizer Refrigsystem

ADIP Extraction

MEROX Treatment

LPG Dehydration

NG Decolorization

Rerun Auxiliary Units

Screening

Initial Assessment

Validation

13

Page 14: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

Lessons LearnedLessons Learned

• Advantage for participants when trained on basics.• Discussion participation shall be fostered.• Opportunity for new engineer’s learning.

Trai

ning

Sche

dule

Prep

arat

ion

Met

hodo

logy

RMP

Hazard

Evaluation

Risk Acceptance

Process Safety Management

14

Page 15: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

Lessons LearnedLessons Learned• Report value is how helpful for Implementation team. • Attention is to be given for procedural systems.

RMP*

Trai

ning

Sche

dule

Prep

arat

ion

Met

hodo

logy

Exception of specific failure

Rational behind optimization

Common industrial trends

*Risk Mitigation Plan

NDT Inspection

Turnaround & Inspection (T&I)

LEL Detection layout

Fixed fire protection layout

Operation Instruction Manual (OIM)

Operator’s training

ESD Procedures

Instrumentation & Rotating equip. PM

15

Page 16: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

Lessons LearnedLessons Learned• Report value is how helpful for Implementation team. • Attention is to be given for procedural systems.• Categorizing action plans addresses RMP priority.

RMP

Trai

ning

Sche

dule

Prep

arat

ion

Met

hodo

logy

*Risk Mitigation Plan

16

Page 17: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

Lessons LearnedLessons Learned• Report value is how helpful for Implementation team. • Attention is to be given for procedural systems.• Categorizing action plans addresses RMP priority.

RMP

Trai

ning

Sche

dule

Prep

arat

ion

Met

hodo

logy

*Risk Mitigation Plan

•Refrig. compressor (DeC2) •Critical & non‐critical SD•Total of “5” SIL 1 rating•Acceptable risk level

SIL Validation

17

Page 18: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

SummarySummary

• PHA revalidation would loose value if not driven by business-objectives and management support.

• Ju’yamah NGL’s scheme of integrated PHAs was successful to optimize time, efforts and assigning RMP.

• PHA is an opportunity for risk reducing and process learning specially for new engineers.

• Findings of retroactive SIL on existing facilities are likely to be minimum unless major upgrade occurs.

• Risk Mitigation Plan should be prioritized either qualitatively or quantitatively for implementation.

18

Page 19: Integrated Revalidation HAZOP/SIL Study: Lessons Learned

Asyad S. [email protected] Box 5033, Ras Tanura 31311Kingdom of Saudi Arabia