Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid Battelle U.S. Department of Energy National Energy Technology Laboratory Mastering the Subsurface Through Technology Innovation, Partnerships and Collaboration: Carbon Storage and Oil and Natural Gas Technologies Review Meeting August 1-3, 2017

Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

  • Upload
    vokhue

  • View
    220

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Integrated Mid-Continent Stacked Carbon Storage Hub

Project Number DE-FE0029264

Andrew Duguid

Battelle

U.S. Department of EnergyNational Energy Technology Laboratory

Mastering the Subsurface Through Technology Innovation, Partnerships and Collaboration:Carbon Storage and Oil and Natural Gas Technologies Review Meeting

August 1-3, 2017

Page 2: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Team2

ADMScott McDonald

BattelleIsis FukaiJustin GlierNeeraj GuptaJared HawkinsMartin JimenezKathryn JohnsonMackenzie ScharenbergValerie Smith

Great Plains EnergyDan Blankenau

LANLRichard Middleton

Nebraska CSDDana DivineMatt Joeckel

PNNLDiana Bacon

Schlumberger Carbon ServicesNick MalkewiczWayne RoweBob WillSi-Yong Lee

Page 3: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

3

Presentation Outline

• Objective

• Tasks

• Source Identification

• Transport Assessment

• Geologic Assessment

• Accomplishments

• Lessons Learned

• Synergy Opportunities

• Summary

LEGENDStudy Area

ADM Plant

Pipeline

Agricultural Processing

Cement Plant

Ethanol Plant

Fertilizer Plant

Industrial Source

Mining

Petroleum and Natural Gas

Refineries/Chemicals

Electrical Generation

Waste Management

Unclassified

Oil Production

N

NEBRASKA

Page 4: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Objective

• Objective: to conduct a pre-feasibility study leading to the development of a commercial-scale integrated stacked storage hub in the Midwest consisting of a source and stacked storage corridor.

• The project will concentrate on identifying specific sources and stacked storage sites in southwest Nebraska and central Kansas. The project will assess capture, transport, and storage potential and develop specific plans for a subsequent Phase II Storage Feasibility Study.

4

Page 5: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Project Tasks

• Task 1: Project Management & Planning

• Task 2: Source Identification

• Task 3: Sub-Basinal Geologic Assessment

• Task 4: Injection/Storage Assessment

• Task 5: Capture and Transportation Assessment

• Task 6: Economic and Liability Assessment

• Task 7: Policy, Outreach, and Permitting

• Task 8: Phase II Planning

5

Page 6: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Task 2 Source Assessment6

• 2011-2015 US EPA greenhouse gas reporting rule data

• Divided into three groups Ethanol Sources

Power Sources

Other SourcesFacility Type

Number of

Facilities

Emissions (MMt CO2e)

2011 2012 2013 2014 2015 TotalAverage Annual

Ethanol 18 3.1 3.2 3.1 3.3 3.3 16 3.2Power Plants 5 15.6 14.5 16.0 14.8 14.3 75.2 15.0Other 23 1.1 1.1 1.2 1.0 1.1 5.6 1.1Study area total 46 19.8 18.8 20.3 19.1 18.7 96.8 19.4

Page 7: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Ethanol7

0

500000

1000000

1500000

2000000

2500000

3000000

3500000

2010 2011 2012 2013 2014 2015 2016

Emiss

ions

(Mt C

O2e

)

Reporting Year

Indivudual Ethanol Production Emissions in the Study Area

Total Emissions

Archer Daniel Midland

Cargill Corn Milling North America

AGP Soy/Corn Processing

Green Plains Wood River, LLC.

Chief Ethanol Fuels, Inc.

Flint Hills Resources, Fairmont, LLC

Valero Albion Plant

Green Plains Central City

Abengoa Bioenergy of Nebraska, LLC

Abengoa Bioenergy Co., LLC

Green Plains ORD

Pacific Ethanol Aurora West, LLC

Elkhorn Valley Ethanol, LLC

Kaapa Ethanol, LLC

AltEn, LLC

Nebraska Corn Processing

Trenton Agri Products

Pacific Ethanol Aurora East, LLC

• Ethanol plants selected based on cost of capture $30/Tonne for capture and

compression for ethanol (NETL 2014)

57/Tonne for capture and compression for subcritical coal (NETL 2015)

• Generally a slight increase over the 2011-2015 period

• Ethanol plants throughout the source corridor

Page 8: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Task 5 Capture and Transport8

Page 9: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Transport Corridor

Ethanol Source CO2

• Corridor 1: 2.3 Million Tonnes/Year CO2

• Corridor 2: 2.3 Million Tonnes/Year CO2

• Corridor 3: 2.1 Million Tonnes/Year CO2

9

Source Corridor 2

Source Corridor 1

Source Corridor 3

Page 10: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Tasks 3 and 4 Stacked Storage

• Sleepy Hollow Field, NE

• Huffstutter Field, KS

10

Page 11: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Sleepy Hollow Field11

Potential Storage Zones

Primary Caprock

Secondary Caprock

Page 12: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Sleepy Hollow Field• Caprock: thick, regional low-permeability shales/siltstones Secondary upper seal is the regionally extensive Carlisle shale (~250 ft

thick) at 600-800 ft bgs

Primary seal in the Upper Permian (~200 ft thick) at 1400-1600 ft bgs

Multiple 15-20 ft low-porosity baffles within and above Lansing-Kansas City (LKC) Group

• Stacked Storage: vertically stacked, isolated high porosity zones Potential Saline storage in: Permian (below supercritical point at

approximately 2,600 ft), non-oil producing zones in LKC Zones and the Basal Pennsylvanian Reagan sandstone

Potential storage associated with CO2 EOR Storage in the LKC B Zone and localized areas of the Reagan

12

Page 13: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Accomplishments to Date• Completed Task 2: Source Analysis Focus on ethanol sources

• Selected Nebraska Stacked-Storage Site: Sleepy Hollow FieldCore data compiled, logs digitized for >200 wells Potential caprocks and storage reservoirs identified Formation tops selected and used to construct static earth model Petrophysical calculations underway for storage resource calculations

• Selected Secondary Stacked Storage Site: Kansas Huffstutter FieldData collection ongoing

13

Page 14: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Lessons Learned

Relatively little CCS data readily available for Nebraska

− Previous work focused largely on northern PCOR area s (e.g. Canada, North Dakota)

Old fields require extra time to get available data into usable formats

− Legacy well data of varying quality: requires thorough QAQC

− Digitization of non-digital log and core data

Much industry interest in the region in bringing CO2 to oil and gas fields in Nebraska and Kansas

14

Page 15: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Synergy Opportunities

• Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

• Building on previous and ongoing work by PCOR

• Active communication and collaboration with several other CarbonSAFE projects (Ohio, Michigan, Kemper, EERC, ICKan): Project technical advisors

Workflow and methodologies shared

Data acquisition and database management facilitated

• Integrated CCS for Kansas (ICKan) Could share resources and expand CCS infrastructure

Could extend transport via a more robust, interstate pipeline infrastructure in NE and KS and allow better availability and use of CO2

15

Page 16: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Project Summary

Sources identified, mapped, and industry partnership established• Sufficient capture quantities verified and operational

Storage sites and formations of interest identified• Data compilation, petrophysical calculations, and Geologic modeling in

progress: Initial results indicate stacked storage is a viable option

Transport scenarios being assessedOutreach in progress: industry support, existing infrastructure, public acceptance potentially favorable for CCS

Phase 2 planning ongoing and promising: Initial analysis indicates geologic storage resources, industry interest, and ethanol-derived CO2 in the region are sufficient to develop commercial-scale CCS infrastructure

16

Page 17: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

Appendix

These slides will not be discussed during the presentation, but are mandatory.

17

Page 18: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

18

Benefit to the Program

• This project addresses four DOE Carbon Storage R&D Program Goals:

1. Develop and validate technologies to ensure 99 percent storage permanence.

2. Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness.

3. Support industry’s ability to predict CO2 storage capacity in geologic formations to within ±30 percent.

4. Develop best practice manuals for monitoring, verification, accounting (MVA), and assessment; site screening, selection, and initial characterization; public outreach; well management activities; and risk analysis and simulation.

Page 19: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

19

Benefit to the Program

• This project addresses U.S. DOE Funding Opportunity Announcement-1584 Phase I: Integrated CCS Pre-Feasibility.

• The project will integrate carbon capture and storage in this area with a dense concentration of ethanol, electric power, and other industrial sources by constructing source and stacked storage corridors.

• This core project team has substantial experience with developing CO2 storage projects, which will contribute to establishment of a safe, economic, and effective commercial-scale carbon storage hub.

• Results of the work will support DOE goals on storage permanence, reservoir efficiency, storage resource predictions, and best practices through the completion of a CarbonSAFE pre-feasibility plan for the Midwest.

Page 20: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

20Project Overview: Goals and Objectives

• Objective: to conduct a pre-feasibility study leading to the development of a commercial-scale integrated stacked storage hub in the Midwest consisting of a source and stacked storage corridor.

• The project will concentrate on identifying specific sources and stacked storage sites in southwest Nebraska and central Kansas. The project will assess capture, transport, and storage potential and develop specific plans for a subsequent Phase II Storage Feasibility Study. The study will aid DOE in meeting their program goals by developing industry

capacity and know-how, technologies and best practices for Nebraska and Kansas.

Page 21: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

21Project Organization

Project Management and Planning (Task 1)

Task Leader: Dr. Andrew Duguid (Battelle)

Source Identification (Task 2)

Task Leader: Mr. Scott McDonald (ADM)

Injection/Storage Assessment (Task 4)

Task Leader: Dr. Si-Yong Lee (Schlumberger)

Sub-Basinal Geological Assessment(Task 3)

Task Leader: Dr. R.M. Joeckel (Nebraska CSD)

Economic and Liability Assessment (Task 6)

Task Leader: Ms. Isis Fukai (Battelle)

Policy, Outreach, and Permitting(Task 7)

Task Leader: Mr. Scott McDonald (ADM)

Phase II Planning(Task 8)

Task Leader: Dr. Andrew Duguid (Battelle)

Capture and Transportation Assessment(Task 5)

Task Leader: Mr. Jared Hawkins (Battelle)

Project Lead

Principal Investigator: Dr. Andrew Duguid

Sponsor

Steering CommitteeDr. Andrew Duguid

(Battelle)Mr. Scott McDonald (ADM)

Dr. R.M. Joeckel (CSD)

Technical Advisor: Dr. Neeraj Gupta

Page 22: Integrated Mid-Continent Stacked Carbon Storage … Library/Events/2017/carbon-storage...Integrated Mid-Continent Stacked Carbon Storage Hub Project Number DE-FE0029264 Andrew Duguid

22

Gantt Chart