35
1 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated © 2017 Bentley Systems, Incorporated © 2017 Bentley Systems, Incorporated Integrated BIM Approach to Design, Modelling and Asset Management of Water and Stormwater Infrastructure Slavco Velickov, PhD. Global asset performance sales director

Integrated BIM Approach to Design, Modelling and Asset

  • Upload
    others

  • View
    6

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Integrated BIM Approach to Design, Modelling and Asset

1 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated © 2017 Bentley Systems, Incorporated© 2017 Bentley Systems, Incorporated

Integrated BIM Approach to Design, Modelling and Asset Management of Water and Stormwater Infrastructure

Slavco Velickov, PhD. Global asset performance sales director

Page 2: Integrated BIM Approach to Design, Modelling and Asset

2 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Agenda

• BIM for Water Infrastructure

• Hydraulic modeling as a reliable decision-support tool for Sustainable Urban Drainage Systems

– Design and rehabilitation

– Engineering support of operation

– Improved emergency response

• Some project examples from the Be Inspired Awards

• Conclusion and additional resources

• Q&As

Page 3: Integrated BIM Approach to Design, Modelling and Asset

3 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Bentley’s mission is to provide innovative software and services for the enterprises

and professionals who design, build, and operate the world’s infrastructure –

sustaining the global economy and environment for improved quality of life.

Page 4: Integrated BIM Approach to Design, Modelling and Asset

4 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Page 5: Integrated BIM Approach to Design, Modelling and Asset

5 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Bentley provides applications across the entire lifecycle

Water, Wastewater and StormWater Infrastructure Lifecycle

Designand

Estimate

Information Management

Asset Recording

Scheduledand

Unscheduled Maintenance

Operationsand

Emergency Response

Planningand

Analysis

Digital

Information

Model

Construction

Engineering Approval

Identify Repair, Replace, Expansion

Page 6: Integrated BIM Approach to Design, Modelling and Asset

6 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Why BIM (building information modelling) for StormWaterInfrastructure

Better

Asset

Performance

IMB

through

Depth of

Information

Modeling

Better Project Delivery

Information Mobility

through Breadth of CAPEX

OPEX !

Page 7: Integrated BIM Approach to Design, Modelling and Asset

7 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

It is All about the - Whole Life Cycle of the Assets

Maintenance

Business Operations

Profitability of Infrastructure

Co

st

Valu

e

Time

Business

Requirements Design Construct Use

Project and InformationIntegration

Asset Performance and Asset Management

Work upstream and downstream to make value flow

Retire

$ $$$$$$

Page 8: Integrated BIM Approach to Design, Modelling and Asset

8 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

BIM Aligns with Asset Management Standards (ISO 55000, PAS55)

• Ensures delivery of both: Physical Infrastructure & Digital Information Model

• Drives asset performance throughout operable life

• Uses disciplined asset lifecycle information management

Page 9: Integrated BIM Approach to Design, Modelling and Asset

9 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Network Models

Analysis

Functional Components

Catalogs & Specifications

3D Models

Schematics

Digital Engineering

Models

Digital Engineering Models…

Page 10: Integrated BIM Approach to Design, Modelling and Asset

10 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Page 11: Integrated BIM Approach to Design, Modelling and Asset

11 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Information Technology

EngineeringTechnology

Operational Technology

Common Data

Environment

Asset Information and Data Management for Smart Infrastructure In the Cloud

IT OT

ET

Page 12: Integrated BIM Approach to Design, Modelling and Asset

12 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

COMMON DATA ENVIRONMENT

CONNECTED ASSET PERFORMANCE

AssetWise CONNECT EditionConverging IT, OT, and ET information for superior asset performance

Compliance & Safety

Asset Reliability Operational

AnalyticsNetwork Design

& AnalysisEnterprise

InteroperabilityAsset Lifecycle

Info Mmgt

Page 13: Integrated BIM Approach to Design, Modelling and Asset

13 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

BIM Level 1Design ModelingReality ModelingDesign

Design

VisualizationDesign

Modeling

Info

rma

tio

n M

od

elin

g

Information Mobility

Page 14: Integrated BIM Approach to Design, Modelling and Asset

14 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

2D: Storm Drainage Networks – SewerGEMS Design

Page 15: Integrated BIM Approach to Design, Modelling and Asset

15 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

3D: Intelligent Storm Drainage Models - SUE Design

Page 16: Integrated BIM Approach to Design, Modelling and Asset

16 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

BIM Level 2Design ModelingReality ModelingConstruction

4D: Time

5D: Cost

Design

VisualizationDesign

Modeling

Info

rma

tio

n M

od

elin

gAnalytical

Modeling

Construction

Modeling

Construction

Simulation

Information Mobility

Page 17: Integrated BIM Approach to Design, Modelling and Asset

17 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Construction

Page 18: Integrated BIM Approach to Design, Modelling and Asset

18 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

BIM Level 3Design Modeling

Construction

ModelingReality ModelingAnalytical ModelingOperations

6D/7D:

Procurement

Environmental Sustainability

Maintenance & Operations

Lifecycle Engineering

Design

VisualizationDesign Modeling

Information Mobility

Info

rma

tio

n M

od

elin

gAnalytical Modeling

Construction Modeling

Construction

Simulation

Operations

Reaction

Page 19: Integrated BIM Approach to Design, Modelling and Asset

19 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

“Context Capture”…

Page 20: Integrated BIM Approach to Design, Modelling and Asset

20 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Example: Paris 500 km of sewers mains

▪ Model and refresh a

sewer infrastructure

(500km long) including

pipes, cables and other

equipment

REQUIREMENT

▪ Multi-directional

camera system (like

Trimble v10) + specific

lighting system +

Smart3DCapture

Ultimate

SOLUTION

▪ Photorealistic 3D model,

helping users to detect

and extract structure

components from the

mesh and point cloud

RESULT

Page 21: Integrated BIM Approach to Design, Modelling and Asset

21 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Why Use Storm Water and Sewer System Models?

• Master planning

• Subdivision design

• Capacity evaluation

• Pump station design

• Force mains

• Pump selection

• Pressure sewer design

• Flood risk analysis

• Overflows

• I&I studies

• Pump operation

• System extensions

• Energy efficiency

• Rehabilitation

• Hydraulic flows in WWTP

• Delivery of BIM-ready models

Bentley Playbook: StormCAD, CivilStorm, SewerGEMS, Open Utilities,

Mohid 2d/3d, PowerCivil, ContextCapture, LumenRT

Page 22: Integrated BIM Approach to Design, Modelling and Asset

22 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Bentley OpenUtilities: Multi-utility GIS for mapping, design and analysis of storm / sewer and other utilities infrastructure

Web Clients

Web Browsers

Bentley Map Mobile

OpenUtilities

PowerView

OpenUtilities

Designer

Publishing Services

Collaboration Services

Asset Performance

Services

File and

Database Servers

OpenUtilities Map

ProjectWise

AssetWise

Field & On Premise - Desktop

Field - Mobile

On Premise - Desktop

CivilStorm/ SewerGEMS WaterGEMS

Page 23: Integrated BIM Approach to Design, Modelling and Asset

23 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

New in CivilStorm & SewerGEMS: Low Impact Development (LID)

Page 24: Integrated BIM Approach to Design, Modelling and Asset

24 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

WCD 2009

Page 25: Integrated BIM Approach to Design, Modelling and Asset

25 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

WCD 2009

Page 26: Integrated BIM Approach to Design, Modelling and Asset

26 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Flexible LID Modeling

Pervious

LID

B

LID A

A

B

Impervious

Impervious

Pervious

a. Before LID

Controls

b. With two LID

controls in series

Page 27: Integrated BIM Approach to Design, Modelling and Asset

27 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

• Manufactured tanks

• Usually underground

• New pond volume type

• Library available

Storage Tanks

Page 28: Integrated BIM Approach to Design, Modelling and Asset

28 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Cost-Effective Design and Rehabilitation

Outcomes

Optimal design - Minimized capital investment

High quality projects

Objectives

Deliver designs that meetregulatory requirements

Reduce modeling time, in order tofocus on engineering decisions

Page 29: Integrated BIM Approach to Design, Modelling and Asset

29 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Design

New Infrastructure

Automatedconstraint-based design

Minimize design costsand capital investments

Maximize performance

Page 30: Integrated BIM Approach to Design, Modelling and Asset

30 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Rehabilitation

Existing Infrastructure

Evaluation of capacity

Assessing the risk of flooding

Find/fix bottlenecks

Improve overall system

Reduce capital investments

Page 31: Integrated BIM Approach to Design, Modelling and Asset

31 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Full Integration with SUE - 3D Storm Drainage Design

SUE = Subsurface Utility Engineering + StormCAD

or CivilStporm or SewerGEMS

Page 32: Integrated BIM Approach to Design, Modelling and Asset

32 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Flood Risk Analysis of Storm Drainage Systems

32 | WWW.BENTLEY.COM

Flood hazard map (flood probability) based

on capacity assessment / modelling using

hydrologic inputs and hydrodynamic

simulation models SwerGEMS / CivilStorm /

HEC – Pack, Mohid 2D/3D

flood damage map showing the exposure

and damage potential (consequences of

flooding), based on available GIS data

flood risk map representing the direct

damage (monetary value). Derived with GIS

spatial analysis (Bentley Map)

Flood risk = probability (flood hazard) x consequences (damage)

Page 33: Integrated BIM Approach to Design, Modelling and Asset

33 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

LumenRT flood visualization (results from flood simulation and Map)

Page 34: Integrated BIM Approach to Design, Modelling and Asset

34 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Take Away Message

• Bentley’s integrated solution cover the complete life-cycle of the Water, Stormwater, Sewer and any other Infrastructure

• Haestad modelling products are the back-bone of this solution to improve the Asset Performance of the infrastructure

• Delivery of BIM-ready digital information models is the way forward to ensure Sustainable Water Infrastructure

Page 35: Integrated BIM Approach to Design, Modelling and Asset

35 | WWW.BENTLEY.COM | © 2017 Bentley Systems, Incorporated

Thank you for your attention!

www.bentley.com/water

[email protected]