Petersberg Phase II / Athens Declaration Process Protection and Sustainable Use of Transboundary Waters in SEE Roundtable on Transboundary Water Management Zagreb, 15 16 December 2011 Neretva and Trebisnjica Neretva and Trebisnjica Neretva and Trebisnjica Neretva and Trebisnjica Management Project Management Project

Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden

Embed Size (px)

DESCRIPTION

Neretva and Trebisnjica Management Project International Roundtable on Protection and Sustainable Use of Trans-boundary Waters in South East Europe, 15-16 December 2011, Zagreb, Croatia

Citation preview

Page 1: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden

Petersberg Phase II / Athens Declaration ProcessProtection and Sustainable Use of Transboundary Waters in SEE

Roundtable on Transboundary Water ManagementZagreb, 15 – 16 December 2011g ,

Neretva and Trebisnjica Neretva and Trebisnjica Neretva and Trebisnjica Neretva and Trebisnjica Management ProjectManagement Project

Page 2: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden

Introduction of the ProjectIntroduction of the Project• NTMP is a regional cooperation project ‐ Republic of 

Croatia and Bosnia and Herzegovina.T b d i b i th t it f• Transboundary river basin on the territory of:

• Republic of Croatia • Dubrovnik‐Neretva County  and• Split‐Dalmatia County

• Bosnia and Herzegovina (B&H)• Federation of BiH (FB&H)

• Herzegovina‐Neretva Canton (7)/ Western Herzegovina Canton (8)

• Herzeg‐Bosnia Canton (10)• Republika Srpska (RS)p p ( )

• Trebinje Region• The Neretva is:

• the longest river of the Adriatic catchment area (215 km long, with only 22 km in Croatia) 

• the water –richest tributary of the Adriatic Sea on thethe water richest tributary of the Adriatic Sea on the territory of these two countries

• complex karst hydrography makes it difficult to define the exact boundaries of the catchment area (around 10,500 km2)

• the water regime of the Neretva River basin has been significantly modified by the construction of hydropower facilities in the upper and middle sections of the Neretva River and on the Trebišnjica River with 7 reservoirs built from 1954 to 1985.

Page 3: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden

BackgroundBackgroundLegal Basis

• Implementation Teamsg

Cooperation between the Republic of Croatia and Bosnia and Herzegovina

REPUBLIC OF REPUBLIC OF  BOSNIA AND HERZEGOVINABOSNIA AND HERZEGOVINA

Grant Agreement concluded in September 2008 with the 

Agreement between the Governments of Croatia and BiH regulating water management relations concluded in July 

1996 – approved and ratified

CROATIACROATIA HERZEGOVINA (BiH)

HERZEGOVINA (BiH)

Project Agreement concluded with the International Bank for i d l ( )

g pInternational Bank for Reconstruction and Development 

(IBRD) acting as an Implementing Agency of GEF Project Implementation Team (PIT)  Hrvatske vode           19 December 2008

BiH Project Implementation Team (PMT & PIT) May 2009

Memorandum of Understanding signed between Bosnia and Herzegovina and the Republic of Croatia on implementation of 

joint activities under the Project

Reconstruction and Development (IBRD) 19 December 2008

Agreements become effective

Croatia – 7 January 2009 BiH – 6 March 2009

joint activities under the Project

COORDINATION COMMITTEE  

8 June 2009

COORDINATION COMMITTEE

22 October 2009 

Official start (meeting in Sarajevo) 12‐13 March 2009

Page 4: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden

Project Implementation StructureProject Implementation StructureInterstate Water CommissionCommission

Component 1 Component 4 Components 2&3

MRDFWM

HV PIT (5)

Coordination Committee

BiH MOFTER

PMT

MRDFWM (1)

MC (2)

MEPPPC (1)

MAFRD (1)

TA

TA

FM

Procurement FBiH MAWMF

RS MAFWM

FM Procurement

Agency for Adriatic Sea Watershed, Mostar

Agency for Adriatic Sea Watershed, Trebinje

PIT

MAWMF

MET PIT

MAFWM

MSPCEEReporting relation

Municip. Municip.p g

Working relation

Page 5: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden

h f hWater Management Characteristics of the Region

oThe water regime of theoThe water regime of the Neretva River basin has been significantly modified by the construction of hydropower f iliti i th dfacilities in the upper and middle sections of the Neretva River and on the Trebišnjica River withTrebišnjica River with reservoirs:

• Jablanica (1954)( )• Rama (1969)• Grabovica (1981)• Salakovac (1981)• Mostar (1985)• Gorica (1965) and Bileća 

(1968)E li i b i f Č lji• Equalizing basins of Čapljinapumping HPP in Popovopolje and Svitava (1978)

Page 6: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
Page 7: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
Page 8: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden

Component 1 – Improved T b d WTransboundary Water Resource Management

Institution and capacity buildingInstitution and capacity building

Measurement, monitoring, and information managementMeasurement, monitoring, and information management

Development of Water Information System, including GISDevelopment of Water Information System, including GIS 

Development of Neretva and Trebišnjica River Basin ( )Management Plan (RBMP)

Page 9: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden

Subcomponent: Neretva and T biš ji Ri B i M tTrebišnjica River Basin Management 

Plan (NTRBMP)Plan (NTRBMP)• The general goal of the project is to improve water management and thus ensure the fulfillment and improvement of functions that the watercourses of this basin have in water management on the national level.

The NTRBMP consists of river basin management plans that address the issues of interest for the entire basin area in a synchronized manner with special emphasis on the valorization of transboundary impacts, i.e. impacts between  gy p , priver basin districts. River basin

district in Croatia

Monitoring

NTRBMP

Status

n

Characterization

River basindistrict in 

RS

River basindistrict in FBiH

Plan

 im

plem

entatio n

e

Status Implementation

Repo

rtingto th

epu

blic Risks

Measures Dead‐lines Funds Competentinstitution

Page 10: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden

Improved Operation of Reservoirs and HPPs

C d i d d i h i i• Conducting a study to determine the minimum environmental flow in the Neretva and TrebišnjicaRiversRivers

• Preparing a plan, guidelines, and training program for optimal management of multipurpose HPP reservoirsoptimal management of multipurpose HPP reservoirs 

• Developing a dynamic management model for reservoir operationreservoir operation

• Developing and implementing mathematical models for hydrological predictions HPP operationsfor hydrological predictions, HPP operations, forecasting and decision‐making

Page 11: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden

Prostorna distribucija godišnjeg suficita/deficita količina kišnih padavina u posljednjoj dekadi (1999-2008.) u poređenju sa referentnim periodom (1961-1990.) u BiH

HM postaje.kmz

Page 12: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
Page 13: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
Page 14: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
Page 15: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden

Precipation DataPrecipation Data• Prema podacima Federalnog hidrometeorološkog zavoda u periodu od 1 11 do 8 12 2010 godine• Prema podacima Federalnog hidrometeorološkog zavoda, u periodu od 1.11. do 8.12.2010. godine 

ukupne padaline sa snijegom na stanici Ivan Sedlo su iznosile 545,00 mm (što je više od 35% od ukupnog srednjeg godišnjeg prosjeka), na stanici Mostar 491,80 mm, na stanici Livno 446,10 mm, na stanici Bjelašnica 398,50 mm, na stanici Stolac 461,20 mm, na stanici Neum 339,40 mm.

• Prema podacima sa nekih od mjernih stanica AVP Jadranskog mora i elektroprivrednih poduzeća p j g p pukupne padaline su iznosile:

• Konjic – Hagenuk ‐ od 1.11. do 5.12. ukupno 460,30 mm (u periodu od 17.11.‐5.12. ukupno 270,90 mm)

• Glavatičevo most – od 17.11. do 3.12., 354,80 mm (u periodu od 1.11.‐1.12. ukupno 539,20 mm)• Brana HE Jablanica – od 1.11. do 5.12. ukupno 832,10 mm• MP Umoljani – od 1.11. do 8.12. ukupno 711,40 mm• MP Trešnjevica – od 1.11. do 8.12. ukupno 425,20 mm• MP Jasenik – od 1.11. do 8.12. ukupno 414,90 mmMP Jasenik  od 1.11. do 8.12. ukupno 414,90 mm• MP Čuhovići – od 1.11. do 8.12. ukupno 433,00 mm (u periodu od 17.11‐8.12 ukupno 327,30 mm)• MP Jasenjani – od 1.11. do 8.12. ukupno 999,40 mm (u periodu od 17.11‐8.12 ukupno 657,70 mm)• MP Blidinje – od 1.11. do 8.12. ukupno 841,00 mm• HP Humac od 1 11 do 8 12 ukupno 343 80 mm (u periodu od 17 11 8 12 ukupno 255 60 mm)• HP Humac  – od 1.11. do 8.12. ukupno 343,80 mm (u periodu od 17.11‐8.12 ukupno 255,60 mm)

Page 16: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
Page 17: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
Page 18: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
Page 19: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
Page 20: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
Page 21: Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden

THANK YOU FOR YOUR ATTENTION