24
HUAWEI TECHNOLOGIES CO., LTD. Page 1 Configuring RTN 950 Series for Smart POC and FTK project (Instruction Manual) HUAWEI TECHNOLOGIES CO., LTD. www.huawei.com

Instruction Manual for RTN 950

Embed Size (px)

Citation preview

HUAWEI TECHNOLOGIES CO., LTD. Page 1

Configuring RTN 950 Series for Smart POC and FTK project

(Instruction Manual)

HUAWEI TECHNOLOGIES CO., LTD.

www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD. Page 2

1. Setting of IP address on your Laptop

1.1 Right Click on icon of Local Area Connection (LAN)

1.2 Click on Properties

1.3 Go to Internet Protocol (TCP/IP) then click Properties

HUAWEI TECHNOLOGIES CO., LTD. Page 3

1.4 Type in IP Address then click on OK

ALWAYS USE THE FOLLOWING:IP Address: 129.9.0.99Subnet mask: 255.255.0.0

(No need to filed-up the Default gateway and DNS)

HUAWEI TECHNOLOGIES CO., LTD. Page 4

2. Open the U2000 Web LCT application (pre-installed) 3. Type in your user name and password to Login

User Name: admin

Password: admin

HUAWEI TECHNOLOGIES CO., LTD. Page 5

4. To Search for a NE (Network Element), click NE Search

4.1 Click on NE SEARCH first before you Add NE

HUAWEI TECHNOLOGIES CO., LTD. Page 6

4.2 Click on SEARCHNote: Domain is automatically set (no need to input

HUAWEI TECHNOLOGIES CO., LTD. Page 7

Web LCT will search and detect available NEs

4.3 Available NE will appear

4.4 Click Add NE

HUAWEI TECHNOLOGIES CO., LTD. Page 8

4.6 After pressing OK, all available NE will be added on the screen (Communication Status will be NORMAL)

4.5 Then click on OK

HUAWEI TECHNOLOGIES CO., LTD. Page 9

5. To Login into the NE

5.1 Highlight the NE you want to login

5.2 Click on NE Login

HUAWEI TECHNOLOGIES CO., LTD. Page 10

5.3 Enter Password: password

5.4 Then press Apply and OK

HUAWEI TECHNOLOGIES CO., LTD. Page 11

6. To configure the NE, check if the Login Status then click on NE Explorer

6.1 Highlight the NE you want to configure

Status will be already Logged in

6.2 Click on NE Explorer

HUAWEI TECHNOLOGIES CO., LTD. Page 12

7. Web LCT will automatically detect the available board/card on the Slot Layout (with color ) 8. To install the cards, right click on the board then pressed “ADD”

Note: PIU, FAN and CSH card will automatically running installed. Also slot 23 and 25 for ODU will not detect until you finished add the IFU2 boards.

8.1 Click add Physical Boards

HUAWEI TECHNOLOGIES CO., LTD. Page 13

8.2 After you add all the physical boards, slot 23 and 25 for ODU board will appear.

8.3 Right click the ODU board then click the add physical board

HUAWEI TECHNOLOGIES CO., LTD. Page 14

9. Configuring NE attribute Site Name and Modifying NE

9.1 Highlight NE name

9.2 Highlight NE attributes

9.3 Double click box under NAME and type SITE NAME. Then click apply and query.

HUAWEI TECHNOLOGIES CO., LTD. Page 15

9.4 Click Modify NE ID and a dialog box will appear.

9.5 Type Site ID based on plan assigned by TNP. Then click OKNOTE: ID is a unique number.

HUAWEI TECHNOLOGIES CO., LTD. Page 16

10. Configuring 1+1 Protection

10.1 Highlight NE name

10.2 Highlight Link Configuration

10.3 Click IF 1+1 Protection

10.4 Click New

HUAWEI TECHNOLOGIES CO., LTD. Page 17

Working Mode : HSB

Revertive Mode : Revertive

WTR : 300

Enable Reverse Switching : Disable

Working Board : 3-IFU2-1

Protection Board : 5-IFU2-1

10.5 Click ok

HUAWEI TECHNOLOGIES CO., LTD. Page 18

11. Configuring Hybrid/AM configuration

11.1 Highlight 3-IFU2

11.2 Highlight Hybrid/AM Configuration

11.3 Click Hybrid/AM Configuration

HUAWEI TECHNOLOGIES CO., LTD. Page 19

11.4 Double Click the box of IF Channel Band and change the band according to the plan

11.5 Double Click the box of Manually Specified Module and change the module according to the plan

11.6 Double Click the box of E1 Capacity and change the capacity according to the plan

11.7 Click Apply then Query

HUAWEI TECHNOLOGIES CO., LTD. Page 20

12. Configuring Transmit Frequency and Transmit Power

12.4 Click apply then query

12.3 Double click the box of transmit frequency and type the frequency according to link budget given by TNP

12.2 Highlight ODU interface

12. 1 Highlight 23-ODU

HUAWEI TECHNOLOGIES CO., LTD. Page 21

12.5 click the power attributes

12.6 Double click the box of transmit power and type the power according to link budget given by TNP 12.7 Click apply

and query

HUAWEI TECHNOLOGIES CO., LTD. Page 22

13. Configuring Cross-Connection

13.1 Highlight NE name

13.2 Highlight cross connection configuration

13.3 Click New

HUAWEI TECHNOLOGIES CO., LTD. Page 23

HUAWEI TECHNOLOGIES CO., LTD. Page 24

Thank You

www.huawei.com