Institutional Master Plan – Task Force Meeting November 16, 2011 1
Institutional Master PlanTask Force Meeting
November 16, 2011
Institutional Master Plan – Task Force Meeting November 16, 2011
Transportation Master Plan - Outline
2003 – 2012• Transportation Goals • Campus Changes • Infrastructure Changes 2012 – 2021• Priorities/Goals for next Master Plan • Expected Campus Changes (Projects) • Expected Infrastructure Changes
2
Institutional Master Plan – Task Force Meeting November 16, 2011
Transportation Master Plan – Technical Topics
• TrafficoOperationso Safety
• Pedestrians• Bicycles• Parking• Public Transportation• Sustainability/Transportation Demand Management• Special Events • Project Impacts
3
Institutional Master Plan – Task Force Meeting November 16, 2011
Charles River Campus Map
WEST CAMPUSCENTRAL CAMPUS
SOUTH CAMPUS
EAST CAMPUS
4
COMMONWEALTH AVEKENMORESQUARE
Institutional Master Plan – Task Force Meeting November 16, 2011
Transportation Goals set in 2003
1. Enhance pedestrian circulation along Commonwealth Avenue and within the Charles River Campus.
2. Limit or reduce trip generation levels at the Charles River Campus
3. Improve traffic operations along Commonwealth Avenue
5
Institutional Master Plan – Task Force Meeting November 16, 2011
Transportation Goals set in 20031. Enhance pedestrian circulation along Commonwealth
Avenue and within the Charles River Campus.
• BU was the key stakeholder in the successful implementation CAP1 (financial support).
• Key stakeholder for implementation of improvements at Kenmore Square (financial support)
• Key supporter of the City’s CAP2 project (technical and financial assistance).
• Supporting planning and engineering to improve safety at Commonwealth Ave / BU Bridge.
• Continue to provide incoming freshman with pedestrian safety training during orientation.
6
Institutional Master Plan – Task Force Meeting November 16, 2011
BU - Sponsored Safety Programs
7
Institutional Master Plan – Task Force Meeting November 16, 2011
Transportation Goals set in 20032. Limit or reduce trip generation levels at the Charles River Campus.• Constructed 960 beds at Student Village Phase 2 and 220 units at 580 Commonwealth Ave
• Constructed 2 new Academic/Student Services facilities with No Parking.
• Implemented TDM program that has achieved a 56%rate for sustainable modes for commuters at CRC o Limit Availability of Parking for Studentso Charge Parking Fees for Faculty and Staffo MBTA Pass programs (Students & Administration)o Ride Matching and Car Pool Programs
http://www.bu.edu/parking/
8
Institutional Master Plan – Task Force Meeting November 16, 2011
Transportation Goals set in 2003
3. Improve traffic operations along Commonwealth Ave.lsupport).
• Key supporter of the City’s CAP1, Kenmore Square and CAP2A projects (technical and financial assistance)
• Supported planning and engineeringto improve operations and safetyat intersection of Comm. Ave and theBU Bridge
9
Institutional Master Plan – Task Force Meeting November 16, 2011
Campus Changes 2003 -2012: Projects
Campus ProjectsLife Sciences/Engineering
(Cummington St.)
Graduate Student Housing(580 Comm. Ave.)
John Hancock S.V. Ph. 1(Comm. Ave.)
John Hancock S.V. Ph. 2(Comm. Ave.)
E. Campus Student Services(Bay State Road)
Parking0
11
+274
-113
-93
xx
TrafficPositive
Minimal
Managed*
Positive
Positive
10
Institutional Master Plan – Task Force Meeting November 16, 2011
Campus Changes 2003 -2012: Trip Generation
Modal composition of Daily Commuters at CRC (faculty, staff & students)
• 31% take Public Transportation• 20% walk or bike to CRC• 5% commute in car/van pools or other• 44% travel in single occupancy vehicles
Commute using Sustainable Modes• Faculty/Staff = 56%• Students = 92%
http://www.bu.edu/sustainability/what‐were‐doing/transportation/
11
Institutional Master Plan – Task Force Meeting November 16, 2011
Campus Changes 2003 -2012: Trip Generation
12
Institutional Master Plan – Task Force Meeting November 16, 2011
Traffic Operations
WEST CAMPUS
CENTRAL CAMPUS
SOUTH CAMPUSEAST CAMPUS
XX Congested XX Moderate Congestion XX Minor Congestion
13
BU = 10% to 15% of Comm. Ave. traffic
Institutional Master Plan – Task Force Meeting November 16, 2011
Traffic Safety
WEST CAMPUS
CENTRAL CAMPUS
SOUTH CAMPUSEAST CAMPUS
XX Safety “Hot Spots”
14
Institutional Master Plan – Task Force Meeting November 16, 2011
Campus Changes 2003 -2012: ParkingCurrent Conditions (2011)• 14major off‐street parking facilities (surface lots + structured parking)
• Current parking capacity = 3,636 spaces (includes Alleys in Central/South Campuses)
• Daily commuters pay $1,156/yr for parking permits (+28%)• BU issued only 182 permits to students for overnight parking.
• Only 179 permits issued to “day” commuting students
15
Institutional Master Plan – Task Force Meeting November 16, 2011
Off-Street Parking Facilities
B
AD
E
F
H
R Q
JN
K M L O
WEST CAMPUS
CENTRAL CAMPUS
SOUTH CAMPUSEAST CAMPUS
16
C-1C-2
S
G
ABC-1C-2DEFGHJ
JHSV (Garage)Babcock Street LotJHSV Lot 1JHSV Lot 2Buick Street LotsCFA Lot808 Commonwealth Ave.Lower Bridge LotBridge LotCAS Lot
Location Spaces640385
37102144
41273
4272
167
Total: 3,636
KLMNOQRS
Warren Towers Garage575 Commonwealth Ave.SMGGranby Street LotKenmore Lot730-750 Commonwealth Ave.766 Commonwealth Ave.890 Commonwealth Ave.Central/South CampusAlleys
Location Spaces481117269126116122
8746
369
Institutional Master Plan – Task Force Meeting November 16, 2011
Campus Changes 2003 -2012: Pedestrians• Pedestrian activity has increased
between 25% and 40% at BU Bridge since 2001 (AM & PM)
• Increase is on top of 40% increase measured between 1996 and 2001
• Why?o New residence halls in West
Campuso New recreation facilities in
West Campus
17
Institutional Master Plan – Task Force Meeting November 16, 2011
Walk Zones from Residential Areas
WEST CAMPUS CENTRAL CAMPUS
SOUTHCAMPUS
EAST CAMPUS
18
Institutional Master Plan – Task Force Meeting November 16, 2011
Campus Changes 2003 -2012: Bicycles• BU has increased bicycle storage
facilities on-campus dramatically since 2003 (Bike Racks/Rooms)
• 2003 capacity = 1,295• 2011 capacity = 3,931 (+200%)• City’s Hubway bike share
program has four locations near CRC (120 bicycles)
• BU encourages students to register bike on-camps. Registered bikes in 2011 = 1,217
19
Institutional Master Plan – Task Force Meeting November 16, 2011
Campus Bicycle Facilities - Utilization
WEST CAMPUS
CENTRAL CAMPUS
SOUTH CAMPUSEAST CAMPUS
180
119
44
310
149 284
224
1,932 Bicycle Use – April 2010
82
90
20
Institutional Master Plan – Task Force Meeting November 16, 2011
Bicycle Growth on Commonwealth Ave.• Bicycle activity has increased
by 57% along Comm. Ave. since implementation of bike lanes (2007)
• Spring 2010 counts = 3,000+bicyclists per day
• Bike data not even collected for 2003 MP
c
21
Institutional Master Plan – Task Force Meeting November 16, 2011
Campus Changes 2003 -2012: BUS shuttle• BUS operates from 7AM to 12
AM, 5 days/week• Serves CRC and connects to BU
Medical Campus (Albany St.) • Provides 10 minute headways
during peak periods• Extremely popular with students,
utilization is near capacity during peak periods
• Over 1,000,000 passengers/year• On-line, real-time ‘tracking” at http://www.bu.edu/thebus/
22
Institutional Master Plan – Task Force Meeting November 16, 2011
BUS Route
WEST CAMPUS
CENTRAL CAMPUS
SOUTH CAMPUSEAST CAMPUS
23
Institutional Master Plan – Task Force Meeting November 16, 2011
Infrastructure Changes 2003 -2012
• Commonwealth Avenue Phase 1• Kenmore Square• Boston University Bridge
24
Institutional Master Plan – Task Force Meeting November 16, 2011
Goals/Priorities for 2012-2021 Master Plan
1. Improve Safety for all users along Commonwealth Avenue
2. Reduce the Carbon Footprint of the CRC3. Minimize Traffic and Parking impacts on Boston
and Brookline neighborhoods
25
Institutional Master Plan – Task Force Meeting November 16, 2011
Transportation Planning Considerations 2012-2021
Typical Issues to be Evaluated
• Parking Needs
• Traffic Impacts
• Pedestrian & Bicycle Facilities
• Managing Traffic and Parking during Construction
26
Institutional Master Plan – Task Force Meeting November 16, 2011
Infrastructure Improvements 2012 -2021
• Commonwealth Avenue Phase 2A
• MBTA Safety Improvements (CAP 1A)
• Commonwealth Avenue Deck Replacement
• BU Bridge/Mountfort St./Carleton St. (CAP2B)
• St. Mary’s Street Bridge Deck repairs
• Yawkey Commuter Rail Station
• Urban Ring (long-range)
27
Institutional Master Plan – Task Force Meeting November 16, 2011
Infrastructure Improvements 2012 -2021Commonwealth Avenue Phase 2A
28
Institutional Master Plan – Task Force Meeting November 16, 2011
Infrastructure Improvements 2012 -2021MBTA Safety Improvements (CAP 1A)
29
Institutional Master Plan – Task Force Meeting November 16, 2011
Discussion
30