Upload
trinhnhi
View
216
Download
0
Embed Size (px)
Citation preview
YID • 0912 / TRJN_InstallationDiagram
Yamaha
Yamaha 6-Volt Batteries
Yamaha 8-Volt Batteries
Yamaha “The Drive” 12-Volt Batteries - (2006 or newer)
Installing a HydroLink™ Watering System on your Trojan Batteries
IMPORTANT: For detailed installation instructions review Trojan’s Hydrolink™ Watering System with the Snake™ Tubing Manual included with your kit. Make sure to follow instructions on Page 4 of the manual before installing.
STEP 1Remove Current Vent Caps and Insert HydroLink™ Vents.
STEP 2Firmly Press HydroLink™ Vents Down. Ensure HydroLink™ vents are completely seated to avoid electrolyte spillage. WARNINg! Press in the HydroLink™ vent with your hands only - do not use a hammer.
STEP 3Install Snake™ Tubing Review the proper diagrams for correct Snake™ tube routing based on the application and manufacturers vehicle. Once reviewed, remove the red center plastic plug from the HydroLink™ vent.
Then snap each Snake™ plug into each HydroLink™ vent. Press firmly until your hear a click.
If you don’t hear a click, it has not been installed correctly.
Your HydroLink™ Watering System is now ready for use.
Correctly Installed Incorrectly Installed
InstallatIon DIagrams
For a Trojan master Distributor near you, call 800.423.6569 or + 1.562.236.3000 or visit www.trojanbattery.com12380 Clark Street, Santa Fe Springs, CA 90670 • USA
Trojan batteries are available worldwide through Trojan’s Master Distributor Network.We offer outstanding technical support, provided by full-time application engineers.
© 2012 Trojan Battery Company. All rights reserved. Trojan Battery Company is not liable for damages that may result from any information provided in or omitted from this publication, under any circumstances. Trojan Battery Company reserves the right to make adjustments to this publication at any time, without notices or obligation.
EZGOZID • 0912 / TRJN_InstallationDiagram
E-Z-GO
E-Z-GO “RXV” 12-Volt Batteries
Installing a HydroLink™ Watering System on your Trojan Batteries
IMPORTANT: For detailed installation instructions review Trojan’s Hydrolink™ Watering System with the Snake™ Tubing Manual included with your kit. Make sure to follow instructions on Page 4 of the manual before installing.
STEP 1Remove Current Vent Caps and Insert HydroLink™ Vents.
STEP 2Firmly Press HydroLink™ Vents Down.Ensure HydroLink™ vents are completely seated to avoid electrolyte spillage. WARNINg! Press in the HydroLink™ vent with your hands only - do not use a hammer.
STEP 3Install Snake™ Tubing Review the proper diagrams for correct Snake™ tube routing based on the application and manufacturer vehicle. Once reviewed, remove the red center plastic plug from the HydroLink™ vent.
Then snap each Snake™ plug into each HydroLink™ vent. Press firmly until your hear a click.
If you don’t hear a click, it has not been installed correctly.
Your HydroLink™ Watering System is now ready for use.
Correctly Installed Incorrectly Installed
E-Z-GO “TXT” 6-Volt / 8-Volt Batteries* Terminal configuration may be differ on 8-Volt battery.
InstallatIon DIagrams
For a Trojan master Distributor near you, call 800.423.6569 or + 1.562.236.3000 or visit www.trojanbattery.com12380 Clark Street, Santa Fe Springs, CA 90670 • USA
Trojan batteries are available worldwide through Trojan’s Master Distributor Network.We offer outstanding technical support, provided by full-time application engineers.
© 2012 Trojan Battery Company. All rights reserved. Trojan Battery Company is not liable for damages that may result from any information provided in or omitted from this publication, under any circumstances. Trojan Battery Company reserves the right to make adjustments to this publication at any time, without notices or obligation.
CCID • 0912 / TRJN_InstallationDiagram
Club Car
Club Car “Precedent” 12-Volt Batteries - (2008 or newer)
Club Car “DS” 12-Volt Batteries - (2006 or newer)
Club Car “Precedent” 8-Volt Batteries - (2008 or newer)
Installing a HydroLink™ Watering System on your Trojan Batteries
IMPORTANT: For detailed installation instructions review Trojan’s Hydrolink™ Watering System with the Snake™ Tubing Manual included with your kit. Make sure to follow instructions on Page 4 of the manual before installing.
STEP 1Remove Current Vent Caps and Insert HydroLink™ Vents.
STEP 2Firmly Press HydroLink™ Vents Down. Ensure HydroLink™ vents are completely seated to avoid electrolyte spillage. WARNINg! Press in the HydroLink™ vent with your hands only - do not use a hammer.
STEP 3Install Snake™ Tubing Review the proper diagrams for correct Snake™ tube routing based on the application and manufacturer vehicle. Once reviewed, remove the red center plastic plug off the HydroLink™ vent.
Then snap each Snake™ plug into each HydroLink™ vent. Press firmly until your hear a click.
If you don’t hear a click, it has not been installed correctly.
Your HydroLink™ Watering System is now ready for use.
Correctly Installed Incorrectly Installed
InstallatIon DIagrams
For a Trojan master Distributor near you, call 800.423.6569 or + 1.562.236.3000 or visit www.trojanbattery.com12380 Clark Street, Santa Fe Springs, CA 90670 • USA
Trojan batteries are available worldwide through Trojan’s Master Distributor Network.We offer outstanding technical support, provided by full-time application engineers.
© 2012 Trojan Battery Company. All rights reserved. Trojan Battery Company is not liable for damages that may result from any information provided in or omitted from this publication, under any circumstances. Trojan Battery Company reserves the right to make adjustments to this publication at any time, without notices or obligation.