29
PHARMA SCHOLARS INSTALLATION QUALIFICATION PROTOCOL CUM REPORT FOR HVAC SYSTEM (AHU No.: ……………) MEDIA PREPARATION ROOM & WASH ROOM PROTOCOL No.: ………………… EFFECTIVE DATE: PAGE No.: 1 of 29 INSTALLATION QUALIFICATION PROTOCOL CUM REPORT FOR HVAC SYSTEM (AHU No.: ……………..) MEDIA PREPARATION ROOM & WASH ROOM EQUIPMENT/INSTRUMENT ID. No. LOCATION DATE OF QUALIFICATION SUPERSEDES PROTOCOL CUM REPORT NO. NIL

INSTALLATION QUALIFICATION PROTOCOL CUM REPORT FOR …€¦ · • Monitoring of Installation Process. Production • Giving clearance to install the unit. • Execution of Installation

  • Upload
    others

  • View
    6

  • Download
    2

Embed Size (px)

Citation preview

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 1 of 29

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………..)

    MEDIA PREPARATION ROOM & WASH

    ROOM

    EQUIPMENT/INSTRUMENT ID. No.

    LOCATION

    DATE OF QUALIFICATION

    SUPERSEDES PROTOCOL CUM REPORT NO. NIL

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 2 of 29

    CONTENTS

    S.No. TITLE PAGE No.

    1.0 Pre Approval 3

    2.0 Objective 3

    3.0 Scope 3

    4.0 Responsibility 4

    5.0 Equipment Details 5

    6.0 System Description 6

    7.0 Pre- qualification Requirement 8

    8.0 Critical Variables to be Met 10

    9.0 References 24

    10.0 Documents to be Attached 24

    11.0 Deviation from Pre-defined Specification, if Any 25

    12.0 Change Control, if Any 25

    13.0 Review (Inclusive of Follow Up Action, If Any ) 25

    14.0 Conclusion 26

    15.0 Recommendation 26

    16.0 Abbreviations 27

    17.0 Post Approval 29

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 3 of 29

    1.0 PROTOCOL CUM REPORT PRE- APPROVAL:

    PREPARED BY CHECKED BY REVIEWED BY

    NAME

    SIGNATURE

    DATE

    2.0 OBJECTIVE:

    • To prepare Installation Qualification Protocol cum Report of HVAC System (AHU No.: …………).

    • To verify that the HVAC System is installed in accordance with the Design User Requirements as

    defined by set acceptance criteria and complies with relevant cGMP Requirements.

    • Successful completion of this Installation Qualification activity will verify that the HVAC System

    (AHU No.: …………..) meets all the acceptance criteria and is ready for OQ.

    3.0 SCOPE:

    • The Protocol Cum Report covers all aspects of Installation Qualification for the HVAC system (AHU

    No.: …………….) serving Media Preparation Room & Wash Room in Microbiology block at

    ……………….).

    • This Protocol Cum Report will Comply the methods and documentation used to qualify the HVAC

    system (AHU No.: ………………) for IQ.

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 4 of 29

    4.0 RESPONSIBILITY:

    The Validation Group, comprising of a representative from each of the following departments,

    shall be responsible for the overall compliance of this Report:

    DEPARTMENTS RESPONSIBILITIES

    Quality Assurance

    • Preparation, Review and Approval of the Installation Qualification Report.

    • Co-ordination with Production and Engineering to carryout Installation

    Qualification.

    • Monitoring of Installation Process.

    Production

    • Giving clearance to install the unit.

    • Execution of Installation Qualification activity.

    • Ensure that the equipment is installed as per Protocol.

    • Review of Report.

    Engineering

    • To co–ordinate and support Installation Qualification activity.

    • Calibration of Process instruments.

    • Ensure that the equipment is installed as per Protocol.

    • Review of Report.

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 5 of 29

    5.0 EQUIPMENT DETAILS:

    Equipment Name Air Handling Unit

    Equipment ID. No. …………………………

    Area Covered Media Preparation Room & Wash Room

    Manufacturer’s Name ………………………….

    Supplier’s Name …………………………..

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 6 of 29

    6.0 SYSTEM DESCRIPTION:

    The HVAC System of Media Preparation Room & Wash Room comprises of the following units.

    • AHU - Air Handling Unit

    • Air Distribution System

    S. No. PARAMETER

    DESCRIPTION

    1. AHU Details It comprises of:

    • AHU Body

    • Pre Filter (EU-4)

    • Heating coil with Pressure gauge & Temperature Gauge.

    • Cooling coil with Pressure gauge & Temperature Gauge.

    • Blower

    • Blower Motor

    • Fine Filter (EU-5) for lower section

    • Fine Filter (EU-7) for upper section

    • HEPA filter (EU-13)

    • Drive

    • Damper

    • Magnehelic Gauge across all filter bank.

    2. Air Distribution System It comprises of:

    • Ducts for supply and return of air.

    • Dampers (Supply Air Damper, Return Air Damper, Fresh Air Damper, Exhaust Air Damper and Fire Damper).

    • Fine filter with housing in Supply duct.

    • Valves (Three way valves, Balance valve and Ball Valve, Solenoid control valves, Y strainer).

    • Final filters in return duct.

    3.

    Environmental conditions:

    Temperature

    Relative Humidity

    NMT 25°C

    NMT 55%

    4. Quantity of Air Circulation Total air quantity: 2000 CFM Recirculation of air.

    5. Air Changes Per Hour 40

    6. Class D

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 7 of 29

    6.1 AHU DESIGN DESCRIPTION FOR AHU No.: SA/AHU-002:

    The User Requirements shall be met by installing AHU having the following configuration:

    6.1.1 AHU specification:

    Type: Re-circulating.

    The Air Handling Unit will be a cabinet type unit, in double skin thermal break modular construction.

    AHU will have Alminium frame with sandwiched panel of GSS sheet duly powder coated from outside

    & thick PUF filled in between. It consists of mixing chamber for return air, fan section & supply air

    section. Port for fresh air complete with damper & 10 micron filter is provided for fresh air. Fan section

    will have plug fan & directly coupled motor. Return air mixes with fresh air in the mixing chamber

    which is passed to 5µ coil protection filter by blower. Prefiltered air passes through the cooling coil

    section with CHW coil of 6 row deep copper tubes & 12 FPI Al fins. CHW coil will be placed on

    condensate tray, sandwiched type in SS construction & proper drain point. Supply plenum will have

    single stage filtration of 3μ filters. Filtered air will be supplied to the room via leak proof GSS ducting

    (Joints sealed with silicon sealant) through Terminal HEPA Filter 0.3μ of (99.99% Efficiency down to

    0.3μ) & will return through return air risers & return duct to air mixing chamber. Both ends of the GI

    ducts will have Angle iron flanges & flanged joints will have neoprene gasket. Air volume control

    dampers should be installed at inlet & out let of AHU, at terminal filter module, at return air risers &

    fresh air module. Fire Damper should be installed at the return air duct. Bleed Module is Installed

    between fan & pre filter.

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 8 of 29

    6.1.2 Principle of Operation:

    Air handling unit will re-circulate air from the room with the help of plug fan. The air carrying the room

    sensible heat and latent heat will be sucked from the room through low level pick up risers via GI ducts

    to mixing chamber. Approximately 10% fresh air filtered through 10 micron filter is mixed with

    returned air in mixing box. Than the air is passed through 5µ filter and CHW coil. The cooled &

    conditioned air shall be passed through blower & 3µ filter. In this process the air is filtered, conditioned.

    This conditioned air is fed to the area via GI sealed ducts and through terminal HEPA filters having

    99.97% Efficiency down to 0.3 microns.

    For RH Conditions NMT 55% achieved with CHW Coil is used in line with the AHU.

    This scheme will control microbial contents & particulate matter as well as controlled temperature &

    humidity thus will maintain Grade “D” status in the rooms.

    7.0 PRE –QUALIFICATION REQUIREMENT:

    7.1 Verification of Documents & General Arrangement Drawing:

    To verify that Approved Drawings and supporting documents of HVAC System (AHU No.:

    ………………..) conform to the Design Qualification.

    7.1.1 Procedure:

    • Verify that Approved Drawings and supporting documents are available and conform to the DQ

    Protocol Cum Report.

    • Approved Drawings and supporting documents would form a part of the IQ Report.

    7.1.2 Acceptance Criteria:

    • Drawing and documents should conform to Design Qualification Protocol cum Report. Any

    Deviations observed must be recorded and approved.

    • The General Arrangement should confer to the approved GA Drawing. Any Deviations observed,

    must be recorded and approved.

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 9 of 29

    Pre-Qualification Checks Acceptance Criteria Observation

    Observed By

    (Engineering)

    Sign& Date

    Drawing:

    • Air Flow Diagram

    Should be as per Approved

    Drawing

    • GA of AHU Should be as per Approved General Arrangement

    Drawing

    Checked By:

    Sign & Date _________________

    Inference:_________________________________________________________________________________

    __________________________________________________________________________________________

    __________________________________________________________________________________________

    __________________________________________________________________________________________

    Reviewed By:

    Sign & Date_________________

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 10 of 29

    8.0 CRITICAL VARIABLES TO BE MET:

    8.1 Verification of Piping & Instrumentation:

    To verify that the installation of HVAC System (AHU No.: ……………..) is carried out as per

    the approved P & ID Drawing.

    8.1.1 Procedure:

    • Perform physical check and verify that the installation has been done as per the Approved P & ID

    Drawing.

    • As-built and Approved P&ID would form a part of the IQ Report.

    8.1.2 Acceptance Criteria:

    The Installed Piping and Instrumentation should confirm to the approved P & ID.

    Installation Checks Acceptance Criteria Observation

    Observed By

    (Engineering)

    Sign & Date

    Piping and Instrumentation Diagram Verification:

    • P &ID Verification The installed Piping and

    instrumentation should confirm to the

    approved P & ID. Any Deviations

    observed, must be Recorded and

    Approved.

    Checked By:

    Sign & Date _________________

    Inference:_________________________________________________________________________________

    __________________________________________________________________________________________

    __________________________________________________________________________________________

    __________________________________________________________________________________________

    Reviewed By:

    Sign & Date_________________

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 11 of 29

    8.2 VERIFICATION OF UTILITY CONNECTION:

    To identify that all Utilities have been installed and connected to the HVAC System as per the DQ.

    8.2.1 Procedure:

    • Verify that all Utilities have been connected as per the requirements in Design Qualification.

    • Carryout installation Checks for Utilities to ensure smooth Commissioning.

    • The method of Checking & Observations has to be recorded.

    • Any Deviations have to be recorded and approved giving reasons for the same.

    8.2.2 Acceptance Criteria:

    • The installation and connection of Utilities should be as per DQ.

    Installation Checks Acceptance Criteria Observation

    Observed By

    (Engineering)

    Sign & Date

    Electrical Supply

    3 Phase plus Earthing, 4 Wire Line up to the panel

    board terminal.

    Voltage: 415 ± 10% V

    Frequency: 50 ± 3% Hz

    Room Condition

    Should be able to meet the

    required controlled

    environment with Temp.

    NMT 25°C & Relative

    Humidity NMT 55%.

    Chilled water piping/

    Temperature 50.8 mm/7-9°C

    Electrical Motor 3.7 KW

    3 Phase wire input

    Checked By:

    Sign & Date _________________

    Inference:_________________________________________________________________________________

    __________________________________________________________________________________________

    __________________________________________________________________________________________

    __________________________________________________________________________________________

    Reviewed By:

    Sign & Date_________________

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 12 of 29

    8.3 VERIFICATION OF MATERIAL OF CONSTRUCTION (MOC):

    To verify that the Material used for construction in HVAC System is as per the Design Requirement in

    DQ Protocol Cum Report.

    8.3.1 Procedure:

    • MOC has to be verified during installation by verifying the Certificates.

    • Certificates for all Major Components to be identified.

    • Material Test Certificates would form a part of the IQ Report.

    8.3.2 Acceptance Criteria:

    The Material of Construction of All Components should be as per DQ.

    Installation Checks Acceptance Criteria Observation

    Observed By

    (Engineering)

    Sign & Date

    GRILLS FOR SUPPLY & RETURN AIR:

    Chilled Water Piping Copper

    Ducting GI Sheet

    Insulation Thermo

    VALVES:

    Butterfly valve Cast iron

    Balancing valve Cast iron

    Three way valve Cast iron

    FILTER & FILTER FRAMES:

    Primary Filter Settled in Al frame

    Secondary Filter Settled in Al frame

    Absolute HEPA Filter Settled in Al frame

    Checked By:

    Sign & Date _________________

    Inference:_________________________________________________________________________________

    __________________________________________________________________________________________

    __________________________________________________________________________________________

    __________________________________________________________________________________________

    Reviewed By:

    Sign & Date_________________

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 13 of 29

    8.4 VERIFICATION OF ALL THE PROVIDED UTILITIES TO THE EQUIPMENT:

    To verify all the provided Utility used for construction in HVAC System is as per the Design

    Requirement in DQ Protocol Cum Report.

    8.4.1 Procedure:

    • All the provided Utility has to be verified during installation.

    8.4.2 Acceptance Criteria:

    All the provided Utility should be as per DQ.

    Installation Checks Acceptance Criteria Observation

    Observed By

    (Engineering)

    Sign & Date

    Electric Connections

    Should be tight, weather

    proof and grounded

    General Method of the

    electrical wiring

    No loose hanging Cables

    Well-insulated Electrical

    Wirings.

    Located in a safe place well

    protected from Water

    Seepage during Machine or

    Floor Cleaning and also safe

    for Operator during

    Operation.

    Identification Tags and

    Electrical Drawing

    Identification tags should be

    available where eventual.

    Electrical Drawing available

    either pasted in the inside of

    the circuit box or as in the

    Manual.

    Checked By:

    Sign & Date _________________

    Inference:_________________________________________________________________________________

    __________________________________________________________________________________________

    __________________________________________________________________________________________

    __________________________________________________________________________________________

    Reviewed By:

    Sign & Date_________________

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 14 of 29

    8.5 VERIFICATION OF SAFTY FEATURES:

    To verify all safety features in HVAC System is as per the Design Requirement in DQ Protocol Cum

    Report.

    8.5.1 Procedure:

    • All the Safety features have to be verified during installation.

    8.5.2 Acceptance Criteria:

    All the Safety features should be as per DQ.

    Installation Checks Acceptance Criteria Observation

    Observed By

    (Engineering)

    Sign & Date

    MECHANICAL:

    ON/OFF Switch AHU stops as required

    Fire Dampers Trips the AHU and isolate

    area in case of fire.

    Safety Guards For Drive assemblies

    like pulleys & belts For Operational Safety.

    Checked By:

    Sign & Date _________________

    Inference:_________________________________________________________________________________

    __________________________________________________________________________________________

    __________________________________________________________________________________________

    __________________________________________________________________________________________

    Reviewed By:

    Sign & Date_________________

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 15 of 29

    8.6 VERIFICATION OF CRITICAL INSTRUMENTS CALIBRATION:

    To verify that all Critical Instruments for the HVAC System have been calibrated before starting

    Operation Qualification.

    8.6.1 Procedure:

    • All Critical Instruments are to be calibrated before installation and their Calibration Certificates have

    to be attached with IQ Report.

    • The next due date for Calibration has to be noted.

    • Deviations are to be recorded and follow-up action is to be recommended.

    8.6.2 Acceptance Criteria:

    • All Critical Instruments should be Calibrated and qualified for installation.

    CALIBRATION DETAILS:

    INSTRUMENT

    NAME

    EQUIPMENT

    ID.

    DATE OF

    CALIBRATION

    CALIBRATION

    CERTIFICATE

    No.

    CALIBRATION

    DUE DATE OBSERVATION

    OBSERVED BY

    (ENGINEERING)

    Sign &Date

    Checked By:

    Sign & Date _________________

    Inference:_________________________________________________________________________________

    __________________________________________________________________________________________

    __________________________________________________________________________________________

    __________________________________________________________________________________________

    Reviewed By:

    Sign & Date_________________

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 16 of 29

    8.7 CHECKLIST FOR INSTALLATION :

    Installation Checks Acceptance Criteria Observation

    Observed By

    (Engineering)

    Sign & Date

    AHU ( Make & Type):

    Make ……………………….

    Body Dimensions 3000 x 850 x 1700 mm

    Air Quantity 2000 CFM

    Static Pressure 140 mm of WC

    Frame Work 2.0 mm thick hollow profile

    MOC Aluminum

    Type Double Skin

    Insulation 40±2 kg/m3 CFC free PUF

    Outer Skin 0.6 mm pre painted

    Inner Skin 0.6 mm GI

    Location of AHU:

    Site of Installation Service Floor

    Block Microbiology block

    Vibration AHU to be mounted on Anti –

    Vibration Pads

    Slope

    Slope to be adjusted so that

    condensate will flow to drain

    line easily. Confirm this by

    pouring water in condensate

    tray of AHU

    AHU Section:

    Mixing Chamber Should be Installed properly

    Coil Section for CHW Coil Should be Installed properly

    Blower Section Should be Installed properly

    Supply Plenum with

    section for 3µ filters. Should be Installed properly

    Pre filter section with filter Should be Installed properly

    Cooling Coil:

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 17 of 29

    Installation Checks Acceptance Criteria Observation

    Observed By

    (Engineering)

    Sign & Date

    Make …………………………

    Type CHW- Coil

    Quantity 1

    Fin Height 571.5 mm

    Fin Length 651 mm

    Row Deep 6 RD

    Fins Per Inch 12 fins/inch

    Area 4.0 Sqft.

    Tube Size (Outer Diameter) ½”

    MOC of Tube Copper

    MOC of Fin Al

    Drain pan SS 304

    Fan:

    Fan RPM/Hz 2490/52

    Fan Discharge TH

    Fan Make Nicotra

    Motor

    Motor 3.7 Kw

    Motor Pole 02

    Motor RPM 2830

    Motor Frame 100

    Motor Make ABB/SIEMENS

    Motor Phase 3 PH

    Heating Coil

    Quantity 1

    FH 571.5

    FL 651

    RD 2

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 18 of 29

    Installation Checks Acceptance Criteria Observation

    Observed By

    (Engineering)

    Sign & Date

    FPI 10

    Area 4.0 Sqft.

    Tube Size (Outer Diameter) ½”

    Tube Material Copper

    Tray Material SS-304-18G

    Fin Material Aluminium

    Header Material MS

    Fine-Filter Details:

    Porosity 5 microns (EU-5)

    Media Non Woven Synthetic Media

    (Washable)

    Air Filter Type Fine Filter

    Flange/Box Type Flange type

    Efficiency 99.0 % Down to 5 micron

    Size & Number of filters 610 x 305 x 305 mm 1 Nos.

    Fine Filter Section (3 microns):

    Porosity 3 microns (EU-7)

    Media Non Woven Synthetic Media

    (Washable)

    Type Flange type

    Efficiency 99.0 % Down to 3 micron

    Size & Number of filters 610 x 610 x 305 mm 1 Nos.

    Terminal HEPA Filter:

    Porosity 0.3 microns (EU-13)

    Media Fiberglass media

    Type Flange Type

    Efficiency 99.97% down to 0.3 Micron

    Size & Number of filters 610 x 610 x 150 mm 2 Nos.

    Damper:

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 19 of 29

    Installation Checks Acceptance Criteria Observation

    Observed By

    (Engineering)

    Sign & Date

    Type Opposed Blade

    MOC Aluminium

    Fresh Air Damper:

    Size 320 x 300 x 50 mm

    Number of Dampers 1 Nos.

    10 micron Filter size 305 x 305 x 50 mm

    Number of Filter 1 Nos.

    Exhaust/Bleed Air Damper

    Size 320 x 300 x 50 mm

    Number of Dampers 1 Nos.

    0.3 micron Filter size (EU-13) 305 x 305 x 305 mm

    Number of Filter 01 No.

    RETURN AIR DAMPER 220 x 500 mm

    SUPPLY AIR DAMPER 220 x 500 mm

    FIRE DAMPER 320 x 300 mm

    TOTAL NUMBER OF

    DAMPERS 05 Nos.

    FILTER & FILTER FRAMES:

    Pre-Filter Settled in Aluminium frame

    Fine Filter Settled in Aluminium frame

    HEPA Filter Settled in Aluminium frame

    Ducting:

    MOC 24 SWG GI

    Flanges

    Angle iron Flanges shall be

    provided for ducts using

    rivets.

    Flange Joints All Flange joints will have 3.0

    mm rubber gasket

    Layout Approved Ducting layout

    should be available.

    Ducting Insulation:

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 20 of 29

    Installation Checks Acceptance Criteria Observation

    Observed By

    (Engineering)

    Sign & Date

    Insulation

    Should be well insulated and

    no projecting parts of GI

    Sheet should be left

    uncovered.

    Cladding 26 SWG Thickness

    Fire Damper:

    Location It should be Installed on

    Ducting Line.

    Electric Connection:

    Voltage 415 ± 10% V

    Phase 3

    Frequency 50 ± 3% Hz

    Earthing Connected with existing

    earthing grid

    Return Air Risers:

    Material of Construction

    The Riser for low level pickup

    shall be inbuilt in PUF panels.

    Return air pick up will be

    through Aluminum extruded

    powder coated grill.

    Size 120 mm × 200 mm

    Dimensions of Room in meter for Which the AHU is:

    Room

    Length

    (in

    Meter)

    Width

    (in

    Meter)

    Height

    (in

    Meter)

    Length

    (in

    Meter)

    Width

    (in

    Meter)

    Height

    (in

    Meter)

    Media Preparation room 3.475 4.536 2.592

    Wash room 3.475 4.229 2.592

    Duct Leakage Test:

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 21 of 29

    Installation Checks Acceptance Criteria Observation

    Observed By

    (Engineering)

    Sign & Date

    Duct Leakage Testing

    Air Leakage through ducts

    should be tested before

    Insulation of ducts by

    Pressure test as per SOP for

    Checking Duct Leakage.

    SOP

    SOP for Duct Leakage Test

    should be available.

    Control Panel:

    AHU ‘START’ Button Start Button

    AHU ‘STOP’ Button Stop Button

    Indicator for AHU ‘ON’ On Indicator

    Indicator for AHU ‘OFF’ Off Indicator.

    In the Supply Area /Room:

    Supply Air Diffuser/Grills Well Fixed with the duct body

    leaving no gaps in between.

    Return Air Diffuser/Grills Well Fixed with the duct body

    leaving no gaps in between.

    Volume Control Damper Should be installed

    Preventive Maintenance Schedule:

    AHU in Preventive

    Maintenance Schedule Should be Included

    Labeling of Supply and Return Ducts:

    Colour used for Supply

    Ducts Green

    Colour used for return

    Ducts Red

    Digital Display for Temperature, Relative Humidity & Pressure Differential:

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 22 of 29

    Installation Checks Acceptance Criteria Observation

    Observed By

    (Engineering)

    Sign & Date

    Location At entry of the room

    Range

    Temperature NMT 25oC

    Relative

    Humidity NMT 55%

    Pressure

    Differential

    Media preparation

    Wash room

    Cleaning:

    Cleaning of AHU

    Ensure proper cleaning of

    AHU from inside & outside

    with dry cloth.

    Cleaning of Ducts

    Ensure proper cleaning of

    ducts at the time of

    Installation from inside &

    outside, ducts should be free

    from particulate matter. To be

    observed visually.

    Standard Operating Procedure:

    SOP for Operation &

    Cleaning of Air Handling

    Unit

    SOP for Operation &

    Cleaning of Air Handling

    Unit should be available.

    SOP for Preventive

    Maintenance of AHU

    SOP for Preventive

    Maintenance of AHU should

    be available.

    General Checks :

    General Installation Checks

    During Installation

    Qualification.

    Placement of rubber pad on

    foundation

    Placement of AHU on

    foundation with proper

    alignment with rubber pad

    Connection of AHU and main

    duct by means of canvass

    connection.

    Noise level of AHU at 1 meter

    distance as per performance

    curve of blower

    Airtight Connection of AHU

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 23 of 29

    Installation Checks Acceptance Criteria Observation

    Observed By

    (Engineering)

    Sign & Date

    to return air duct & fresh air

    duct.

    Leakages through inspection

    door and access door.

    Proper Connection of AHU to

    chilled water piping.

    Whether servicing to AHU is

    easily accessible or not.

    Dimension of the AHU as per

    AHU GA drawing.

    Individual dimension for

    every section.

    Proper positioning of pre

    filter, coil, blower, Fine Filter

    in the AHU.

    Statically and Dynamically

    balance.

    Proper placement of

    Humidistat and thermostat in

    the Return Air Duct

    Magnehelic Gauge location as

    per AHU GA drawing.

    Electrical connection to AHU

    as per requirement.

    8.8 INSTALLATION VERIFICATION:

    Check that all the Ducting connections are as per drawing .

    Parameters Acceptance Criteria Observation Remark Checked By

    Sign & Date

    Verify that the “as built”

    drawing are complete &

    represent the design

    concept

    The “as built” drawing

    should be as per the

    design concept

    Verify that all ducts

    have been properly

    insulated

    All ducts should be

    insulated

    There is no observable

    physical damage for

    AHU

    No physical damage to

    the AHU to be

    confirmed

    Sufficient room for

    servicing provided

    Space for servicing will

    be provided

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 24 of 29

    Parameters Acceptance Criteria Observation Remark Checked By

    Sign & Date

    Verify that all

    component of manifold

    have been installed

    according to the drawing

    All components should

    have been done

    according to the drawing

    Valves identification

    nameplate is visible

    All valve should be

    identified, tested &

    labeled

    8.9 Checks on General Erection & Installation:

    Checks that the Components are installed as described in AHU Schematic Drawing. Follow the

    construction & highlight with fluorescent yellow the parts that are assembled correctly & with blue

    those show deviation.

    9.0 REFERENCES

    • Design Qualification Protocol Cum Report

    • GA and P&ID Drawings

    • Approved Design & Specification.

    • Any Other Relevant documents.

    10.0 DOCUMENTS TO BE ATTACHED:

    • A Copy of Purchase order

    • Technical details for Equipment Requirement with Engineering Drawings.

    • Approved Design and Specifications.

    • Certificate of MOC

    • Calibration Certificates

    • Operation and Maintenance Manual

    • GA and P & ID Drawings

    • Any other relevant documents

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 25 of 29

    11.0 DEVIATION FROM PRE-DEFINED SPECIFICATIONS, IF ANY:

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    12.0 CHANGE CONTROL, IF ANY:

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    13.0 REVIEW (INCLUSIVE OF FOLLOW UP ACTION, IF ANY):

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 26 of 29

    14.0 CONCLUSION:

    ………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    15.0 RECOMMENDATION:

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

    …………………………………………………………………………………………………………

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 27 of 29

    16.0 ABBREVIATIONS:

    HVAC : Heating Ventilation and Air Conditioning

    AHU : Air Handling Unit

    HEPA : High Efficiency Particulate Air

    Nos. : Number

    cGMP : Current Good Manufacturing Practice

    A/L : Air Lock

    GA : General Arrangement

    Pvt. : Private

    Ltd. : Limited

    DQ : Design Qualification

    IQ : Installation Qualification

    °C : Degree Centigrade

    V : Volt

    Hz : Hertz

    HP : Horse Power

    KW : Kilo Watt

    MOC : Material of Construction

    CFM : Cubic Feet per Minute.

    WC : Water Column

    PUF : Poly Urethane Foam

    GI : Galvanized Iron

    FAD : Fresh Air Damper

    EAD : Exhaust Air Damper

    mm : Millimeter

    CHW : Chilled Water

    TR : Ton of Refrigeration

    Sft : Square Feet

    Al : Aluminium

    SS : Stainless Steel

    DIDW : Double Inlet Double Width

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 28 of 29

    RDH : Rapid Displacement Heat

    m/s : Meter per Second

    rpm : Revolution per minute

    TEFC : Totally Enclosed Fan Cooled

    SWG : Standard Wire Gauge

    % : Percentage

    RH : Relative Humidity

    ID. : Identification

    S.No. : Serial Number

    GA : General Arrangement

    SOP : Standard Operating Procedure

    IQ : Installation Qualification

    P&ID : Piping & Instrumentation Diagram

  • PHARMA SCHOLARS

    INSTALLATION QUALIFICATION

    PROTOCOL CUM REPORT

    FOR

    HVAC SYSTEM

    (AHU No.: ……………)

    MEDIA PREPARATION ROOM &

    WASH ROOM

    PROTOCOL No.:

    …………………

    EFFECTIVE DATE:

    PAGE No.: 29 of 29

    17.0 POST APPROVAL:

    REVIEWED BY: