Installation of Truck Water Mains in 9th Avenue

(W.51st Street to W.59th Street)

Project ID: MED609

Community Board 4 Public Meeting

________, 2017 6:00PM

Project Data

Project ID: MED609

Registered Date: December 9, 2015

Notice To Proceed: March 1, 2017

Contractor: Waterworks JV

Contract Value: $ 28,000,000.00

Contract Duration: 1460 Days

Federal / State Fund: No

Holiday Embargo: Thanksgiving – New Year Holiday

Field Office: 333 W.52nd Street – Room 406

Brief Description of Project

• Installation of new 36” Trunk water main. • Installation of valves, regulators and chambers. • Replacement of 20” and 12” distribution water mains. • Replacement of 12” sewer pipe with new 15” sewer pipe. • Private utility upgrades (gas, electric and communication). • Reconstruction of curbs and sidewalk in certain locations. • Pedestrian ramps at corners (based on field conditions). • Installation of new traffic signals and street lighting poles.

PROJECT LIMITS

Water Main Work

36” Trunk Water Main 20” Distribution Main 12” Distribution Main

Sewer Work

15” Combined sewer

Community Board MEETING Manhattan CB4

330 West 42nd St 26th Floor

New York, New York 10036

Construction Schedule Overview

PRELIMARY SCHEDULE: WORK HOURS / SPECIAL NOTES:

City DOT Allowable Work Hours

• 7AM – 4PM: Monday – Friday

• 8AM – 4PM: Saturday & Sunday

• Typical weekday work hours are 7AM to 3:30PM, Monday – Friday

• Night Time Hours may be requested for work involving water main

shut downs or when special conditions apply.

Phase 1A 9th Avenue between W.55th Street and W.58th Street

Combined Sewer

Phase 1A 9th Avenue between W.51st Street and W.52nd Street

12” Water-main

COMMUNITY IMPACTS

&

WHAT TO EXPECT

COMMUNITY IMPACTS • Pedestrian access will be maintained at all times

• Temporary Street closures and / or limited access may be necessary

• Uniformed NYPD traffic agents assigned for traffic control & Uniformed Flaggers for

Pedestrian movement

• R.E. will monitor operations and work within DEP Noise Code regulations

• Sidewalk and/or loading dock access from the curb may be temporarily restricted while

work is conducted (coordination will be arranged on a case by case basis)

• Parking may be temporarily restricted during construction

• Bus Stops may be temporarily relocated

• Garbage/Trash pick up may be affected

COMMUNITY IMPACTS CONT’D

Water Service Interruptions:

• 72-Hour Advance Advisory will be provided, followed by 24 hour

confirmation/cancellation notice.

• Specific instruction will be provided prior to water shutoff

• If your water service is not restored within 3 hours of the indicated time on the Shutoff

Notice, please contact the Community Construction Liaison (CCL) or 311 if after hours.

• Water Shut-downs are typically scheduled at night.

Special Needs:

Individuals with special needs should contact the CCL

DDC field staff will work specially with those individuals to minimize certain

inconveniences

KEEPING YOU INFORMED • Wayan Brown will be the Community Construction Liaison (CCL). He will be responsible

for keeping the community informed by:

– Being the first point of contact between the project and the community

– Identifying, addressing and/or resolving field inquiries & issues as well as any coordination between the project and needs of the affected stakeholders

– Providing regular updates/advisories for the community to better plan around construction activities

• CCL contact information: Name: Wayan Brown Email: [email protected] Field Office: 333 W.52nd Street, Suite 406 Telephone : (646) 738-4894

• DDC Website: www.nyc.gov/ddc • DDC Video: www.nyc.gov/webuild • During Non-Working hours, please call 311 and give the Project ID: MED609

• On-Site CCL

• Consistent communication with

Community Boards and other stakeholders

(Residents, Businesses, BID, Tenant

Associations, etc.)

• Brochures

• Weekly Bulletins

• Special Advisory notices

• E-mail Alerts

COMMUNITY OUTREACH

Office of Community Outreach & Notification