Installation instructions for Scanning Transient Current Setup

Particulars, Advanced Measurement System Ltd.

Page 2: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Unpacking Put the Al box on the stable and flat surface and remove the front and top lid (unscrew the

screws and lift/pull).

Unload all the packaging boxes from it.

May 2015 2

Top lid

Front lid

Particulars, Advanced Measurement Systems Scanning TCT Installation Manual Ver. 1.1

Page 3: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Connections (I) After unpacking you should find

the following items: z-axis stage

y-axis stage

amplifier

Bias-T

HV filter

May 2015 3

z - axis

x - axis

Bias-T ampl.

HV filter s1

s2

s3

Laser connections

Scanning TCT Installation Manual Ver. 1.1

Connections: amplifier power to the Al housing (Lemo cable)(s1)

Connect output from HV filter to the input of the Bias-T, labeled DC (short SMA-SMA cable) (s2)

Connect amplifier output to the housing (short BNC – SMA cable) (s3)

HV to HV filter (HV BNC soldered to housing connector)

Page 4: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Moving stages (I)

Mount y-stage to the position it comes with mounting table (cooling block – Peltier element – mounting plane) preinstalled.

place small distance holder to x-stage and screw the y-stage to x-stage (screws are in the bag with holder)

May 2015 4

distance holder

Scanning TCT Installation Manual Ver. 1.1

x-axis

Page 5: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Moving stages (II) Connect the Peltier element (s1) power and Pt-100 temperature sensor (s2)

May 2015 5

s1 s2

s1

s2

Scanning TCT Installation Manual Ver. 1.1

Page 6: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Optics (I) - old beam-expander Assembling optics

take optics system (iris, lens, beam expander, collimator, fiber connector preinstalled) and mounts/holders from the packaging boxes

Assemble FH,BH, HH together as indicated in the figure (red arrows)

May 2015 6

BH

FH

HH

place optics system on the assembled mount and screw it (blue arrows)

use red cloth to prevent optics system to slide in the mount as indicated in the figure below

optics system

Scanning TCT Installation Manual Ver. 1.1

Page 7: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Optics (II) - old beam-expander Mount optics to the z-stage

take the optics system (iris, lens, beam expander, collimator, fiber connector) from the packaging box

place distance holder to z-stage and scree the optics system to the z-stage (screws are in the bag with holder). IMPORTANT! Pay attention on the orientation of the distance holder!

May 2015 7

optics system

Fully mounted optics on z-stage

Scanning TCT Installation Manual Ver. 1.1

Page 8: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Optics – new beam expander Assembling optics

take optics system (iris, lens, beam expander, collimator, fiber connector preinstalled) and mounts/holders from the packaging boxes

Assemble FH,BH, HH together in a similar way as shown for the old beam expander (please note that holders are somewhat different for both expanders). When assembled the system should look as shown below.

May 2015 8

Scanning TCT Installation Manual Ver. 1.1

Page 9: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Moving Stages (III) – cable routing

Mount hose-plugs (Dry air/N2, cooling water for Peltier) on the back side of the housing box as indicated in the right figure

May 2015 9

Scanning TCT Installation Manual Ver. 1.1

Route cables of the stages outside the housing box Unscrew the back side of the housing box

Loosen the screws used to hold laser and HV filter

Push the cover backwards and lift it a bit to be able to get connectors through

route the cables of

the stages through

Page 10: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Moving Stages (IV) – cable routing Make sure that the stage cables on the inside are positioned as indicated in the figure

Fix the cables by a fixation washer Screw the back lid

Screw the washer so that the cables are fixed

Please note the cables should be routed underneath the Pt100, Peltier Power , amplifier power and amplifier out cables

May 2015 10

fixation washer

fixation washer

Before mount During mount After mount

Scanning TCT Installation Manual Ver. 1.1

Page 11: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Moving Stages (V) – cable routing The stages cables should be routed through the cable holders

May 2015 11

Scanning TCT Installation Manual Ver. 1.1

Once the stage cables are in position slide in the HV filter to the optimum position (no mechanical stress) and tighten the screw that fixes it to the back side

Page 12: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Laser (I) Carefully unmounts the laser from the shipping package and mount it in the box! IMPORTANT –

fiber is very sensitive – make sure to handle it with EXTREME care. Cut the plastic ropes that tie the laser to the supporting PCB and unwind the fiber from the fiber-roll.

May 2015 12

Scanning TCT Installation Manual Ver. 1.1

Unscrew laser holder so that it becomes very loose

Insert the laser carefully in from the left side.

Slide the laser to the appropriate position (no mechanical stress to cables and fiber)

Tighten the laser holder screw Connect:

• Laser power cable (2 pin lemo)

• Laser trigger – to drv. output (short lemo)

• USB cable for communication with PC

Connect the fiber to the optics system as indicated in the picture on the right.

Page 13: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

How should it look at this point ?

May 2015 13

Scanning TCT Installation Manual Ver. 1.1

Page 14: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Connections outside (I) – old controller Connect the controller to the stages: make sure stages correspond to the right

controller (try in the software) IMPORTANT (read instructions at the side of the controller box) – connect firmly the connectors

before powering the controller! connect the controller via USB cable to the PC

Some of the connectors on the front side are not used i.e. can be used for different purposes (multi channel readout, additional power supply for detectors …).

May 2015 14

Scanning TCT Installation Manual Ver. 1.1

The connections used in the basic configuration in the front panel are: amplifier power (lemo)

amplifier output (BNC)

HV for the detector (HV BNC)

Pt-100 (4 pole lemo)

Peltier power (2 bananas)

Page 15: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Connections outside (I) – new controller Follow the instructions for the old controller – most of the remarks hold also for the

new controller!

May 2015 15

Scanning TCT Installation Manual Ver. 1.1

The controller comes in 2+1 configuration. A short USB cable is provided to connect both controller boxes and the power supply has a cable adapter which enables powering of both controller boxes.

Note that the cables and controllers have labels denoting the axis.

Page 16: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Connections outside (II) On the opposite side of the housing there are connections related to the laser

operation:

laser power supply cable

trigger output (lemo)

USB cable for connection

of laser to PC

May 2015 16

laser power supply

laser power supply cable

PLEASE NOTE: The label on power supply tells the power ratings of the power supply ( USA/EU ). Make sure that you obey it. Use converter for other voltage ratings.

Scanning TCT Installation Manual Ver. 1.1

Page 17: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Adjusting stage positions (I) Depending on the sample/mount used, the stages should be brought to proper position

to get the focus at the sample position. To adjust the range of the stages in in z-axis (optical axis)

the stage can be shifted by sliding the z-stage support plate (unscrew the plate and position it). If even larger range is required used different screw positions.

alternatively the support plate of x and y stages can be shifted. Unscrew the top support plate, then the bottom support plate, shift it to the right position and fix it with screws.

May 2015 17

z-stage support plate

different screw positions

xy stage top support plate

xy stage bottom support plate

NOTE: WHEN CHOSING THE STAGE POSITION MAKE SURE THAT THERE IS ENOUGH ROOM FOR THE FIBRE AT THE BACK!

Scanning TCT Installation Manual Ver. 1.1

Page 18: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Adjusting stage positions (II) x-axis

unscrew the xy stage top support plate and slide it to the proper position (see bottom figure)

y-axis

Mounting table can be positioned at three different places at the y-stage (unscrew the mounting table and fix it in appropriate position – important - make sure that the distance washer is in place)

May 2015 18

ALWAYS MAKE SURE THAT STAGES IN EXTREME POSITIONS DO NOT HIT ANY OBJECT!

Scanning TCT Installation Manual Ver. 1.1

Page 19: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Focus The focus length depends on the wavelength of the laser. The precise value should be

obtained with sample mounted by a so called knife edge scan. Approximate focal distances are 8.2-8.3 cm for red (658 nm) laser

8.4-8.5 cm for infra-red (1064 nm) laser

May 2015 19

focal distance

Scanning TCT Installation Manual Ver. 1.1

Page 20: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Cooling and heating the samples Peltier element is placed between the mounting plane and a liquid/water cooled block (cooling block) and can be used for cooling and heating the samples. The hoses and the choice of the coolant are the left to the user. To minimize the mechanical stress to the tables please user the bar above the y-stage to support the hoses. Make sure that there that hoses are properly fitted and there is no coolant leak. If cooling the samples below the dew point make sure the box is flushed by nitrogen or dry air to avoid moisture.

May 2015 20

coolant inlet/outlet

coolant outlet/inlet

hoses’ support bar

inlet/outlet for the hoses

dry air/nitrogen inlet

Peltier element is rated for max. 15.4 V and 8.5 A.

Replace metal screws with plastic ones and isolate the mounting plane for maximum DT.

Scanning TCT Installation Manual Ver. 1.1

Page 21: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Connecting detector/sample Detector/sample is connected to Bias-T with SMA-SMA cable. Using longer cable prevents (i.e. moves out of the region of interest) distortion of the measured pulse due to reflections caused by improper impendence matching – note the sensors have different impedances and it is impossible to have impedances matched for every sample.

May 2015 21

sample in small housing mounted on the mounting plane

to detector Detector connected to Bias-T

A small pad detector housing with test sample (FZ-p silicon diode) is included.

Scanning TCT Installation Manual Ver. 1.1

Page 22: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Mounting table and plane The standard mounting table has the mounting plane with the following layout

M2 = screw hole of 2 mm diameter

M2.5 = screw hole of 2.5 mm diameter

May 2015 22

openings for SMA connectors

Scanning TCT Installation Manual Ver. 1.1

Page 23: Installation instructions for Scanning Transient Current Setup · Installation instructions for Scanning Transient Current Setup Particulars, Advanced Measurement System Ltd. Particulars,

Particulars, Advanced Measurement Systems

Help needed? Warnings!

May 2015 23

Scanning TCT Installation Manual Ver. 1.1

Please contact [email protected] in case of questions, advice, help or comment!

Please use common sense at all points during the assembly. Although there is a very small chance that anything can go wrong make sure to follow all precautions:

Note the voltage ratings of the power supplies (laser requires 220 V/50Hz)

Read the instruction on the sticker of the stage controller!

Do not look into the laser fiber while laser is in operation!

Make sure that the stages in extreme positions do not hit any objects!