12
Installation instructions for Purus Line vinyl floor covering version For concrete floor, placed as a door channel For wooden beam floor constructions, as a door channel. Concrete toplayer for heating cables. 1 3 page 2-4 Page 9-11 Cleaning and maintenace 4 page 12 For wooden beam floor constructions, as a door channel 2 Page 5-8 Purus AB, Södergatan 7, SE 275 31 Sjöbo – Tel (+46) 0416-257 00, Fax (+46) 0416-257 20 [email protected], www.purus.se Vers.16.06.2008

Installation instructions for Purus Line vinyl floor …qbankfrontend.purus.se/deployedFiles/612b7f0d62f21fab8f0...Installation instructions for Purus Line vinyl floor covering version

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Installation instructions for Purus Line vinyl floor …qbankfrontend.purus.se/deployedFiles/612b7f0d62f21fab8f0...Installation instructions for Purus Line vinyl floor covering version

Installation instructions for Purus Linevinyl floor covering version

For concrete floor, placed as adoor channel

For wooden beam floor constructions, as a door channel. Concrete toplayer for heating cables.

1

3

page 2-4

Page 9-11

Cleaning and maintenace

4 page 12

For wooden beam floor constructions, as a door channel

2 Page 5-8

Purus AB, Södergatan 7, SE 275 31 Sjöbo – Tel (+46) 0416-257 00, Fax (+46) 0416-257 [email protected], www.purus.se

Vers.16.06.2008

Page 2: Installation instructions for Purus Line vinyl floor …qbankfrontend.purus.se/deployedFiles/612b7f0d62f21fab8f0...Installation instructions for Purus Line vinyl floor covering version

Installation instructions no 1

For concrete floor, placed as adoor channelInstallation package for concrete:

Art. no. 711 41 51 - 300 mm

Art. no. 711 41 81 - 600 mm

Art. no. 711 42 10 - 700 mm

Art. no. 711 42 39 - 800 mm

Art. no. 711 42 68 - 900 mm

Art. no. 711 42 96 - 1000 mm

F1

Our ongoing product development may cause

changes in the specifications. We reserve these rights.

When choosing Purus Line,please note:● The upper part is made of stainless steel.● The well part is made of Polypropylene (PP).● When PP is burning, it forms only carbon

dioxide and water.● PURUS LINE has a clip frame for membrane /

sealing-vinyl floor.● Spare parts for PURUS LINE are always

available.● PURUS LINE is self-cleaning and seldom

demands cleaning or maintenance.● PURUS LINE fulfills the standards according to

Housing Authorities (BBR) regulations and EN 1253.

● For installation of vinyl floors refer to BS 8203 2001

● Purus Line must be installed flat - i.e. not on falls.● Do not solvent weld waste connections.

Maximum height with one distance casing. Further casings can be mounted, if necessary.

Necessary tools:- Wrench 11 mm. dimension- Torx bits 6 mm. dimension- Phillips screwdriver

88

202*Distancecasing

PURUS SupportThe grip claw fits the brackets of the lower part ofthe channel. It is easy to adjust so that the upperedge of the tile frame is in line with the ready-made floor

Min.height = 88 mmMax height = 202 mmDistance case = 50 mm.

Page 3: Installation instructions for Purus Line vinyl floor …qbankfrontend.purus.se/deployedFiles/612b7f0d62f21fab8f0...Installation instructions for Purus Line vinyl floor covering version

PURUS Line is placed on thesurface and the height is adjusted by PURUS support.

Connect to the drain. The instal-lation is attached to the arma-ment with steel wire. The PURUS

support maybe nailed or screwed to the surface.

IMPORTANT:Leave the protection plastic onduring cementing!

3

B

Installing of the gully part

The gully is fixed with six nutsand washers.

A separate mounting spanner isenclosed, attached on the bottom of the channel.

1

2

Enclosed brackets for PURUS support are mounted on thechannel, with one bracket on each side of the channel.

For a channel length of 1000 mm, an extra bracket is

fastened in the middle.

On rough concrete bed, the mounting can be fixed with cementunder the gully (fig. B).

(1)

Gasket

Lay the concrete!

The gasket must be mounted before the floor covering.

Lay the floor covering into the frame and cut to the inneredge of the frame.

Alt. 2. Cut in portionWhen the drain pipe is moulded, make a cut-in portion in themould form, which is approxi-mately 5 cm longer and widerthan Purus Line. When the concrete has hard-ened, Purus Line is set in thehole and connected to the drainpipe. Fill the hole with concrete.

PURUS LINE is installed on the samelevel as surface layers.

3B

It must beinstalled flat

Page 4: Installation instructions for Purus Line vinyl floor …qbankfrontend.purus.se/deployedFiles/612b7f0d62f21fab8f0...Installation instructions for Purus Line vinyl floor covering version

Mount the top frame with the widest opening over the watertrap. Attach to the clip-frame with the6 screws.

4

5

6

Check list● When choosing the

position for mounting, remember the need for easy access for cleaning of the channel and water trap.

● Purus Line must be mounted horizontally.

● Purus Line’s surface must be on the same level as the finished floor, the i.e.flat and in level with floor covering.

(2)

(2)

Place the grating

Gasket

Clip frame forfloor covering

Remove the clip frame (standard) which comes withthe channel.Replace with the special clipframe for floor covering.This comes with the frame package.

Position the clip frame and pierce holes for the screws with an awl. Remember to use hand tools! OBS! The 4 adjustment screws (2) for the tile frame are not used on this version.

Page 5: Installation instructions for Purus Line vinyl floor …qbankfrontend.purus.se/deployedFiles/612b7f0d62f21fab8f0...Installation instructions for Purus Line vinyl floor covering version

When choosing Purus Line,please note:● The upper part is made of stainless steel.● The well part is made of Polypropylene (PP).● When PP is burning, it forms only carbon

dioxide and water.● PURUS LINE has a clip frame for membrane /

sealing-vinyl floor.● Spare parts for PURUS LINE are always

available.● PURUS LINE is self-cleaning and seldom

demands cleaning or maintenance.● PURUS LINE fulfills the standards according to

Housing Authorities (BBR) regulations and EN 1253.

● For installation of vinyl floors refer to BS 8203 2001

● Purus Line must be installed flat - i.e. not on falls.

● Do not solvent weld waste connections.

For wooden beam floor constructions, as a door channel.

Installation package:Length:

300 Art. no 340 15 31600 Art. no 340 15 32 700 Art. no 340 15 33 800 Art. no 340 15 34 900 Art. no 340 15 35

1000 Art. no 340 15 36

Necessary tools:- Wrench 11 mm. dimension- Torx bits 6 mm. dimension- Phillips screwdriver

Installation instructions no 2

Our ongoing product development may cause

changes in the specifications. We reserve these rights.

Page 6: Installation instructions for Purus Line vinyl floor …qbankfrontend.purus.se/deployedFiles/612b7f0d62f21fab8f0...Installation instructions for Purus Line vinyl floor covering version

Attach the mounting rail for thewooden beams (A) to the channel.

2

Installing of the gully part

The gully is fixed with six nutsand washers.

A separate mounting spanner isenclosed, attached on the bottom of the channel.

1

(A)

(A)

3NB! Strengthen the beams with

extra cross-beams.

Fasten the mounting rails direct to the wooden beamswith wood screws.

Check list● When choosing the

position for mounting, remember the need for easy access for cleaning of the channel and water trap.

● Purus Line must be mounted horizontally.

● Purus Line’s surface must be on the same level as the finished floor, the i.e.flat and in level with floor covering.

Page 7: Installation instructions for Purus Line vinyl floor …qbankfrontend.purus.se/deployedFiles/612b7f0d62f21fab8f0...Installation instructions for Purus Line vinyl floor covering version

Place the gasket, then lay thefloor covering (1 )into the frameanc cut to the inner edge of theframe.

Position the clip frame and pierce holes for the screws with an awl.

Remember to use hand tools!

NOTE! The 4 adjustment screws for thetile frame are not used on thisversion.

(1)

(2)

clip frame for floor covering

(2)

Gasket

Remove the clip frame (standard) which comes withthe channel.Replace with the special clip frame for floor covering.This comes with the frame pacage.

6

5The gasket must be mounted

before the floor covering.

The mounting rails are fastenedto the floor beamsMount the chip-boards.The opening between theboards must be 115 mm wide.

4

115 mm

Chip-board

Vinyl surfacelayer

Gasket

Chip board

Page 8: Installation instructions for Purus Line vinyl floor …qbankfrontend.purus.se/deployedFiles/612b7f0d62f21fab8f0...Installation instructions for Purus Line vinyl floor covering version

Mount the topframe with the widest opening over the watertrap. Attach to the clip-framewith the 6 screws.

5

6 Check list● When choosing the

position for mounting, remember the need for easy access for cleaning of the channel and water trap.

● Purus Line must be mounted horizontally.

● Purus Line’s surface must be on the same level as the finished floor, the i.e.flat and in level with floor covering.

Place the grating

Page 9: Installation instructions for Purus Line vinyl floor …qbankfrontend.purus.se/deployedFiles/612b7f0d62f21fab8f0...Installation instructions for Purus Line vinyl floor covering version

When choosing Purus Line,please note:● The upper part is made of stainless steel.● The well part is made of Polypropylene (PP).● When PP is burning, it forms only carbon

dioxide and water.● PURUS LINE has a clip frame for membrane /

sealing-vinyl floor.● Spare parts for PURUS LINE are always

available.● PURUS LINE is self-cleaning and seldom

demands cleaning or maintenance.● PURUS LINE fulfills the standards according to

Housing Authorities (BBR) regulations and EN 1253.

● For installation of vinyl floors refer to BS 8203 2001

● Purus Line must be installed flat - i.e. not on falls.

● Do not solvent weld waste connections.

For wooden beam floor constructions, as a door channel. Concrete toplayer for heating cables.

Installation package:Length: Height 35 mm Mounting rails.

(22+13 mm concrete)

300 At. no 711 41 55 2 pc.600 At. no 711 41 85 2 pc.700 At. no 711 42 43 2 pc.800 At. no711 42 13 2 pc.900 At. no 711 42 72 2 pc

1000 At. no 711 43 01 2 pc.

Necessary tools:- Wrench 11 mm. dimension- Torx bits 6 mm. dimension- Phillips screwdriver

Installation instructions no 3

Our ongoing product development may cause changes

in the specifications. We reserve these rights.

Page 10: Installation instructions for Purus Line vinyl floor …qbankfrontend.purus.se/deployedFiles/612b7f0d62f21fab8f0...Installation instructions for Purus Line vinyl floor covering version

The mounting rails are fastened to the floor beams.Mount the chip-boards. The opening between theboards must be 115 mm wide.

4

115 mm

Attach the mounting rail for thewooden beams (A) to the channel.

2

Installing of the gully part

The gully is fixed with six nutsand washers.

A separate mounting spanner isenclosed, attached on the bottom of the channel.

1

(A)

(A)

3 NB! Strengthen the beamswith extra cross-beams.

Fasten the mounting rails direct to the woodenbeams with wood screws.

Page 11: Installation instructions for Purus Line vinyl floor …qbankfrontend.purus.se/deployedFiles/612b7f0d62f21fab8f0...Installation instructions for Purus Line vinyl floor covering version

(1)

Remove the clip frame (standard) which comes withthe channel.Replace with the special clipframe for floor covering.This comes with the frame package.

IMPORTANT:Leave the protection plastic onduring cementing!

Concrete

6

5

Lay the concrete!

The gasket must be mountedbefore the floor covering.

Lay the vinyl floor covering intothe frame and cut to the inneredge of the frame.

Check list● When choosing the

position for mounting, remember the need for easy access for cleaning of the channel and water trap.

● Purus Line must be mounted horizontally.

● Purus Line’s surface must be on the same level as the finished floor, the i.e.flat and in level with floor covering.

Gasket

Concrete

chip-board

Place the gasket.Lay the floor covering (1).

Position the clip frame and pierce holes for the screws with an awl.

Remember to use hand tools!

7

8 Place the grating!

NOTE! The 4 adjustment screws for the tile frame are not used on this version.

Page 12: Installation instructions for Purus Line vinyl floor …qbankfrontend.purus.se/deployedFiles/612b7f0d62f21fab8f0...Installation instructions for Purus Line vinyl floor covering version

ww

w.ultra-d

esign.no-1959.06.2008

Cleaning and maintenance 4

Purus AB, Södergatan 7, SE 275 31 Sjöbo – Tel (+46) 0416-257 00, Fax (+46) 0416-257 [email protected], www.purus.se

This product is adapted to trade regulations for Säker Vatteninstallation (securewater installation). The supplier guarantees the function of the product when Trade regulations are followed and in accordance with mounting instructions.

1. 1. Lift out the water trap, shown by picture (1)2. If necessary, rinse the water trap under water

(see picture 2)3. Replace the water trap.

Tip: Put your fingers in the water lock and presssideways for easier loosening.

Hold the water lock with the spring loaded bodyopen whilst rinsed clean. Alternatively use a brush.

Make sure the packings are completely clean for awatertight fitting as possible!

1 2