Upload
others
View
5
Download
0
Embed Size (px)
Citation preview
February2015 www.tubeliteinc.com Page13056WalkerRidgeDr.NW,SuiteG●Walker,MI49544●800-866-2227
14000 SERIES STOREFRONT
INSTALLATION INSTRUCTIONS
14000SeriesInstallationInstructions
Page2 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
February2015 www.tubeliteinc.com Page3
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
GENERAL CONSTRUCTION NOTES........................................................................................5
PARTS LIST .................................................................................................................. 6-18
QUICK REFERENCE CHECKLIST..........................................................................................19
ELEVATION DETAILS........................................................................................................ 20-22
FRAME FABRICATION Step1 DetermineFrameSize..................................................................................23 Step2 CutMaterialtoLength...................................................................................23 Step3 SillFlashing...................................................................................................24 Step4 Verticals&CloserPocketsforHorizontals.............................................. 25-26 Step5 HorizontalsforShearBlockAssembly..........................................................27 Step6 ShearBlockModification...............................................................................28 Step7 SteelStiffener................................................................................................29
FRAME ASSEMBLY Step8 SillFlashingEndDams.................................................................................30 Step9 OptionalHighSideliteBase..................................................................... 31-33 Step10 AssembleFrames................................................................................... 34-36 Step11 GasketInstallation.........................................................................................37
FRAME INSTALLATION Step12 SillFlashingInstallation.................................................................................38 Step13 SillFlashingSplicing............................................................................... 39-40 Step14 InstallFrames.......................................................................................... 41-42 Step15 FrameatEntrance.........................................................................................43
GLAZING Step15 GlazingPreparation.......................................................................................44 Step16 InstallingGlazingUnits............................................................................ 45-46CORNER CONDITIONS for 90º & 135º Step1 SillFlashingFabrication&Installation..................................................... 47-49
CORNER CONDITIONS for ROTATIONAL MULLION Step1 SillFlashingFabrication&Installation..................................................... 50-51
NARROW SIDELITE BASE Step1 Fabrication&Installation...............................................................................52
INSIDE GLAZE Guidelines: ScrewSpline&ShearBlockAssembly................................................... 53-54
OPTIONAL THERMAL ENHANCEMENT Details: AlternateDetails............................................................................................55
TABLE OF CONTENTS
14000SeriesInstallationInstructions
Page4 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
February2015 www.tubeliteinc.com Page5
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
GENERAL CONSTRUCTION NOTES
1. Theseinstructionscovertypicalproductapplication,fabrication,installationandstandardconditionsandaregeneralin nature.Theyprovideusefulguidelines,butthefinalshopdrawingsmayincludeadditionaldetailsspecifictothe project.Anyconflictordiscrepanciesmustbeclarifiedpriortoexecution.
2. Materialsstoredatthejobsitemustbekeptinasafeplaceprotectedfrompossibledamagebyothertrades.Stack withadequateseparationsomaterialswillnotrubtogetherandstoreofftheground.Cardboardorpaperwrapped materialsmustbekeptdry.Checkarrivingmaterialsforquantityandkeeparecordofwherevariousmaterialsare stored.
3. AllfieldweldingmustbedoneinaccordancewithAISCguidelines.Allaluminumandglassshouldbeshieldedfrom fieldweldingtoavoiddamagefromweldsplatter.Resultswillbeunsightlyandmaybestructurallyunsound.Advise generalcontractorandothertradesaccordingly.
4. Coordinateprotectionofinstalledworkwithgeneralcontractorand/orothertrades.
5. Coordinatesequenceofothertradeswhichaffectframinginstallationwiththegeneralcontractor(e.g.fireproofing, backupwalls,partitions,ceilings,mechanicalducts,HVAC,etc.).
6. Generalcontractorshouldfurnishandguaranteebenchmarks,offsetlinesandopeningdimensions.Theseitems shouldbecheckedforaccuracybeforeproceedingwitherection.Makecertainthatalladjacentsubstrateconstruction isinaccordancewiththecontractdocumentsand/orapprovedshopdrawings.Ifnot,notifythegeneralcontractorin writingbeforeproceedingwithinstallationbecausethiscouldconstituteacceptanceofadjacentsubstrateconstruction byothers.
7. Isolateallaluminumtobeplaceddirectlyincontactwithmasonryorotherincompatiblematerialswithaheavycoatof zincchromateorbituminouspaint.FastenersattachingframingtobuildingstructurearetypicallynotprovidedbyTubelite. Note:Useonlyflatheadfastenersatheadandjambconditions.
8. Sealantselectionistheresponsibilityoftheerector,installerand/orglazingcontractorandmustbeapprovedbythe sealantmanufacturerwithregardtoapplicationandcompatibilityforitsintendeduse.Allsealantsmustbeusedin strictaccordancewiththemanufacturer’sinstructionsandappliedonlybytrainedpersonneltosurfacesthathavebeen properlyprepared.
9. Sealantmustbecompatiblewithallmaterialswithwhichtheyhavecontact,includingothersealantsurfaces.Consult thesealantmanufacturerforrecommendationsrelativetoshelflife,compatibility,cleaningofsubstrate,priming, toolingadhesion,etc.Allsurfacescomingincontactwithwaxesoroilsthroughthefabricationorassemblyprocessmust becleanedtoassureproperadhesionofsealant.
10. Drainageguttersandweepholesmustbekeptcleanatalltimes.Tubelitewillnotacceptresponsibilityforimproper drainageasaresultofcloggedguttersandweepholes.
11. Thisproductrequiresclearancesatthehead,sillandjambstoallowforthermalexpansionandcontractionaswell asconstructiontolerances.Refertofinaldistributiondrawingsforjointsizes.Jointssmallerthan1/4”maybesubject tofailure.Consultthesealantmanufacturerforpropersizingofjoints.
12. Allframingmembers,entrancesandothermaterialsaretobeinstalledplumb,levelandtruewithregardto establishedbenchmarks,columncenterlinesorotherworkingpointsestablishedbythegeneralcontractorand checkedbytheerector,installerand/orglazingcontractor.
13. Aftersealantissetandarepresentativeamountofthewallhasbeenglazed(500squarefeetormore),runawater hosetesttocheckinstallation.Onlargeprojects,ahosetestshouldberepeatedduringglazingoperation.Thistesting shouldbeconductedinaccordancewithAAMA501.2specifications.
14. CleaningofexposedaluminumsurfacesshouldbedoneperAAMArecommendations.15. Checkwww.tubeliteinc.comforanyinstallationinstructionupdates.
14000SeriesInstallationInstructions
Page6 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
SHAPE DESCRIPTION PART No.
E1435
T14441
E1430
T14261
E1400
Standard Open BackHead/Jamb/Vertical
Open Back (Non-Thermal)Head/Jamb/Vertical
Open BackVertical Mullion for Steel Reinforcement
Open Back (Non-Thermal)Heavy Duty Vertical Mullion
T1435Open Back (Thermal)Heavy Duty Vertical Mullion
Slotted
Tubular Vertical Mullion (Non-Thermal)
T1400Tubular Vertical Mullion (Thermal)
Heavy Duty (Non-Thermal)Tubular Vertical Mullion
T1430Heavy Duty (Thermal)Tubular Vertical Mullion
E14141
Slotted
VERTICAL EXTRUSIONS
February2015 www.tubeliteinc.com Page7
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
VERTICAL EXTRUSIONS
SHAPE DESCRIPTION PART No.
E14107
E14106Female Half (Non-Thermal)Expansion Mullion
Male Half (Non-Thermal)Expansion Mullion
Sun Shade (Non-Thermal)Vertical Mullion
E14249
TU24336
TU24346Female Half (Thermal)Expansion Mullion
Male Half (Thermal)Expansion Mullion
Sun Shade (Thermal)Vertical Mullion T14249
14000SeriesInstallationInstructions
Page8 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
SHAPE DESCRIPTION PART No.
T14240
T14143
E14047
Open BackHorizontal/Sill
Open BackHorizontal/Sill
TubularHorizontal/Sill
Standard TubularHorizontal/Sill
4½" x 4½" (Non-Thermal) Horizontal/Sidelite Base
T140474½" x 4½" (Thermal) Horizontal/Sidelite Base
E14103
E14140
HORIZONTAL EXTRUSIONS
February2015 www.tubeliteinc.com Page9
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
HORIZONTAL EXTRUSIONS
SHAPE DESCRIPTION PART No.
E14054
E14104
E14288
E14289
4½" x 6" (Non-Thermal) Self Mating Horizontal
T140544½" x 6" (Thermal) Self Mating Horizontal
Horizontal Glass Stop
Perimeter Memberfor CurvingUsed with P1707 clip
Perimeter Facefor Curving
14000SeriesInstallationInstructions
Page10 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
SHAPE DESCRIPTION PART No.
E14130
E14129
T14259
T14055
Head Receptor (Non-Thermal)
T14129Head Receptor (Thermal)
Head Receptor
Sidelite Base Anchor Shoe
4" x 2½"Sidelite Base
Head Receptor Snap Stop
Sill Flashing
Sill Flashing
Sill Flashing
E14026
E14027
E45116
E14059
SIDELITE BASE, SILL FLASHING and HEAD RECEPTOR EXTRUSIONS
February2015 www.tubeliteinc.com Page11
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
SHAPE DESCRIPTION PART No.
E14118
E14119
E45110
E14110
90° Single PocketCorner Mullion Half(Non-Thermal)
T1411890° Single PocketCorner Mullion Half(Thermal)
90° Single PocketCorner Mullion Half(Non-Thermal)
T1411990° Single PocketCorner Mullion Half(Thermal)
90° Duel PocketCorner Mullion Half(Non-Thermal)
T1411090° Duel PocketCorner Mullion Half(Thermal)
90° No PocketCorner Mullion Half
CORNER EXTRUSIONS
14000SeriesInstallationInstructions
Page12 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
SHAPE DESCRIPTION PART No.
E14246
E14247
E4500545°/135° Corner Mullion Post
Rotational Corner Mullion Half(Non-Thermal)
Rotational Corner Mullion Post(Non-Thermal)
T14246
T14247
Rotational Corner Mullion Half(Thermal)
Rotational Corner Mullion Post(Thermal)
CORNER EXTRUSIONS
February2015 www.tubeliteinc.com Page13
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
SHAPE DESCRIPTION PART No.
T14442
E4543
T14022
T14445
E14248
Flat Snap-In Filler
Closer Pocker Filler
Closer Pocker Filler
Closer Pocker Filler (Alternate)See page 55 for usage
Deep Closer Pocker Filler
Deep Closer Pocker Filler (Alternate)See page 55 for usage
Snap-In Sidelite Base Adaptor
Snap-In 1" PVC Pocket Filler
Snap-In 1" Pocket Filler
Snap-In ¼" Glazing Adaptor
Snap-In ½" Glazing Adaptor
P4563
E1411
E14036
E14061
E14022Deep Closer Pocker Filler
E14445Closer Pocker Filler
P4543
P4543A
Flat Snap-In PVC Filler
Flat Snap-In PVC Filler
T14248Snap-In Sidelite Base Adaptor
Slotted
A244040
A245050
POCKET FILLERS and GLAZING ADAPTOREXTRUSIONS
14000SeriesInstallationInstructions
Page14 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
SHAPE DESCRIPTION PART No.
Open BackDoor Jamb
Heavy Duty TubularIntermediate Door Jamb
TubularDoor Jamb
TubularIntermediate Door Jamb
Heavy Duty TubularDoor Jamb
Open Back Center Hung Door Jamb
Standard TubularDoor Header
TubularDoor Header
4½" x 4½" TubularDoor Jamb
4½" x 4½" TubularIntermediate Door Jamb
E1438
E14250
E45009
E14021
E14121
E14144
E14145
E14245
E14124
E14125
DOOR FRAME EXTRUSIONS
February2015 www.tubeliteinc.com Page15
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
SHAPE DESCRIPTION PART No.
Offset Arm CoverDoor Stop
Applied Transom Gutter
Snap-InTransom Gutter
Snap-InTransom Gutter
Gutter Glass Stop for E1414 & E4013
Gutter Glass Stop for E14024
E2298
E1414
E4013
E1415
E14024
E14025
Snap-InDoor Stop E4531
DOOR FRAME ACCESSORIESEXTRUSIONS
14000SeriesInstallationInstructions
Page16 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
SHAPE DESCRIPTION PART No.
Roll-In Glazing Gasket for Undersized Glass
Finger Gasket for E45116 (Equal Leg Head Channel) andE14246 (Variable Angle Corner Mullion Half)
Bulb Gasket for Two Piece Head ChannelE14129/T14129 (Base Channel Member)E14130 (Snap-In Channel Stop)
3/16" Setting Blockat Inside Glaze Horizontals Only
Setting Block (Standard)
Face Clip for E14288 & E14289
P2428
P487
P1221
P2400
P2511
P1132(EPDM)
P1131(Silicone)
P1707
Roll-In Glazing Gasket for 1" Glass(Standard)
Roll-In Glazing Gasket for 1⅛" Glass
P2728
GASKETS and SETTING BLOCKS
February2015 www.tubeliteinc.com Page17
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
SHAPE DESCRIPTION PART No.
Silicone Splice Sleeve - (Optional)(Use at E14055, T14055, E14259 and T14259 Sill Flashing)
Aluminum Splice Sleeve(Use at E14059, T14055 and T14259 Sill Flashing)
P1144
P3444
Sill Flashing End Dam P1153
EPDM AntiWalk “W” Block (Optional)(Use at Deep Pockets on Verticals and Jambs) P1916
Water Diverter(Use at Intermediate Horizontals) P1135
WATER CONTROL ACCESSORIESand DRILL GUIDE
14000SeriesInstallationInstructions
Page18 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
SHAPE DESCRIPTION PART No.
#10 X 1¾" type B Phillips Pan Head(Fastens shear block to verticals)
#12 X ¾" Phillips Flat Head(Fastens head member to shear block & sidelite base to P1137 anchor)
#10 X ½" Phillips Truss Head(Fastens horizontal and sill to shear block & P1137 anchor to vertical)
#8 X ⅜" type A Phillips Pan Head(Fastens end dam to sill flashing)
#10-24 X 1" Phillips Hex Head(Frame assembly screw at screw splines)
Drill Guide(for screw spline and shear clip assembly)
S149
S009
S191
S196
S202
P1139X
XX
X
Z
Z
X
XX
X
Z
Z
SHAPE DESCRIPTION PART No.
2" X 4½" X ⅛" Tube
4½" X 4½" X ⅛" Tube
E1451
E0133
SYSTEM SCREWS
OPTIONAL TUBE MEMBERS
February2015 www.tubeliteinc.com Page19
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
1. Makesuretheopeningissquareandthecaulkjointsare1/4”minimumaroundtheframe. Note:FramesthatutilizetheT14259sillflashingmusthaveaminimumof3/8”caulkjointathead.
2. Ensuresurfacesthatwillbesealedarefreeofcontaminantsthatcanleadtoadhesionissues.
3. Sillflashingmustbeproperlyshimmedandlevelfromlefttorightandfronttobackforproperdrainage.
4. Acontinuouslineofsealantmustbeappliedbetweenthesillandthetopinteriorlegofthesillflashing
5. Checkthatallweepsandbaffles(ifrequired)conformtothelocationsandsizescalledoutinthese instructions.
6. Ensurethatsillflashingweepholesarenotpluggedbytheperimeterseal.
7. Asillflashingspliceisneededinopeningslargerthan24feet.Followinstructionsforinstallingandsealing.
8. Enddamsmustbeinstalledandsealedontothesillflashing.Fastenersusedmustalsobesealed.
9. Wherethesillflashingabutsadoorjamb,thejambpocketcavitymustbecompletelysealedtodamthis area.
10.Capsealanyexposedanchororscrew.
11.Buttersealendsofhorizontalframemembersthatarejoinedtoverticalmembers.
12.Waterdiverterinstallationandsealingiscritical.Checkinstallationagainstinstructionstoensureconformity.
13.Applysealantbetweenallcornergasketjoints.
14.Glassbitesmustbeequalonallsides.
15.Doublecheckanchorsizeandlocationagainstinstallationinstructionsorapprovedshopdrawings.
16.Insurethatinteriorsealismarriedtosillflashinginteriorleg.
GLASS SIZE CALCULATIONWidth tolerance = + 0", ‒ 1⁄16"
Typical Framing: GlassWidth=D.L.O.plus¾" GlassHeight=D.L.O.plus¾”
Transoms with Sash: GlassWidth=D.L.O.plus¾” GlassHeight=D.L.O.plus¾”(Ref.Fig.19.1)
QUICK REFERENCE CHECKLIST
DLO at
Transom
DLO
+ ⅞
"
3 /8"
3 /8"
VERTICAL D.L.O. at SASH
1¼"
Fig. 19.1
14000SeriesInstallationInstructions
Page20 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
4
5
62"2"
2"D
.L.O
.D
.L.O
.⅝
"
⅝"
⅜"
Min
imum ¼"
Min
imum
41/2"
Head Channel(Optional)
41 / 2"
41 / 2"
D.L
.O.
D.L
.O.
4A
5A
6A
5B
6B
2"2"
2"1"
D.L
.O.
D.L
.O.
¾"
32C 2D2 2A1
P2728(Typ)
2" 2"2" 2" 2⅝" 4½"D.L.O.D.L.O. D.L.O. D.L.O. 2" D.L.O. D.L.O.1/4"
41 / 2"
2B
41/2"
1 2
4A4
2D
2C
2A2B
3
5B
6B
5A
6A
5
6
SCREW SPLINEASSEMBLY
SHEAR CLIPASSEMBLY
Shown with shear clip.Screw spline assembly
similar without clip.
OptionalSill Flashing
TYPICAL ELEVATIONwith DETAILS
February2015 www.tubeliteinc.com Page21
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
1
33A3B
44A
22A2B
44A
1
4 4A
3B3
3A
2"D
LO1 / 4
" M
inim
um
41/2"
2"D
.O.
2"
1¼"
1¼"
DLO
1¼"
DLO
DLO
D.O
.
2"D
.O.
D.O
.
D.O
.
NOTE:1. Narrow Stile door are shown. Refer to entrance section for other door types and stiles.
2. Doors are available with a1” glazing.
2B2
2A
2"D
.O.
2"D
.O.
2"D
.O.
1 / 4"
Min
imum
1 / 4"
Min
imum
1 / 4"
Min
imum
DOOR FRAME ELEVATIONwith HORIZONTAL DETAILS
14000SeriesInstallationInstructions
Page22 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
5A5B
5
7B
6A6B
7A
6
7
8B8A8
9
NOTE:1. Narrow Stile door are shown. Refer to entrance section for other door types and stiles.
2. Doors are available with a1” glazing.
5 6 7
9
5A 6A
5B 6B
7A
7B
8
8A
8B
2" DLOD.O.
2" DLOD.O.
2" DLOD.O.
2" D.O.1/4"
2" D.O.1/4"
2" D.O.
D.O.
1/4"
2" DLO
2" DLO
2"1"1" DLODLODLO
1"1" DLODLO
1"1" DLODLO2"1/4"
2"1/4"
2"1/4"
DOOR FRAME ELEVATIONwith VERTICAL DETAILS
February2015 www.tubeliteinc.com Page23
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Measure
Dimension "A" = "B"
Measure
Measure
Measure
Measure
Measure
Measure
Measure
Dimension "A" Dimension "B"
Fig. 23.1
Fig. 23.2
Fig. 23.3
Fig. 23.4
Step 1: Determine Frame Size
FrameWidth
A. Makesuretheopeningissquareandplumb. Measureeachdiagonaloftheopening. SEE Fig. 23.1.
B. Measurethewidthoftheopeningatthetop, middleandbottom.Selectthesmallestof thesedimensionsandsubtracttheleftand rightcaulkjointwidthperapprovedshop drawings(1/4”mincaulkjointateachjamb). SEE Fig. 23.2.
FrameHeight
C. Measuretheheightoftheopeningatseveral pointsalongtheentirewidthoftheopening. Selectthesmallestofthesedimensionsand subtractthetopandbottomcaulkjointheight perapprovedshopdrawings(1/4”minimum caulkjointatsill.Athead,caulkjointcanbe 1/4”whenusingT14055orsimilarflashing. WhenusingT14259orE14059sillflashing, headcaulkjointmustbe1/2”). SEE Fig. 23.3.
NOTE: Non-thermal extrusions are shown in these instructions for clarity. Fabrication and installation of thermal members are the same.
Step 2: Cut Material to Size
Note:Doorframingmaterialcomescuttosizefromthefactory.Incasesofdoorframeswithtransoms,thedoor jambsmustbecutdowninthefieldtosizeandheadmemberattachedperstandardinstructionsshown withinthismanual.
Sill Flashing Note:Foropeningswiderthan24’,thesillflashingmustbesplicedatthecenterlineofaD.L.O.everytwelvetofifteenfeet.Splicejointshouldbe3/8”wide.SEE Step 13, Page 39 & 40 forsillflashingsplicedetails.
Door jamb toend of frame
Fram
e H
eigh
t at
T142
59, E
1405
9 si
ll fla
shin
g
Rou
gh O
peni
ng
¾"
⅝"
¼"
⅜"
Fram
e H
eigh
t at
T140
55 s
ill fl
ashi
ng
1/8" to endof flashing
Framing Members SillFlashingwithEntrance.DoorJambtoEndofFrame+⅛” (SEE Fig. 23.4) SillFlashingwithoutEntrance................... FrameWidth+¼” Verticals........................................................... SeeFig. 20.4 Head,Horizontal&Sill.................................................D.L.O. Horizontal&SillGlassStops............................. D.L.O.–1⁄32” ClosurePocketsatVerticals............................ SeeFig. 20.4 GlazingAdaptors................................................ D.L.O.–1⁄32” Snap-InFillers..................RefertoApprovedShopDrawingsAccessories ExteriorGasket...................................... D.L.O.+Allowance* InteriorGasket....................................... D.L.O.+Allowance*
*Allowance=1/8”extralengthperfootofD.L.O.
FRAME FABRICATION
14000SeriesInstallationInstructions
Page24 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
2"
ReferenceApproved
Shop Drawings
* Clearance Holes for Anchor Bolts
1/8"2"* * * ** Reference approved shop drawings for anchor hole sizes, locations and quantity.
2"
Vertical Members
NOTE:DLO's larger than 42" require an additional anchor hole at mid-point of bay.
T14259 (Shown)E14059 (Similar)
T14055
2" 2" 6" 6"6" 2" 2"1/8" 2"
Jamb
T14259 (Shown)E14059 (Similar)
Mullion 7/32" Dia.Weep Holes
Fig. 24.1
Fig. 24.2
Fig. 24.3
Step 3: Fabricate Sill Flashing
A. WhenusingT14259orE14059,drilltwo7/32”dia.weepholesat2”and6”fromeachsideoftheverticals.
B. Drillclearanceholesforperimeteranchors.Sizeandquantityvaryperjob.Refertoapprovedshopdrawings.
FRAME FABRICATION
SpliceJoint
SlottedHoles
SlottedHoles
SlottedHoles
Fixed
Holes
SlottedHoles
SlottedHole
SpliceJoint
90ºCorner
135ºCorner
Typical Sill Flashing Anchor Hole Patterns (Head channel similar)(Refer to appproved shop drawings for project requirements)
Spl
ice
Join
t
FixedHoles
SlottedHoles
SpliceJoint
SlottedHoles
Slo
tted
Hol
es
Fixed
Holes
Splice
Joint
Slotted
Holes
February2015 www.tubeliteinc.com Page25
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
2"D
LOD
LO2"1"
2"1"
T14441T14445E14445
Drill with .201" bit.(Typ)
EXTE
RIOR
EXTE
RIOR
EXTE
RIOR
EXTE
RIOR
DLO
+ 5
/16"
DLO
+ 1
"
5 /32
"5 /
32"
5 /32
"
1 5
/32"
1 5
/32"
7/8" 7/8" 15/32" 15/32"
1 2
7 /32
"
Open Back Vertical and Filler
X
X
X
X
Z
Z
X
X
X
X
Z
Z
Open Back Mulllion
Snap-In Filler
P1139 Drill Guide
Use short drop-off piece of Open Back Mullion to facilitate drilling Snap-In Filler.
Guide holes are markedwith ‘X’ and ‘Z’ for required hole patterns.
Lightly tighten bolt to hold drill guide in place while drilling.
P1139 Drill Guide
Fig. 25.1
Fig. 25.2
Step 4: Fabricate Verticals & Closure Pockets for Horizontals
A. Drillframeassemblyholesinverticals,jambs&closurepocketswithdrillfixtureP1139. SEE Fig. 25.1&Fig. 21.1.
a. Forscrewsplineassembly,useholesmarked‘X’inP1139.SEE Fig. 25.2b. Forshearblockassembly,useholesmarked‘Z’inP1139.SEE Fig. 25.2
FRAME FABRICATION
14000SeriesInstallationInstructions
Page26 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
T1400E1400
T1400E1400
EXTE
RIOR
EXTE
RIOR
EXTE
RIOR
EXTE
RIOR
Tubular Mullion
2"D
LOD
LO2"1"
2"
DLO
+ 5
/16"
DLO
+ 1
"
1 /2"
1 1
/2"
1"
1 /2"
1 1
/2"
1 /2"
7/8" 7/8" 7/8" 7/8"
1 1 /
2"
Drill with .149" bit.(Typ)
Fig. 26.1
FRAME FABRICATION
February2015 www.tubeliteinc.com Page27
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
DLO
.201" Dia. Hole
T14441E14141
7/8" 7/8"
1 5
/8"
DLO
T14240E14140
T14143E14103
7/8" 7/8"
7/8" 7/8"
3 /4"
7 /16
"3 /
4"
.201" Dia. Hole
Fig. 27.1
Fig. 27.2
Step 5: Fabricate Horizontal Members for Shear Blocks
A. Forshearblockassembly,drill.201”diaholesinthehead, horizontalandsillmembersasshowninFig. 27.1&Fig. 27.2
FRAME FABRICATION
14000SeriesInstallationInstructions
Page28 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Fig. 28.1
Fig. 28.2
P1134 (Un-modified)Used at non-thermal open back horizontal & sill members.
P1134 (Modification type #2)Used at tubular horizontal and sill members.
P1134 (Modification type #1)Used at thermal open back horizontal & sill and at 4½" x 4½" sidelite base.
ModificationBreak point'V' grooves
Type#1 & #2
Type#2
Type#1E14140
T14240
T14143
P1133 (Un-modified)Used at non-thermal open back head members.
P1133 (Modified)Used at thermal open back head members
Remove one tab for head members designed to receive thermal break.
T14441
E14141
Step 6: Fabricate Shear Blocks (As Required)
A. Forshearblockassembly,P1134shearblockmust bemodified.B. SEE Fig. 28.1&Fig. 28.2forinstructionson modifyingforthevarioushorizontalsections.
FRAME FABRICATION
February2015 www.tubeliteinc.com Page29
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
12" O
.C.
3"
P-1437
C L
3"
Equal front and back
Insulator tape or shim
Use thermal insulator tape or shim (Not by Tubelite) to isolate the steel reinforcement from the vertical members.
NOTE: E14445 & T14445 mustbe used when applying P1437steel reinforcement.
NOTE:Use of #10 screw at spacing shown as a general guide. Refer to approved shop drawings or enginerer's calculations for specific application.
Drill .201 dia clear hole for #10 screw
S206#10-24 X ½" type F
Match drill .154 dia(drill #23) pilot holesin mullion
Step 7: Steel Stiffener (As Required)
A. IfP1437steelstiffenersarerequired(referto approvedshopdrawings),cut4”shorterthanthe verticalmullionlength.Paintendstoprevent rust. B. Usethermalinsulatortapeorshim(notbyTubelite) toisolatethesteelreinforcementfromthevertical members(thermalapplicationsonly). C. Drillandcountersinkclearholeinverticalandtap holeinP1437steelstiffenerforattachmentscrew. Sizeandspacingofscrewperapprovedshop drawings.
FRAME FABRICATION
Fig. 29.1
14000SeriesInstallationInstructions
Page30 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Cap seal screw heads after secured in place.
T14259E14059
T14055E14055
P1153 End Dam(Typ) Fig. 30.1
Step 8: Install Sill Flashing End Dams
A. InstallP1153enddamateachendofsillflashingwith(2)S196#8x⅜”PHscrews. Setasideandallowsealanttocure.
NOTE: Ifsillflashingisspliced,installenddamsonjamb-endonly.RefertoStep 13, page 39forsplicing instructions.
FRAME ASSEMBLY
February2015 www.tubeliteinc.com Page31
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
FRAME ASSEMBLY
Cut
leng
th fo
rP
4563
fille
r
P4563
T14441
Apply sealant to interior and exterior snap legs of T14248filler prior to snapping into place.
T14248
T14240
T14441
Step 9: Optional High Sidelite Bases
Priortoassemblingframes,followthesestepsifusinghighsidelitebasemembers.
A. Pre-attachP4563pocketfillerintothepocketoftheverticalmullionandclosurepocketmembers. Cutlengthofthefillercanbedeterminedbymeasuringfromthebottomoftheverticalmullion/closure pockettotheundersideofthewaterdiverteratthehighsidelitebase.SEE Fig. 31.1B. Attachsnap-inadaptorT14248totheT14441horizontal(lowermemberofthesidelitebase). SEE Fig. 31.2C. Sealjointsbetweentheadaptorandhorizontal.D. Attachsnap-inadaptorT14248totheT14240openbacksill(uppermemberofthesidelitebase). SEE Fig. 31.2.
Fig. 31.1
Fig. 31.2
14000SeriesInstallationInstructions
Page32 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Apply sealant to each end of sidelite base members.
Exterior application shown,Interior application similar.
NOTE:Refer to Step 14, page 37 for typical seals required at sill flashing.
Foam tape
Sealant
Sealant
Step 9: Optional High Sidelite Bases(Continued)
E. Sealendsoftheupperandlowermemberswhereitwillcontacttheverticalmullionandclosurepocket. SEE Fig. 32.1&Fig. 32.2.F. Beforeattachingtheupperandlowermemberstothevertical,determinetheheightofthesnapcoverto beused. Attachtheloweranduppermembersofthesidelitebasetotheverticalandclosurepocket.G. Optional:Placeone-sidedclosedcelladhesivetapealongtheedgesoftheverticalwherethesidelite basecoverswillbeinstalled.Placeabeadofsealantontothetape.SEE Fig. 32.3.H. Placeabeadofsealantintothereceptorareasofthesnap-inadaptor.SEE Fig. 32.3.
Fig. 32.1 Fig. 32.2
Fig. 32.3
Apply sealant to each end of sidelite base members.
CLIP ASSEMBLYSPLINE ASSEMBLY
February2015 www.tubeliteinc.com Page33
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Install snap cover or break metal
Install and seal this cover before applying exterior cover.
Step 9: Optional High Sidelite Bases(Continued)
I. Attachasnapcoverorbrakemetaltotheinsidesurfaceofthesidelitebase.SEE Fig. 33.1.J. Fromtheexterior,sealjointsbetweenthesnapcoverandverticalmembers.SEE Fig. 33.2.
K. Attachasnapcoverorbrakemetaltotheexterior.SEE Fig. 33.1.
Tool excess sealant
Refer to Step 17, page 41 for water diverter installation
From interior,seal joint betweencovers and vertical
Snap cover or break metal
Fig. 33.1
Fig. 33.2
14000SeriesInstallationInstructions
Page34 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Apply sealant to each end of all horizontal members
Refer to approved shop drawings for head filler locations and use.
Assemble with S202 screws
Fig. 34.1
Step 10: Assemble Frames
ScrewSplineAssemblyA. Cleanallmatingsurfacesonhorizontal&vertical.B. Applysealanttoendsofthehead,horizontalandsillmemberspriortoattachingtothe verticalmembers.SEE Fig. 34.1.C. Attachhead,horizontalandsillmemberstotheverticalandclosurepocketmemberswith S202#10-24x1”HHframeassemblyscrew.D. Toolsealantateachjoint.
FRAME ASSEMBLY
February2015 www.tubeliteinc.com Page35
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
S009 (2)
P1133(Modified)
P1134(Modified)
P1134(Modified)
S009 (3)
S009 (3)
Apply sealant to each end of all horizontal members
Refer to approved shop drawings for head filler locations and use.
Fig. 35.1
Fig. 35.2
Step 10: Assemble Frames(Continued)
ShearBlockAssembly
A. InstallshearblocksontoverticalandclosurepocketmemberswithS009#10x13/4”PHscrewasshown inFig. 35.1.B. Cleanallmatingsurfacesonhorizontal,verticalandshearblock.C. Applysealanttoendsofthehead,horizontalandsillmembersandtoperimeterofshearblockspriorto attachingthehorizontalmemberstotheverticalmembers.SeeFig. 35.2.D. Installhead,horizontalandsillmembersovertheshearblocks.E. Matchdrilltapholeinheadshearblockwithdrill#14(.182dia)for#12screw.F. Matchdrilltapholeinhorizontalandsillshearblockswithdrill#23(.154dia)for#10screw.
FRAME FABRICATION
14000SeriesInstallationInstructions
Page36 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Attach head member to clips using S149 Screw at each end.
Attach horizontal and sill member to clips using S191 Screws at each end.
NOTE:Cap Seal all screw heads.
Fig. 36.1
Step 10: Assemble Frames(Continued)
ShearBlockAssembly(Continued)
G. Secureheadmembertoshearblockwith(1)S149#12x3/4”FHscrew.Securehorizontalandsill memberswith(2)S191#10x1/2”trussheadscrew.SeeFig. 36.1. H. Capsealheadsofscrewsathorizontalandsillmembers.
FRAME ASSEMBLY
Seepage28forshearblockpartnumberreference.
February2015 www.tubeliteinc.com Page37
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Fig. 37.1
Fig. 37.2
Step 11: Install Gaskets
A. Installglazinggasketononesideoftheframing member,dependingupondirectionofglazing. a. Forinsideglazing,installgasketsonexterior sideofframingfirst. b. Foroutsideglazing,installgasketsoninterior sideofframingfirst. DONOTSTRETCHGASKETSWHENINSTALLING. StartatthecenterofD.L.O.andworktowardstheends.
NOTE: Allowance=1/8”extralengthperfootofD.L.O.
FRAME FABRICATION
INSIDE GLAZEOUTSIDE GLAZE
1"
1"
Add sealant to ends of horizontal gaskets to seal intersection with vertical gaskets at interior and exterior gaskets.
Apply sealant to corners as shown. This seal is typical at all corners at interior and exterior gaskets.
14000SeriesInstallationInstructions
Page38 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Shim at high point of substrate first. Shim remainder of length as required to level.
NOTE:All shims are to be positioned under each fastener location.
Shim between end dams and structure
1/4" Minimum
Weep Hole
NOTE: 1/4" Shim space at sill flashing is preferred, but building opening may not allow.
Flashing must be level
End Dam
Anchor Screwper approved shop drawings
Slotted Hole
Slotted Hole
Fixed Holes
See Fig. 24.3
See Fig. 24.3
See Fig. 24.3
Fig. 38.1
Step 12: Install Sill Flashing (Ifrequired)
A. Centerthesillflashingintheopening.Ifsillflashingisspliced,besurethejointatthejambisper approvedshopdrawings(jambcaulkjointminus1/8”).If there is an entrance door in the opening, leave a gap in the sill flashing for the door frame to be installed and refer to Step 15, page 43 for sealing instructions.Splicejointtobe3/8”minimum.B. Atthehighestpointofthesill(smallestroughopeningheight),shimthesillflashingwithaminimum1/4” shimspace.Sillflashingmustbeinstalledlevelsidetosideandfronttoback.C. Shimtightbetweenthesillflashingenddamandbuildingconditiontoensureenddamisnotdislodged duringframeinstallation.Removeshimafterframesaresetinplace.D. Anchorsillflashingtobuildingsubstrateperapprovedshopdrawings.Capsealanchorsafterinstallation. Wherethesillflashingabutsadoorjamb,thesillflashinganchormustbelocatedwithin6”ofthedoor jamb.
FRAME INSTALLATION
February2015 www.tubeliteinc.com Page39
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Step 13: Sill Flashing Splice
StandardAluminumSplice-Fig. 39.1A. ContinueinstallingsillflashingperStep12acrosstheopening.B. SetP1144splicesleeveinabedofsealantunderthesillflashingatthesplicelocationas showninFig. 39.1.C. Maintain3/8”minimumsplicejointgapatthesillflashingpriortoanchoring.D. Applysealantatthesillflashingsplicejoint.E. Donotlocateasplicedirectlybelowaverticalmullion.CenterlineofD.L.O.ispreferred.
FRAME INSTALLATION
Inject sealant into splice joint to completely fill gap, all voids and contours.
NOTE:It may be necessary use backer rod to plug larger voids prior to sealant application.
Tool sealant at front gap
Tool sealant
1/4" Minimum
P1144 Splice
Weep Hole
NOTE: 1/4" Shim space at sill flashing is preferred, but building opening may not allow.
Shim under splice to allow sealant to cure
Apply bed of sealant to contact areas
Slide splice under flashing and press upward. Hold splice in place with temporary shim
P1144 Splice
Fig. 39.1
14000SeriesInstallationInstructions
Page40 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Fig. 40.1
Step 13: Sill Flashing Splice (Continued)
OptionalSiliconeSplice-Fig. 40.1A. ContinueinstallingsillflashingperStep12acrosstheopening.B. LayP3444siliconesheetintosillflashingatsplicelocation(centerofD.L.O.)andcuttolength.C. Installbackerrodunderthesillflashingatthesplicejoint.D. Cleansurfaceswheresplicewillbeapplied.ApplysealantasshowninFig. 40.1.
E. Setsiliconesplicesleeveinplaceandtoolsealant.Sealfrontandbackjoints. F. Donotlocateasplicedirectlybelowaverticalmullion.CenterlineofD.L.O.ispreferred.
Tool sealantApply silicone sealant into joint at interior leg
Tool sealant at front gap
Press splice into silicone sealant conforming to flashing shape
NOTE:Consult sealant manufacturer for compatability of sealant with silicone splice.
Allowing for contours cut splice material to length
February2015 www.tubeliteinc.com Page41
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Step 14: Install Frames
A. Startingononesideoftheopening,applyabeadofsiliconetothebacklegofthesillflashingandthe enddampriortoinstallingeachframe.Applyasealantbeadonthebacklegoftheflashingonlyforthe frametobeinstalled.B. Liftthefirstframeontothesillflashing,snugagainsttheenddam.
Seal along back leg
T14259
Seal end dam
NOTE:6" long filler is requiredat bottom of jamb for seal between jamb and flashing end dam.
Sealant length = Frame panel width
Fig. 41.1
FRAME INSTALLATION
C. Lifteachframeontothesillflashingandengagewiththepreviousframe.D. Checktoensureframeisplumb,levelandjambcaulkjointisperapprovedshopdrawings.E. Shimheadandjambatanchorpointsandattachtothebuildingstructure.Size,quantityandlocationof anchorsareperapprovedshopdrawings.Removeshimsbetweensillflashingenddamsandsecure beforeproceeding.
F. Whentheframeisanchoredtothestructure,applytheexteriorperimetersealatthehead,sillandjambs. Interiorperimetersealmustbeappliedtothehead,sillandjambs.
14000SeriesInstallationInstructions
Page42 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Step 14: Install Frames (Continued)
FrameinstallationwhenusingtheoptionalT14055sillflashing.
G. InstallfameunitsasdirectedinstepsAandBonpage40.H. Pushframetighttoverticalfinofsillflashingandmatchdrillthrough sillanchorholesintosillflashing.SeeFig. 42.1.Sillanchornotby Tubeliteandistobesizedaccordingtoprojectloadingrequirements.I. Shimbetweensillandflashingcenteredonanchor.SeeFig. 42.2.J. Injectsealantintoanchorholetocoverholeinflashing.SeeFig. 42.2.K. Applysealanttothreadsoffastenerandsecureframetosillflashing.SeeFig. 42.3.L. Capsealallfastenerheads.SeeFig. 42.4.
FRAME INSTALLATION
Inject sealant through anchor hole in sill to cover hole in sill flashing below.
Insert 1/8" shim between sill and sill flashing centered on fastener
Cover threads of fastener with sealant and tighten in place.
Cap seal over fastener head
Match drill through anchor hole into sill flashing. Drill bit diameter to be determined by fastener type.
Frame should be tight against vertical leg of flashing when drilling.
T14055
Fig. 42.1
Fig. 42.3
Fig. 42.2
Fig. 42.4
February2015 www.tubeliteinc.com Page43
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Step 15: Sealing Sill Flashing at Door Jamb
A. Installdoorframeintotheopeningwheresillflashingisdiscontinued.B. Sealthebottomofthedoorjambmulliontothebuildingsubstrateandtothesillflashing.C. Fillthedoorjambcavitycompletelyandmarrytothesillflashing.
FOOTPRINT of
DOORFRAME
and
THRESHOLDApply sealant to area to receive door frame
6" Max.(Typical)
Cap seal fastener heads
Seal exposed holes at threshold ends.
Apply sealant into voids at bottom of door jamb and at intersection joints between subsill and jamb.
Seal end of sill flashingat intersection of door frame
Fig. 43.1
6" Max.(Typical)
Insert backer rod and apply sealant into glazing pocket of mullion and at intersection. Seal joints between subsill and vertical.
Knee wall at frames or door frames with unequal sill heights.
Fig. 43.2
NOTE: Whena“KneeWall”occurswithinanelevation,thesillflashingmustbesealedtointersectingverticalmemberasshowninFig. 43.2.
FRAME INSTALLATION
14000SeriesInstallationInstructions
Page44 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
GLAZING
Step 16: Glazing Preparation
A. Removeanydebrisfromtheglazingpockets. B. Trimexcesssiliconefromedgesofglazingunitstoallowformaximumglazingclearance.
Fig. 44.1
GlazingpocketsaredesignedtoacceptIGU’suptoandincluding1-1/8”thick.RefertoouronlineSystem GlazingChartforafulllistofglazingsizeoptionsforthissystem: http://www.tubeliteinc.com/wp-content/uploads/2014/05/Tubelite_Glazing_Chart.pdf
2"2"
2"D
.L.O
.D
.L.O
.
D.L
.O.+
¾"
D.L
.O.+
¾"
2" 2"D.L.O. D.L.O.
D.L.O.+ ¾"
GLASS LITE SIZES
February2015 www.tubeliteinc.com Page45
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
GLAZING
Step 17: Installing the Glazing Units
NOTE:Glazingmustbedonefrombottomofframeup.
A. Sealthecornersofthepreviouslyinstalled gaskets(refertoStep11,page37.).B. Settheglassbyinstallingintothedeeppocket oftheverticalfirst,thencarefullyslidingintothe shallowpocket.Setglassonto(2)settingblocks locatedatquarterpointsorperapproved shopdrawings.Consultglassmanufacturerif glasssizeexceeds40sq.ft.C. Inapplicationswhereseismicactivityis anticipated,installP1916anti-walkblocksinto thedeeppocketsideoftheverticalperglazing manufacturerrecommendations.D. Installremaininggasketsontheverticalsides oftheglass,holdingbackatthebottomtoallow forglassstopinstallation.E. Installglassstopatthebottomofthelite.F. Pumpsealantintoglazingreglet1”awayfrom eachcornerandthehorizontal-to-verticaljoint fromthewaterdiverteruptotheglazingreglet.G. Finishinstallinggasketsattopandbottomof D.L.O.H. Repeatsteps17A-Gfortheremainingrowof lites.
I. Priortoglazingthenextrowoflites,installwater diverterP1135atendsofintermediate horizontals.SeeFig. 45.1.
NOTE: Position water diverter to cover glass corner. Sealdivertertohorizontal,leavingthegapat thefrontandsideopenintheverticalglazing pocket.SeeFig. 45.1 & 45.2. (Alsoseeisometricdetailsonpage45)
FRONT VIEW
END VIEW(Partial)
Glass unit
Prior to glazing upper lites, inject sealant into exterior vertical gasket reglets at horizontal intersection. Sealant must merge with top of lower gasket of glazed openings and up to top of horizontal glass pocket. Water diverter
must overhang corner of glass.
TOP VIEW
Leave indentations behind gasket reglets of optional T14442 pocket filler open for drainage.
Seal around edges of water diverter.
NOTE: T14445 is the standard pocket filler. (Optional T14442 shown)
Fig. 45.1
Fig. 45.2
14000SeriesInstallationInstructions
Page46 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
GLAZING
Step 17: Installing the Glazing Units (continued)
Seal around edgesof water diverter. Leave forward pocketportion open fordrainage.
NOTE:Lower openings should be glazed prior to installing water diverters in upper openings.
Fig. 46.3
Fig. 46.2Water diverters and lower lite glazing not shown for detail clarity.
Apply sealant in verticalinterior and exterior gasket reglets
1"
1"
Fig. 46.1
These seals are CRITICAL and must prevent water from draining into gasket reglets and into agaskets of lower glass units.
P1135 Water diverterSet in full bed of sealant
February2015 www.tubeliteinc.com Page47
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Step 1: Corner Sill Flashing Fabrication
A. MiterendsofsillflashingasshowninFigs. 47.1,47.2,47.3&47.4.(Onelefthandandonerighthand.)B. Drillanchorholesasshow.
* Reference approved shop drawings.
*
3"
45º
3"18"
Anchor holes
* Reference approved shop drawings.
3"45º
3"18"
*
Anchor holes
* Reference approved shop drawings.
3"3"
*
67.5ºAnchor holes
18"
* Reference approved shop drawings.
3"
*
Anchor holes
18"
67.5º
90º OUTSIDE CORNER
90º INSIDE CORNER
135º OUTSIDE CORNER
135º INSIDE CORNER
3"
Fig. 47.1 Fig. 47.2
Fig. 47.3 Fig. 47.4
CORNER CONDITIONS
14000SeriesInstallationInstructions
Page48 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
18"
7"
3"C L of Splice
18"
7"
3"
C L of spliceSeal over miter joint at corners.
T14259 (Shown)Corners using T14055 (Similar)Installation of Head Channel is similar.
Anchor sill flashing as shown and cap seal all fastener heads.
Seal splice joints as shown in Fig. 39.1.
Seal miter joint with silicon
Seal fastener heads1½"
Fig. 48.2
Fig. 48.1
Step 2: Corner Sill Flashing Installation
A. Installflashingcornermembersinplace.B. Applysealantfulllengthofmiteredjoint.SeeFig. 48.2.C. Splicecornerflashingtosillflashingusingproceduresshownonpage39andFig. 39.1.
CORNER CONDITIONS
February2015 www.tubeliteinc.com Page49
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Step 3: Assemble Frames
A. Assemblecornerbayframesasaunitandsetontothesillflashing.SeeFigs. 49.2. Note: For 135 degree corners, deep pocket closures must be used (E14022 or T14022). B. Completetheinstallationperstandardinstructionswithinthismanual.
Assemble and install corner unit in one piece(90° corner shown 135° corner is similar)
Sill Flashing
Splice joints
Fig. 49.2
CORNER CONDITIONS
14000SeriesInstallationInstructions
Page50 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
CORNER CONDITIONS
ROTATIONAL MULLIONS
Step 1: Sill Flashing Fabrication & Installation
A. Determinecutlengthofthesillflashingatthesplayedcondition.SeeFig. 50.1.Thesillflashingis miteredandbutttightatthecorner. B. InstallflashingperinstructionsinStep12,page38.Anchorthesillflashingtothebuildingsubstrateeach sideofthecorner.Sealheadsoffasteners. C. Sealentiremiterjointatsillflashing,toolingthesealantoverthejoint.SeeFig. 46.2.
NOTE:Ifrotationalmullionisutilizedatonlyonecorneronaframeinlieuofasplayedframewithmanysegments,Tubeliterecommendssplicingthesillflashingoneithersideofthecorneraspertypicalcornerconditions.
Corner Angle
A (Miter Angle)
W.P.
A
BC a
a
b
b c
A = ½ Corner AngleB = 90º - AC = 90ºa = b x tan Ab = 2.528" (Center of Mullion)c = b / cos A (Not required)
1.590"
D.L.O. 1.590" + a
Fig. 50.1
Fig. 50.2
Sill Flashing
SegmentedFlashings
Splice joint
Splice joint
February2015 www.tubeliteinc.com Page51
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
CORNER CONDITIONS
ROTATIONAL MULLIONS
Step 2: Assemble Frames
A. Installinnerrotationalmullion(E14247orT14247)ontothesillflashing. B. Assembleframesoneachsideofthesplayedcondition.Makesurethewipergaskets(P1221)are installedintotheouterrotationalmullions. C. Setframesintothesillflashingandagainsttheinnerrotationalmullionuntiltheylockintoplace. D. Onceframeunitsareinstalledandinposition,drillandcountersinkfor#10F.H.screw6”fromend and24”oncenter.SeeFig. 51.1. E. Completetheinstallationperstandardinstructionswithinthismanual.
Fig. 51.1
Seal miter joint#10 x 1" FH SMS6" from each end and 24" O.C.
14000SeriesInstallationInstructions
Page52 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
OPTIONAL NARROW SIDELITE BASE
Finish Floor
1/4" dia.Weep holes(2) per DLO
Top of Clip
4 3 /
16"
7 /16
"5
1 /4"
5 11
/16"
Apply a full length bead of sealant to interior snap receiver edge prior to snapping in glazing insert.
Pre-Attach P1137 clip to vertical using (2) #10 screws.
Attach E14026 sill to clip using (2) #10 FH UC screws at each end. Cap seal fastener heads.
Set E14027 in full bed of sealant. Attach E14027 to structure and seal fastener heads. Rederence approved shop drawing for fastener type and spacing.
Apply sealant up interior vertical leg of glazing insert where it intersectsmullion or door jamb.
P1137
Seal joint at intersection
Seal around bottom of vertical
E14027Set in bed of sealant
P4563
P4563
Seal pocket Slope sealant to facilitate water drainage
Backer rod
Step 1: Assemble Frames
A. InstallP4563snap-infilleratbottomofvertical B. InstallbackerrodinverticalpocketattopofP4563. Sealovertoavoidwaterpenetrationintovertical. C. DrillforandattachP1137clipasshown. D. Fabricate(2)1/4”diameterweepholesinE14027. E. FabricateanchorholesinE14027asdescribedinapprovedshopdrawings. F. InstallE14027Sidelitebaseanchorshoeintofullbedofsealantandsealends. G. SlideE14026sidelitebaseoveranchorshoeandclip. H. Fastentoclipswith(2)#10FHUCscrewsateachend. I. Applyacontinuousbeadofsealantatinteriorsnapreceiver. J. Snap-ininteriorstop. K. Installsettingblocks,interiorgasketsandglaze. L. Installgasketinexteriorglassstopandsnapinplace.
Fig. 52.3
Fig. 52.2
Fig. 52.1
February2015 www.tubeliteinc.com Page53
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
INSIDE GLAZE
INSIDE GLAZING GUIDELINES
Forinsideglazingapplications,refertoFig. 53.1forscrewsplineassemblyandFig. 47.1forshearblockassembly.Followstandardinstructionsforfabrication,assemblyandglazingofinsideglazedapplications.
Apply sealant to each end of all horizontal members
Assemble with S202 screws
Fig. 53.1
14000SeriesInstallationInstructions
Page54 www.tubeliteinc.com February2015
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
Apply sealant to each end of all horizontal members
Shear Blocks
Fig. 54.1
INSIDE GLAZE
Seepage28forshearblockpartnumberreference.
February2015 www.tubeliteinc.com Page55
14000SeriesInstallationInstructions
LEADERS IN ECO-EFFICIENT STOREFRONTCURTAIN WALL AND ENTRANCE SYSTEMS
OPTIONAL THERMAL ENHANCEMENT
OPTIONAL THERMAL ENHANCEMENT
TheT14000systemcanbemodifiedforenhancedCRFandU-valueperformancebyusingtheoptionalA244040andA245050fillerasshowninthedetailsbelow.RefertoourwebsiteforthemostcurrenttestreportsandCADdetails.
T14143E14104 E14104
T14047
E14005
A244040A244040
MULLION MULLION
HORIZONTAL HORIZONTAL
45º CORNER
A244040
A244040
A245050
T14261T14441
T14445
A244040
A245050
T14022
T14442
(Standard)
(Alternate)
(Alternate)
(Standard)
(Standard)
Fig. 55.1
Fig. 55.1THERMALFILLEROPTIONS
ALTERNATEASSEMBLIES