Installation Guide 10GX IDC X-Conn. Multiple Frames Installation PX105226-EN Release B Page 1/10 This Installation Guide is available in the “Document Center” of the Belden Networking website - www.belden.com A) General Components Standard components 1- BHHR194 - Two Post Self Supporting Rack 2- AX104225 - Front-to-Back Trough Kit 42" 3- BHVH006 - 6" Vertical Manager 4- BHVH012 - 12" Vertical Manager Optionnal components 5- AX104225-S Front-to-Back Trough Kit 38" 6- AX104226 - Overhead Kit Related Documents: - IS-8_BELDEN_V1: Belden Cable Manager Installation Instructions - PX104781 10GX IDC Patch Panel - PX105081 10GX IDC Connecting Block Termination Procedure - PX105224 10GX IDC X-Conn. Front-to-Back Cross-Conn. Cable Management Trough Kit - PX105225 10GX IDC X-Conn. Horizontal Cross-Conn. Cable Management Tray Kit - TELIS00-2BEL Two Post Self-Supporting Equipment Rack Assembly Instruction 2 or 5 1 1 3 4 6

Installation Guide - Belden

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Installation Guide - Belden

Installation Guide10GX IDC X-Conn. Multiple Frames Installation

PX105226-EN Release B Page 1/10

This Installation Guide is available in the “Document Center” of the Belden Networking website - www.belden.com

A) General

Components

Standard components

1- BHHR194 - Two Post Self Supporting Rack2- AX104225 - Front-to-Back Trough Kit 42"3- BHVH006 - 6" Vertical Manager4- BHVH012 - 12" Vertical Manager

Optionnal components

5- AX104225-S Front-to-Back Trough Kit 38"6- AX104226 - Overhead Kit

Related Documents:- IS-8_BELDEN_V1:

Belden Cable Manager Installation Instructions- PX104781

10GX IDC Patch Panel- PX105081

10GX IDC Connecting Block TerminationProcedure

- PX10522410GX IDC X-Conn. Front-to-Back Cross-Conn.Cable Management Trough Kit

- PX10522510GX IDC X-Conn. Horizontal Cross-Conn.Cable Management Tray Kit

- TELIS00-2BELTwo Post Self-Supporting Equipment RackAssembly Instruction

2 or 5

1

1

3

4

6

Page 2: Installation Guide - Belden

Page 2/10

B) Floor Layout

10GX IDC X-Conn. Multiple Frames Installation PX105226-EN Release B

This Installation Guide is available in the “Document Center” of the Belden Networking website - www.belden.com

C) Installation

Step 1:- Install first rack with a co-worker (referto PX105224 for 10GX IDC X-Conn. Front-to-Back Cross-conn. Cable Management TroughKit)

Page 3: Installation Guide - Belden

Page 3/1010GX IDC X-Conn. Multiple Frames Installation PX105226-EN Release B

Step 2:- Install end 6" vertical manager- Refer to IS-8_BELDEN_V1: BeldenCable Manager Installation Instructions

6" verticalmanager

This Installation Guide is available in the “Document Center” of the Belden Networking website - www.belden.com

Step 3:- Install center 12" vertical manager- Refer to IS-8_BELDEN_V1: BeldenCable Manager Installation Instructions

12" verticalmanager

Page 4: Installation Guide - Belden

Page 4/1010GX IDC X-Conn. Multiple Frames Installation PX105226-EN Release B

Step 4:- Install as many frames (Step-1) and 12"vertical manager (Step-3) with a co-worker- Refer to IS-8_BELDEN_V1: Belden CableManager Installation Instructions andPX105224 10GX IDC X-Conn. Front-to-Back Cross-Conn. Cable ManagementTrough Kit

This Installation Guide is available in the “Document Center” of the Belden Networking website - www.belden.com

6" verticalmanager

Step 5:- Install end 6" vertical manager- Refer to IS-8_BELDEN_V1: BeldenCable Manager Installation Instructions

Page 5: Installation Guide - Belden

Page 5/1010GX IDC X-Conn. Multiple Frames Installation PX105226-EN Release B

Step 6:- Install optional 10GX IDC X-Conn. HorizontalCross-Conn. Cable Management Tray Kit (AX104226)- Refer to PX105225 10GX IDC X-Conn. HorizontalCross-Conn. Cable Management Tray Kit InstallationInstructions

This Installation Guide is available in the “Document Center” of the Belden Networking website - www.belden.com

Page 6: Installation Guide - Belden

Page 6/1010GX IDC X-Conn. Multiple Frames Installation PX105226-EN Release B

This Installation Guide is available in the “Document Center” of the Belden Networking website - www.belden.com

Bundle 1

D) Cabel management

Step 1:- Dress each cable bundle (96 cable/bundel) and tie them at each trough

Bundle 7

Bundle 5

Bundle 6

Bundle 1

Bundle 7

Bundle 2

Bundle 3

Bundle 4

Bundle 5

Bundle 6

OVERHEAD KIT

Overhead kit is reserved to managecross-connect cables only.

CABLE LENGTH

Bundels shown at tie point.

Make sure to keep required slack toterminate connections

Page 7: Installation Guide - Belden

Page 7/1010GX IDC X-Conn. Multiple Frames Installation PX105226-EN Release B

This Installation Guide is available in the “Document Center” of the Belden Networking website - www.belden.com

E) Cross-ConnectManagement

BackVertical

manager

Option 1:Same rack, same half- Rout cross-connect cable from frontto back across trough

- Change level in hatched area ifrequired

CL CL

FrontCross-connect cable

Verticalmanager

Front

Back

Cross-connect cable

Change levelin this area

Page 8: Installation Guide - Belden

Page 8/1010GX IDC X-Conn. Multiple Frames Installation PX105226-EN Release B

This Installation Guide is available in the “Document Center” of the Belden Networking website - www.belden.com

BackVertical

manager

Option 2:Next rack, adjacent half- Rout cross-connect cable from frontto back across trough

- Change level in hatched area ifrequired

CL CL

FrontCross-connect cable

Verticalmanager

Front

Back

Cross-connect cable

Change levelin this area

Page 9: Installation Guide - Belden

Page 9/1010GX IDC X-Conn. Multiple Frames Installation PX105226-EN Release B

This Installation Guide is available in the “Document Center” of the Belden Networking website - www.belden.com

BackVertical

manager

Option 3:Same rack, next half- Rout cross-connect cable from frontto back across trough

- Rout through overhead kit to reachnext half

- Change level in hatched area

CL CL

FrontCross-connect cable

Verticalmanager

Front

Back

Cross-connect cable

Cable ManagementTray Kit

Change levelin this area

Page 10: Installation Guide - Belden

Page 10/10

For additional information, call 1-800-belden1

Copyright 2008, Belden Inc.

10GX IDC X-Conn. Multiple Frames Installation PX105226-EN Release B

BackVertical

manager

Option 4:Any next rack, any next half- Rout cross-connect cable from front to backacross trough

- Rout through overhead kit to reach next half

- Change level in hatched area

CL CL

FrontCross-connect cable

Front

Back

Cable ManagementTray Kit

Cross-connect cable

Verticalmanager

Change levelin this area