INSTALLATION GUIDE 1 Pas ol i n k V 4 T r ai n i n g Cou r s e . I NSTALL ATI ONS GUI DE  CH APTER 03  

Installation Guide

Embed Size (px)

DESCRIPTION

Filename: Installation Guide.ppt

Citation preview

  • Pasolink V4 Training Course.INSTALLATIONS GUIDECHAPTER 03

    INSTALLATION GUIDE

  • PreparationsBefore going to any site, please be sure you completely prepared the following items:

    The installation tools.

    The test equipment ,materials ,and tools.( for test work only)

    Site installation drawings.

    All labels/stickers (hard and soft copy)

    Frequency plan and system configuration documents.

    Test procedure and test data sheets .( for test work only)

    Confirm access to site/station.

    Check the condition of the vehicle to be used.

    Make sure you and your staff are in good conditions (physically)

    Confirm the site/station entrance conditions.

    Move to site/station safely.

    INSTALLATION GUIDE

  • Indoor Installations Flow Chart

    IF CableConnectionIDU Grounding ConnectionConnect the Power Follow Start up and set up ProcedureFollow The termination ProcedureIDU Mounting19" rack fixingUnpacking of 19" rack (if supplied)IF Connector & Power Connector terminationUnpacking of AccessoriesUnpacking of IDURefer to the IDU fixing Procedure PhotosConfirm 19" Rack Location & DC-Power Source

    INSTALLATION GUIDE

  • 2-1UNPACKING IDU / ODUOpen the cartonTake out the cushioning materialsTake out the IDU with the antistatic bag from the cartonTake out the IDU from the antistatic bagOpen the cartonTake out the ODU with the cushioning materialsRemove the cushioning material from the ODUInspect ODUInspect IDU

    INSTALLATION GUIDE

  • 2-3IDU MOUNTFRONT POSITIONCENTER POSITIONFix each side of the IDU to the rack with (M5) screwsAlign the IDU to the mount positionWhen mounting the IDU in a 19 inch rack, leave a space of 200mm to the rear section and space of one rack unit to the top and bottom.WALLMount the two brackets to the IDU with four screwsAlign the IDU to the center mount position and fix each side with (M5) screws

    INSTALLATION GUIDE

  • Outdoor Installations Flow Chart

    IF Cable ConnectionODU Grounding ConnectionIF Cable Laying Connect to IDU & Follow Start up and set up ProcedureFollow The termination ProcedureODUMountingUnpacking of AntennaIF ConnectorUnpacking of AccessoriesUnpacking of ODURefer to the IDU fixing Procedure PhotosRemove the ODU cover, Confirm the PolarityAntenna bracket assembling,Confirm the PolarityRefer to the Antenna assembling guide

    INSTALLATION GUIDE

  • 3-1(1+1) V /H POLARIZATION SETTINGS (1/2)PROCEDURE FOR SETTING V/H POLARIZATIONANTENNAAntenna is set to V polarization when shipped from the factoryTo change to H polarization, loosen the four screws and rotate the antenna connection unit by 90 degrees. Then tighten the screws.NEC HYBRID UNITHybrid is set to V polarization when shipped from the factoryTo change to H polarization, loosen the two screws and rotate the two plates as shown and fix it back.Antenna direct mounting type ODUAntenna connection unitV-POLH-POLScrewsHYBRID

    INSTALLATION GUIDE

  • V-POLH-POLHybrid is set to V polarization when shipped from the factoryTo change to H polarization, loosen the two screws and rotate the three plates as shown and fix it back.3-1(1+1) V /H POLARIZATION SETTINGS (2/2)

    INSTALLATION GUIDE

  • 3-2ANTENNA DIRECT MOUNT V/H POLPROCEDURE FOR SETTING V/H POLARIZATIONWhen vertical polarization is required, rotate the ODU so that the plate marked with V is pointing up. Fix the ODU in this positionWhen horizontal polarization is required, rotate the ODU so that the plate marked with H is pointing up. Fix the ODU in this position

    INSTALLATION GUIDE

  • 3-3POLE MOUNTING BRACKET

    INSTALLATION GUIDE

  • 3-4WALL MOUNTING BRACKETBOLT

    INSTALLATION GUIDE

  • 3-5Antenna Direct Mount TypeMount the Hybrid to the Antenna with screws, use the guide pins to position correctlyFix the ODUs one by one to the Hybrid. Take care not to damage the o-rings.Remove the Blanking plateMount the blanking plate here for reuse

    INSTALLATION GUIDE

  • 3-67/8 GHz ODU CONNECTIONSUSING NEC HYBRIDUSING QUASAR HYBRID

    INSTALLATION GUIDE

  • 3-7Antenna connection using WGWAVEGUIDE WITH PBR [ ] FLANGE

    INSTALLATION GUIDE

  • 3-8O-RING INSTALLATION RULETwo (small and large) O-rings are attached in 18-52 GHz band Andrew/RFS direct mount antenna. Table 2 Show how to use small and Large O-Rings

    13/15 GHz band antenna does not have small O-ring (Small O-ring is not used for Andrew/RFS direct mount antenna).

    If the small O-ring is used for ODU direct mount installation, a gap may occur between ODU and antenna for RF interface. This may cause transmit or receive level down.Table 2 How to use O-Rings

    INSTALLATION GUIDE

  • FRAME GROUNDING (1/2)In mounting IDU and ODU, perform frame grounding.

    Location of frame grounding in each of the IDU and ODU is shown in Fig. 1, and Fig.2

    Fig.1 Location of Frame GroundFig.2 Location of Frame Ground

    INSTALLATION GUIDE

  • FRAME GROUNDING (2/2)Fig.2 Connection for Frame Grounding

    INSTALLATION GUIDE

  • Cable Termination This section describes the cable termination method. The necessary toolsand materials are summarized in Table 1.

    The following cables are described for reference. D-sub connector N-P connector of the L angle type N-P connector of the straight type Molex M5557-4R connector

    Note: Use ISO standardized screw (mm unit) for D-SUB connector.Table 1 Tools and Material List

    INSTALLATION GUIDE

  • 5-1Terminating Supervisory Cables with D-Sub Connector (1/4) Step 1. Strip back the cable sheath, taking care not to damage the braided Shield.Step 2. Fold back the braided shield (donot separate the strands) and trim it as shown,Step 3. Remove the insulation over a length of 4 mm from the end of the wire, CONFORMABLEWIRE SOCKET CONTACT

    AWG#20-24 : CD-PC-111AWG#24-28 : CD-PC-121Step 4. Insert the cable into the socket contact,Step 5. Cable should be fitted, so that insulation and bare wire are arranged as shown,

    INSTALLATION GUIDE

  • 5-1Terminating Supervisory Cables with D-Sub Connector (2/4) Step 6. Mount the socket contact using a hand crimping tool

    CONFORMINGWIRE SOCKET CONTACT

    AWG#20-24 : TC-CD-111AWG#24-28 : TC-CD-121Step 7. Recheck that the wire position is as shown in step 5 beforecrimping the socket contact (see illustration at left),

    INSTALLATION GUIDE

  • 5-1Terminating Supervisory Cables with D-Sub Connector (3/4) Step 8. Wind the metallic shield tape on the braided shield,Step 9. Set the cable into the plug case as shown in figure,Then, fit the cable using the cable clamper and two screws

    INSTALLATION GUIDE

  • 5-1Terminating Supervisory Cables with D-Sub Connector (4/4) Step 10. Referring to circle A, fix drain wire with screw,Step 11. Referring to circle B, insert each wire to the specified position, Insert the socket contacts into the upper and lower row positions while taking care that the socket contacts are inserted the right way round.Step 12. Fix the plug case with two screws, as shown in the figure.

    INSTALLATION GUIDE

  • 5-2Terminating Coaxial (IF Signal) with N-P Connector (L Angle Type) (1/3) Step 1. First fit the tying metal, washer and gasket on the cable,Step 2. Strip back the cable sheath, taking care not to damage the braided shield, and fit the clampStep 3. Fold back the braided shield (separating the strands of the braid) and trim it,Step 4. Insert the ferrule,

    INSTALLATION GUIDE

  • 5-2Terminating Coaxial (IF Signal) with N-P Connector (L Angle Type) (2/3) Step 5. Fit the bush,Step 6. Cut the aluminium fail and inner insulator away along the bush and remain the inner conductor,Step 7. Taper the edge of the center conductor using a file as shown in the circle,

    INSTALLATION GUIDE

  • 5-2Terminating Coaxial (IF Signal) with N-P Connector (L Angle Type) (3/3) Step 8. Mount the contact onto the center conductor and mount insulator onto the contact,Step 9. Insert the cable into the shell,Step 10. Tighten tying metal with wrench point by wrench (Tighten with torque 4 to 10 Nm).

    INSTALLATION GUIDE

  • 5-3Terminating Coaxial (IF Signal) with N-P Connector (Straight Type) (1/2) Step 1. First fit the lock nut, washer and gasket on the cable as shown,Step 2. Strip back the cable sheath, taking care not to damage the braided shield, and fit the clamp A,Step 3. Fold back the braided shield (separating the strands of the braid) and trim it,Step 4. Cut away the insulation from the center conductor and fit the clamp B. Be sure not to cut or scratch the conductor while stripping the insulation,

    INSTALLATION GUIDE

  • 5-3Terminating Coaxial (IF Signal) with N-P Connector (Straight Type) (2/2) Step 5. Cut the center conductor. Taper the end of the center conductor using a fie as shown in the circle,Step 6. Mount the center contact onto the center conductor as shown,Note: Insert the center contact into insulator (1.5mm).Step 7. Mount the insulation onto the center contact,Step 8. Insert the cable into the connector shell,Step 9. Tighten the lock nut.

    INSTALLATION GUIDE

  • 5-4Terminating Power Supply Cables with Molex Connector (1/2) Step 1. Remove 3.0 to 3.5 mm of insulation,Step 2. Set the socket contact to the following position onto a hand crimping tool,

    HAND CRIMPING OUTSIDE DIAMETER SET TOOL TYPE OF CABLE POSITION

    57026-5000 1.5 to 1.8 1 1.8 to 2.2 2 57027-5000 2.3 to 2.6 1 2.6 to 3.1 2

    INSTALLATION GUIDE

  • 5-4Terminating Power Supply Cables with Molex Connector (2/2) Step 3. Squeeze the handle of the hand crimping tool, insert cable into socket contact,Step 4. Cable should fit, so insulation and bare wire are arranged as shown,Step 5. Squeeze the handle of the hand crimping tool until ratchet is released,Step 6. Insert socket contacts into the power connector till they lock.

    INSTALLATION GUIDE

  • Water Proof Protection After cable connection, the following part should be wrapped by selfbonding tape for waterproof see following figures.

    INSTALLATION GUIDE

  • Antenna Orientation Antenna Orientation Flow Chart

    INSTALLATION GUIDE

  • IF Cable Termination1-First, Fit the Lock Nut, Washer and Gasket on the Cable as shown

    INSTALLATION GUIDE

  • 2-Strip Back the cable sheath, taking care not to damage the braided shield.Fit Clamp ANESIC CAIRO

    INSTALLATION GUIDE

  • 3-Fold back the Braided shield, Separating the strands of the braid.Cut the extra length, to fit to Clamp A

    INSTALLATION GUIDE

  • 4-Cut away the insulation from the center conductor and fit the clamp B.

    Be sure not to cut or scratch the conductor while stripping the insulationNESIC CAIRO

    INSTALLATION GUIDE

  • 5- Cut the center conductor to fit the connector center contact (~1.2cm).

    6- Mount the center contact onto the center conductor

    7- Mount the Insulation onto the center contact.Taper the end of the center conductor using a fileInsulation

    INSTALLATION GUIDE

  • 8-Insert the cable into the connector shell

    9- Tighten the Lock Nut. Insure the good tighten condition using the suitable wrench

    NESIC CAIRO

    INSTALLATION GUIDE

  • 10- Check the connector-cable continuity suing multemeter.

    11- Cover the outdoor connector with rubber tape.

    12- Cover the rubber tape with all weather vinyl tape.

    13- The connector is ready for use.NESIC CAIRO

    INSTALLATION GUIDE

  • CONNECTOR &POWER CABLEPower CableSocket Contact

    INSTALLATION GUIDE

  • 1-Remove 3.0 to 3.5 mm of Insulation

    2- Set the socket contact to the following position onto the hand crimping toolHand Crimping tool (57026-5000)Crimping Type dia. of Cable Position 57026-5000 1.5 to 1.8 1 1.8 to 2.2 257027-5000 2.3 to 2.6 1 2.6 to 3.1 2

    INSTALLATION GUIDE

  • 3- Squeeze the handle of the hand crimping tool, insert cable into socket contact

    4- Cable should fit, so insulation and bare wire are arranged as shown,

    5- Squeeze the handle of the hand crimping tool until ratchet is released.

    INSTALLATION GUIDE

  • 6- Insert socket contacts to power connector till they locked and be sure it is well fixed.

    5-Squeeze the handle of the hand crimping tool until ratchet Is released(0 V)(-48 V)NESIC CAIRO

    INSTALLATION GUIDE

  • The Connector is ready to useNESIC CAIRO

    INSTALLATION GUIDE

  • 7-2DC input Voltage value & Polarity1-Check the DC input voltage in IDU is connected correctly Check the DC input voltage in IDU is connected correctly and in the accepted range and in the accepted range Power requirement: (+/- 20 to +/- 60) Or (+/-20 to +/- 72)

    INSTALLATION GUIDE

  • POWER CABLE TERMINATION

    INSTALLATION GUIDE

  • 7-1Visual InspectionVisual Inspection purpose is to insure all installation and wiring work were done in proper way and wiring work were done in proper way:-

    1-Check the appearance and label Check the appearance and label

    2-Check the ODU &Antenna frequency based on Check the ODU &Antenna frequency based on frequency plan frequency plan

    3-Check the fixing way of rack and equipment Check the fixing way of rack and equipment

    4-Check the cable connection and power Polarity Check the cable connection and power Polarity

    INSTALLATION GUIDE

  • 7-3IDU Start UP1-Be sure the power cable and IF cable are connected in Proper way

    2- Carefully Poll out the Power On / Off toggle switch and put in ON position.

    3- To shutdown the IDU switch the toggle switch to Off To shutdown to Off Position NOTES:-

    1-Never switch it Off before at least 30 sec.2-Never connect or disconnect the IF Cable while the equipment is powered On3-Leave the equipment to warm up7-4IDU Settings and Testing ( Refer go Chapter 04 Operation Description).

    INSTALLATION GUIDE

  • 7-5Antenna Orientation (1/4)

    INSTALLATION GUIDE

  • 7-5Antenna Orientation (2/4)

    INSTALLATION GUIDE

  • 7-5Antenna Orientation (3/4)

    INSTALLATION GUIDE

  • 7-5Antenna Orientation (4/4)

    INSTALLATION GUIDE

    OPERATIONAL DESCRIPTIONRefer to the installation guide of the pasolink system in the pasolink training book page 68

    OPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTIONOPERATIONAL DESCRIPTION