    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 8 (Optional) Installing Batteries and Cables

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    68

    8 (Optional) Installing Batteries and Cables

    l  Smoking and sparks are prohibited near batteries.

    l  Switch off battery circuit breakers before installing batteries.

    l  Comply with regulations and warnings of the battery manufacturer.

    l  Use tools with insulated handles, otherwise, batteries may be burnt out and personal injurymay occur.

    l  During battery operations, wear goggles, rubber gloves, and protective clothes. Remove

    conductive articles such as watches, bracelets, and rings.

    l  If battery acid gets in the eyes, rinse with cold water for more than 15 minutes and seekmedia advice immediately. If battery acid contacts skin or clothing, wash with soap and

    water immediately.

    Do not use metal to simultaneously contact two or more battery terminals. Do not usemetal to simultaneously touch battery terminals and grounded objects (for example,

     battery compartment); otherwise, transient short circuit occurs, which produces sparks or

    explosion.

    l  During battery installation, never short-circuit or reversely connect positive and negative battery terminals. Connect the negative battery cable before the positive battery cable.

    l  Secure battery cables to a torque specified in battery documentation. Loose connections

    will result in excessive voltage drop or cause batteries to burn out when the current is

    large.

    The following describes how to install the first layer of battery. All batteries are installed in

    the same manner. Figure 8-1 shows battery installation completed.

  • 8/20/2019 Installation Guide 01 - Parte 3

    2/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 8 (Optional) Installing Batteries and Cables

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    69

    Figure 8-1 

    Battery installation completed

    8.1 (Optional) Installing Antitheft Baffle Plate Bases forthe Battery Cabinet

    Procedure

    Step 1  Remove screw caps from the position for installing antitheft baffle plate bases on the battery

    cabinet.

    Step 2  Install the antitheft baffle plate bases on the cabinet.

  • 8/20/2019 Installation Guide 01 - Parte 3

    3/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 8 (Optional) Installing Batteries and Cables

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    70

    Figure 8-2 

    Installing antitheft baffle plate bases

    ----End

    8.2 Installing Busbars

    Prerequisites

    Install busbars when there are two battery cabinets.

    Procedure

    Step 1  Take out positive and negative busbars from the fitting bag, and remove insulation covers.

    Properly store the covers and reinstall them after installing battery cables.

    Step 2 

    Remove screw caps from the position for installing battery cabinet busbars.

    Step 3  Install two negative busbars on the left panels of two battery cabinets respectively.

  • 8/20/2019 Installation Guide 01 - Parte 3

    4/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 8 (Optional) Installing Batteries and Cables

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    71

    Step 4 

    Install two positive busbars on the right panels of two battery cabinets respectively, as shownin Figure 8-3.

    Figure 8-3 

    Installing busbars

    (1) Negative busbar (2) Positive busbar

    ----End

  • 8/20/2019 Installation Guide 01 - Parte 3

    5/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 8 (Optional) Installing Batteries and Cables

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    72

    8.3 Installing Battery Strings

    Prerequisites

    Ensure that batteries are from the same manufacturer and of the same model and have a close

    voltage. New and old batteries cannot be used together.

    Procedure

    Step 1 

    Install batteries into the battery compartment in the sequence shown in Figure 8-4.

    Figure 8-4 

    Installing battery strings

    ----End

    8.4 Installing Copper Bars Between Batteries

    Procedure

    Step 1 

    Remove the insulation cover from the batteries.

    Step 2 

    Install copper bars between batteries.

    Step 3 

    Reinstall the insulation covers onto the two batteries in the middle.

  • 8/20/2019 Installation Guide 01 - Parte 3

    6/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 8 (Optional) Installing Batteries and Cables

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    73

    Figure 8-5 

    Installing copper bars between batteries

    ----End

    8.5 Installing Battery Cables (One Battery Cabinet)Prerequisites

    When installing battery cables, install the negative cable before the positive cable.

    Procedure

    Step 1 

    Lay out battery cables. Secure one end of a negative battery cable to the battery circuit breaker on the power cabinet, and the other end to the negative battery terminal.

    After you install all negative battery cables, install positive battery cables.

  • 8/20/2019 Installation Guide 01 - Parte 3

    7/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 8 (Optional) Installing Batteries and Cables

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    74

    Step 2 

    Secure one end of a positive battery cable to the RTN+busbar on the power cabinet, and the

    other end to the positive battery terminal.

    Step 3 

    Reinstall insulation covers for batteries on the left and right.

    Figure 8-6 Installing battery cables (using the TP48200A-HX09A5 as an example)

    ----End

    8.6 Installing Battery Cables (Two Battery Cabinets)

    Prerequisites

    When installing battery cables, install the negative cable before the positive cable.

  • 8/20/2019 Installation Guide 01 - Parte 3

    8/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 8 (Optional) Installing Batteries and Cables

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    75

    Procedure

    Step 1 

    Take out two negative battery cables. Connect one end of the cables to the negative busbarsfor two battery cabinets and the other end to battery circuit breakers on the battery cabinet.

    Step 2  Take out four negative battery cables. Connect one end of the cables to negative busbars on

    two battery cabinets and the other end to negative battery terminals.

    Figure 8-7 Installing negative battery cables

    After you install all negative battery cables, install positive battery cables.

  • 8/20/2019 Installation Guide 01 - Parte 3

    9/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 8 (Optional) Installing Batteries and Cables

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    76

    Step 3 

    Take out two positive battery cables. Connect one end of the cables to positive busbars on two

     battery cabinets and the other end to the RTN+ busbar on the power cabinet.

    Step 4 

    Take out four positive battery cables. Connect one end of the cables to positive busbars ontwo battery cabinets and the other end to positive battery terminals.

    Figure 8-8 

    Installing positive battery cables

    Step 5 

    Reinstall insulation covers for batteries on the left and right.

    Step 6 

    Reinstall the insulation covers for the busbars on the left and right of the battery cabinet, asshown in Figure 8-9.

  • 8/20/2019 Installation Guide 01 - Parte 3

    10/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 8 (Optional) Installing Batteries and Cables

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    77

    Figure 8-9 

    Installing insulation covers for busbars

    ----End

    8.7 (Optional) Installing Antitheft Baffle Plates for the

    Battery Cabinet

    Procedure

    Step 1 

    Install antitheft baffle plates on the antitheft baffle plate bases for the battery cabinet, as

    shown in Figure 8-10.

  • 8/20/2019 Installation Guide 01 - Parte 3

    11/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 8 (Optional) Installing Batteries and Cables

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    78

    Figure 8-10 

    Installing an antitheft baffle plate

    ----End

  • 8/20/2019 Installation Guide 01 - Parte 3

    12/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 9 Verifying the Installation

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    79

    9 Verifying the Installation9.1 Checking Hardware Installation

    l  Check that all screws, especially those used for electrical connections, are secured.

    Check that flat washers and spring washers are installed properly.l  Check that rectifiers are completely inserted into their respective slots and properly

    locked.

    9.2 Checking Electrical Connectionsl  Check that all circuit breakers are switched off.

    l  Check that flat washers and spring washers are securely installed for all the OT terminalsand that all the OT terminals are intact and properly connected.

    l  Check that batteries are correctly installed and that battery cables are correctly connected

    without being short circuited.

    l  Check that input and output power cables and ground cables are correctly connectedwithout being short circuited.

    9.3 Checking Cable Installationl  Check that all cables are securely connected.

    l  Check that all cables are arranged neatly and bound properly to their nearest cable ties

    without being distorted or excessively bent.

    l  Check that cable labels are properly and securely attached in the same direction.

  • 8/20/2019 Installation Guide 01 - Parte 3

    13/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 10 Commissioning

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    80

    10 Commissioning

    l  The following commissioning procedure may result in power failure or alarm generation.Inform the alarm center before and after the procedure.

    l  The commissioning involves various technologies. Only trained personnel are allowed to

     perform commissioning. Perform operations strictly in compliance with commissioninginstructions.

    l  The commissioning is performed with power on. During commissioning, stand on dry

    insulating objects, and remove conductive articles such as watches and rings. Use

    insulated tools.

    l  During operations, do not contact two electric bodies that have different currents.

    l  During commissioning, check that the status of the related unit or component meets

    requirements before turning on any switch.

    l  When you are performing operations and do not want others to operate, attach the label

    "Do not turn on the switch because operations are in process." to the power distributiondevice.

    l  During commissioning, shut down the device immediately if any fault is detected. Rectify

    the fault and proceed with the commissioning.

    10.1 Connecting the AC Power Supply

    Procedure

    Step 1 

    Measure the input voltage on the AC input circuit breaker. The value should range from 85 VAC to 300 V AC.

    Step 2 

    Switch on the AC input circuit breaker and measure the output voltage of the AC input circuit breaker. The value should range from 85 V AC to 300 V AC.

    Step 3 

    Check that the indicators on the rectifiers are steady on.

    Step 4 

    Measure the voltage between the -48 V busbar and the RTN+ busbar. The value should range

    from -42 V DC to -58 V DC.

  • 8/20/2019 Installation Guide 01 - Parte 3

    14/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 10 Commissioning

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    81

    ----End

    10.2 Setting the Display Language

    After powering on the SMU, select English by pressing or on the LCD, and then

     press to enter the standby screen.

    If you select an undesired language, remove and then insert the SMU. Select a language again after theSMU restarts.

    10.3 Setting the AC Input SystemIf the AC input system is dual-live wire, set the AC input system to single-phase on the LCD,as shown in Table 10-1.

    If the AC input system is single-/three-phase, set the AC input system as required, as shown inTable 10-2.

    Table 10-1 Setting a dual-live wire AC input system

    MainMenu

    Second-

    LevelMenu

    Third-

    LevelMenu

    Fourth-

    LevelMenu

    Default Setting

    Parameters

    Settings

    Power

    System

    Basic

    ParametersAC Type Single-Phase Single-Phase

    Table 10-2 

    Setting a single- or three-phase AC input system

    MainMenu

    Second-

    LevelMenu

    Third-

    LevelMenu

    Fourth-

    LevelMenu

    Default Setting

    Parameters

    Settings

    Power

    System

    Basic

    ParametersAC Type Three

    Phases

    Both the

    single-phaseand

    three-phase

    inputsystems are

    available.

    Set to thelocal input

    system.

  • 8/20/2019 Installation Guide 01 - Parte 3

    15/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 10 Commissioning

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    82

    10.4 Setting the Date and Time

    l  The LCD screen becomes dark if no button is pressed within 30 seconds.

    l  You need to log in again if no button is pressed within 1 minute.

    The preset user name is admin and the preset password is 000001.

    Set the date and time as required.

    Table 10-3 Setting the date and time

    Main Menu Second-LevelMenu

    Third-LevelMenu

    Default Value Setting

    Setting Wizard Date and Time

    NOTE

    The date and

    time varyaccording to

    time zones. Setthe time zone,

    date, and time based on the

    local situation.

    Date and Time - Set to the local

    date and time.

    Time Zone UTC +08:00

    Beijing

    Set to the local

    time zone.

     NTP Enable No Yes/No

    NOTE

    Set the

     parameter to

    Yes if you needto synchronize

    the SMU time

    and the site

    network servertime.

    10.5 Setting Battery ParametersSet the Battery N Connected , Rated Capacity and Installation Timeas required.

    Table 10-4 Setting battery parameters

    MainMenu

    Second-

    LevelMenu

    Third-

    LevelMenu

    Fourth-

    LevelMenu

    Default Value Setting Value

    Parameters

    SettingsBattery Basic

    Parameters

    Battery 1

    ConnectedYes If  N  battery

    strings are

    connected, setBattery 1Connected to

    Battery N

    Connected toYes, and set the

    other parameters to

    Battery 2

    ConnectedYes

  • 8/20/2019 Installation Guide 01 - Parte 3

    16/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 10 Commissioning

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    83

    MainMenu

    Second-

    LevelMenu

    Third-

    LevelMenu

    Fourth-

    LevelMenu

    Default Value Setting Value

    No.

    RatedCapacity

    150 Ah Rated capacityof the batteriesin a battery

    string.

    NOTE

    The batteries

    controlled byone circuit

     breaker or fuse

    are called a

     battery string.

    Other

    Parameters

    Installation

    Time- Set to the

    current date

    l  If battery routes 1 and 2 are respectively connected to a battery string (each battery string consists of

    four 12 V, 150 Ah batteries in series), set Battery1 Connected and Battery2 Connected to Yes and

    others to No, and set Rated Capacity to 150 Ah.

    l  If battery route 1 is connected to two battery strings in parallel (each battery string consists of four

    12 V, 150 Ah batteries in series), set Battery1 Connected to Yes and others to No, and set Rated

    Capacity to 300 Ah.

    10.6 (Optional) Setting the Hibernation ParameterSet Hibernation Enable to Yes if you need to use the intelligent hibernation function of therectifiers.

    Table 10-5 Setting the hibernation parameter

    Main Menu Second-LevelMenu

    Third-LevelMenu

    Default Setting

    ParametersSettings

    Energy Saving HibernationEnable

     No Yes

    10.7 (Optional) Setting Sensor ParametersSet sensor parameters based on site requirements.

  • 8/20/2019 Installation Guide 01 - Parte 3

    17/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 10 Commissioning

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    84

    Table 10-6 

    Sensor parameter settings

    MainMenu

    Second-

    Level Menu

    Third-

    Level Menu

    Fourth-

    Level Menu

    DefaultValue

    Setting

    Parameters

    Settings

    Power System Sensor

    Config. Para.

    Water Sensor None Set to Yes

    or No asrequired.Smoke Sensor None

    Ambient Temp.

    Sensor None

    Ambient Humi.

    Sensor None

    10.8 Setting Communications Parameters

    10.8.1 Setting Parameters Before Using WebUI Management

    Procedure

    Step 1  Apply to the site or equipment room network administrator for a fixed IP address.

    Step 2  Set the IP address, subnet mask, and gateway on the LCD, as shown in Table 10-7.

    Table 10-7 IP parameters

    MainMenu

    Second-

    LevelMenu

    Third-

    Level Menu

    Default Value Setting

    Setting

    Wizard

     Network

    ParametersIP Address 192.168.0.10 Set this parameter

    according to the IP address

    assigned by the network

    administrator.

    Subnet Mask 255.255.255.0 Set this parameter

    according to the subnet

    mask provided by the

    network administrator.

    Default

    Gateway192.168.0.1 Set this parameter

    according to the gateway

    address provided by thenetwork administrator.

    ----End

  • 8/20/2019 Installation Guide 01 - Parte 3

    18/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 10 Commissioning

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    85

    10.8.2 (Optional) Setting Parameters Before Using the NetEcoManagement

    Networking Mode 1: over FE Port

    Step 1 

    Apply to the site or equipment room network administrator for a fixed IP address.

    Step 2  Set the IP address, subnet mask, and gateway on the LCD, as shown in Table 10-8.

    Table 10-8 

    IP parameters

    MainMenu

    Second-

    LevelMenu

    Third-

    Level Menu

    Default Value Setting

    Setting

    Wizard

     Network

    ParametersIP Address 192.168.0.10 Set this parameter

    according to the IP addressassigned by the network

    administrator.

    Subnet Mask 255.255.255.0 Set this parameter

    according to the subnet

    mask provided by thenetwork administrator.

    Default

    Gateway192.168.0.1 Set this parameter

    according to the gateway

    address provided by the

    network administrator.

    Step 3 

    Set the IP Addresses and Ports for the active and standby servers of the NetEco on the LCD,as described in Table 10-9.

    Table 10-9 

     NetEco parameters

    MainMenu

    Second-

    LevelMenu

    Third-

    LevelMenu

    Fourth-

    LevelMenu

    DefaultValue

    Setting

    Parameters

    Settings

    Comm.

    Parameters

     Network

    Parameters

     NetEco

    Primary IP192.168.0.10 Set an IP

    address for

    the active NetEco

    server.

     NetEco

    Backup IP192.168.0.10 Set an IP

    address for

    the standby NetEco

    server.

     NetEco Port

     Number31220 Set a port for

    the NetEco.

  • 8/20/2019 Installation Guide 01 - Parte 3

    19/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 10 Commissioning

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    86

    ----End

    Networking Mode 2: over RS485 Port

    Step 1 

    Check that the following parameters are set properly: Port Mode to Manual, Protocol Type 

    to M/S Protocol, Baud Rate to 9600, and Comm. Address to 3.

    Table 10-10 Communications parameters

    MainMenu

    Second-

    LevelMenu

    Third-

    LevelMenu

    Fourth-

    LevelMenu

    Fifth-

    LevelMenu

    DefaultValue

    Setting

    Parameters

    Settings

    Comm.

    Parameters

    Serial

    Port Northbound Port

    ModeManual Manual

    Protocol

    Type

    M/S

    Protocol

    M/S

    Protocol

    M/SProtocol

     Northbound BaudRate

    9600 9600

    Comm.

    Address3 3

    ----End

    10.8.3 (Optional) Setting Parameters Before Using the SNMPManagement

    Prerequisites

    Before setting SNMP parameters, obtain the information listed in Table 10-11 from the NMS.

    Table 10-11 

    Information obtained from the NMS

    Information Description

    SNMP version SNMP version and port number used by the SMU and NMS.The SNMP versions include SNMPv1, SNMPv2c, and

    SNMPv3.SNMP Port Number

    Read Community Name If you use SNMPv1 or SNMPv2c, enter the read community

    name and write community name that comply with the NMS.Otherwise, the SMU will not connect to the NMS.Write Community Name

    User Name To enhance the security, you need a user name and password

    for authentication if you use SNMPv3. After the authentication

    succeeds, the SMU can communicate with the NMS.MD5 Password

    DES Password

  • 8/20/2019 Installation Guide 01 - Parte 3

    20/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 10 Commissioning

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    87

    Information Description

    Trap Target Address IP address and port number reported in the alarm trap.

    Trap Port

    Procedure

    Step 1 

    Apply to the site or equipment room network administrator for a fixed IP address.

    Step 2 

    Set the IP address, subnet mask, and gateway on the LCD, as shown in Table 10-12.

    Table 10-12 

    IP parameters

    MainMenu

    Second-

    LevelMenu

    Third-

    Level

    Menu

    Default Value Setting

    Setting

    Wizard

     Network

    ParametersIP Address 192.168.0.10 Set this parameter

    according to the IPaddress assigned by the

    network administrator.

    Subnet Mask 255.255.255.0 Set this parameter

    according to the subnet

    mask provided by thenetwork administrator.

    Default

    Gateway192.168.0.1 Set this parameter

    according to the gateway

    address provided by the

    network administrator.

    Step 3 

    Enter the IP address for the SMU in the address box of Internet Explorer. Log in to theWebUI on the login page shown in Figure 10-1.

    l  The preset user name is admin and the preset password is Changeme.

    l  You can set SNMP parameters on the WebUI locally or remotely.

  • 8/20/2019 Installation Guide 01 - Parte 3

    21/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 10 Commissioning

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    88

    Figure 10-1 

    Login page

    Step 4  On the System Settings tab page, select SNMP.

    l  If the SNMP version is SNMPv1 or SNMPv2c, set SNMP Version to

    SNMPv1&SNMPv2c under SNMP, and then set SNMP Port Number, ReadCommunity Name, and Write Community Name, as shown in Figure 10-2.

    Figure 10-2 Setting SNMPv1 and SNMPv2c parameters

    l  If the SNMP version is SNMPv3, set SNMP Version to SNMPv3 under SNMP, click

    Add under SNMPv3, and then set User Name, MD5 Password, and DES Password, as

    shown in Figure 10-3.

  • 8/20/2019 Installation Guide 01 - Parte 3

    22/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 10 Commissioning

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    89

    Figure 10-3 

    Setting SNMPv3 parameters

    Step 5  Under SNMP Trap, set Trap Target Address and Trap Port.

    Step 6 

    Under Mib files, click Export to export the Mib file and import it to the NMS.

    If there is only one NMS, perform Step 6 once.

    ----End

    Follow-up Procedure

    You can query the power system operating status, active alarms, and the names ofuser-defined dry contact inputs, and configure dry contact outputs on the NMS that is

    connected over the SNMP.

    10.9 Connecting the Battery Supply

    Prerequisites

    To avoid damage to batteries, switch on the battery circuit breaker only after you correctly set

     battery parameters.

    Procedure

    Step 1 

    Switch off AC input circuit breakers.

  • 8/20/2019 Installation Guide 01 - Parte 3

    23/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide 10 Commissioning

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    90

    Step 2 

    Switch on the battery circuit breaker.

    Step 3 

    Switch on AC input circuit breakers.

    Step 4  Switch all the circuit breakers to the appropriate status based on site requirements.

    Step 5 

    Observe the power system for 15 minutes. If no alarm (excluding door alarms) is generated on

    the LCD during this period, the voltage and current for batteries and loads are normal.

    l  Before delivery, the battery switch is set to AUTO and the system is under automaticcontrol.

    l  Open the cover and flip the battery switch to MANUAL only when you need to forcibly

    connect the battery supply. Flip the battery switch back to AUTO after commissioning.

    Figure 10-4 Battery switch

    (1) Battery switch (behind the cover)

    ----End

    10.10 Subsequent Operations

    Procedure

    Step 1 

    Reinstall the removed cover or panel (if there is).

    Step 2 

    Fasten package entry module.

    Step 3 

    The paint on the surface of the cabinet should be kept intact. Therefore, any damaged paintmust be repaired.

    Step 4 

    Lock the cabinet door and hand over the key to the administrator. Clean the site and leave.

    ----End

  • 8/20/2019 Installation Guide 01 - Parte 3

    24/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide

    A Associations Between Alarms and Dry Contacts on the

    UIM

    Issue 01 (2014-07-09) Huawei Proprietary and Confidential

    Copyright © Huawei Technologies Co., Ltd.

    91

    A Associations Between Alarms and DryContacts on the UIM

    Table A-1 Associations between dry contacts and alarms

    Dry ContactType

    Silkscreen Associated Alarm

    Dry contact inputs DIN1 Dry contact input 1

    DIN2 Dry contact input 2

    DIN3 Dry contact input 3

    DIN4 Dry contact input 4

    DIN5 Dry contact input 5

    DIN6 Dry contact input 6

    Dry contactoutputs

    The default setting

    (closed: alarm;open: normal) can

     be modified.

    ALM1 Mains failure

    ALM2 DC over/undervoltage

    ALM3 Rectifier faults

    ALM4 AC or DC SPD faults

    ALM5 Load fuse blown, battery fuse blown, or loop

    disconnection

    ALM6 Battery over/undertemperature

    ALM7 Door status alarm

    ALM8 Heater/Air conditioner/Fan fault

    alarm/Temperature control high temperature

    alarm

  • 8/20/2019 Installation Guide 01 - Parte 3

    25/25

    TP48200A-HX09A5 & HX09A6 & HX09A7 &

    DX09A2 & TBC300A-DCA6 & DCA7 & TCA3

    Installation Guide B Acronyms and Abbreviations

    B Acronyms and AbbreviationsB

    BBU Building base band unit

    F

    FE Fast Ethernet

    H

    HAU Heater Assembly Unit

    HTTPS Hypertext Transfer Protocol Secure

    L

    LCD Liquid crystal display

    S

    SMU Site monitor unit

    SNMP Simple Network Management Protocol

    T

    TCUC Temperature control unit C

    U

    UIM User interface module