installation checklist

Embed Size (px)

DESCRIPTION

gas turbine construction

Citation preview

  • Liste des Contrles dInstallation Installation Check List

    ICL ICQ 0200

    DESIGNATION DE MONTAGE :

    Assembly designation

    AIR INTAKE FILTER Mechanical part

    MODULE(S) : /

    Modulus

    NOM DE L'AFFAIRE : DEIR AMMAR

    Project name

    TYPE DE MACHINE : TG-9E Machine type

    MARQUAGE : 9048058/01 ; 9048064/01 &

    9048065/01

    Identification

    N CLIENT : 104/498997, 104/498998 & 104/498999- E1315 Customer Nr

    REFERENCE : 48058meca REV/Issue : A PAGE :1/3

    Ce document, proprit exclusive de GE Energy Products France SNC, est

    strictement confidentiel. Il ne peut tre communiqu, copi, ou reproduit sans

    notre autorisation crite.

    This document, exclusive property of GE Energy Products France SNC, is strictly

    confidential. It must not be communicated, copied or reproduced without our

    written consent.

    RESPONSABLE(S) QUALITE DE L'ENTREPRISE(S) DE MONTAGE

    Assembly manufacturer's quality representative

    Entreprise : Nom : Date/Signature :

    S

    Q

    S

    Date : Nom : Signature :

    DT-7C

    GE Of

    ficial

  • Liste des Contrles

    dInstallation Installation Check List

    ICL REFERENCE : 48058meca

    REV/Issue : A Page : 2/3

    LIGNE

    Line

    NATURE DES CONTROLES

    Type of checks

    EXIGENCES Requirements

    SPECIFICATIONS

    REV

    Issue

    N RAPPORT / REPORT Nr

    Signature & date

    N PV NC

    NCR Nr

    Subcontractor

    or Partner

    GE Customer

    V = Vrification / Verify W = Convocation + vrification / witness point

    R = Document rapport / Document Report H = Point d'arrt + vrification/Hold point + verify Plan Qualite Site.DOT

    01 Site inspection delivery and storage: R Packing list . Visual . Quantity

    02 Inspection of supporting structure R . Levels, alignement; . Bolts, tightening, evenness; . Visual and measurement

    03

    04

    Erection of the flexible below . Check need shims for horizontal position . Check all eye lifting bolts . Control position with gas turbine axis . Control bolt securing on structure

    Erection of transition piece:

    V Erection procedure - Mechanical part Tightening torque refer to appendix of erection book

    . Check need shims for horizontal position V Erection procedure - Mechanical part

    . Check all eye lifting bolts Tightening torque refer to appendix . Control position with gas turbine axis of erection book . Control bolt securing on structure

    05

    Erection of inlet module.

    . Check all eye lifting bolts V Tightening torque refer to appendix . Control tightness and securing with transition piece of erection book . Control position with gas turbine axis Air seal between the modules refer to . Control bolt securing on structure appendix of erection book

  • Liste des Contrles

    dInstallation Installation Check List

    ICL REFERENCE : 48058meca

    REV/Issue : A Page : 3/3

    LIGNE

    Line

    NATURE DES CONTROLES

    Type of checks

    EXIGENCES Requirements

    SPECIFICATIONS

    REV

    Issue

    N RAPPORT / REPORT Nr

    Signature & date

    N PV NC

    NCR Nr

    Subcontractor

    or Partner

    GE Customer

    V = Vrification / Verify W = Convocation + vrification / witness point

    R = Document rapport / Document Report H = Point d'arrt + vrification/Hold point + verify Plan Qualite Site.DOT

    06 Erection of Downstream module. V Erection procedure - Mechanical part . Check all eye lifting bolts Tightening torque refer to appendix . Control tightness and securing with transition piece of erection book . Control position with gas turbine axis Air seal between the modules refer to . Control bolt securing on structure appendix of erection book

    07 Erection of coalescers cells: V check open cells are installed vertically

    check the securing of latches Erection procedure - Mechanical part

    of erection book 08 Erection of prefilters cells : V

    check open cells are installed vertically Erection procedure - Mechanical part

    09 Erection of HF filter cells : V Erection procedure - Mechanical part check open cells are installed vertically

    check the securing of latches

    10 Final inspection of all installed equipment V Erection procedure - Mechanical part Internal cleaning and dedusting of the housing and

    filter frames visual control