Installation and Assembly:HITACHI PROJECTOR SHORT THROW WALL ARM
Model: A3WALLARM
ISSUED:07-25-11 SHEET #: 125-9225-1
PROJECTOR POSITION FOR 60" - 70" SCREEN SIZE
PROJECTOR POSITION FOR 70" - 100" SCREEN SIZE
CP-AW250NCP-A220NCP-A300NIPJ-AW250N
COMPATIBLE PROJECTOR MODELS:
Max Load Capacity: 40 lb (18.1 kg)
2 of 14 ISSUED:07-25-11 SHEET #: 125-9225-1
• DonotbegintoinstallyourPeerlessproductuntilyouhavereadandunderstoodtheinstructionsandwarningscontainedinthisInstallationSheet.Ifyouhaveanyquestionsregardinganyoftheinstructionsorwarnings,forUScustomerspleasecallPeerlesscustomercareat1-800-865-2112,forallinternationalcustomers,pleasecontactyourlocaldistributor.
• Thisproductshouldonlybeinstalledbysomeoneofgoodmechanicalaptitude,hasexperiencewithbasicbuildingconstruction,andfullyunderstandstheseinstructions.
• Makesurethatthesupportingsurfacewillsafelysupportthecombinedloadoftheequipmentandallattachedhardwareandcomponents.
• NeverexceedtheMaximumLoadCapacity.Seepageone.• Ifmountingtowoodwallstuds,makesurethatmountingscrewsareanchoredintothecenterofthestuds.Useofan“edgetoedge”studfinderishighlyrecommended.
• Alwaysuseanassistantormechanicalliftingequipmenttosafelyliftandpositionequipment.• Tightenscrewsfirmly,butdonotovertighten.Overtighteningcandamagetheitems,greatlyreducingtheirholdingpower.
• Thisproductisintendedforindooruseonly.Useofthisproductoutdoorscouldleadtoproductfailureandpersonalinjury.
• Thisproductwasdesignedtobeinstalledonthefollowingwallconstructiononly; WALL CONSTRUCTION HARDWARE REQUIRED• WoodStud Included• WoodBeam Included• SolidConcrete Included• CinderBlock Included• Brick ContactQualifiedProfessional• Otherorunsure? ContactQualifiedProfessional
WARNING
Tools Needed for Assembly• studfinder("edgetoedge"studfinderisrecommended)• phillipsscrewdriver• drill• 1/4"bitforconcreteandcinderblockwall• 5/32"bitforwoodstudwall• level• maskingtape• 6mmallenwrench
Table of ContentsPartsList.................................................................................................................................................................................3
WallPlateLocationTemplate .................................................................................................................................................4
InstallationtoSingleWoodStudWall .....................................................................................................................................5
InstallationtoSolidConcreteandCinderBlockWall .............................................................................................................6
Attachingadapterplateassemblytoprojector .......................................................................................................................7
Installationusingwallarmbracket.........................................................................................................................................8
Installationusingwallarmbracketandextensionbracket .............................................................................................. 9-10
AdjustingtheProjector ................................................................................................................................................... 12-13
Fastenwallarmcover ......................................................................................................................................................... 14
3 of 14 ISSUED:07-25-11 SHEET #: 125-9225-1
Some parts may appear slightly different than illustrated.
Before you start make sure all parts listed are included with your product.
F
A
E
G H
I J K
B
DC
NL M
PARTS LISTDescription Qty. Part #
A adapterplateassembly 1 056-2051B extensionbracket 1 056-2039C wallarmbracket 1 056-2045D wallplate 1 056-2046E wallplatecover 1 056-2047F projectortiltplate 1 056-2042G cablemanagementbracket 2 056-2050H projectorattachmentbracket 1 056-2048I shimspacerplate 1 056-2049J #14x2.5"woodscrew 4 5S1-015-C04K concreteanchor 4 590-0320L M4x8mmsocketpinserratedwasherheadscrew 4 510-2005M M6x8mmsocketpinscrew 4 520-2255N #8x3/8"sheetmetalscrew 2 500-2008O #10flatblackwasher 4 540-9400P M5x8mmpanheadblackscrew 4 570-0005Q 4mmallenwrench 1 560-9646R M5x20mmsocketpinserratedwasherheadscrew 5 510-2065S wallarmcap 1 056-2054T M5x10mmsocketpinserratedwasherheadscrew 6 510-2063U extensioncap 1 590-2337
P
O
Q RS T
U
4 of 14 ISSUED:07-25-11 SHEET #: 125-9225-1
Wall Plate Location Determineandmarkthetopedgeofthe screenactiveimage. NOTE: Makesuretoleaveadequatespaceabovethe topedgeoftheactiveimageforthewallarmandprojectortobeinstalled.Approximatedimension(23.0")
Usingyourmarkforthetopedgeofactiveimagedetermine dimensionBtolocatethebottomwallplate(D) mountinghole.
A=Boardsize/diagonalactiveimagesize
B=Distancefromthetopedgeoftheactiveimagetothebottom mountingholeofwallplate(D). C=Distancefromthetopedgeoftheactiveimagetothebottom edgeofwallplate(D).
TOPOFACTIVEIMAGE
SCREENACTIVEIMAGE
8.9"
7.5"
B
PROJECTORMIRROR
AMOUNTOFVERTICALADJUSTMENT
BOARDTHICKNESS
A
.7
.7
SCREENCENTER
2.0"
1
MANUFACTURER MODEL A B CHitachi Starboard Trio 88 88 13.90 11.90Hitachi Starboard Trio 77 77 11.68 9.68
Mimio HD90 88 13.90 11.90Mimio Board 80 78 11.82 9.82Mimio Board 100 98 14.60 12.60
Polyvision/ENO TS620 77.8 11.79 9.79Polyvision/ENO TSL620 77.8 11.79 9.79Polyvision/ENO 2610 78 11.82 9.82Polyvision/ENO 2650 75‐16:10 12.00 10.00Polyvision/ENO 2650 75‐4:3 11.40 9.40Polyvision/ENO 2810 96 15.10 13.10Polyvision/ENO 2850 93‐16:10 14.65 12.65Polyvision/ENO 2850 93‐4:3 13.85 11.85
Promethean 587 Pro 87 13.75 11.75Promethean 387 87 13.75 11.75Promethean 387 Pro 87 13.75 11.75Promethean 595 Pro 95 14.95 12.95Promethean 395 95 14.95 12.95Promethean 395 Pro 95 14.95 12.95Promethean 164 64 9.86 7.86Promethean 378 78 11.82 9.82Promethean 378 Pro 78 11.82 9.82Promethean 178 78 11.82 9.82
Smart 885 87 13.75 11.75Smart 685 87.13 13.76 11.76Smart 690 94 14.80 12.80Smart 660 64 9.86 7.86Smart 880 77 11.68 9.68Smart 680 77 11.68 9.68
BOTTOM MOUNTINGHOLE
D
C
5 of 14 ISSUED:07-25-11 SHEET #: 125-9225-1
Usingwallplate(D)asatemplate,drillfour5/32"(4mm)dia.holestoaminimumdepthof2.5"(64mm).Attachwallplate(D)tocentersofwoodstudsusingfour#14x2.5"woodscrews(J)showninfigure1.1.Fastenwallarmbracket(C)looselytowallplate(D)usingfourM5x8mmpanheadblackscrews(P),andfour#10blackwashers(O).
Installation to Single Wood Stud Wall
1
P O
D
D
J
DIAMONDINDICATES TOPOFWALLPLATE
Cfig1.1 fig1.2
• Installermustverifythatthesupportingsurfacewillsafelysupportthecombinedloadoftheequipmentandallattachedhardwareandcomponents.
• Tightenwoodscrewssothatwallplateisfirmlyattached,butdonotovertighten.Overtighteningcandamagethescrews,greatlyreducingtheirholdingpower.
• Nevertighteninexcessof80in.•lb(9N.M.).• Makesurethatmountingscrewsareanchoredintothecenterofthestud.Theuseofan"edgetoedge"studfinderishighlyrecommended.
• Hardwareprovidedisforattachmentofmountthroughstandardthicknessdrywallorplasterintowoodstuds.Install-ersareresponsibletoprovidehardwareforothertypesofmountingsituations.
WARNING
6 of 14 ISSUED:07-25-11 SHEET #: 125-9225-1
J
K
fig1.4
CINDERBLOCK
SOLIDCONCRETE
C
Installation to Solid Concrete or Cinder Block
• WheninstallingPeerlesswallmountsoncinderblock,verifythatyouhaveaminimumof1-3/8"(35mm)ofactualconcretethicknessintheholetobeusedfortheconcreteanchors.Donotdrillintomortarjoints!Besuretomountinasolidpartoftheblock,generally1"(25mm)minimumfromthesideoftheblock.CinderblockmustmeetASTMC-90specifications.Itissuggestedthatastandardelectricdrillonslowsettingisusedtodrilltheholeinsteadofahammerdrilltoavoidbreakingoutthebackoftheholewhenenteringavoidorcavity.
• Concretemustbe2000psidensityminimum.Lighterdensityconcretemaynotholdconcreteanchor.• Makesurethatthewallwillsafelysupportfourtimesthecombinedloadoftheequipmentandallattachedhardwareandcomponents.
WARNING
1
CU
TAW
AY V
IEW
INCORRECT CORRECT
wallplate
wallplate
plaster/drywall
plaster/drywall
concrete concrete
1
3
2
KDrillholesandinsertanchors(K).
Placeplate(AA)overanchors(EE)andsecurewithscrews(DD).
Tightenallfasteners.
C
K J
concretesurface
• Tightenscrewssothatwallplateisfirmlyattached,butdonotovertighten.Overtighteningcandamagescrews,greatlyreducingtheirholdingpower.
• Nevertighteninexcessof80in.•lb(9N.M.).• Alwaysattachconcreteexpansionanchorsdirectly toload-bearingconcrete.
• Neverattachconcreteexpansionanchorstoconcretecoveredwithplaster,drywall,orotherfinishingmaterial.Ifmountingtoconcretesurfacescoveredwithafinishingsurfaceisunavoidable),thefinishingsurfacemustbecounterboredasshownbelow.Besureconcreteanchorsdonotpullawayfromconcretewhentighteningscrews.Ifplaster/drywallisthickerthan5/8"(16mm),customfastenersmustbesuppliedbyinstaller.
WARNING
Makesurethatwallarmbracket(C)islevel,useitasatemplatetomarkfourmountingholes.Drillfour5/16"(8mm)dia.holestoaminimumdepthof2.5"(64mm).Insertconcreteanchors(K)inholesflushwithwallasshown(right).Placewallarmbracketoveranchorsandsecurewith#14x2.5"screws(J).Level,thentightenallfasteners.
7 of 14 ISSUED:07-25-11 SHEET #: 125-9225-1
Secureloweradapterplateontoprojectortiltplate(F)usingfourM6x8mmsocketpinscrews(M).Re-fastenknobsandM10washersfromtopofadapterplateassembly(A).
Placeprojectortiltplate(F)ontoprojectorandsecureusingfourM4x8mmsocketpinserratedwasherheadscrews(L).
RemoveknobsandM10washersfromtopofadapterplateassembly(A). 2 3
4
A
KNOBS
M10 WASHERS
BACKOF PROJECTOR
MOUNTINGLOCATIONS
BACKOF PROJECTOR
KNOBS
M10 WASHERS
UPPER ADAPTERPLATE
LOWERADAPTERPLATE
UPPER ADAPTER PLATE
LOWER ADAPTER PLATE
F
L
MA
F
SHORTFLANGE OPPOSITETHEPROJECTORLENS
NOTE: MAKESURETHATUPPERADAPTERPLATEHOLESARECENTEREDWITHPROJECTORLENS
UPPERADAPTER PLATEHOLES
8 of 14 ISSUED:07-25-11 SHEET #: 125-9225-1
FastentwoM5x20mmsocketpinserratedwasherheadscrews(R)intotopofadapterplateassembly(A)leaving3/8"ofexposedthreadasshownbelow.
FastenoneM5x20mmsocketpinserratedwasherheadscrews(R)intotopofprojectorattachmentbracket(H)leavingnoexposedthreadonbottomofbracketasshownbelow.
5 6
3/8"
Slidetwocablemanagementbrackets(G)intochannelinwallarmbracket(C)asshownbelow. Slidewallplatecover(E)ontowallarmbracket(C).
7
Option 1 - PROJECTOR POSITION FOR 60" - 70" SCREEN SIZE.................PAGE 8 Option 2 - PROJECTOR POSITION FOR 70" - 100" SCREEN SIZE..............PAGE 9
R
H
R
G C
8 Selectprojectormountorientation.
R H
FLUSHWITHBOTTOM
EC
A
9 of 14 ISSUED:07-25-11 SHEET #: 125-9225-1
DETAIL 1Securewallarmcap(S)intowallarmbracket(C)usingtwo#8x3/8"sheetmetalscrews(N). Routeprojectorcablesasshown.Usetwocablemanagementbrackets(G)asneeded.NOTE:#8x3/8"sheetmetalscrews(N)willbeshortenedforproduction.FastentwoM5x20mmsocketpinserratedwasherheadscrews(R)intotopofadapterplateassembly(A).SKIPTOPAGE11.
10
AttachexposedM5x20mmsocketpinserratedwasherheadscrews(R)ontopofadapterplateassembly(A) throughslotinwallarmbracket(C)andkeyholesinprojectorattachmentbracket(H)asshownindetail1.Slideprojectorattachmentbracket(H)towardwall.OnceinlockedpositiontightenallthreeM5x20mmsocketpinserratedwasherheadscrews(R)usingsecuritywrench(Q)asshownindetail2.
9
BACKOFPROJECTORBACKOFPROJECTOR BACKOFPROJECTOR
Installation using Wall Arm Bracket
PROJECTORCABLES
TIGHTENSCREWS
S
N
G
R
NOTE: Verifythatallscrewsareinthecenteroftheslot.
PROJECTOR POSITION FOR 60" - 70" SCREEN SIZE SKIP TO PAGE 9 IF MOUNTING WITH 70" - 100" SCREEN SIZE
H
DETAIL 2
R
10 of 14 ISSUED:07-25-11 SHEET #: 125-9225-1
BACKOFPROJECTOR
BACKOFPROJECTOR
Installation using Wall Arm Bracket and Extension Bracket
BACKOFPROJECTOR
9
10
DETAIL 2
B
CSnapextensioncap(U)intoextensionbracket(B)inorientationasshowninfigure9.1.Slidewallplatecover(E)ontowallarmbracket(C). Slideextensionbracket(B)intowallarmbracket(C)indesiredposition.
TIGHTENSCREWS
H
I
SECONDHOLE MAYALSOBE USED IF DESIRED
I
KEYHOLE
NOTE: Verifythatallscrewsareinthecenteroftheslot.
T
FIGURE 9.2FIGURE 9.1
B
U
PROJECTOR POSITION FOR 70" - 100" SCREEN SIZE
E
DETAIL 3 DETAIL 4
R
Requirements for Shim Spacer WhenBOTHinstancesbelow,occursimultaneously,oneshimspacerplate(I)isrequired.Ashimspacerplate(I)isusedtobridgethegapbetweentheextensionbracket(B)andarmbracket(C).NOTE:1and2requiretheuseofshimspacerplate(I). 1.Whenthefrontpre-fastenedM5x20mmsocketpinserratedwasherheadscrew(R)oftheadapterplate assembly(A)goesthroughtheextensionbracket(B)andwallarmbracket(C).2.Whenthereisagapbetweenthebottomoftheprojectorattachmentbracket(H)andtheextensionbracket(B).
NOTE:IfShimspacerplate(I)isnotrequiredskiptostep11PositionexposedM5x20mmsocketpinserratedwasherheadscrews(R)throughslotinextensionbracket(B)andwallarmbracket(C).Positionscrewsinkeyholesinprojectorattachmentbracket(H),andholeinshimspacerplate(I)asshownindetail3.Slideprojectorattachmentbracket(H)towardwall.OnceinlockedpositiontightenallthreeM5x20mmsocketpinserratedwasherheadscrews(R)usingsecuritywrench(Q)asshownindetail4.Secureextensionbracket(B)intowallarmbracket(C)andsecureusingfourM5x10mmsocketpinscrews(T)indesiredposition.NOTE: MakesurethatfourM5x10mmsocketpinscrews(T)areused.SKIPTOSTEP12.
A
R
R
B
B B
C CC
11 of 14 ISSUED:07-25-11 SHEET #: 125-9225-1
BACKOFPROJECTOR BACKOFPROJECTOR
FIGURE 9.2FIGURE 9.1
BACKOFPROJECTOR
BACKOFPROJECTOR
BACKOFPROJECTOR BACKOFPROJECTOR
Installation using Wall Arm Bracket and Extension Bracket
PROJECTORCABLES
11
12
AttachexposedM5x20mmsocketpinserratedwasherheadscrews(R)intotopofadapterplateassembly(A) throughslotinextensionbracket(B)andkeyholesinprojectorattachmentbracket(H)asshownindetail5.Slideprojectorattachmentbracket(H)towardwall.OnceinlockedpositiontightenallthreeM5x20mmsocketpinserratedwasherheadscrews(R)usingsecuritywrench(Q)asshownindetail6.Secureextensionbracket(B)intowallarmbracket(C)andsecureusingfourM5x10mmsocketpinscrews(T) usingsecuritywrench(Q)indesiredposition.NOTE: MakesurethatfourM5x10mmsocketpinscrews(T) areused.
TIGHTENSCREWS
GB
C
Routeprojectorcablesasshown.Usetwocablemanagementbrackets(G)asneeded.FastentwoM5x20mmsocketpinserratedwasherheadscrews(R)intotopofadapterplateassembly(A).
R
NOTE: Verifythatallscrewsareinthecenteroftheslot.
T
DETAIL 3 DETAIL 4
DETAIL 5 DETAIL 6
BH
A R
R
H
12 of 14 ISSUED:07-25-11 SHEET #: 125-9225-1
Pitch AdjustmentLoosenknobsonfrontofprojector,andtightenknobsonbackofprojectortopitchprojectorforward.Reverseforprojectortopitchbackward.
SUPPORTING SURFACE NOT SHOWN FOR CLARITY
Roll AdjustmentLoosenknobsonleftsideofprojector,andtightenknobsonrightsideofprojectortorollprojectortotheright.Reverseforprojectorrolltotheleft.
SUPPORTING SURFACE NOT SHOWN FOR CLARITY
LOOSEN DO NOT ADJUST
TIGHTEN
LOOSEN DO NOT ADJUST
TIGHTEN DETAIL 5 DETAIL 6
14
13 of 14 ISSUED:07-25-11 SHEET #: 125-9225-1
DO NOT ADJUST
TIGHTEN
DO NOT ADJUST
TIGHTEN
Combination for Pitch and Roll Rotation
SUPPORTING SURFACE NOT SHOWN FOR CLARITY
Tightenknobonbackrightofprojector,andloosenknobonleftfrontofprojectortopitchandrotateprojectorbackwardtotherightasshowninfig.13.1.Reverseforprojectortopitchbackwardtotheleft.
Loosenknobonbackrightofprojector,andtightenknobonleftfrontofprojectortopitchandrotateprojectorbackwardtotherightasshowninfig.13.2.Reverseforprojectortopitchbackwardtotheleft.
Fig. 13.1
NOTE:Formoreadjustment,knobscanbeturnedindividually
LOOSEN DO NOT ADJUST
TIGHTEN
Gripsidesofprojectorandgentlyrotatetodesiredposition.
Swivel Adjustment
SUPPORTING SURFACE NOT SHOWN FOR CLARITY
D
14 of 14 ISSUED:07-25-11 SHEET #: 125-9225-1
©2009PeerlessIndustries,Inc.Allrightsreserved.PeerlessisaregisteredtrademarkofPeerlessIndustries,Inc.
Allotherbrandandproductnamesaretrademarksorregisteredtrademarksoftheirrespectiveowners.
Securewallplatecover(E)towallarmbracket(C)usingtwoM5x10mmsocketpinserratedwasherheadscrews(T). Note:Adjustheightofwallplatepriortofasteningwallplatecover(E)forprojectorimagelocation.Usesecuritywrench(Q)tofastenscrews.
SUPPORTING SURFACE NOT SHOWN FOR CLARITY
T
E
C
Fig. 13.2
14