4

 · Install the first 1/4" Pitch Rail at 2' out from the house, and increase the pitch 1/4" every 2' ... will be finished by turning the Wall Trim down (see Finishing The System)

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1:  · Install the first 1/4" Pitch Rail at 2' out from the house, and increase the pitch 1/4" every 2' ... will be finished by turning the Wall Trim down (see Finishing The System)
Page 2:  · Install the first 1/4" Pitch Rail at 2' out from the house, and increase the pitch 1/4" every 2' ... will be finished by turning the Wall Trim down (see Finishing The System)
Page 3:  · Install the first 1/4" Pitch Rail at 2' out from the house, and increase the pitch 1/4" every 2' ... will be finished by turning the Wall Trim down (see Finishing The System)
Page 4:  · Install the first 1/4" Pitch Rail at 2' out from the house, and increase the pitch 1/4" every 2' ... will be finished by turning the Wall Trim down (see Finishing The System)