Page 1: Inspection Checklist - RedTeam Software - Cloud ... PAINTING OFFICE REMODEL C:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint Office TI\Calculations\COMcheck\ROYAL
Page 2: Inspection Checklist - RedTeam Software - Cloud ... PAINTING OFFICE REMODEL C:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint Office TI\Calculations\COMcheck\ROYAL
Page 3: Inspection Checklist - RedTeam Software - Cloud ... PAINTING OFFICE REMODEL C:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint Office TI\Calculations\COMcheck\ROYAL

Inspection ChecklistRequirements: 0.0% were addressed directly in the COMcheck software

COMcheck Software Version 4.0.5.3

Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For eachrequirement, the user certifies that a code requirement will be met and how that is documented, or that an exceptionis being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.

Energy Code: 2015 IECC

Section#

& Req.IDPlan Review Complies? Comments/Assumptions

C103.2[PR2]1

Plans, specifications, and/orcalculations provide all informationwith which compliance can bedetermined for the mechanicalsystems and equipment anddocument where exceptions to thestandard are claimed. Loadcalculations per acceptableengineering standards andhandbooks.

CompliesDoes NotNot ObservableNot Applicable

C103.2[PR4]1

Plans, specifications, and/orcalculations provide all informationwith which compliance can bedetermined for the interior lightingand electrical systems and equipmentand document where exceptions tothe standard are claimed. Informationprovided should include interiorlighting power calculations, wattage ofbulbs and ballasts, transformers andcontrol devices.

CompliesDoes NotNot ObservableNot Applicable

Additional Comments/Assumptions:

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title:Data filename:

ROYAL PAINTING OFFICE REMODELC:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint OfficeTI\Calculations\COMcheck\ROYAL PAINTING.cck

03/02/17Report date:113 ofPage

Page 4: Inspection Checklist - RedTeam Software - Cloud ... PAINTING OFFICE REMODEL C:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint Office TI\Calculations\COMcheck\ROYAL

Section#

& Req.IDFooting / Foundation Inspection Complies? Comments/Assumptions

C403.2.4.5,C403.2.4.6[FO9]3

Snow/ice melting system sensors forfuture connection to controls. Freezeprotection systems have automaticcontrols installed.

CompliesDoes NotNot ObservableNot Applicable

Additional Comments/Assumptions:

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title:Data filename:

ROYAL PAINTING OFFICE REMODELC:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint OfficeTI\Calculations\COMcheck\ROYAL PAINTING.cck

03/02/17Report date:114 ofPage

Page 5: Inspection Checklist - RedTeam Software - Cloud ... PAINTING OFFICE REMODEL C:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint Office TI\Calculations\COMcheck\ROYAL

Section#

& Req.IDPlumbing Rough-In Inspection Complies? Comments/Assumptions

C404.5,C404.5.1,C404.5.2[PL6]3

Heated water supply piping conformsto pipe length and volumerequirements. Refer to section details.

CompliesDoes NotNot ObservableNot Applicable

C404.5,C404.5.1,C404.5.2[PL6]3

Heated water supply piping conformsto pipe length and volumerequirements. Refer to section details.

CompliesDoes NotNot ObservableNot Applicable

C404.6.3[PL7]3

Pumps that circulate water between aheater and storage tank have controlsthat limit operation from startup to<= 5 minutes after end of heatingcycle.

CompliesDoes NotNot ObservableNot Applicable

C404.6.3[PL7]3

Pumps that circulate water between aheater and storage tank have controlsthat limit operation from startup to<= 5 minutes after end of heatingcycle.

CompliesDoes NotNot ObservableNot Applicable

C404.7[PL8]3

Water distribution system that pumpswater from a heated-water supplypipe back to the heated-water sourcethrough a cold-water supply pipe is ademand recirculation water system.Pumps within this system havecontrols that start the pump uponreceiving a signal from the action of auser of a fixture or appliance andlimits the temperature of the waterentering the cold-water piping to104°F.

CompliesDoes NotNot ObservableNot Applicable

C404.7[PL8]3

Water distribution system that pumpswater from a heated-water supplypipe back to the heated-water sourcethrough a cold-water supply pipe is ademand recirculation water system.Pumps within this system havecontrols that start the pump uponreceiving a signal from the action of auser of a fixture or appliance andlimits the temperature of the waterentering the cold-water piping to104°F.

CompliesDoes NotNot ObservableNot Applicable

Additional Comments/Assumptions:

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title:Data filename:

ROYAL PAINTING OFFICE REMODELC:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint OfficeTI\Calculations\COMcheck\ROYAL PAINTING.cck

03/02/17Report date:115 ofPage

Page 6: Inspection Checklist - RedTeam Software - Cloud ... PAINTING OFFICE REMODEL C:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint Office TI\Calculations\COMcheck\ROYAL

Section#

& Req.IDMechanical Rough-In Inspection Complies? Comments/Assumptions

C402.2.6[ME41]3

Thermally ineffective panel surfaces ofsensible heating panels haveinsulation >= R-3.5.

CompliesDoes NotNot ObservableNot Applicable

C403.2.12.1[ME65]3

HVAC fan systems at designconditions do not exceed allowablefan system motor nameplate hp or fansystem bhp.

CompliesDoes NotNot ObservableNot Applicable

See the Mechanical Systems list for values.

C403.2.12.1[ME65]3

HVAC fan systems at designconditions do not exceed allowablefan system motor nameplate hp or fansystem bhp.

CompliesDoes NotNot ObservableNot Applicable

See the Mechanical Systems list for values.

C403.2.12.3[ME117]2

Fans have efficiency grade (FEG) >=67. The total efficiency of the fan atthe design point of operation <= 15%of maximum total efficiency of thefan.

CompliesDoes NotNot ObservableNot Applicable

C403.2.12.3[ME117]2

Fans have efficiency grade (FEG) >=67. The total efficiency of the fan atthe design point of operation <= 15%of maximum total efficiency of thefan.

CompliesDoes NotNot ObservableNot Applicable

C403.2.13[ME71]2

Unenclosed spaces that are heateduse only radiant heat.

CompliesDoes NotNot ObservableNot Applicable

C403.2.3[ME55]2

HVAC equipment efficiency verified. CompliesDoes NotNot ObservableNot Applicable

See the Mechanical Systems list for values.

C403.2.6.1[ME59]1

Demand control ventilation providedfor spaces >500 ft2 and >25people/1000 ft2 occupant density andserved by systems with air sideeconomizer, auto modulating outsideair damper control, or design airflow>3,000 cfm.

CompliesDoes NotNot ObservableNot Applicable

C403.2.6.2[ME115]3

Enclosed parking garage ventilationhas automatic contaminant detectionand capacity to stage or modulatefans to 50% or less of design capacity.

CompliesDoes NotNot ObservableNot Applicable

C403.2.7[ME57]1

Exhaust air energy recovery onsystems meeting Table C403.2.7(1)and C403.2.7(2).

CompliesDoes NotNot ObservableNot Applicable

C403.2.8[ME116]3

Kitchen exhaust systems comply withreplacement air and conditionedsupply air limitations, and satisfy hoodrating requirements and maximumexhaust rate criteria.

CompliesDoes NotNot ObservableNot Applicable

C403.2.9[ME60]2

HVAC ducts and plenums insulated.Where ducts or plenums are installedin or under a slab, verification mayneed to occur during FoundationInspection.

CompliesDoes NotNot ObservableNot Applicable

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title:Data filename:

ROYAL PAINTING OFFICE REMODELC:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint OfficeTI\Calculations\COMcheck\ROYAL PAINTING.cck

03/02/17Report date:116 ofPage

Page 7: Inspection Checklist - RedTeam Software - Cloud ... PAINTING OFFICE REMODEL C:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint Office TI\Calculations\COMcheck\ROYAL

Section#

& Req.IDMechanical Rough-In Inspection Complies? Comments/Assumptions

C403.2.9[ME10]2

Ducts and plenums sealed based onstatic pressure and location.

CompliesDoes NotNot ObservableNot Applicable

C403.2.9.1.3[ME11]3

Ductwork operating >3 in. watercolumn requires air leakage testing.

CompliesDoes NotNot ObservableNot Applicable

C403.2.9.1.3[ME11]3

Ductwork operating >3 in. watercolumn requires air leakage testing.

CompliesDoes NotNot ObservableNot Applicable

C403.4.4.6[ME110]3

Multiple zone VAV systems with DDCof individual zone boxes have staticpressure setpoint reset controls.

CompliesDoes NotNot ObservableNot Applicable

See the Mechanical Systems list for values.

C403.4.4.6[ME110]3

Multiple zone VAV systems with DDCof individual zone boxes have staticpressure setpoint reset controls.

CompliesDoes NotNot ObservableNot Applicable

See the Mechanical Systems list for values.

C408.2.2.1[ME53]3

Air outlets and zone terminal deviceshave means for air balancing.

CompliesDoes NotNot ObservableNot Applicable

Additional Comments/Assumptions:

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title:Data filename:

ROYAL PAINTING OFFICE REMODELC:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint OfficeTI\Calculations\COMcheck\ROYAL PAINTING.cck

03/02/17Report date:117 ofPage

Page 8: Inspection Checklist - RedTeam Software - Cloud ... PAINTING OFFICE REMODEL C:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint Office TI\Calculations\COMcheck\ROYAL

Section#

& Req.IDRough-In Electrical Inspection Complies? Comments/Assumptions

C405.2.1[EL15]1

Lighting controls installed to uniformlyreduce the lighting load by at least50%.

CompliesDoes NotNot ObservableNot Applicable

C405.2.1[EL18]1

Occupancy sensors installed inrequired spaces.

CompliesDoes NotNot ObservableNot Applicable

C405.2.1,C405.2.2.3[EL23]2

Independent lighting controls installedper approved lighting plans and allmanual controls readily accessible andvisible to occupants.

CompliesDoes NotNot ObservableNot Applicable

C405.2.2.1[EL22]2

Automatic controls to shut off allbuilding lighting installed in allbuildings.

CompliesDoes NotNot ObservableNot Applicable

C405.2.3[EL16]2

Daylight zones provided withindividual controls that control thelights independent of general arealighting.

CompliesDoes NotNot ObservableNot Applicable

C405.2.3,C405.2.3.1,C405.2.3.2[EL20]1

Primary sidelighted areas areequipped with required lightingcontrols.

CompliesDoes NotNot ObservableNot Applicable

C405.2.3,C405.2.3.1,C405.2.3.3[EL21]1

Enclosed spaces with daylight areaunder skylights and rooftop monitorsare equipped with required lightingcontrols.

CompliesDoes NotNot ObservableNot Applicable

C405.2.4[EL4]1

Separate lighting control devices forspecific uses installed per approvedlighting plans.

CompliesDoes NotNot ObservableNot Applicable

C405.2.4[EL8]1

Additional interior lighting powerallowed for special functions per theapproved lighting plans and isautomatically controlled andseparated from general lighting.

CompliesDoes NotNot ObservableNot Applicable

C405.3[EL6]1

Exit signs do not exceed 5 watts perface.

CompliesDoes NotNot ObservableNot Applicable

Additional Comments/Assumptions:

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title:Data filename:

ROYAL PAINTING OFFICE REMODELC:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint OfficeTI\Calculations\COMcheck\ROYAL PAINTING.cck

03/02/17Report date:118 ofPage

Page 9: Inspection Checklist - RedTeam Software - Cloud ... PAINTING OFFICE REMODEL C:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint Office TI\Calculations\COMcheck\ROYAL

Section#

& Req.IDFinal Inspection Complies? Comments/Assumptions

C303.3,C408.2.5.2[FI17]3

Furnished O&M instructions forsystems and equipment to thebuilding owner or designatedrepresentative.

CompliesDoes NotNot ObservableNot Applicable

C303.3,C408.2.5.3[FI8]3

Furnished O&M manuals for HVACsystems within 90 days of systemacceptance.

CompliesDoes NotNot ObservableNot Applicable

C403.2.2[FI27]3

HVAC systems and equipmentcapacity does not exceed calculatedloads.

CompliesDoes NotNot ObservableNot Applicable

C403.2.4.1[FI47]3

Heating and cooling to each zone iscontrolled by a thermostat control.Minimum one humidity control deviceper installedhumidification/dehumidificationsystem.

CompliesDoes NotNot ObservableNot Applicable

C403.2.4.1[FI47]3

Heating and cooling to each zone iscontrolled by a thermostat control.Minimum one humidity control deviceper installedhumidification/dehumidificationsystem.

CompliesDoes NotNot ObservableNot Applicable

C403.2.4.1.2[FI38]3

Thermostatic controls have a 5 °Fdeadband.

CompliesDoes NotNot ObservableNot Applicable

C403.2.4.1.3[FI20]3

Temperature controls have setpointoverlap restrictions.

CompliesDoes NotNot ObservableNot Applicable

C403.2.4.2[FI39]3

Each zone equipped with setbackcontrols using automatic time clock orprogrammable control system.

CompliesDoes NotNot ObservableNot Applicable

C403.2.4.2.1,C403.2.4.2.2[FI40]3

Automatic Controls: Setback to 55°F(heat) and 85°F (cool); 7-day clock, 2-hour occupant override, 10-hourbackup

CompliesDoes NotNot ObservableNot Applicable

C405.4.1[FI18]1

Interior installed lamp and fixturelighting power is consistent with whatis shown on the approved lightingplans, demonstrating proposed wattsare less than or equal to allowedwatts.

CompliesDoes NotNot ObservableNot Applicable

See the Interior Lighting fixture schedule for values.

C408.2.1[FI28]1

Commissioning plan developed byregistered design professional orapproved agency.

CompliesDoes NotNot ObservableNot Applicable

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title:Data filename:

ROYAL PAINTING OFFICE REMODELC:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint OfficeTI\Calculations\COMcheck\ROYAL PAINTING.cck

03/02/17Report date:119 ofPage

Page 10: Inspection Checklist - RedTeam Software - Cloud ... PAINTING OFFICE REMODEL C:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint Office TI\Calculations\COMcheck\ROYAL

Section#

& Req.IDFinal Inspection Complies? Comments/Assumptions

C408.2.3.1[FI31]1

HVAC equipment has been tested toensure proper operation.

CompliesDoes NotNot ObservableNot Applicable

C408.2.3.2[FI10]1

HVAC control systems have beentested to ensure proper operation,calibration and adjustment of controls.

CompliesDoes NotNot ObservableNot Applicable

C408.2.4[FI29]1

Preliminary commissioning reportcompleted and certified by registereddesign professional or approvedagency.

CompliesDoes NotNot ObservableNot Applicable

C408.2.5.1[FI7]3

Furnished HVAC as-built drawingssubmitted within 90 days of systemacceptance.

CompliesDoes NotNot ObservableNot Applicable

C408.2.5.1[FI16]3

Furnished as-built drawings forelectric power systems within 90 daysof system acceptance.

CompliesDoes NotNot ObservableNot Applicable

C408.2.5.3[FI43]1

An air and/or hydronic systembalancing report is provided for HVACsystems.

CompliesDoes NotNot ObservableNot Applicable

C408.2.5.4[FI30]1

Final commissioning report due tobuilding owner within 90 days ofreceipt of certificate of occupancy.

CompliesDoes NotNot ObservableNot Applicable

C408.3[FI33]1

Lighting systems have been tested toensure proper calibration, adjustment,programming, and operation.

CompliesDoes NotNot ObservableNot Applicable

Additional Comments/Assumptions:

1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)

Project Title:Data filename:

ROYAL PAINTING OFFICE REMODELC:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint OfficeTI\Calculations\COMcheck\ROYAL PAINTING.cck

03/02/17Report date:1110 ofPage

Page 11: Inspection Checklist - RedTeam Software - Cloud ... PAINTING OFFICE REMODEL C:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint Office TI\Calculations\COMcheck\ROYAL

Project Title:Data filename:

ROYAL PAINTING OFFICE REMODELC:\Users\Jarret's\Google Drive\Choice Engineering 2017 Projects\17023-01-07 Royal Paint OfficeTI\Calculations\COMcheck\ROYAL PAINTING.cck

03/02/17Report date:1111 ofPage