INSPECTION CHECKLIST

INSPECTION REQUEST NO: 25045-D2150-69-ITR-T-000DATE:

CONTRACT NO: 25045-000-FC1-CY10-00069CONTRACTOR NAME: Johnson Controls Refrigeration and Air Conditioning

REQUEST NO.: 000BUILDING/AREA LOCATION :

SYSTEM :BURIED FIBER OPTIC SENSOR-PIDSWORK PACKAGE : CP 69

Item(s) to be Inspected:OTDR Test on Fiber Optic cables

Comments

Item No.ITEM FOR INSPECTIONSubconJCIOBIClient

1Check the validity of the calibration certificate of the OTDR machine.

2Check that a long launch lead cable is used. This will allow the OTDR to settle down after the initial pulse and provides a reference cable for testing the first connector on the cable. (Note: Always start with the OTDR set for the shortest pulse width for best resolution and a range at least twice (2) times the length of the cable you are testing.)

3Check that the each end face of connector of the test cables is clean and free from dirt prior to plug-in.

4Ensure that a launch lead cable is used to enable full evaluation of the path

5Ensure to use correct mating adapter and fiber connector (where applicable).

6Ensure that the Fiber optic cable has no active or power light source connected on either end, before connecting the OTDR.

7Ensure that the set-up of OTDR is not set to auto-configuration options enabled; else OTDR will struggle with the configuration of the FFT sensor.

8Ensure that all testing on the Micro strain systems is performed at 1550 nm with fiber refractive index of 1.4682.

9Ensure the distance setting at the OTDR is set to a distance longer than the total expected length of the cable.

10Ensure to set the pulse width setting as necessary to slightly increase the pulse width to allow for the excess losses from the start and end sensors.

11Ensure to test the Fiber Optic cable in both directions, first from the lead-in, then from the lead-out.

12Check that the fiber loss result meets the recommended typical reading of 0.25dB/km and an increase margin of 0.02dB/Km is acceptable.

14Check that the fusion splices losses must be less than 0.05dB at a maximum.

15Check that the connector loss must be less than 0.5dB at maximum.

16Ensure to make record and or document in every test conducted.

_________________________Subcontractors QA/QC Inspector_____________________JCI QA/QC Engineer

REMARKS:

CONTRACTORS QC REP.____Jamil Awkar___JCI QA/QC ManagerDATE:

OBI REP.:

_____________________ (PRINT NAME AND SIGN)

WITNESS AND REVIEW

ONLY REVIEWDATE:

Inspection Checklist of Buried Fiber Optic Sensor - PIDSForm No: SAS-ZQ-T-INC-006

Doc.Ref.No. 25045-D2150-69-ITP-T-002 Page 2of 2

NDIA Project: CP-69 PSSE