Liquid & Powder Coating Systems Inspection in accordance with the Ordinance on Industrial Health & Safety (BetrSichV) for Information | Inspection | Documentation on the inspection as Information per BetrSichV J. Wagner GmbH Industrial Solutions D-88677 Markdorf Tel +49 (0) 7544 505 - 0 www.wagner-group.com As per the Ordinance on Industrial Health & Safety (BetrSichV), powder coating systems are among the systems which require obligatory inspection. They are required to be inspected by a qualified person before the first use and at least every three years thereafter. The inspection is broken down into two subdivisions. Firstly the ordinance inspection, as part of which the technical documents and safety information are che- cked, and secondly the technical inspection. For this, technical safety aspects are checked. Inspection as per the Ordinance on Industrial Health & Safety §§ 14 & 15 Powder North Germany: Erik Stein Service and Advice Inspection as per BetrSichV §§ 14 & 15 Powder Germany 0151 / 52 63 76 57 [email protected] South Germany: Jürgen Kögel Inspection as per BetrSichV §§ 14 & 15 Powder Germany Explosion protection powder & liquid coatings 0151 / 19 51 57 31 [email protected] Your contact for a safe system §§ 14 & 15 Liquid coating Udo Schneider Service and Advice Inspection as per BetrSichV §§ 14 & 15 Liquid coatings Germany 0151 / 52 63 76 38 [email protected]

Inspection as per the Ordinance on Your contact Information … · technical documents and safety information are che-cked, and secondly the technical inspection. For this, technical

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Inspection as per the Ordinance on Your contact Information … · technical documents and safety information are che-cked, and secondly the technical inspection. For this, technical

Liquid & Powder Coating Systems

Inspection in accordance with the Ordinance on Industrial Health & Safety (BetrSichV) for

Information | Inspection | Documentation

on the inspection asInformation

per BetrSichV

J. Wagner GmbHIndustrial SolutionsD-88677 MarkdorfTel +49 (0) 7544 505 - 0 www.wagner-group.com

As per the Ordinance on Industrial Health & Safety (BetrSichV), powder coating systems are among the systems which require obligatory inspection. They are required to be inspected by a qualified person before the first use and at least every three years thereafter.

The inspection is broken down into two subdivisions. Firstly the ordinance inspection, as part of which the technical documents and safety information are che-cked, and secondly the technical inspection. For this,

technical safety aspects are checked.

Inspection as per the Ordinance on Industrial Health & Safety§§ 14 & 15

PowderNorth Germany:

Erik SteinService and AdviceInspection as per BetrSichV §§ 14 & 15Powder Germany0151 / 52 63 76 [email protected]

South Germany:

Jürgen KögelInspection as per BetrSichV §§ 14 & 15Powder GermanyExplosion protection powder & liquid coatings0151 / 19 51 57 [email protected]

Your contact for a safe system

§§ 14 & 15

Liquid coatingUdo SchneiderService and AdviceInspection as per BetrSichV §§ 14 & 15Liquid coatings Germany0151 / 52 63 76 [email protected]

Page 2: Inspection as per the Ordinance on Your contact Information … · technical documents and safety information are che-cked, and secondly the technical inspection. For this, technical

Inspection as per the Ordinance on Industrial Health & Safety§§ 14 & 15

Ordinance Inspection

In the first part of the safety inspection the following documents will be checked:

Explosion protection document

Explosion zone plan

Operating instructions

Circuit diagrams

Test certificates

Warning signs in place

Powder safety data sheet

Proof of cleaning, maintenance and

servicing procedures

Technical Inspection

The technical inspection begins with a visual check. As well as this a close and detailed inspection will also be carried out. Safe functioning of the following compo-nents will be checked:

Devices (electrical & mechanical)

Protective systems

Safety, checking and control mechanisms

Technical ventilation

Gun technology

Powder circulation

Potential equalization

Recording

After a successful inspection we issue you with the inspec-tion protocol. Should anything be lacking during the inspection, you will receive a detailed report. The indicated shortcomings must be rectified as soon as possible. We will happily help you out in this regard.

If all shortcomings are rectified, you will receive an ex-tensive inspection protocol. In addition you will receive information regarding explosion protection and an employee instruction sheet.

General Advice

Booths and applications must be clean and available to use at the time of the inspection. The conveyor should be relieved in the booth area. Ideally all documentation for the Ordinance Inspection should be pre-pared, with any missing documents completed beforehand or arranged with us as the case may be. The in-spection will be carried out by Jürgen Kögel, Erik Stein or Udo Schneider – the qualified parties according to TRBS 1203 part 1.

DocumentationInspection protocol / Rectification of shortcomings