www.inspectionforindustry.com Remark Manuf. TPI Client 1 PreInspection Meeting Spec. Spec. MOM H H H 2 DWG, Design, Calculation Document ASME I ASME I DWG, Calculation book H R A 3 WPS&PQR ASME IX, I ASME IX, I Welding Book H R A 4 Welder Qualification Certificates ASME IX, I ASME IX, I Certificates H R 5 NDT procedures ASME V ASME V Procedures H R A 6 NDE Personnel Certificates ASME I ASME I Certificates H R 7 PWHT Procedure (if needed) ASME I ASME I Procedure H R A 11 Hydro Static Test Procedure ASME I ASME I Procedure H R A 12 Painting Procedure Spec. Spec. Procedure H R A 13 Material Certificates ASME II ASME II Original Material Certificates H R 14 Material Identification ASME II ASMEII Report H H 15 Visual, Dimension and Marking Control (Plates, Tubes, Flanges and etc.) ASME II ASME II Report H W Inspection and Test Plan for Fire Tube Boiler Before Manufacturing Materials Activity By No. Inspection and Test Plan Reference Document Acceptance Criteria Verifying Document 1

Inspection and Test Plan for Fire Tube Boiler

Embed Size (px)

DESCRIPTION

Inspection and Test Plan for Fire Tube Boiler

Citation preview

  • www.inspectionforindustry.com

    Remark

    Manuf. TPI Client

    1 PreInspectionMeeting Spec. Spec. MOM H H H

    2DWG,Design,

    CalculationDocumentASMEI ASMEI

    DWG,Calculationbook

    H R A

    3 WPS&PQR ASMEIX,I ASMEIX,I WeldingBook H R A

    4WelderQualification

    CertificatesASMEIX,I ASMEIX,I Certificates H R

    5 NDTprocedures ASMEV ASMEV Procedures H R A

    6NDEPersonnelCertificates

    ASMEI ASMEI Certificates H R

    7PWHTProcedure

    (ifneeded)ASMEI ASMEI Procedure H R A

    11HydroStaticTest

    ProcedureASMEI ASMEI Procedure H R A

    12 PaintingProcedure Spec. Spec. Procedure H R A

    13 MaterialCertificates ASMEII ASMEIIOriginalMaterial

    CertificatesH R

    14 MaterialIdentification ASMEII ASMEII Report H H

    15Visual,DimensionandMarkingControl(Plates,Tubes,Flangesandetc.)

    ASMEII ASMEII Report H W

    InspectionandTestPlanforFireTubeBoiler

    BeforeManufacturing

    Materials

    ActivityByNo. InspectionandTestPlan ReferenceDocument AcceptanceCriteria VerifyingDocument

    1

  • www.inspectionforindustry.com

    16ShellPlateFitup

    InspectionWPS WPS Report H W

    17 EndPlateFitupInspection WPS WPS Report H W

    18ShellandEndPlate

    DimensionalInspectionDWG/ASMEI DWG/ASMEI Report H W

    19ShellandEndPlateweldingInspection

    WPS/ASMEI WPS/ASMEI Report H W

    20DimensionalControlafter

    ShellPostRollingASMEI ASMEI Report H SW

    21ConfirmationofNDEinShellandEndPlate

    ASMEI ASMEI Report H W

    22TubesandIntegralPipes

    FitupInspectionWPS/ASMEI WPS/ASMEI Report H W

    23TubesandintegralPipes

    WeldingInspectionWPS/ASMEI WPS/ASMEI Report H W

    24VisualandDimensional

    InspectiononAttachmentsandReinforcementPlates

    DWG/ASMEI DWG/ASMEI Report H W

    25VisualandDimensionalInspectiononNozzles

    AttachmentsDWG/ASMEI DWG/ASMEI Report W

    DuringFabrication

    2

  • www.inspectionforindustry.com

    25 HydrostaticTesting Procedure/ASMEI Procedure/ASMEI Report H H

    27AuxiliaryEquipment

    InspectionandTesti.e.Piping,Valvesandetc.

    ASMEI ASMEI Report H W

    39FinalVisual&

    DimensionalCheckDWG/Spec. DWG Report H H

    40SurfacePreparationand

    PaintingProcedure SSSP/Spec. Report H W

    41 CheckofNamePlate DWG DWG H H

    42 CheckofFinalBook Spec. DWG/P.O H R Submitted

    by

    43 InspectionReports Spec./DWG Spec./DWG Report H R

    44 NCR Spec./DWG Spec./DWG Report H R

    45 ReviewFinalDataReport Spec./DWG Spec./DWG Report H R

    46 PreservationandPacking Spec. Spec. Report H H

    47 Marking Spec. Spec. Report H H

    48 LoadingInspection Spec. Spec. Report H H

    49ShippingDocument

    ControlProcedure Spec. PackingList H H

    Documentation

    PreShipmentInspection

    auxiliaryequipmentsuchasPiping,filter,burner,safetyvalveandetc.arenotincludedtothisITP

    FinalInspection

    3

  • www.inspectionforindustry.com

    http://www.inspectionforindustry.com/thirdpartyinspectionforfiretubeboiler.htmlhttp://www.inspectionforindustry.com/inspectionandtestplanforfiretubeboiler.html

    formoreinformationreviewfollowingarticles:

    SW:SpotWitness=foritemswithspotwitnessmanufactureshallnotifyTPIinspectorasfulfillingthemonitoring;ForexampleonerandomvisitforwholeUTtestsoroneortwovisitsforwholesurfacepreparationworksforpainting.

    P.O:PurchaseOrder

    MOM:MinuteofMeeting

    Abbreviations:

    H:HoldPoint=HoldontheproductiontillTPIInspectorperformsinspectionandsupervisetherequiredtest

    W:WitnessPoint=ManufactureshallnotifyclientandTPIInspectorbutthereisnoholdontheproduction;ClientcanwaivethisinspectionbasedonhisdiscretionandinformsTPIInspectoraccordingly.

    R:DocumentReview=ReviewmeansReviewdocument,whichincludesofmaterialtestcertificates,WPS,PQR,NDTProceduresandetc.A:Approval

    4