INSITE_DSNT

Embed Size (px)

Citation preview

  • 7/30/2019 INSITE_DSNT

    1/32

    DSNTDSNT--II

    Dual Spaced Neutron Tool

    Insite

  • 7/30/2019 INSITE_DSNT

    2/32

    DSNTDSNT--II

    INC board Insite Numar Controller

    Controls all functionality of the SDLT-I

    and DSNT-IMAU board

    Media Access Unit

    Controls communication between theINC board and GTET

  • 7/30/2019 INSITE_DSNT

    3/32

    DSNTDSNT--II

    Motor Control board Controls three phase dc power for

    caliper motor

    Determines end-of-travel Controls caliper motor movement

  • 7/30/2019 INSITE_DSNT

    4/32

    DSNTDSNT--II

    DC Power Supplies 3.3 volts

    Digital 5 volts

    Analog +/- 5 volts +/- 15 volts

    - 9 volts

  • 7/30/2019 INSITE_DSNT

    5/32

    DSNTDSNT--II

    Neutron Detection Two He3 Detectors

    1 x 4 Short Spaced

    2.5 x 12 Long Spaced

    Pre-Amplifiers

    Amplifier/Discriminator

    INC Board (count discriminated pulses)

  • 7/30/2019 INSITE_DSNT

    6/32

    DSNTDSNT--II

    INSITE 12 +1 Lower Connector Pins 7 and 8 are the 200 volt dc toolbuss power.

    The center coax is the toolstringcommunication buss.

    The upper end of the communication buss isterminated with 50-ohms in the GTET.

    The lower end of the communication bussMUST be terminated with 50 ohms in thelower most tool (or bull-plug).

  • 7/30/2019 INSITE_DSNT

    7/32

    DSNTDSNT--II

    INSITE 31 + 1 Lower ConnectorConnects Directly to the SDLT Mandrel

  • 7/30/2019 INSITE_DSNT

    8/32

    DSNTDSNT--II

    When logged without the SDLT-IMandrel.

    Must insert the X-Over sub

    Upper 31 + 1 Insite connectorLower 12 +1 Insite connector

    Sets both Mandrel Open and Close EOT linesa condition that cannot exist. So the DSN

    instrument recognizes the SDL is notattached.

  • 7/30/2019 INSITE_DSNT

    9/32

    DSNTDSNT--II

    Master CalibrationWater Tank Background

    Water Tank Ratio

    Field Verifier

  • 7/30/2019 INSITE_DSNT

    10/32

    DSNTDSNT--II

    Master Calibration PreparationFill Water Tank

    Install 31+1 to 12+1 x-over

    Install 12+1 bull-plug to terminate bussInstall DSNT-I into water tank

    Jumper GTET to DSNT-I

  • 7/30/2019 INSITE_DSNT

    11/32

    DSNTDSNT

  • 7/30/2019 INSITE_DSNT

    12/32

  • 7/30/2019 INSITE_DSNT

    13/32

  • 7/30/2019 INSITE_DSNT

    14/32

  • 7/30/2019 INSITE_DSNT

    15/32

  • 7/30/2019 INSITE_DSNT

    16/32

  • 7/30/2019 INSITE_DSNT

    17/32

  • 7/30/2019 INSITE_DSNT

    18/32

  • 7/30/2019 INSITE_DSNT

    19/32

  • 7/30/2019 INSITE_DSNT

    20/32

  • 7/30/2019 INSITE_DSNT

    21/32

  • 7/30/2019 INSITE_DSNT

    22/32

    PARAMETERSPARAMETERS

  • 7/30/2019 INSITE_DSNT

    23/32

    Constant TemperatureConstant Temperature

  • 7/30/2019 INSITE_DSNT

    24/32

    Gradient TemperatureGradient Temperature

  • 7/30/2019 INSITE_DSNT

    25/32

    Tool TemperatureTool Temperature

  • 7/30/2019 INSITE_DSNT

    26/32

    Constant PressureConstant Pressure

  • 7/30/2019 INSITE_DSNT

    27/32

    Gradient PressureGradient Pressure

  • 7/30/2019 INSITE_DSNT

    28/32

    Mud Weight PressureMud Weight Pressure

  • 7/30/2019 INSITE_DSNT

    29/32

    Well ParametersWell Parameters

  • 7/30/2019 INSITE_DSNT

    30/32

    DSNTDSNT--I LoggingI Logging

    De-CentralizationDe-Centralize in boreholes7 7/8 up to 17 inches

    Remove De-Centralizer in boreholesless than 7 7/8 inches

    Align with SDLT-I Caliper

    Use Indents for proper locationWithin 5 of top

  • 7/30/2019 INSITE_DSNT

    31/32

  • 7/30/2019 INSITE_DSNT

    32/32