Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Social Monitoring Report
# Semiannual Report July-December 2019 December 2019
INO: West Kalimantan Power Grid Strengthening
Project – Part 2
Prepared by Pusat Manajemen Proyek (Pusmanpro) for the PT PLN and the Asian Development
Bank.
CURRENCY EQUIVALENTS (as of 31 December 2019)
Currency unit – Indonesian rupiah (Rp) Rp1.00 = $0.000071849
$1.00 = Rp13,918
NOTE
(i) In this report, "$" refers to US dollars. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Social Semi Annual Report July - December 2019
APPENDICES
Social Semi Annual Report July - December 2019
Appendix 1 Project Organization Charts
PROJECT ORGANIZATION CHART
ORGANIZATION CHART OF PT PLN (PERSERO) UIP KALBAGBAR
PLT. General Manager
Rachmat Lubis
Planning Senior Manager
Agus Risfian Noor
Operation Construction
Senior Manager
I Wayan Semudiarsa
PLT Finance and HRD
Senior Manager
Dadang Hardiana
PLT Land Affairs &
Communication
Senior Manager
Effrizon
MANAGERUPP KBB 2
R. Djoko Pribadi
MANAGERUPP KBB 3
Benaya Sutami
ORGANIZATION CHART OF PT PLN (Persero) UPP KALBAGBAR 2
`
MANAGER
R. Djoko Pribadi
ADMINISTRATION & FINANCE
SUPERVISOR
Hendy Guntur S.
MANAGER ENGINEERING
Ivan Dharma Sihite
PLT. MANAGER LAND
AFFAIRS
Kumara Bagus RW.
PMIS Management
Supervisor
Wega Dwi Putra
K3L EXECUTIVE OFFICER
Afditia Azhari
ORGANIZATION CHART OF PT PLN (Persero) UPP KALBAGBAR 3
PLT. MANAGER
Benaya Sutami
ADMINISTRATION & FINANCE
SUPERVISOR
Rosda Agung A
MANAGER ENGINEERING
Yulius Wiji HS.
PLT.MANAGER LAND
AFFAIRS
Hariadi Putiray
PMIS Management
Supervisor
Sanjaya Nasution PLT. PROJECT MANAGER
(PLTU 3 KALBAR)
Faizal Hidayatur RH.
PLT. PROJECT MANAGER
(PLTU 2 KALBAR)
Harry Gusti N
K3L EXECUTIVE OFFICER
M. Sayyid Romdhoni.
STRUKTUR ORGANISASI TIM MANAJEMEN KONSTRUKSI STRENGTHENING WEST KALIMANTAN PROJECT
ADB LOAN 3015 DAN AFD 1024-01 B
PT PLN (Persero) PUSAT MANAJEMEN PROYEK
PROJECT COORDINATING AND REPORTING
PROJECT SUPERVISION
PROJECT TEAM LEADER
PROJECT ADMINISTRATOR
Bilingual Secrctary : Nungky Mesayu
Project Administrator: Aqil Zulfikar
TENAGA AHLI ENGINEER
Ahli Keuangan :
Ahli Konstruksi E/M :
Ahli Konstruksi Sipil :
Ahli Sosial dan LARP :
Eng, Lingkungan :
Eng, K3 :
Eng, Schedule : Kristina Wulan
MANAGER UMK II
P/C
KTSK ( 1 orang )
Dedi Hartanto
P/C ADMINISTRATOR (2 orang)
Adm Proyek: Brendhadea
Adm Umum : Diera Rahmia Arif
Pengawas Lingkungan (1
orang)
Naffa
Pengawas Sosial (1 orang )
Aqil
Koor Proyek Gardu Induk
Muchlis
Pengawas K3 (4 orang)
Risdyanti
Pengawas Sipil (6 orang)
Dicky, Hermawan
Pengawas E/M (6 orang)
Samsul Arbi
Koor Proyek Transmisi (1 orang)
Dedy Galih
Pengawas K3 (8 orang)
Naffa, Angga Alvin, Tari,
Huda
Pengawas Sipil (2orang)
Ikas
Lisen
Deny
Pengawas E/M (14 orang)
Sugeng, Samsul Arbi, Pengawas Scadatel (4 orang)
Deka, Angga
Social Semi Annual Report July - December 2019
Appendix 2 Submission Letter of Revised IMA
Social Semi Annual Report July - December 2019
Appendix 3 Vulnerable Affected People List in the Corridor of the 275 kV
Bengkayang - Jagoibabang TL
Status of Age Sex
Affected AP in In In Other Total
People (th) M/F Project Location Area
(AP) Household Area
Lumar Lamolda
1 Amoi widow 56 F 0 Yes No Yes Yes 20000 144 10000 30000 9
Cannot work any more, livelihood supported
by her children. Prefer to get cash as income
restoration.
Sudah tidak bekerja, Biaya sehari hari di berikan dari
anak anaknya, Jika di berikan bantuan program income
restoration lebih menyukai mendapatkan uang kas
Vulnerable
Sanggau Ledo Bange
2 Surai widow 75 F Farmer 550,000 Yes Yes Yes Yes 10000 2600 2500 12500 1
Cannot work any more, livelihood supported
by her children. Prefer to get fertilizer and
seed as income restoration.
Sudah tidak bekerja, Biaya sehari hari di berikan dari
anak anaknya, Jika di berikan bantuan program income
restoration lebih menyukai mendapatkan pupuk dan
bibit
Vulnerable
Seluas Mayak
3 Batu householder 70 M farmer 150,000 Yes Yes No Yes 40000 40000 6
He is 80 years old, he work as rock breaker
and sell the rock. His income is less than Rp.
250,000/month, Eventhough he has 1 Ha of
land but he cannot work on his farm as he's
very old. He involved in every process of land
acquisition but unfortunatly compensation
was taken away by his son.
Pak Batu sudah berumur 80 tahun dan tidak lagi
berladang, saat ini pekerjaannya adalah memecah batu
dan menjualnya. Penghasilannya adalah Rp. 250,000/
bulan. Pada saat proses pemebebasan ROW ikut aktif
menghadiri sosialisasi. Pak Batu tidak bisa
memanfaatkan uang kompensasinya karena telah di
ambil oleh anaknya
Vulnerable
Jagoi Babang Jagoi Babang
4 Akon household 80 M farmer 693,333 Yes Yes No Yes 40000 40000 10
work as farmer, his house is far away from
village, so PIC only can meet his son. His
income is less than Rp. 1,000,000/ month.
Mr. akon also join in farmer group which
each group receive corn seeds from
Agriculture agency
Bekerja sebagai petani, karena rumahnya jauh dari
desa maka PIC hanya bisa menemui anaknya. Mr.
akon termasuk dalam kelompok tani yang menerima
bantuan bibit jagung dari dinas pertanian bengkayang.
Pendapatannnya kurang dari Rp. 1,000,000/bulan
Vulnerable
5Nyawop /
Anyenhousehold 78 M farmer 100,000 Yes Yes No Yes 113
Land belongs to his son Mr, Anyen. Work as
motor bike taxi and his income is Rp.
500,000,- as additional income he plant
pepper and get Rp. 5,600,000 /year. He
expect to get fertilizer for pepper tree as
income restoration
Lahan yang terkena adalah milik anaknya : Bp. Anyen
yang bekerja sebagai ojek dengan penghasilan Rp.
500,000/bulan. Sebagai tambahan pendapatannya Bp.
Anyen menanam sahang dengan tambahan
penghasilan Rp. 5,600,000/bulan. Mengharapkan
mendapatkan bantuan berupa pupuk untuk sahang
Vulnerable
Jumlah Vulnerable 0
Survey Result by PIC/ Hasil Survey PIC
KECAMATAN DESA
KECAMATAN DESA
KECAMATAN DESA
KECAMATAN DESA
Photos
AP Affected by the ROW of 275 kV
No Occupation
Status / Vulnerability Field Surveky result by PIC / Survey Lapangan oleh PIC
VulnerabilityIncome/
MonthStatus
IncomeUsage
Status
Aged
Status
Gender
Vulnerabl
e Propose
Affected
Trees
Tower Name Of
Affected People
Number (AP)
KECAMA: Seluas DESA : Seluas
T.160 Kartini Melayu F 25,000 625 2.5Private,
farmer600,000 Yes Yes No Yes
Cannot work as she's
already old and her right
leg was fracture, daily
cost is supproted by her
brother and sister.
Sudah tidak mampu lagi bekerja
karena sudah tua dan kakinya
patah. Biaya sehari hari di
tanggung oleh saudaranya.
Vulnerabl
e Propose%
Occupatio
n
Income
/month
Income
Status
Gender
Status
Ethnic
Status
AP Affected by the Tower Foundation of 275 kV
Ethnic
GroupGender
Landho
lding
(m2)
Affected LandSTATUS
m
Field Surveky result by PIC / Survey Lapangan oleh PIC
Survey Result by PIC/ Hasil Survey PIC Photos
Social Semi Annual Report July - December 2019
Appendix 4 Coordination Meeting related to CSR Package 1: 275 kV
Bengkayang - Jagoibabang TL
Oate 28 Februari 2019
Time 09.00 WlB - selesai
Place
Note Taker
RR. Lt.l3 PLN Pusat
Teuku M. Reza FahmyAttendess : (daftar hadir terlampir)
endaAg
MinutesPembahasan Usulan Program CSR terkaitSocial Safeguard SUTET 275 kV Bengkayang -Jagoibabang
Presenter 1. DIV KR KAL
2. CS & CSR.
3, UIP KALBAGBAR4, UIP KALBAGTIIM
5, ADB
Rapat dibuka oleh VP Konstruksi Jaringan Regional Kalimantan.
Menindaklanjuti rapat sebelumnya pada tanggal 28 November 2018
PLN UIP Kalbaqtim :
Menindaklanjuti kewajiban PLN untuk memenuhi IRRP Paket '1, UIP Kalbagtim telah melakukansurvey ke 13 lokasi di sepanjang jalur SUTET 275 Bengkayang - Jagoibabang. dimana program
CSR ini lebih kepada program pemberdayaan ekonomi masyarakat terkena dampak ROW
disepanjang Jalur SUTET 275 kV Bengkayang - Jagoibabang.
ADB :
Menyampaikan terkait program-program yang akan dilakukan agar memastikan partisipasi
warga yang terkena dampak ROW, memperhatikan partisipasi kelompok Perempuan, dan ada
unsur pendampingan . ADB mengharapkan agar monitoring kegiatan IRRP dibuatkan laporan
tersendiri agar nantinya dapat dilampirkan ke dalam Laporan semi annual social monitoring
report dengan dilengkapi evidence (foto/video). Pada prinsipnya ADB menyetujui program-program usulan CSR UIP Kalbagtim. Agar detail workplan program dapat disampaikan ke pihak
ADB.
CSR :
Proposal Usulan program CSR UIP Kalbagtim sudah disampaikan dan diterima oleh Corporate
Communication & CSR pada tanggal 20 Februari 2019. Terkait usulan program dan anggaranprogram CSR UIP Kalbagtim ini masih akan dibahas terlebih dahulu, dan surat persetujuan akan
disampaikan paling lambat tanggal 04 maret 2019.
KESIMPULAN:- Pada prinsipnya ADB menyetujui program-program usulan CSR UIP Kalbagtim.- Pelaksanaan program - program CSR UIP Kalbagtim ini dilaksanakan Oleh UIP
KALBAGTIM. UIP Kalbagbar akan mensupport transportasi dan akomodasi pelaksanaan
program dilapangan.- Tentative ladwal dan detail lmplementasi program akan dilaksanakan April - November
2019.
Notulis,
Teuku M. Reza Fahmy
Minutes of Meeting
PT PrN (PERSERO)
KANTOR PUSAT
Hari/ Tgl
Tempat
Waktu
Agenda
DAFTAR HADIR
: Kamis / 28 Februari 2019
: PT PLN (Persero) Kantor Pusat, RR Lt. 13
: 09.00 WIB - Selesai
: Usulan Program CSR terkait Social Safeguard SUTET 275 kV
Bengkayang - Jagoibabang
NAMA INSTANSIEMAIL/
NO. TELPTTD
L lStv/A).P-utlltGll11,"" o?rz6ol{39a \
2 1ilr,r Ul.'tze terny DUhc\6$Ltown^,. o.z^{*U-e-aflf
3. NI6nrno Manh-rv at ., Aogttynd rrlt ruah e culbo o u1
4 Medhn^ +{sr\dii^fr da}rr AMmM n el-nidef i . consuttanfg ,dboD
,\t"d4Aruugoa96.
5 ,rlnr[r]tL U? KAlw'
A^rt-bl QI4h.o.,o P
6. fbcr.rnavtlnp nvl+l<ALffin +u so LD
7 i-larrv UJ CSRO8}8tr3 .t & fLP 4Ftar,g,nwrJr @ yln.co,u)
8 1ggyA? LrgrANF \.rt? kg0tirrran€rr\e'd"ri @ Ita .c<+t
o8l2 8Bo9 q0t'7.
9
10.
i
'.,ol
0
I