Innovative projects on renewed energy sources. Main objectives of realization of investment projects in the republic of Belarus. The purpose: Increase of power safety of The Republic of Belarus Diversification deliveries of power resources to The Republic of Belarus - PowerPoint PPT Presentation

Citation preview

Page 1: Innovative projects on renewed energy sources

Innovative projects on renewed energy sources

Page 2: Innovative projects on renewed energy sources

2

Main objectives of realization of investment projects in the republic of Belarus

The purpose: Increase of power safety of The Republic of

Belarus Diversification deliveries of power resources

to The Republic of Belarus Attraction of direct investments to republic of

Belarus

Page 3: Innovative projects on renewed energy sources

3

Potential of wind-power engineering in Belarus

The area on which can be placed RSE, sqkm 499

Quantity of platforms on which can be placed RSE

1840

Mid-annual background speed of a wind at height of 10 m, m/s

4,9 - 5,3

The maximum mid-annual speed of a wind taking into account local conditions in km/s:

 

at height of 10 m 5,8 - 6,2at height of 50 m 7,4 - 7,8

Page 4: Innovative projects on renewed energy sources

-

Oshmiani district 25 MW

Liozno district 50 MW

Grodno

Novogrudok district 25 MW

Smorgon district15 MW

Dzerzhinsk district 60 MW

Projects suggested for implementationOn building wind farm

windfarm

MINSK

Vitebsk

Mogilev

Gomel

Brest

4

Page 5: Innovative projects on renewed energy sources

5

Characteristics of projects

DistrictHeight above sea level, m

Average speed at height of 50 m, m/s

Installed capacity

Realization terms

Requirement for investments, million euro

Dzerjinsk 300 - 350 6,5 – 7,5 60 MW 2011-2015 78

Liozno 200 - 300 6 - 7 50 MW 2011-2015 65

Oshmiani 250 - 310 6 – 7,5 25 MW 2011-2015 32,5

Novogrudok 250 - 300 6 - 7 25 MW 2011-2015 32,5

Smorgon 250 - 320 6 – 7,5 15 MW 2011-2015 19,5

Page 6: Innovative projects on renewed energy sources

The HYDROELECTRIC POWER STATION cascade on the river Zapadnaya Dvina

6

Page 7: Innovative projects on renewed energy sources

HYDROELECTRIC POWER STATION characteristics on the rivers Neman and Zapadnaya Dvina

HPS Nemnovo Verkhnedvinsk Beshenkovichi Vitebsk

Installed capacity, MW

20 29 30.5 40

Construction cost, $mln. (estimated)

130 203 210 280

Current status of project

Investments justification

study

technical

assignment

investments justification study

7

Page 8: Innovative projects on renewed energy sources

8

Page 9: Innovative projects on renewed energy sources

The main data as well as technical and economic indicators of the investment projects “Cascade of

hydropower plants on the Dnieper river”

Name of project Estimated installed capacity, MW

Estimated projectcost, mln. USD

Construction of the Orsha hydropower plant

5.65 26.0

Construction of the Shklov hydropower plant

4.89 19.0

Construction of the Zhlobin hydropower plant

9 42.0

Construction of the Vilyakhovka hydropower

plant

2.83 41.0

Construction of the Mogilev hydropower plant

15 71.0

Construction of the Rechitsa hydropower plant

4.6 34.09

Page 10: Innovative projects on renewed energy sources

10

Ways of realization of projects

Creation of foreign enterprise which operates like structures “BOT” (Build, Own and Transfer), “BOO” (Build, Own and Operate), combined “BOOT” (Build, Own, Operate and Transfer);

Realization of investment project on basis of concession;

Creation of joint venture with state ownership participation;

Realization of the investment project with attraction of credit resources of foreign banks.

Page 11: Innovative projects on renewed energy sources

11

The State guarantees for the investor

The Decree of the President of the Republic of Belarus of March 21, 2008 No. 168 “On certain measures of investment projects implementation, which are financed at the expense of external governmental loans (credits)”

it provides for gaining benefits and additional advantages, including participation in implementation of the investment object on a noncompetitive basis, immunity from imported equipment taxation.

Page 12: Innovative projects on renewed energy sources

12

The State guarantees for the investor

The Decree of the President of the Republic of Belarus of August 6, 2009 No. 413 “On granting of authority to individuals and legal persons for representation of interests of the Republic of Belarus regarding attraction of investments to the Republic of Belarus”

it grants a power to investment agents to perform all necessary procedures regarding attraction of investment to the Republic of Belarus for implementation of investment projects.

Page 13: Innovative projects on renewed energy sources

13

The State guarantees for the investor

The Decree of the President of the Republic of Belarus of August 6, 2009 No. 10 «On creation of additional conditions for investment activity in the Republic of Belarus”

it defines that implementation of investment projects on the territory of the Republic of Belarus may be realized by means of conclusion of investment contract between investor and the Republic of Belarus on the basis of resolution of republican governmental body, in case when the implementation of investment project is within the framework of appropriate branch and within the competence of governmental body.

Page 14: Innovative projects on renewed energy sources

14

The State guarantees for the investor

By the Decree of the President of the Republic of Belarus of December 27, 2007 No. 667 Regulation on procedure for final land allocation (withdrawal) was adopted

there is a possibility of transfer of land to legal persons, who are the residents of the Republic of Belarus, with the right of private ownership or for lease, and for nonresidents only for lease.

Page 15: Innovative projects on renewed energy sources

15

Buying of energy from investor’s electricity generating plants

According to the Decision of the Ministry of Economic Affairs of the Republic of Belarus of May 31, 2006 No. 91 promotional rates for electric energy, produced at wind-driven power plant are stipulated

First five years from the day of putting into operation – 1,3;

Next five years of service – 0,85;

More than ten years of service – 0,7.

Base rate 14,6 American cents for 1 kilowatt of energy per hour