Innovative projects on renewed energy sources
2
Main objectives of realization of investment projects in the republic of Belarus
The purpose: Increase of power safety of The Republic of
Belarus Diversification deliveries of power resources
to The Republic of Belarus Attraction of direct investments to republic of
Belarus
3
Potential of wind-power engineering in Belarus
The area on which can be placed RSE, sqkm 499
Quantity of platforms on which can be placed RSE
1840
Mid-annual background speed of a wind at height of 10 m, m/s
4,9 - 5,3
The maximum mid-annual speed of a wind taking into account local conditions in km/s:
at height of 10 m 5,8 - 6,2at height of 50 m 7,4 - 7,8
-
Oshmiani district 25 MW
Liozno district 50 MW
Grodno
Novogrudok district 25 MW
Smorgon district15 MW
Dzerzhinsk district 60 MW
Projects suggested for implementationOn building wind farm
windfarm
MINSK
Vitebsk
Mogilev
Gomel
Brest
4
5
Characteristics of projects
DistrictHeight above sea level, m
Average speed at height of 50 m, m/s
Installed capacity
Realization terms
Requirement for investments, million euro
Dzerjinsk 300 - 350 6,5 – 7,5 60 MW 2011-2015 78
Liozno 200 - 300 6 - 7 50 MW 2011-2015 65
Oshmiani 250 - 310 6 – 7,5 25 MW 2011-2015 32,5
Novogrudok 250 - 300 6 - 7 25 MW 2011-2015 32,5
Smorgon 250 - 320 6 – 7,5 15 MW 2011-2015 19,5
The HYDROELECTRIC POWER STATION cascade on the river Zapadnaya Dvina
6
HYDROELECTRIC POWER STATION characteristics on the rivers Neman and Zapadnaya Dvina
HPS Nemnovo Verkhnedvinsk Beshenkovichi Vitebsk
Installed capacity, MW
20 29 30.5 40
Construction cost, $mln. (estimated)
130 203 210 280
Current status of project
Investments justification
study
technical
assignment
investments justification study
7
8
The main data as well as technical and economic indicators of the investment projects “Cascade of
hydropower plants on the Dnieper river”
Name of project Estimated installed capacity, MW
Estimated projectcost, mln. USD
Construction of the Orsha hydropower plant
5.65 26.0
Construction of the Shklov hydropower plant
4.89 19.0
Construction of the Zhlobin hydropower plant
9 42.0
Construction of the Vilyakhovka hydropower
plant
2.83 41.0
Construction of the Mogilev hydropower plant
15 71.0
Construction of the Rechitsa hydropower plant
4.6 34.09
10
Ways of realization of projects
Creation of foreign enterprise which operates like structures “BOT” (Build, Own and Transfer), “BOO” (Build, Own and Operate), combined “BOOT” (Build, Own, Operate and Transfer);
Realization of investment project on basis of concession;
Creation of joint venture with state ownership participation;
Realization of the investment project with attraction of credit resources of foreign banks.
11
The State guarantees for the investor
The Decree of the President of the Republic of Belarus of March 21, 2008 No. 168 “On certain measures of investment projects implementation, which are financed at the expense of external governmental loans (credits)”
it provides for gaining benefits and additional advantages, including participation in implementation of the investment object on a noncompetitive basis, immunity from imported equipment taxation.
12
The State guarantees for the investor
The Decree of the President of the Republic of Belarus of August 6, 2009 No. 413 “On granting of authority to individuals and legal persons for representation of interests of the Republic of Belarus regarding attraction of investments to the Republic of Belarus”
it grants a power to investment agents to perform all necessary procedures regarding attraction of investment to the Republic of Belarus for implementation of investment projects.
13
The State guarantees for the investor
The Decree of the President of the Republic of Belarus of August 6, 2009 No. 10 «On creation of additional conditions for investment activity in the Republic of Belarus”
it defines that implementation of investment projects on the territory of the Republic of Belarus may be realized by means of conclusion of investment contract between investor and the Republic of Belarus on the basis of resolution of republican governmental body, in case when the implementation of investment project is within the framework of appropriate branch and within the competence of governmental body.
14
The State guarantees for the investor
By the Decree of the President of the Republic of Belarus of December 27, 2007 No. 667 Regulation on procedure for final land allocation (withdrawal) was adopted
there is a possibility of transfer of land to legal persons, who are the residents of the Republic of Belarus, with the right of private ownership or for lease, and for nonresidents only for lease.
15
Buying of energy from investor’s electricity generating plants
According to the Decision of the Ministry of Economic Affairs of the Republic of Belarus of May 31, 2006 No. 91 promotional rates for electric energy, produced at wind-driven power plant are stipulated
First five years from the day of putting into operation – 1,3;
Next five years of service – 0,85;
More than ten years of service – 0,7.
Base rate 14,6 American cents for 1 kilowatt of energy per hour
16
THANKS FOR ATTENTION!!!