Page 1
INNOVATION IN PRECAST CONCRETE BRIDGESPROF MAHESHTANDON
MANAGING DIRECTOR, TANDON CONSULTANTS PVT LTDDISTINGUISHED VISITING PROFESSOR IIT GANDHINAGAR
IAHE-WORLD BANK 20 FEB15
PRESIDENT<INDIAN SOCIETY OF WIND ENGINEERING
PRESIDENT<INDIAN ASSOCIATION OF STRUCTURAL ENGINSSRS
KU
ALA
LU
MP
UR
-PU
TRA
JA
YA
HIG
HW
AY
: P
AC
KA
GE 5
(RA
MP
4)
Page 7
BARAPULLA ELEVATED ROAD
TRADITIONAL BOX GIRDER SEGMENTS OF FULL ROADWAY WIDTH
Page 8
BARAPULLA ELEVATED CORRIDOR: LAYOUT AND COMPLETED STRUCTURE
8
Page 12
ELEVATED ROAD ABOVE BARAPULLA STREAM 2*4.5= 9km
Page 13
CASTING-STACKING YARD
Page 14
TRANSPORTATION OF BIG SEGMENTS OF MAJOR CROSSING
Page 15
SEGMENT ERECTION TECHNIQUE
BARARULLA ELEVATED CORRIDOR
Page 16
SPECIAL CROSSINGS: SEGMENT ERECTION
Page 17
SPECIAL CROSSINGS: SEGMENT ERECTION
Page 18
THE RAILWAY CROSSING UNDER CONSTRUCTION
OPERATION MIDNIGHT: 2 hrs, alternate days
18
Page 19
LALA LAJPAT RAI CROSSING NO DISTURBANCE TO TRAFFIC
19
Page 20
LLR: SIMULTANEOUS PROGRESS OF BOTH CARRIAGEWAYS
Page 23
BANGALORE ELECTRONIC CITY
EXPRESSWAY
TRADITIONAL BOX GIRDER SEGMENTS OF FULL ROADWAY WIDTH
Page 24
FIG I. BANGALORE HOSUR EXPRESSWAY
Page 25
PRECAST SEGMENT TRANSPORTED BY LOW BEDDED TRAILOR TO SITE
Page 26
BANGALORE-ELECTRONIC CITY X’WAY: SEGMENT ARRIVAL AT SITE
Page 27
PRECAST SEGMENTS SUSPENDED FROM MAIN TRUSS DURING ERECTION
Page 28
GENERAL VIEW OF PRECAST SEGMENTAL CONSTRUCTION
WITH OVERHEAD LAUNCHING TRUSS
Page 29
MUMBAI AMBEDKAR ROAD FLYOVERS
BOX GIRDER SEGMENTS OF HALF ROADWAY WIDTH
Page 32
PILING IN DIFFICULT CONDITIONS CREATED BY OLD WATER MAINS
Page 33
PERSPECTIVE :1 - TOP VIEW
Page 34
PERSPECTIVE :2 - BOTTOM VIEW
Page 35
AMBEDKAR ROAD FLYOVER, MUMBAI, AFTER COMPLETION
Page 36
READY FOR MATCH CASTING
Page 37
MATCH-CASTING IN PROGRESS
Page 38
CASTING YARD MOULDS WITH ADJUSTABLE BED
Page 39
PREPARATION FOR LAST SPAN ERECTION
Page 40
PRECAST SEGMENTAL FLYOVERS FOR DELHI GOVT. ERECTION
OFFOURINDEPENDENT SUB-BRIDGES
IN PROGRESS
PRECAST SEGMENTAL FLYOVERS FOR DELHI GOVT. ERECTION
OFFOURINDEPENDENT SUB-BRIDGES
IN PROGRESS
ERECTION TRUSS WT 52t
1 2 3 4
Page 41
STRESSING
DELHI FLYOVERS:
CONSTRUCTION METHODOLOGY
Page 42
COHIN PORT CONNECTIVITY BRIDGE FULL GIRDERS DIFFICULT TO ERECT
GIRDERS CAN BE TRANSPORTED ONLY BY BARGE
SECTION OF HALF-DECK FOR 45m SPAN
Page 44
HANGING GIRDERS OF GURGAON:
NEARING COMPLETION
Page 45
VIEW OF CASTING YARD SHOWING STORAGE OF GIRDER SEGMENTS
Page 46
85t PLATE GIRDERS USED FOR SEGMENT ASSEMBLY
Page 47
GIRDER SEGMENTS Wt 30t EACH
Page 48
80t BARGE MOUNTED CRANE ERECTING THE GIRDER SEGMENTS
Page 49
SEGMENTS PLACED WITH GAPS ON ASSEMBLY GIRDER
TOTAL WT 150t
Page 50
SEGMENT SPLICING AND DIAPHRAGM STUBS
Page 52
JURL (E18 BRIDGE): FULL SPAN LAUNCHING
Page 53
SHOWING LAUNCHING GIRDERS, LIFTING PORTALS AND
POSITIONED PSC BOX GIRDERS
JAMMU UDHAMPUR RAIL LINK - VIADUCT E18
LAUCHING GIRDER
LIFTING PORTAL
HOLLOW CIRCULAR
RCC PIERS
UP TO 30m HIGH
Page 54
JURL: VIADUCT E18
LIFTING OF PSC GIRDER IN ORDER TO MOVE LAUNCHING GIRDER
FORWARD
400T PSC GIRDERCOUNTER WEIGHT
Page 55
JURL (E18 BRIDGE): FULL SPAN LAUNCHING
Page 58
DFCC: SEQUENCE OF ERECTION
Page 62
FULL SPAN PRECAST U GIRDER FOR EACH TRACK
AIRPORT LINE DELHI
MUMBAI
COCHIN
LUCKNOW
Simple spans upto 28m
METRO
Page 63
PRECAST SEGMENTAL U GIRDER FOR TWO TRACKS
DELHI LINE 3