1
NOTE 7 NOTE 7 EDGE STRIP SCALE 1:20 SEE NOTES DRAINAGE HOLE WHERE SPECIFIED SHALL BE LINED WITH 150x75 RHS EXTENDING FROM KERB FACE TO 50mm BEHIND BACK OF KERB. 0 0 SEE NOTE 7 � -'�<>/> 30 KERB ONLY ROAD NOTES 1 : 1. CONCRETE STRENGTH A) KERB, KERB GUTTER, FOOTPATH, CYCLEWAY, VEHICLE CROSSING, PRAM RAMP, EDGE STRIP: 25MPA O 28 DAYS B) DISH CROSSING, ROAD PTFORM/HUMP, ROAD SB: 40MPA 0 28 DAYS C) FOR TRAFFICKED AREAS WHERE FACILITY MUST BE OPEN TO TRAFFIC WITHIN 12 HOURS (EG VEHICLE CROSSING, ROAD SB, DISH CROSSING, ROAD PTFORM/HUMP: 40 MPA WITH ACCELERATOR SUCH AS 2" CACL (REFER TO SP40HC). 2. CONCRETE FINISH A) KERB, GUTTER, YBACK, DISH CROSSING, PIT (OUTER EXPOSED) -STEEL TROWEL B) VEHICLE CROSSINGS, FOOTPATH, CYCLEWAY, ROAD SBS, PRAM RAMP, ROAD HUMPS/RAMPS -BROOM/BRUSH. 3. REINRCEMENT A) TO AS 4671 H) CONTRACTION/DUMMY JOINTS (UNREINFORCED CONCRETE) - NOMINALLY AT 3M INTERVALS OR EQUALLY BETWEEN EXPANSION JOINTS BUT NOT LESS THAN THE CONCRETE WIDTH BETWEEN JOINTS/EDGES. 5. KERB RAMPS A) SEE STANDARD PN F4. 6. EXCAVATION D) AT ALL JOINS TO EXISTING CONCRETE/ASPHALT -THE JOIN SHALL BE SAW CUT BEFORE EXCAVATION. E) ALL EXCAVATED MATERIAL SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT A LICENSED WASTE DISPOSAL FACILITY. 7. ROAD BASE A) ROAD BASE SHALL BE PROVIDED BENEATH KERBS, GUTTERS, APRONS AND DISH CROSSINGS WITH 150MM THICK RECYCLED COMPACTED DGB20 OR 150mm THICK LEAN MIX CONCRETE. B) COMPACTION: 95" STANDARD. 1 5Om m INTEGRAL KERB & GUTTER 1. CSS A REFERS TO RESIDENTIAL USE. 2. CSS B REFERS TO GARDEN BED SURROUND ONLY. ROLL KERB SCALE 1:20 B) MINIMUM COVER: 50MM 4 . JOINNG, MINIMUM DIMENSIONS, AND REINFORCEMENT IN CONCRETE SBS C) RECYCLED DGB SPECIFICATION: FOR SUPP OF RECYCLED MATERIAL FOR PAVEMENTS, EARTHWORKS, AND DRAINAGE REFER TO SPECIFICATION FOR SUPPLY OF RECYCLED SCALE 1:20 MATERIAL FOR PAVEMENTS, EARTHWORKS AND DRAINAGE' BY IPWEA (NSW) (TEST EDITION). SCALE 1:20 SEE NOTE o CSS A 60 CSS B 160 CSS C 225 (SEE NOTES) MOUNTABLE KERB-TYPE 1 (OVER ASPHALT SCALE 1:20 FOR NEW FOOTPATH: SAWCUT SANDSTONE FOR THE LENGTH OF WORK t CONC.) 3. CSS C REFERS TO MEDIUM DENSITY COMMERCIAL AND INDUSTRIAL USE. MOUNTABLE o CSS A 60 CSS B 160 CSS C 225 (SEE NOTES) N12o DOWEL, 300mm LONG EMBEDDED 200mm INTO PAVEMENT, AT 300mm CENTRES KERB-TYPE 2 (OVER CONCRETE SLAB) SCALE 1 :20 200 (OR MAtCH , , 0 TO EXI STI NG i /i 1 50 G- -- - EXISTING SANDSTONE KERB TO REMAIN. RESET HERITAGE SANDSTONE GUER. DOWELS (12mm DIA & 450mm LENGTH) AT 500mm c/c. DOWELS CAN BE OMITTED WHERE PAVED FOOTPATH PROVIDED AT BACK OF KERB SANDSTONE DETAIL(WITH PROVIDE 100mm THICK CONCRETE FOOTING KERB RESETTING S/STONE GUTTER) SCALE 1:20 SANDSTONE RESETTING 150MM THICK LEAN CONCRETE. GUTTER DETAIL SCALE 1:20 N12o DOWEL, 300mm LONG EMBEDDED 150mm INTO PAVEMENT, AT 300mm CENTRES TYPICAL BULLNOSE KERB TYPICAL SM KERB DETAIL (ASPHALT ROADS) (CONCRETE ROADS) SCALE 1:20 SCALE 1:20 SEE TABLE 1 X N URFACE SEE REINFORCED DISH CROSSING FOR NEW FOOTPATH: SAWCUT SANDSTONE FOR THE LENGTH OF WORK DOWE (12mm DIA & 450mm LENGTH) AT 500mm c/c. DOWE CAN BE OMITTED WHERE PAVED FOOTPATH PROVIDED AT BACK OF KERB SANDSTONE SCALE 1:20 RESET HERITAGE SANDSTONE KERB. TABLE 1: DISH CROSSING WIDTHS (X VALUE) TYPE X (WIDTH) 1 300 2 450 3 600 PROVIDE 100mm THICK CONCRETE FOOTING KERB RESETTING DETAIL (WITH CONC GUTTER) DOWE (12mm DIA 450mm LENGTH) AT 500mm c/c. DOWE CAN BE OMITTED WHERE PAVED FOOTPATH PROVIDED AT BACK OF KERB SCALE 1:20 20 NEW DIMENSION SANDSTONE KERB. 150mm WIDE, 300mm DEEP 900-1000mm LENGTH, WITH ONE LONG A) ANY RECONSTRUCTED SECTION OF CONCRETE SHALL HAVE A MINIMUM DIMENSION OF 900MM IN ANY DIRECTION. B) ALL JOINTS SHALL BE AT RIGHT ANGLES UNLESS DIRECTED OTHERWISE BY THE COUNCIL ENGINEER. C) EXPANSION JOINTS WILL BE ALIGNED WITH ADJOINING FOOTPARH/ROAD JOINTS. D) EXPANSION JOINTS (REINFORCED CONCRETE, IE DISH CROSSINGS YBACKS): 10MM APPROVED BITUMEN FILLER AT MAXIMUM 12M INTERVALS, WITH 12MM DIA DEFORMED HOT DIPPED GALVANISED DOWELS, 600MM LONG, AT 500MM CENTRES WITH UPVC SLEEVE AND LEG - MINIMUM 2 DOWELS/JOINT, WITH NO DOWEL CLOSER THAN 150MM TO A VERTICAL EDGE. 'CONNELLY' JOINTS OR EQUIVALENT MAY BE USED. E) ALL DOWELS SHALL BE PERFECTLY ALIGNED IN PN VIEW AND IN ELEVATION, IE THE DOWELS SHALL NOT BE SPYED RELEVANT TO EACH OTHER. F) ALL EXPANSION JOINT MATERIAL SHALL BE THE SAME THICKNESS OF THE CONCRETE AND BE IN ONE LENGTH WIDTH. G) AT ALL EXPANSION JOINTS, ANY 'SPILL' CONCRETE FROM THE PREVIOUS POUR (IE SEPARATE TO THE FINISHED CONCRETE) SHALL BE REMOVED. ELSHOLZ- NEARSIDE INSTALTION SCALE 1:20 R25 R25 PROVIDE 100mm THICK CONCRETE FOOTING IDE HALF BULLNOSE. COLOUR GUINEA GOLD OF GOSFORD QUARRIES PRODUCT OR SIMIR ELSHOLZ- TYPICAL MEDIAN INSTALLATION FLEXIBLE PAVEMENT SCALE 1:20 400 MIN. TYPICAL 1 SOMM DIMENSION R25 R25 SANDSTONE KERB SCALE 1:10 N12o DOWEL, 300mm LONG EMBEDDED 200mm INTO PAVEMENT, AT 300mm CENTRES BARRIER SHELL BE SET IN A CONTINUOUS KEYED FOUNDATION AS SHOWN OR 8. RESTORATION OF ADJOINING ROAD PAVEMENT A) SHALL MATCH EXISTING IF APPROVED BY COUNCIL ENGINEER OR BE CARRIED OUT WITH FULL DEPTH AC20 AND AC10, WITH THE SURFACE FINISH BEING WITH AC10 (MINIMUM THICKNESS 30MM). B) AC SHALL CONFORM TO RMS SPECIFICATION R116 - 'ASPHALT (DENSE AND OPEN GRADED)'. 9. UTILITIES, SERVICES & SURVEY MARKS A) ALL UNDERGROUND UTILITY SERVICES SHALL BE CHECKED FOR LEVEL AND LOCATION PRIOR TO COMMENCEMENT OF WORKS, BY THE CONTRACTOR. B) ALL SERVICE COVERS AFFECTED BY THE WORKS SHALL BE ADJUSTED AS REQUIRED AND TO SUIT THE LEVELS OF THE NEW WORK. NO SERVICE FIINGS SHALL BE COVERED. C) PROPERTY STORMWATER PIPES: WHERE AFFECTED, SHALL BE REPCED WITH 90MM UPVC OR TO SUIT EXISTING AND INVERT SHALL MATCH THE GUTTER LEVEL. D) STATE SURVEY MARKS (SSM'S) -SHALL NOT BE DISTURBED UNLESS APPROVED BY THE COUNCIL ENGINEER. E) AT ALL LIGHT/POWER POLES, THE CONCRETE SHALL BE ENDED 150MM CLEAR OF THE POLE AND THE GAP FILLED WITH 30MM OF 10MM COLDMIX/ASPHAIC CONCRETE. 10. NATURE STRIP RESTORATION A) MATCH EXISTING TURF. B) IF NEW TURF IS SPECIFIED - USE SOFT LEAF BUFFALO 'SHADEMASTER', ID ON 1OOMM THICK PREPARED TOPSOIL, AS SPECIFIED BY THE COUNCIL ENGINEER. 11. EXISTING SIGNAGE A) SUCH SIGNAGE SHALL BE REINSTATED UNLESS THE COUNCIL ENGINEER ADVISES OTHERWISE. B) SIGNS REPCED OR NEW, WITHIN THE NEW CONCRETE SHALL BE INSTALLED WITH A V-LOK. C) HERITAGE STREET NAME SIGNS EMBEDDED IN FOOTPATH PAVING AND KERBS - CAUTION SHALL BE EXERCISED TO NOT DAMAGE THESE SIGNS AND THE CONTRACTOR SHALL LIAISE WITH THE COUNCIL ENGINEER TO DETERMINE WHAT ACTION TO IMPLEMENT WHERE DISTURBANCE OF THE SIGN IS ESSENTIAL. 12. RESIDENT NOTIFICATION A) ALL RESIDENTS AFFECTED BY THE WORKS SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS BEFORE THE RELEVANT WORK COMMENCES AND ANY REASONABLE REQUESTS ACCOMMODATED. 13. SAFE/SIGNAGE/ACCESS A) DURING CONSTRUCTION, ADEQUATE WARNING SIGNS AND BARRICADING SHALL BE PROVIDED TO ENSURE THAT THE WORK SITE MEETS THE REQUIREMENTS OF AS 1742.2 1743.3, AND TO PROVIDE ADEQUATE PROTECTION TO PEDESTRIANS MOTORISTS. B) ADEQUATE AND SAFE ACCESS FOR PEDESTRIANS SHALL BE PROVIDED AT ALL TIMES. C) AT DRIVEWAYS -PREVENTION OF ACCESS SHALL BE KEPT TO AN ABSOLUTE MINIMUM AND ARRANGEMENTS SHALL BE MADE WITH THE RESIDENT/BUSINESS, BY THE CONTRACTOR, FOR A SUITABLE DAY/TIME FOR THIS WORK. USE OF HIGHER STRENGTH CONCRETE, WITH SHORTER CURING TIME MAY BE NECESSARY. 14. DIMENSIONS A) ALL DIMENSIONS ARE IN MILLIMETERS UNLESS SHOWN OTHERWISE. 15.GENERAL A) ALL WORKS SHALL BE CARRIED OUT TO COUNCl�S SPECIFICATION, TO BEST PRACTICE STANDARDS, AND TO THE SATISFACTION OF COUNCIL'S SUPERVISING ENGINEER. B) DURING AND AFTER EXCAVATION, ANY UNSOUND AREAS BELOW THE CONCRETE WORK SHALL BE DRAWN TO THE COUNCIL ENGINEER'S ATTENTION, TO ESTABLISH IF ANY ADDITIONAL EXCAVATION/ BASE COURSE IS NECESSARY. C) THE WORK SITE SHALL BE KEPT IN A CLEAN, TIDY, AND SAFE CONDITION AT ALL TIMES AND TO THE SATISFACTION OF COUNCIL'S ENGINEER. 16. DOCUMENT PRIORITY A) THIS PN SUPERSEDES ANY STATEMENTS ON OTHER DOCUMENTS, EG SPECIFICATIONS, OTHER PNS, ETC, UNLESS ADVISED BY THE COUNCIL ENGINEER. 17, INSPECONS INSPECTIONS BY THE COUNCIL SUPERVISING ENGINEER SHALL BE REQUIRED AT THE FOLLOWING STAGES AND AS OTHERWISE DIRECTED BY THE COUNCIL ENGINEER:- TYPICAL BULLNOSE KERB (ASPHALT ROADS) TYPICAL SM KERB DETAIL DIMENSIONS OF U1-12 BARS DEPENDENT ON BRIDGE DECK OR CONCRETE PAVEMENT DESIGN DOWELLED TO CONCRETE PAVEMENT AT 1000 c/c USING 28 DOWELS (240 LONG) A) EXCAVATION COMPLETED, B) DGB PCES AND COMPACTED. (ORIGINAL = A3 SHEET) CHìKED & D R NUON SU D DIGNí PG/D Y 201+ DWN PG/DJT Y 201+ Q SCALE 1:20 INNER WES COUNCIL SC D S.R / SU. GEN. R.TA AG.L / SH PIPN N WATER / OS N ELEIC NCE OF K & GR NOTIC ÚTE (CONCRETE ROADS) SCALE 1:20 SEICES DUM COM/OS -T-T-T-T- A. H. -G-G- S -s-s- SCALES WA - LY -R-R- El. ಫ -E-E-E-E- 1 :20 OIL PIPN -P-PPP- ORM WAT ---- D. D M DCRION ELSHOLZ- NARROW MEDIAN CONCRETE PAVEMENT AND BRIDGE DECKS SCALE 1:20 C) FORMWORK AND REINFORCEMENT SET. D) CONCRETE POURED AND CURED. E) COMPLETED. INNER WEST COUNCIL STANDARD ROADS DRAWING - R1 STANDARD KERB PROFILES NO. SHE NO. P NO. R1 VERSION V1

INNER WEST COUNCIL

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INNER WEST COUNCIL

NOTE 7

NOTE 7 EDGE STRIP SCALE 1:20

SEE

NOTES

DRAINAGE HOLE WHERE SPECIFIED SHALL BE LINED WITH 150x75 RHS EXTENDING FROM KERB FACE TO 50mm BEHIND BACK OF KERB.

0 0

SEE NOTE 7 �-i; -.............'�<>x:/> �

30

KERB ONLY

ROAD NOTES 1 : 1. CONCRETE STRENGTH

A) KERB, KERB ac GUTTER, FOOTPATH, CYCLEWAY, VEHICLE CROSSING, PRAM RAMP, EDGE STRIP: 25MPA O 28 DAYS

B) DISH CROSSING, ROAD PLATFORM/HUMP, ROAD SLAB: 40MPA 0 28 DAYS

C) FOR TRAFFICKED AREAS WHERE FACILITY MUST BE OPEN TO TRAFFIC WITHIN 12 HOURS (EG VEHICLE CROSSING, ROAD SLAB, DISH CROSSING, ROAD PLATFORM/HUMP: 40 MPA WITH ACCELERATOR SUCH AS 2" CACL (REFER TO SP40HC).

2. CONCRETE FINISH A) KERB, GUTTER, LAYBACK, DISH CROSSING, PIT (OUTER

EXPOSED) -STEEL TROWEL B) VEHICLE CROSSINGS, FOOTPATH, CYCLEWAY, ROAD SLABS,

PRAM RAMP, ROAD HUMPS/RAMPS -BROOM/BRUSH. 3. REINFORCEMENT

A) TO AS 4671

H) CONTRACTION/DUMMY JOINTS (UNREINFORCED CONCRETE) -NOMINALLY AT 3M INTERVALS OR EQUALLY BETWEEN EXPANSION JOINTS BUT NOT LESS THAN THE CONCRETE WIDTH BETWEEN JOINTS/EDGES.

5. KERB RAMPSA) SEE STANDARD PLAN F4.

6. EXCAVATIOND) AT ALL JOINS TO EXISTING CONCRETE/ASPHALT -THE JOIN

SHALL BE SAW CUT BEFORE EXCAVATION. E) ALL EXCAVATED MATERIAL SHALL BE REMOVED FROM THE

SITE AND DISPOSED OF AT A LICENSED WASTE DISPOSAL FACILITY.

7. ROAD BASEA) ROAD BASE SHALL BE PROVIDED BENEATH KERBS, GUTTERS,

APRONS AND DISH CROSSINGS WITH 150MM THICK RECYCLED COMPACTED DGB20 OR 150mm THICK LEAN MIX CONCRETE.

B) COMPACTION: 95" STANDARD.

1 5Om m INTEGRAL KERB & GUTTER

1. CLASS A REFERS TO RESIDENTIAL USE. 2. CLASS B REFERS TO GARDEN BED

SURROUND ONLY.

ROLL KERB SCALE 1 :20

B) MINIMUM COVER: 50MM 4. JOINTING, MINIMUM DIMENSIONS, AND

REINFORCEMENT IN CONCRETE SLABS

C) RECYCLED DGB SPECIFICATION: FOR SUPPLY OF RECYCLED MATERIAL FOR PAVEMENTS, EARTHWORKS, AND DRAINAGE REFER TO SPECIFICATION FOR SUPPLY OF RECYCLED

SCALE 1:20 MATERIAL FOR PAVEMENTS, EARTHWORKS AND DRAINAGE' BY IPWEA (NSW) (LATEST EDITION).

SCALE 1 :20

SEE NOTE

�..._o CLASS A 60 CLASS B 160 CLASS C 225 (SEE NOTES)

MOUNTABLE KERB-TYPE 1 (OVER ASPHALT

SCALE 1:20

FOR NEW FOOTPATH: SAWCUT SANDSTONE

FOR THE LENGTH OF WORK

� t

CONC.)

3. CLASS C REFERS TO MEDIUM DENSITY COMMERCIAL AND INDUSTRIAL USE.

MOUNTABLE

..._o CLASS A 60 � CLASS B 160

CLASS C 225 (SEE NOTES)

N12111 DOWEL, 300mm LONG EMBEDDED 200mm INTO PAVEMENT, AT 300mm CENTRES

KERB-TYPE 2 (OVER CONCRETE SLAB)

SCALE 1 :20

200 (OR MAtCH .:..,, , 0 1/ TO EXISTINGi...= /i...1,-•,;;5071..---/--------i

EXISTING SANDSTONE KERB TO REMAIN. RESET

HERITAGE SANDSTONE GUTTER.

DOWELS (12mm DIA & 450mm LENGTH) AT 500mm c/c. DOWELS CAN BE OMITTED WHERE PAVED FOOTPATH PROVIDED AT BACK OF KERB

SANDSTONE DETAIL(WITH

PROVIDE 1 00mm THICK CONCRETE FOOTING

KERB RESETTING S/STONE GUTTER) SCALE 1:20

SANDSTONE RESETTING

150MM THICK LEAN CONCRETE.

GUTTER DETAIL

SCALE 1 :20

N12111 DOWEL, 300mm LONG EMBEDDED 150mm INTO PAVEMENT, AT 300mm CENTRES

TYPICAL BULLNOSE KERB TYPICAL SM KERB DETAIL

(ASPHALT ROADS) (CONCRETE ROADS)

SCALE 1:20 SCALE 1 :20

SEE TABLE 1 � X

N URFACE

SEE

REINFORCED DISH CROSSING

FOR NEW FOOTPATH: SAWCUT SANDSTONE

FOR THE LENGTH OF WORK

DOWELS (12mm DIA & 450mm LENGTH) AT 500mm c/c. DOWELS CAN BE OMITTED WHERE PAVED FOOTPATH PROVIDED AT BACK OF KERB

SANDSTONE

SCALE 1:20

RESET HERITAGE SANDSTONE KERB.

TABLE 1: DISH CROSSING WIDTHS (X VALUE)

TYPE X (WIDTH) 1 300 2 450

3 600

PROVIDE 100mm THICK CONCRETE FOOTING

KERB RESETTING DETAIL (WITH CONC GUTTER)

DOWELS (12mm DIA ac 450mm LENGTH) AT 500mm c/c. DOWELS CAN BE OMITTED WHERE PAVED FOOTPATH PROVIDED AT BACK OF KERB

SCALE 1 :20

20

NEW DIMENSION SANDSTONE KERB. 150mm WIDE, 300mm DEEP ac 900-1000mm LENGTH, WITH ONE LONG

A) ANY RECONSTRUCTED SECTION OF CONCRETE SHALL HAVE A MINIMUM DIMENSION OF 900MM IN ANY DIRECTION.

B) ALL JOINTS SHALL BE AT RIGHT ANGLES UNLESS DIRECTED OTHERWISE BY THE COUNCIL ENGINEER.

C) EXPANSION JOINTS WILL BE ALIGNED WITH ADJOINING FOOTPARH/ROAD JOINTS.

D) EXPANSION JOINTS (REINFORCED CONCRETE, IE DISH CROSSINGS ac LAYBACKS): 10MM APPROVED BITUMEN FILLER AT MAXIMUM 12M INTERVALS, WITH 12MM DIA DEFORMED HOT DIPPED GALVANISED DOWELS, 600MM LONG, AT 500MM CENTRES WITH UPVC SLEEVE AND LEG - MINIMUM 2 DOWELS/JOINT, WITH NO DOWEL CLOSER THAN 150MM TO A VERTICAL EDGE. 'CONNELLY' JOINTS OR EQUIVALENT MAY BE USED.

E) ALL DOWELS SHALL BE PERFECTLY ALIGNED IN PLAN VIEW AND IN ELEVATION, IE THE DOWELS SHALL NOT BE SPLAYED RELEVANT TO EACH OTHER.

F) ALL EXPANSION JOINT MATERIAL SHALL BE THE SAME THICKNESS OF THE CONCRETE AND BE IN ONE LENGTH ac WIDTH.

G) AT ALL EXPANSION JOINTS, ANY 'SPILL' CONCRETE FROM THE PREVIOUS POUR (IE SEPARATE TO THE FINISHED CONCRETE) SHALL BE REMOVED.

ELSHOLZ- NEARSIDE INSTALLATION SCALE 1:20

R25 R25

PROVIDE 100mm THICK CONCRETE FOOTING

IDE HALF BULLNOSE. COLOUR GUINEA GOLD OF GOSFORD QUARRIES PRODUCT OR SIMILAR

ELSHOLZ- TYPICAL MEDIAN INSTALLATION FLEXIBLE PAVEMENT

SCALE 1:20 400 MIN.

TYPICAL 1 SOMM DIMENSION R25 R25

SANDSTONE KERB SCALE 1 :10

N12111 DOWEL, 300mm LONG EMBEDDED 200mm INTO PAVEMENT, AT 300mm CENTRES

BARRIER SHELL BE SET IN A CONTINUOUS KEYED FOUNDATION AS SHOWN OR

8. RESTORATION OF ADJOINING ROAD PAVEMENT A) SHALL MATCH EXISTING IF APPROVED BY COUNCIL ENGINEER

OR BE CARRIED OUT WITH FULL DEPTH AC20 AND AC10, WITH THE SURFACE FINISH BEING WITH AC10 (MINIMUM THICKNESS 30MM).

B) AC SHALL CONFORM TO RMS SPECIFICATION R116 -' ASPHALT (DENSE AND OPEN GRADED)'.

9. UTILITIES, SERVICES & SURVEY MARKSA) ALL UNDERGROUND UTILITY SERVICES SHALL BE CHECKED

FOR LEVEL AND LOCATION PRIOR TO COMMENCEMENT OF WORKS, BY THE CONTRACTOR.

B) ALL SERVICE COVERS AFFECTED BY THE WORKS SHALL BE ADJUSTED AS REQUIRED AND TO SUIT THE LEVELS OF THE NEW WORK. NO SERVICE FITTINGS SHALL BE COVERED.

C) PROPERTY STORMWATER PIPES: WHERE AFFECTED, SHALL BE REPLACED WITH 90MM UPVC OR TO SUIT EXISTING AND INVERT SHALL MATCH THE GUTTER LEVEL.

D) STATE SURVEY MARKS (SSM'S) -SHALL NOT BE DISTURBED UNLESS APPROVED BY THE COUNCIL ENGINEER.

E) AT ALL LIGHT/POWER POLES, THE CONCRETE SHALL BE ENDED 150MM CLEAR OF THE POLE AND THE GAP FILLED WITH 30MM OF 10MM COLDMIX/ASPHALTIC CONCRETE.

10. NATURE STRIP RESTORATION A) MATCH EXISTING TURF. B) IF NEW TURF IS SPECIFIED - USE SOFT LEAF BUFFALO

'SHADEMASTER', LAID ON 1 OOMM THICK PREPARED TOPSOIL, AS SPECIFIED BY THE COUNCIL ENGINEER.

11. EXISTING SIGNAGEA) SUCH SIGNAGE SHALL BE REINSTATED UNLESS THE COUNCIL

ENGINEER ADVISES OTHERWISE. B) SIGNS REPLACED OR NEW, WITHIN THE NEW CONCRETE SHALL

BE INSTALLED WITH A V-LOK. C) HERITAGE STREET NAME SIGNS EMBEDDED IN FOOTPATH

PAVING AND KERBS - CAUTION SHALL BE EXERCISED TO NOT DAMAGE THESE SIGNS AND THE CONTRACTOR SHALL LIAISE WITH THE COUNCIL ENGINEER TO DETERMINE WHAT ACTION TO IMPLEMENT WHERE DISTURBANCE OF THE SIGN IS ESSENTIAL.

12. RESIDENT NOTIFICATIONA) ALL RESIDENTS AFFECTED BY THE WORKS SHALL BE NOTIFIED

AT LEAST 2 WORKING DAYS BEFORE THE RELEVANT WORK COMMENCES AND ANY REASONABLE REQUESTS ACCOMMODATED.

13. SAFETY/SIGNAGE/ACCESSA) DURING CONSTRUCTION, ADEQUATE WARNING SIGNS AND

BARRICADING SHALL BE PROVIDED TO ENSURE THAT THE WORK SITE MEETS THE REQUIREMENTS OF AS 17 42.2 ac 1743.3, AND TO PROVIDE ADEQUATE PROTECTION TO PEDESTRIANS ac MOTORISTS.

B) ADEQUATE AND SAFE ACCESS FOR PEDESTRIANS SHALL BE PROVIDED AT ALL TIMES.

C) AT DRIVEWAYS -PREVENTION OF ACCESS SHALL BE KEPT TO AN ABSOLUTE MINIMUM AND ARRANGEMENTS SHALL BE MADE WITH THE RESIDENT/BUSINESS, BY THE CONTRACTOR, FOR A SUITABLE DAY/TIME FOR THIS WORK. USE OF HIGHER STRENGTH CONCRETE, WITH SHORTER CURING TIME MAY BE NECESSARY.

14. DIMENSIONSA) ALL DIMENSIONS ARE IN MILLIMETERS UNLESS SHOWN

OTHERWISE. 15.GENERAL

A) ALL WORKS SHALL BE CARRIED OUT TO COUNCl�S SPECIFICATION, TO BEST PRACTICE STANDARDS, AND TO THE SATISFACTION OF COUNCIL'S SUPERVISING ENGINEER.

B) DURING AND AFTER EXCAVATION, ANY UNSOUND AREAS BELOW THE CONCRETE WORK SHALL BE DRAWN TO THE COUNCIL ENGINEER'S ATTENTION, TO ESTABLISH IF ANY ADDITIONAL EXCAVATION/ BASE COURSE IS NECESSARY.

C) THE WORK SITE SHALL BE KEPT IN A CLEAN, TIDY, AND SAFE CONDITION AT ALL TIMES AND TO THE SATISFACTION OF COUNCIL'S ENGINEER.

16. DOCUMENT PRIORITY A) THIS PLAN SUPERSEDES ANY STATEMENTS ON OTHER

DOCUMENTS, EG SPECIFICATIONS, OTHER PLANS, ETC, UNLESS ADVISED BY THE COUNCIL ENGINEER.

17, INSPECTIONS INSPECTIONS BY THE COUNCIL SUPERVISING ENGINEER SHALL BE REQUIRED AT THE FOLLOWING STAGES AND AS OTHERWISE DIRECTED BY THE COUNCIL ENGINEER:-

TYPICAL BULLNOSE KERB (ASPHALT ROADS)

TYPICAL SM KERB DETAIL DIMENSIONS OF U 1 -12 BARS DEPENDENT ON BRIDGE DECK OR CONCRETE PAVEMENT DESIGN

DOWELLED TO CONCRETE PAVEMENT AT 1000 c/c USING lf28 DOWELS (240 LONG) A) EXCAVATION COMPLETED,

B) DGB PLACES AND COMPACTED.

(ORIGINAL = A3 SHEET)

CHECKED & APPROVED

D FOR CONSTRUCTION

SUR'vEYED a: DRAFTED

DESIGNED

PG/DJT MAY 20111

DRAWN

PG/DJT MAY 20111

QUNITTl1ES

SCALE 1:20

INNER WES COUNCIL

SERVICES AFFECTED S.R.A. / SURV. GEN.

R.TA

A.G.L / SHELL PIPELINES

SYDNEY WATER

TELSTRA / OPTUS

SYDNEY ELECTRICITY

NOTICE OF ENTRY

KERB & GUTTER

NOTICES DATE

(CONCRETE ROADS) SCALE 1:20

SERVICES DATUM TELECOM/OPTUS -T-T-T-T-

A. H. GAS -G---G---G-G-

SEWER -s-s-s-s- SCALES WAlER ---w---w---w---w-RAILWAY -R-R---R-R-

El.EC. CABLES -E-E-E-E- 1 :20 OIL PIPELINES -P-P---P---P-

STORM WATER -sw-sw-sw-

D.

AMEND MTE DESCRIPTION

ELSHOLZ- NARROW MEDIAN CONCRETE PAVEMENT AND BRIDGE DECKS

SCALE 1:20

C) FORMWORK AND REINFORCEMENT SET. D) CONCRETE POURED AND CURED. E) COMPLETED.

INNER WEST COUNCIL

STANDARD ROADS DRAWING - R1

STANDARD KERB PROFILES

FILE NO. SHEET NO.

PLAN NO.

R1

VERSION V1

AutoCAD SHX Text
150mm INTEGRAL KERB & GUTTER
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
NOMINAL KERB LINE
AutoCAD SHX Text
SCALE 1:20
AutoCAD SHX Text
DRAINAGE HOLE WHERE SPECIFIED SHALL BE LINED WITH 90mm uPVC PIPE EXTENDING FROM KERB FACE TO 50mm BEHIND BACK OF KERB.
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
150mm INTEGRAL KERB & GUTTER
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
NOMINAL KERB LINE
AutoCAD SHX Text
SCALE 1:20
AutoCAD SHX Text
DRAINAGE HOLE WHERE SPECIFIED SHALL BE LINED WITH 90mm uPVC PIPE EXTENDING FROM KERB FACE TO 50mm BEHIND BACK OF KERB.
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
ROLL KERB
AutoCAD SHX Text
SCALE 1:20
AutoCAD SHX Text
LEVEL
AutoCAD SHX Text
1:12
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
ROLL KERB
AutoCAD SHX Text
SCALE 1:20
AutoCAD SHX Text
LEVEL
AutoCAD SHX Text
NOM. KERB LINE
AutoCAD SHX Text
1:12
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
DRAINAGE HOLE WHERE SPECIFIED SHALL BE LINED WITH 150x75 RHS EXTENDING FROM KERB FACE TO 50mm BEHIND BACK OF KERB.
AutoCAD SHX Text
REINFORCED DISH CROSSING SCALE 1:20
AutoCAD SHX Text
NAT. SURFACE
AutoCAD SHX Text
SL82 MESH CENTRALLY PLACED
AutoCAD SHX Text
NAT. SURFACE
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
SEE TABLE 1
AutoCAD SHX Text
REINFORCED DISH CROSSING SCALE 1:20
AutoCAD SHX Text
NAT. SURFACE
AutoCAD SHX Text
SL82 MESH CENTRALLY PLACED
AutoCAD SHX Text
NAT. SURFACE
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
SEE TABLE 1
AutoCAD SHX Text
KERB ONLY
AutoCAD SHX Text
NOMINAL KERB LINE
AutoCAD SHX Text
SCALE 1:20
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
KERB ONLY
AutoCAD SHX Text
NOMINAL KERB LINE
AutoCAD SHX Text
SCALE 1:20
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
MOUNTABLE KERB-TYPE 1 (OVER ASPHALT CONC.) OVER ASPHALT CONC.) ) SCALE 1:20
AutoCAD SHX Text
CLASS C 225 (SEE NOTES)
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
MOUNTABLE KERB-TYPE 1 (OVER ASPHALT CONC.) OVER ASPHALT CONC.) ) SCALE 1:20
AutoCAD SHX Text
CLASS C 225 (SEE NOTES)
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
RESET HERITAGE SANDSTONE KERB.
AutoCAD SHX Text
200 (OR MATCH TO EXISTING)..
AutoCAD SHX Text
RESET HERITAGE SANDSTONE KERB.
AutoCAD SHX Text
EXISTING SANDSTONE GUTTER TO REMAIN.
AutoCAD SHX Text
FOR NEW FOOTPATH: SAWCUT SANDSTONE FOR THE LENGTH OF WORK
AutoCAD SHX Text
SANDSTONE KERB RESETTING DETAIL(WITH S/STONE GUTTER)
AutoCAD SHX Text
SCALE 1:20
AutoCAD SHX Text
DOWELS (12mm DIA & 450mm LENGTH) AT 500mm C/C. DOWELS CAN BE OMITTED WHERE PAVED FOOTPATH PROVIDED AT BACK OF KERB
AutoCAD SHX Text
PROVIDE 100mm THICK CONCRETE FOOTING
AutoCAD SHX Text
EXISTING SANDSTONE KERB TO REMAIN.
AutoCAD SHX Text
SANDSTONE GUTTER RESETTING DETAIL
AutoCAD SHX Text
SCALE 1:20
AutoCAD SHX Text
150MM THICK LEAN CONCRETE.
AutoCAD SHX Text
RESET HERITAGE SANDSTONE GUTTER.
AutoCAD SHX Text
SANDSTONE GUTTER RESETTING DETAIL
AutoCAD SHX Text
SCALE 1:20
AutoCAD SHX Text
MOUNTABLE KERB-TYPE 2 (OVER CONCRETE SLAB) OVER CONCRETE SLAB) ) SCALE 1:20
AutoCAD SHX Text
CLASS C 225 C 225 (SEE NOTES)
AutoCAD SHX Text
MOUNTABLE KERB-TYPE 2 (OVER CONCRETE SLAB) OVER CONCRETE SLAB) ) SCALE 1:20
AutoCAD SHX Text
CLASS C 225 C 225 (SEE NOTES)
AutoCAD SHX Text
N12 DOWEL, 300mmLONG EMBEDDED 200mm INTO PAVEMENT, AT 300mm CENTRES
AutoCAD SHX Text
TYPICAL SM KERB DETAIL (ASPHALT ROADS) SCALE 1:20
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
TYPICAL SM KERB DETAIL (ASPHALT ROADS) SCALE 1:20
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
EDGE STRIP
AutoCAD SHX Text
SCALE 1:20
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
EDGE STRIP
AutoCAD SHX Text
SCALE 1:20
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
TYPICAL SM KERB DETAIL (CONCRETE ROADS) SCALE 1:20
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
TYPICAL SM KERB DETAIL (CONCRETE ROADS) SCALE 1:20
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
N12 DOWEL, 300mmLONG EMBEDDED 200mm INTO PAVEMENT, AT 300mm CENTRES
AutoCAD SHX Text
N12 DOWEL, 300mmLONG EMBEDDED 150mm INTO PAVEMENT, AT 300mm CENTRES
AutoCAD SHX Text
TYPICAL BULLNOSE KERB (CONCRETE ROADS) SCALE 1:20
AutoCAD SHX Text
N12 DOWEL, 300mmLONG EMBEDDED 150mm INTO PAVEMENT, AT 300mm CENTRES
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
TYPICAL BULLNOSE KERB (ASPHALT ROADS) SCALE 1:20
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
TABLE 1: DISH CROSSING WIDTHS (X VALUE)
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
X (WIDTH)
AutoCAD SHX Text
1
AutoCAD SHX Text
300
AutoCAD SHX Text
2
AutoCAD SHX Text
450
AutoCAD SHX Text
3
AutoCAD SHX Text
600
AutoCAD SHX Text
TABLE 1: DISH CROSSING WIDTHS (X VALUE)
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
X (WIDTH)
AutoCAD SHX Text
1
AutoCAD SHX Text
300
AutoCAD SHX Text
2
AutoCAD SHX Text
450
AutoCAD SHX Text
3
AutoCAD SHX Text
600
AutoCAD SHX Text
150 (OR MATCH TO EXISTING)..
AutoCAD SHX Text
RESET HERITAGE SANDSTONE KERB.
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
CONSTRUCT CONCRETE GUTTER
AutoCAD SHX Text
FOR NEW FOOTPATH: SAWCUT SANDSTONE FOR THE LENGTH OF WORK
AutoCAD SHX Text
SANDSTONE KERB RESETTING DETAIL (WITH CONC GUTTER)
AutoCAD SHX Text
SCALE 1:20
AutoCAD SHX Text
DOWELS (12mm DIA & 450mm LENGTH) AT 500mm C/C. DOWELS CAN BE OMITTED WHERE PAVED FOOTPATH PROVIDED AT BACK OF KERB
AutoCAD SHX Text
PROVIDE 100mm THICK CONCRETE FOOTING
AutoCAD SHX Text
ELSHOLZ- NEARSIDE INSTALLATION
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
SCALE 1:20
AutoCAD SHX Text
SEE NOTE 7
AutoCAD SHX Text
8%
AutoCAD SHX Text
ELSHOLZ- TYPICAL MEDIAN INSTALLATION
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
FLEXIBLE PAVEMENT SCALE 1:20
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
ELSHOLZ- NARROW MEDIAN
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
CONCRETE PAVEMENT AND BRIDGE DECKS SCALE 1:20
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
U1-12 @ 300 C/C
AutoCAD SHX Text
DIMENSIONS OF U1-12 BARS DEPENDENT ON BRIDGE DECK OR CONCRETE PAVEMENT DESIGN
AutoCAD SHX Text
BARRIER SHELL BE SET IN A CONTINUOUS KEYED FOUNDATION AS SHOWN OR DOWELLED TO CONCRETE PAVEMENT AT 1000 C/C USING 28 DOWELS (240 LONG)
AutoCAD SHX Text
TYPICAL 150MM DIMENSION SANDSTONE KERB
AutoCAD SHX Text
PROVIDE 100mm THICK CONCRETE FOOTING
AutoCAD SHX Text
DOWELS (12mm DIA & 450mm LENGTH) AT 500mm C/C. DOWELS CAN BE OMITTED WHERE PAVED FOOTPATH PROVIDED AT BACK OF KERB
AutoCAD SHX Text
SCALE 1:10
AutoCAD SHX Text
LANDSCAPE GARDEN
AutoCAD SHX Text
R20
AutoCAD SHX Text
GUTTER INVERT LEVEL
AutoCAD SHX Text
NEW DIMENSION SANDSTONE KERB. 150mm WIDE, 300mm 150mm WIDE, 300mm DEEP & 900-1000mm LENGTH, WITH ONE LONG SIDE HALF BULLNOSE. COLOUR GUINEA GOLD OF GOSFORD QUARRIES PRODUCT OR SIMILAR
AutoCAD SHX Text
INNER WEST COUNCIL
AutoCAD SHX Text
SW
AutoCAD SHX Text
SW
AutoCAD SHX Text
FILE NO. SHEET NO.
AutoCAD SHX Text
PLAN NO.
AutoCAD SHX Text
VERSION
AutoCAD SHX Text
SCALES
AutoCAD SHX Text
A. H. D.
AutoCAD SHX Text
DATUM
AutoCAD SHX Text
AMEND DATE DESCRIPTION APPROV.
AutoCAD SHX Text
T
AutoCAD SHX Text
G
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
T
AutoCAD SHX Text
T
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
W
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
T
AutoCAD SHX Text
G
AutoCAD SHX Text
S
AutoCAD SHX Text
W
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
P
AutoCAD SHX Text
SW
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SERVICES
AutoCAD SHX Text
TELECOM/OPTUS
AutoCAD SHX Text
GAS
AutoCAD SHX Text
SEWER
AutoCAD SHX Text
WATER
AutoCAD SHX Text
RAILWAY
AutoCAD SHX Text
ELEC. CABLES
AutoCAD SHX Text
OIL PIPELINES
AutoCAD SHX Text
STORM WATER
AutoCAD SHX Text
R.T.A.
AutoCAD SHX Text
SERVICES AFFECTED
AutoCAD SHX Text
S.R.A. / SURV. GEN.
AutoCAD SHX Text
A.G.L. / SHELL PIPELINES
AutoCAD SHX Text
SYDNEY WATER
AutoCAD SHX Text
TELSTRA / OPTUS
AutoCAD SHX Text
SYDNEY ELECTRICITY
AutoCAD SHX Text
NOTICE OF ENTRY
AutoCAD SHX Text
KERB & GUTTER
AutoCAD SHX Text
NOTICES
AutoCAD SHX Text
CHECKED & APPROVED
AutoCAD SHX Text
APPROVED FOR CONSTRUCTION
AutoCAD SHX Text
QUANTITIES
AutoCAD SHX Text
SURVEYED & DRAFTED
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
(ORIGINAL = A3 SHEET)
AutoCAD SHX Text
PG/DJT
AutoCAD SHX Text
MAY 2019
AutoCAD SHX Text
STANDARD ROADS DRAWING - R1
AutoCAD SHX Text
STANDARD KERB PROFILES
AutoCAD SHX Text
R1
AutoCAD SHX Text
1:20
AutoCAD SHX Text
PG/DJT
AutoCAD SHX Text
MAY 2019
AutoCAD SHX Text
V1
AutoCAD SHX Text
ROAD NOTES 1: 1.CONCRETE STRENGTH CONCRETE STRENGTH A)KERB, KERB & GUTTER, FOOTPATH, CYCLEWAY, VEHICLE KERB, KERB & GUTTER, FOOTPATH, CYCLEWAY, VEHICLE CROSSING, PRAM RAMP, EDGE STRIP: 25MPA @ 28 DAYS B)DISH CROSSING, ROAD PLATFORM/HUMP, ROAD SLAB: 40MPA DISH CROSSING, ROAD PLATFORM/HUMP, ROAD SLAB: 40MPA @ 28 DAYS C)FOR TRAFFICKED AREAS WHERE FACILITY MUST BE OPEN TO FOR TRAFFICKED AREAS WHERE FACILITY MUST BE OPEN TO TRAFFIC WITHIN 12 HOURS (EG VEHICLE CROSSING, ROAD SLAB, DISH CROSSING, ROAD PLATFORM/HUMP: 40 MPA WITH ACCELERATOR SUCH AS 2% CACL (REFER TO SP40HC). 2.CONCRETE FINISH CONCRETE FINISH A)KERB, GUTTER, LAYBACK, DISH CROSSING, PIT (OUTER KERB, GUTTER, LAYBACK, DISH CROSSING, PIT (OUTER EXPOSED) – STEEL TROWEL STEEL TROWEL B)VEHICLE CROSSINGS, FOOTPATH, CYCLEWAY, ROAD SLABS, VEHICLE CROSSINGS, FOOTPATH, CYCLEWAY, ROAD SLABS, PRAM RAMP, ROAD HUMPS/RAMPS – BROOM/BRUSH. BROOM/BRUSH. 3.REINFORCEMENT REINFORCEMENT A)TO AS 4671 TO AS 4671 B)MINIMUM COVER: 50MM MINIMUM COVER: 50MM 4.JOINTING, MINIMUM DIMENSIONS, AND JOINTING, MINIMUM DIMENSIONS, AND REINFORCEMENT IN CONCRETE SLABS A)ANY RECONSTRUCTED SECTION OF CONCRETE SHALL HAVE A ANY RECONSTRUCTED SECTION OF CONCRETE SHALL HAVE A MINIMUM DIMENSION OF 900MM IN ANY DIRECTION. B)ALL JOINTS SHALL BE AT RIGHT ANGLES UNLESS DIRECTED ALL JOINTS SHALL BE AT RIGHT ANGLES UNLESS DIRECTED OTHERWISE BY THE COUNCIL ENGINEER. C)EXPANSION JOINTS WILL BE ALIGNED WITH ADJOINING EXPANSION JOINTS WILL BE ALIGNED WITH ADJOINING FOOTPARH/ROAD JOINTS. D)EXPANSION JOINTS (REINFORCED CONCRETE, IE DISH EXPANSION JOINTS (REINFORCED CONCRETE, IE DISH CROSSINGS & LAYBACKS): 10MM APPROVED BITUMEN FILLER AT MAXIMUM 12M INTERVALS, WITH 12MM DIA DEFORMED HOT DIPPED GALVANISED DOWELS, 600MM LONG, AT 500MM CENTRES WITH UPVC SLEEVE AND LEG - MINIMUM 2 DOWELS/JOINT, WITH NO DOWEL CLOSER THAN 150MM TO A VERTICAL EDGE. 'CONNELLY' JOINTS OR EQUIVALENT MAY BE USED. E)ALL DOWELS SHALL BE PERFECTLY ALIGNED IN PLAN VIEW ALL DOWELS SHALL BE PERFECTLY ALIGNED IN PLAN VIEW AND IN ELEVATION, IE THE DOWELS SHALL NOT BE SPLAYED RELEVANT TO EACH OTHER. F)ALL EXPANSION JOINT MATERIAL SHALL BE THE SAME ALL EXPANSION JOINT MATERIAL SHALL BE THE SAME THICKNESS OF THE CONCRETE AND BE IN ONE LENGTH & WIDTH. G)AT ALL EXPANSION JOINTS, ANY 'SPILL' CONCRETE FROM AT ALL EXPANSION JOINTS, ANY 'SPILL' CONCRETE FROM THE PREVIOUS POUR (IE SEPARATE TO THE FINISHED CONCRETE) SHALL BE REMOVED.
AutoCAD SHX Text
H)CONTRACTION/DUMMY JOINTS (UNREINFORCED CONCRETE) - CONTRACTION/DUMMY JOINTS (UNREINFORCED CONCRETE) - NOMINALLY AT 3M INTERVALS OR EQUALLY BETWEEN EXPANSION JOINTS BUT NOT LESS THAN THE CONCRETE WIDTH BETWEEN JOINTS/EDGES. 5. KERB RAMPS KERB RAMPS A)SEE STANDARD PLAN F4. SEE STANDARD PLAN F4. 6.EXCAVATION EXCAVATION D)AT ALL JOINS TO EXISTING CONCRETE/ASPHALT – THE JOIN AT ALL JOINS TO EXISTING CONCRETE/ASPHALT – THE JOIN THE JOIN SHALL BE SAW CUT BEFORE EXCAVATION. E)ALL EXCAVATED MATERIAL SHALL BE REMOVED FROM THE ALL EXCAVATED MATERIAL SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT A LICENSED WASTE DISPOSAL FACILITY. 7.ROAD BASE ROAD BASE A)ROAD BASE SHALL BE PROVIDED BENEATH KERBS, GUTTERS, ROAD BASE SHALL BE PROVIDED BENEATH KERBS, GUTTERS, APRONS AND DISH CROSSINGS WITH 150MM THICK RECYCLED COMPACTED DGB20 OR 150mm THICK LEAN MIX CONCRETE. B)COMPACTION: 95% STANDARD. COMPACTION: 95% STANDARD. C)RECYCLED DGB SPECIFICATION: FOR SUPPLY OF RECYCLED RECYCLED DGB SPECIFICATION: FOR SUPPLY OF RECYCLED MATERIAL FOR PAVEMENTS, EARTHWORKS, AND DRAINAGE REFER TO SPECIFICATION FOR SUPPLY OF RECYCLED SPECIFICATION FOR SUPPLY OF RECYCLED MATERIAL FOR PAVEMENTS, EARTHWORKS AND DRAINAGE' BY IPWEA (NSW) (LATEST EDITION). . 8.RESTORATION OF ADJOINING ROAD PAVEMENT RESTORATION OF ADJOINING ROAD PAVEMENT A)SHALL MATCH EXISTING IF APPROVED BY COUNCIL ENGINEER SHALL MATCH EXISTING IF APPROVED BY COUNCIL ENGINEER OR BE CARRIED OUT WITH FULL DEPTH AC20 AND AC10, WITH THE SURFACE FINISH BEING WITH AC10 (MINIMUM THICKNESS 30MM). B)AC SHALL CONFORM TO RMS SPECIFICATION R116 - AC SHALL CONFORM TO RMS SPECIFICATION R116 - 'ASPHALT (DENSE AND OPEN GRADED)'. 9.UTILITIES, SERVICES & SURVEY MARKS UTILITIES, SERVICES & SURVEY MARKS A)ALL UNDERGROUND UTILITY SERVICES SHALL BE CHECKED ALL UNDERGROUND UTILITY SERVICES SHALL BE CHECKED FOR LEVEL AND LOCATION PRIOR TO COMMENCEMENT OF WORKS, BY THE CONTRACTOR. B)ALL SERVICE COVERS AFFECTED BY THE WORKS SHALL BE ALL SERVICE COVERS AFFECTED BY THE WORKS SHALL BE ADJUSTED AS REQUIRED AND TO SUIT THE LEVELS OF THE NEW WORK. NO SERVICE FITTINGS SHALL BE COVERED. C)PROPERTY STORMWATER PIPES: WHERE AFFECTED, SHALL BE PROPERTY STORMWATER PIPES: WHERE AFFECTED, SHALL BE REPLACED WITH 90MM UPVC OR TO SUIT EXISTING AND INVERT SHALL MATCH THE GUTTER LEVEL. D)STATE SURVEY MARKS (SSM’S) – SHALL NOT BE DISTURBED STATE SURVEY MARKS (SSM’S) – SHALL NOT BE DISTURBED S) – SHALL NOT BE DISTURBED SHALL NOT BE DISTURBED UNLESS APPROVED BY THE COUNCIL ENGINEER. E)AT ALL LIGHT/POWER POLES, THE CONCRETE SHALL BE AT ALL LIGHT/POWER POLES, THE CONCRETE SHALL BE ENDED 150MM CLEAR OF THE POLE AND THE GAP FILLED WITH 30MM OF 10MM COLDMIX/ASPHALTIC CONCRETE. 10.NATURE STRIP RESTORATION NATURE STRIP RESTORATION A)MATCH EXISTING TURF. MATCH EXISTING TURF. B)IF NEW TURF IS SPECIFIED - USE SOFT LEAF BUFFALO IF NEW TURF IS SPECIFIED - USE SOFT LEAF BUFFALO 'SHADEMASTER', LAID ON 100MM THICK PREPARED TOPSOIL, AS SPECIFIED BY THE COUNCIL ENGINEER. 11.EXISTING SIGNAGE EXISTING SIGNAGE A)SUCH SIGNAGE SHALL BE REINSTATED UNLESS THE COUNCIL SUCH SIGNAGE SHALL BE REINSTATED UNLESS THE COUNCIL ENGINEER ADVISES OTHERWISE. B)SIGNS REPLACED OR NEW, WITHIN THE NEW CONCRETE SHALL SIGNS REPLACED OR NEW, WITHIN THE NEW CONCRETE SHALL BE INSTALLED WITH A V-LOK. C)HERITAGE STREET NAME SIGNS EMBEDDED IN FOOTPATH HERITAGE STREET NAME SIGNS EMBEDDED IN FOOTPATH PAVING AND KERBS - CAUTION SHALL BE EXERCISED TO NOT DAMAGE THESE SIGNS AND THE CONTRACTOR SHALL LIAISE WITH THE COUNCIL ENGINEER TO DETERMINE WHAT ACTION TO IMPLEMENT WHERE DISTURBANCE OF THE SIGN IS ESSENTIAL. 12.RESIDENT NOTIFICATION RESIDENT NOTIFICATION A)ALL RESIDENTS AFFECTED BY THE WORKS SHALL BE NOTIFIED ALL RESIDENTS AFFECTED BY THE WORKS SHALL BE NOTIFIED AT LEAST 2 WORKING DAYS BEFORE THE RELEVANT WORK COMMENCES AND ANY REASONABLE REQUESTS ACCOMMODATED. 13.SAFETY/SIGNAGE/ACCESS SAFETY/SIGNAGE/ACCESS A)DURING CONSTRUCTION, ADEQUATE WARNING SIGNS AND DURING CONSTRUCTION, ADEQUATE WARNING SIGNS AND BARRICADING SHALL BE PROVIDED TO ENSURE THAT THE WORK SITE MEETS THE REQUIREMENTS OF AS 1742.2 & 1743.3, AND TO PROVIDE ADEQUATE PROTECTION TO PEDESTRIANS & MOTORISTS. B)ADEQUATE AND SAFE ACCESS FOR PEDESTRIANS SHALL BE ADEQUATE AND SAFE ACCESS FOR PEDESTRIANS SHALL BE PROVIDED AT ALL TIMES. C)AT DRIVEWAYS – PREVENTION OF ACCESS SHALL BE KEPT TO AT DRIVEWAYS – PREVENTION OF ACCESS SHALL BE KEPT TO PREVENTION OF ACCESS SHALL BE KEPT TO AN ABSOLUTE MINIMUM AND ARRANGEMENTS SHALL BE MADE WITH THE RESIDENT/BUSINESS, BY THE CONTRACTOR, FOR A SUITABLE DAY/TIME FOR THIS WORK. USE OF HIGHER STRENGTH CONCRETE, WITH SHORTER CURING TIME MAY BE NECESSARY. 14.DIMENSIONS DIMENSIONS A)ALL DIMENSIONS ARE IN MILLIMETERS UNLESS SHOWN ALL DIMENSIONS ARE IN MILLIMETERS UNLESS SHOWN OTHERWISE. 15.GENERAL GENERAL A)ALL WORKS SHALL BE CARRIED OUT TO COUNCIL’S ALL WORKS SHALL BE CARRIED OUT TO COUNCIL’S S SPECIFICATION, TO BEST PRACTICE STANDARDS, AND TO THE SATISFACTION OF COUNCIL'S SUPERVISING ENGINEER. B)DURING AND AFTER EXCAVATION, ANY UNSOUND AREAS DURING AND AFTER EXCAVATION, ANY UNSOUND AREAS BELOW THE CONCRETE WORK SHALL BE DRAWN TO THE COUNCIL ENGINEER’S ATTENTION, TO ESTABLISH IF ANY S ATTENTION, TO ESTABLISH IF ANY ADDITIONAL EXCAVATION/ BASE COURSE IS NECESSARY. C)THE WORK SITE SHALL BE KEPT IN A CLEAN, TIDY, AND THE WORK SITE SHALL BE KEPT IN A CLEAN, TIDY, AND SAFE CONDITION AT ALL TIMES AND TO THE SATISFACTION OF COUNCIL’S ENGINEER. S ENGINEER. 16.DOCUMENT PRIORITY DOCUMENT PRIORITY A)THIS PLAN SUPERSEDES ANY STATEMENTS ON OTHER THIS PLAN SUPERSEDES ANY STATEMENTS ON OTHER DOCUMENTS, EG SPECIFICATIONS, OTHER PLANS, ETC, UNLESS ADVISED BY THE COUNCIL ENGINEER. 17.INSPECTIONS INSPECTIONS INSPECTIONS BY THE COUNCIL SUPERVISING ENGINEER SHALL BE REQUIRED AT THE FOLLOWING STAGES AND AS OTHERWISE DIRECTED BY THE COUNCIL ENGINEER:- A)EXCAVATION COMPLETED, EXCAVATION COMPLETED, B)DGB PLACES AND COMPACTED. DGB PLACES AND COMPACTED. C)FORMWORK AND REINFORCEMENT SET. FORMWORK AND REINFORCEMENT SET. D)CONCRETE POURED AND CURED. CONCRETE POURED AND CURED. E)COMPLETED.COMPLETED.
AutoCAD SHX Text
NOTES 1.CLASS A REFERS TO RESIDENTIAL USE. CLASS A REFERS TO RESIDENTIAL USE. A REFERS TO RESIDENTIAL USE. REFERS TO RESIDENTIAL USE. 2.CLASS B REFERS TO GARDEN BED CLASS B REFERS TO GARDEN BED REFERS TO GARDEN BED SURROUND ONLY. 3.CLASS C REFERS TO MEDIUM DENSITY CLASS C REFERS TO MEDIUM DENSITY REFERS TO MEDIUM DENSITY COMMERCIAL AND INDUSTRIAL USE.