Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Embed Size (px)

DESCRIPTION

LTSO Objectives LTSO should provide a wide range of services to university laboratories that includes, but not limited to: Survey of vendors Help in writing technical specifications Technical analysis of bids Maintenance, Repairs and calibrations Training on equipment Chemicals and materials procurement etc…

Citation preview

Page 1: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Initiating Equipment PRs using ERP

Process & Common MistakesDr. Khaled Al-Athel

Director, Lab Technical Support Office

Page 2: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Overview • LTSO Overview• LTSO Services• Equipment PRs using ERP• Process for PRs through Bids

Page 3: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

LTSO Objectives• LTSO should provide a wide range of services

to university laboratories that includes, but not limited to:• Survey of vendors• Help in writing technical specifications• Technical analysis of bids• Maintenance, Repairs and calibrations• Training on equipment• Chemicals and materials procurement• etc…

Page 4: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Stakeholders

Lab Technical Support Office

Academic Departments

Vendors

Environment, Health & Safety

Research Institutes

Deanship of Research

Purchasing

Storehouse

Page 5: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

LTSO Structure

Lab Technical Support Office- Director - Assistant Director

Chemicals & Gas Cylinders

Equipment (Purchasing)

Lab Structures & Equipment

Purchasing

Tracking

POs Review

Waste Handling

Maintenance & Repairs

Equipment Training

Bids Analysis

Latest Tech.

Lab Refurbishing & Establishment

Page 6: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Equipment PRs using ERP• Choose correct stock number that fits your requirement

• If no stock number matches your item

• Request storehouse to generate a new stock number

• Make a separate line for each service required with the equipment (Installation, Training, Calibration, etc.)

• Create separate lines for each additional taggable accessories, kits, etc.

Page 7: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Equipment PRs using ERP• For services, use “Technical Data1 & Data2” with your service requirements

(Ex: On-site training, training at manufacturer, etc.)

Page 8: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Equipment PRs using ERP• If the four fields are not enough to cover all specifications

prepare detailed specifications in word format

• DO NOT include any internal information (internal approvals, signatures, memes, prices, web links, or catalogs)

• Any internal information like MEMO, planning committee approval etc. should be attached to internal category only. (Not to supplier)

• Specifications should be attached to supplier category (not to buyer)

• Specifications should be prepared by the end user/originator, any quotation attached as specs will lead to cancellation of the PR.

Page 9: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Equipment PRs using ERP• Providing 1-3 suppliers to the Buyer could expedite your process

• Buyer might contact other companies & get different quotations

Page 10: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Equipment PRs using ERP• Need-by date should be minimum 3 months after initiation of PR

• Department name should be changed from “Dhahran” to proponents department/center

Page 11: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Equipment PRs using ERP• Department cost center must be added in the charge account• For RI & DSR projects, fill the charge account & other information

Page 12: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Equipment PRs using ERP• Justification should be clear why proponent wants to buy this equipment, not

on the use of it• It is important to understand the difference between the notes

Page 13: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Equipment PRs using ERP• Equipment is for teaching or research?• If research, mention the project number• Is this a new equipment, replacement of an existing equipment, or an

integration with an existing equipment

Page 14: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Equipment PRs using ERP• Notes to Buyer, Receiver, & Supplier should not include any technical

specification• If you need to give site information & other environmental information, use

Note To Supplier

Page 15: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Request for Quotations (RFQ)• Once RFQ is created and published for suppliers to quote

• Proponent can use “online discussion” message to provide any clarifications to supplier or buyer

• Online discussion should no be used to add new requirements or change the specifications

• It is the proponent’s responsibility to check online discussion messages regularly and provide the feedback

Page 16: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Recommendation of Supplier (Award)• Once RFQ is closed, purchasing department will send you a notification to

proponent make the recommendation of supplier within two weeks

• Recommendation is done through i-Procurement Sourcing Home Page• Recommended supplier should be the lowest bidder that matches the PR

requirements/specifications (government regulations)

• Note to approver: provide justification of recommended supplier and reason for rejecting others

• If the lowest bidder is rejected, proponent must clarify the reason for rejection

• Once recommendation is submitted for approval, proponent can track the status from “View Award Approval History”

Page 17: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Delivery of PO• Supplier should deliver the PO to storehouse

• Storehouse will receive the material/equipment in the system and forward it to end user

• Note: Any PO directly received by the proponent or the department/center from supplier is not acceptable and illegal

• Proponent has to accept the material/equipment of the issued PO once delivered

• Any changes with new or additional requirements are not acceptable and illegal

Page 18: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Example 1• Certificate must be in the original requirements

• Supplier with lowest quotation should be requested to clarify if the calibration certificate is included

Page 19: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Example 2• No justification was written in this case

Page 20: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Example 3• Proponent requested 32 items with estimated cost of SAR 6,000/each

• Total estimated cost = SAR 192,000

• Proponent awarded a supplier with a quotation of SAR 300,000

• Any equipment/item > SAR 300,000 must be directed to Contracts department to acquire through tenders

Page 21: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Steps to Announce a Tender• Equipment coast > SAR 300,000

• A PO must be created and approved in ERP

• A sealed envelope with the estimated cost must be sent to Chairman, Bids & Tenders Committee with• PO number• Tenders name• Department name

• Specifications must be written and information according to a checklist form

• Specifications must be translated into Arabic (in addition to the English specs)

• Email checklist and specs to contracts department to prepare the tender

Page 22: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office

Summary• Review/feedback on purchase orders

• Review/feedback on bids analysis

• Contact vendors for faculty members & researchers• Equipment specification• Quotations

• Any technical support for laboratories and equipment

• www.kfupm.edu.sa/sites/LTSO

• Email: [email protected]

• Phone (Directors): 8831 (Director), 8833 (Assist.)

• Phone (Scientists & Eng.): 7838, 8384, 8759

Page 23: Initiating Equipment PRs using ERP Process & Common Mistakes Dr. Khaled Al-Athel Director, Lab Technical Support Office