1
Retaining Wall Future I-5985 Project HIGHLAND RAIL TRAIL I-5000 Under Construction John Harmon Cemetery E X IT 1 7 O N R A MP R A NB DR M AR TI NL UT H E RK I NG J RW A Y EXIT 17 ON RAMP RA SB N C H E S T E R S T WEIRS LN T H U ND ERBIR D RD B R O A DC A S T S T N M O RR I S S T I 85 HWY N RADIO ST R ANKIN LAKE RD I 8 5 HWY S WREN TPK E BAR KLE Y S T BULB AVE TULIP DR E XIT 17 OFF R AMP RA SB EXIT 17 O FF RAM P RA NB GAST O N CENTER CT BAPTIST ASSOCIATION £ ¤ 321 § ¨ ¦ 85 1 NCCGIA SIMS LEGION PARK Legend Parcel Boundary Cemetery Highland Rail Trail Park Stream Wetland 100-Year Floodplain Boundary Project Design Area AERIAL DATA Source = NC One Map Date = 2015 Bridge No. 350120 0 500 1,000 250 Feet ¯ N M ORRI S ST E X I T 1 7O N RAMP RA NB S I M S C I R P I N E H U R S T S T D R M AR T I N LU T H E R K I N G J R W A Y EXIT 17 ON RAMP RA SB N W E L D ON S T BO XWO O D L N WEIRS LN B R O A D C A ST ST DOWD DR NORTON DR RA NK I N L AK E R D R ADI O S T I 8 5 HW YS I 8 5 HW YN N C H E S T E R S T W RE N T PK E BU S I N ES S P A R K C T E X I T 1 7O F F RAM P RA S B CORL DR BARKLEY ST E X I T 17 OF F R AMP R A N B GA S T ON C E NT E R CT £ ¤ 321 § ¨ ¦ 85 Legend Sketch: New Bridge and Alignment Interstate US Route NC Route Road Stream Parcel Boundary Building Footprint 100-Year Floodplain Boundary ¯ 0 500 1,000 250 Feet I-85 Improvements STIP Project Nos. I-5719/U-3608/U-5800 | Gaston County U.S. 321 Interchange Initial Option Concept Recommended for Further Study Preliminary - Subject to change Improve Existing Improve Existing A project (NCDOT STIP Project No. I-5000) is under construction due to be completed in 2020. Traffic analysis showed a need to extend the two lanes from the flyunder ramp onto I-85 to increase capacity and improve merge safety. Improvements for this interchange area will be designed to stay within the I-5000 project right-of-way for total avoidance of the Sims Legion Park. Improvements for this area will be designed to avoid the John Harmon Cemetery. I-5719 begins at U.S. 321. Exit 17, Bridge 350120

Initial Option Concept Recommended for Further Study• Improvements for this interchange area will be designed to stay within the I-5000 project right-of-way for total avoidance of

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Initial Option Concept Recommended for Further Study• Improvements for this interchange area will be designed to stay within the I-5000 project right-of-way for total avoidance of

Retaining Wall

Future I-5985 Project

HIGHLA

ND RAIL

TRAILI-5000 Under Construction

John HarmonCemetery

EXIT 17 ON RAMP RA NB

DRM

ARTINLU

THER

KING

JRW

AY

EXIT 17 ON RAMP RA SB

NC

HESTER

ST

WEI

RS LN

THU

ND

ER

BIR

DR

D

BRO

ADCA

STST

NM

OR

RIS

ST

I 85 HWY N

RADIO ST

RANKIN LAKE RD

I 85 HWY S

WREN TPKE

BARKLEY ST

BULB AVE

TULIP DR

EXIT 17 OFF RAMP RA SB

EXIT 17 OFF RAMP RA NB

GASTON CENTER CT

BAPTISTASSOCIATION

£¤321

§̈¦85

1

NCCGIA

SIMS LEGION PARK

Legend

Parcel Boundary

Cemetery

Highland Rail Trail

Park

Stream

Wetland

100-Year Floodplain Boundary

Project Design Area

AERIAL DATA

Source = NC One MapDate = 2015

Bridge No. 350120

0 500 1,000250Feet

¯

NM

ORR

ISST

EXIT 17 ON RAMP RA NB

SIMS

CIR

PINE

HURS

TST

DRM

ARTI

NLU

THER

KING

JRW

AYEXIT 17 ON RAMP RA SB

NW

ELDO

NST

BOXWOOD LN

WEI

RS LN

BRO

ADCA

STST

DOWD DR

NORTON DR

RANKIN LAKE RD

RADIO ST

I 85 HWY SI 85 HWY N

NC

HESTERST

WREN TPKE

BUSI

NESS PARK

CT

EXIT

1 7 OFF RAMP RA SB

CO

RL

DR

BARKLEY ST

EXIT 17 OFF RAMP RA NB

GASTON CENTERCT

£¤321

§̈¦85

Legend

Sketch: NewBridge andAlignment

Interstate

US Route

NC Route

Road

Stream

ParcelBoundary

BuildingFootprint

100-YearFloodplainBoundary

¯0 500 1,000250

Feet

I-85 ImprovementsSTIP Project Nos. I-5719/U-3608/U-5800 | Gaston County

U.S. 321 Interchange

Initial Option Concept Recommended for Further Study

Preliminary - Subject to change

Improve ExistingImprove Existing

• A project (NCDOT STIP Project No. I-5000) is under construction due to be completed in 2020. Traffic analysis showed a need to extend the two lanes from the flyunder ramp onto I-85 to increase capacity and improve merge safety.

• Improvements for this interchange area will be designed to stay within the I-5000 project right-of-way for total avoidance of the Sims Legion Park.

• Improvements for this area will be designed to avoid the John Harmon Cemetery.

• I-5719 begins at U.S. 321.

Exit 17, Bridge 350120