22
INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name: Fair Design Printing Ltd (New Location) Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur Gazipur Dhaka Bangladesh Assessor: BD Technology Date: 24 Jul 2016 Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. The Alliance for Bangladesh Worker Safety Page 1/22

INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

INITIAL ELECTRICAL ASSESSMENT REPORT(EAR)

 

Factory Name: Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor,Gazipur Gazipur Dhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

 

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 1/22

Page 2: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

 Introduction to the Report

The following report contains a site profile and summary of non-conformities identified during an onsite assessment commissioned by theAlliance for Bangladesh Worker Safety (Alliance) and conducted by a third-party Qualified Assessment Firm (QAF). The assessment wasconducted against the Alliance for Bangladesh Worker Safety Assessment Protocols (APs) and Fire Safety and Structural Integrity Standard,which is harmonized with the factory assessment guidelines developed by Bangladesh University of Engineering and Technology (BUET) forthe Bangladesh National Tripartite Plan of Action (NTPA). The goal of the Alliance process is to provide clear and practical technicalrequirements by which Bangladeshi Ready Made Garment (RMG) Factories producing for Alliance members may be consistently and fairlyevaluated for fire, structural, and electrical safety in a non-duplicative manner. Each assessment will prompt action plans that will be used byRMG factories to systematically and sustainably improve safety conditions for garment workers. Beyond tracking and reporting on actionsteps taken in a transparent manner, the Alliance organization and its members will seek to further support factory improvements throughtechnical assistance, training, implementation support for functional Worker Committees, and in some cases financial assistance and wagesupport for workers if factories are closed for remediation.

The contents of the report do not constitute a guarantee of compliance with the applicable laws, the Alliance Standard or the absolute orcontinued safety against fire, electrical and/or structural integrity issues that may lead to injury or loss of life. The report is designed to providea non-exhaustive summary of risk issues, based on a limited sampling and duration of time onsite by the named QAF. Neither the QAF northe Alliance can certify or guarantee the quality, outcome, or effectiveness of actions taken in response to the report.

For more information and report feedback please go to: www.bangladeshworkersafety.org. 

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 2/22

Page 3: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

GENERAL INFORMATION 

General Information

Factory Name: Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur Gazipur Dhaka Bangladesh

Country: Bangladesh

Province: Dhaka

City: Gazipur

Zip Code:

Audit Duration:

Re-Audit: Re-Audit After 0 Months

Draft Report Date : 26.07.2016

Final Report Date : 02.08.2016

Are all action items fromprevious assessmentcomplete? :

N/A

Buildings in Complex : There are 4 Buildings, one main and three ancillary buildings.

Is the building(s) ownedor rented by theFactory?:

Owned

Number of BuildingLevels (Stories) :

3-stories

Approximate BuildingArea (SF) :

32,648 SF

Date of BuildingConstruction :

2015 to present.

Date of Last BuildingRenovation/Addition :

N/A

Ancillary Structures inComplex :

Three ancillary buildings. 1) Ancillary-1: Guard Room; 2) Ancillary-2: Utility Room; 3) Ancillary-3: ETP.

Approximate AncillaryStructures Area (SF) :

1) Guard Room: 120 SF; 2) Utility room: 798 SF; 3) ETP: 766 SF.

Number of Occupants : Proposed occupant Load: 200 (GF:60, 1st:70, 2nd: 70)

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 3/22

Page 4: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

Provide brief descriptionof the electrical systemfor each building.:

Transformer: 400 kva oil immerse - 1 no. Diesel Generator - 1: 126 kva Diesel Generator - 2: 460 kva Themain power supply has been taken from Rural Electrification Board (REB) network available in the area. Incase of failure of supply from the REB, two generators rated at 126 kva and 460 kva work as standby powersupply sources.

Physical location ofSubstation? :

Ground floor and physically separate from main production building.

What equipment/loadsdoes the UPS serve? :

Emergency lights, exit lights

 

 

 

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 4/22

Page 5: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

ASSESSMENT FINDINGS 

Electrical System Information

Question: Are as-built electrical drawings indicating information such as panel and circuitlocations throughout the building(s) available for review?

 

Priority Level: High

Non-Compliance Level: 2

Description: As-built drawings were available in the factory. Modifications are required andsubmit to Alliance for approval.

Source of Findings: Visual Assessment: Existing single line diagram does not match the standard.

Suggested Plan ofAction:

Have a qualified electrical engineer develop as-built drawings detailing keycomponents and capacity of the electrical system in accordance with Alliancerequirements. Install electrical system according to the drawing instructionafter approval.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard Part 10 Section 10.3.7

Electrical System Maintenance

Question: Have workers that operate and maintain the electrical system receivedelectrical safety training? Is training documentation on site?

 

Priority Level: High

Non-Compliance Level: 3

Description: The workers of the organization that operate and maintain the electricalsystem have not received electrical safety training. There was no trainingrelated documentation on site.

Source of Findings: Visual Assessment: Electrical responsible persons aren't trained the electricalsafety.

Suggested Plan ofAction:

Develop and implement an electrical safety program. Include key topes suchas lock-out tag-out procedures, personal protective equipment requirements,etc. Reference NFPA 70E for example program requirements.

Suggested DeadlineDate:

31 Oct 2016

Standard: Reference NFPA 70e for example

Question: Is a periodical Insulation Resistance Measurement Program established andrecorded?

 

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 5/22

Page 6: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

Priority Level: Medium

Non-Compliance Level: 3

Description: Periodical Insulation Resistance Measurement Program is not established orrecorded.

Source of Findings: Visual Assessment: Insulation Resistance Measurement report is not found.

Suggested Plan ofAction:

Develop an Insulation Resistance Measurement Program that ensuresdeterioration of insulation resistance will be identified quickly. Testing shouldbe in compliance with International Electrical Testing Association (NETA). Alltransformers, switchgears, etc. shall be subject to an insulation resistancemeasurement test to ground after installation but before any wiring isconnected. Insulation tests shall be made between open contacts of circuitbreakers, switches, etc. and between each phase and earth.

Suggested DeadlineDate:

31 Oct 2016

Standard: Alliance Standard Part 10 Section 10.13.4 Insulation Tests and 10.13.8Electrical Inspections

Question: Are thermographic scans of electrical equipment completed at least everythree years?

 

Priority Level: Medium

Non-Compliance Level: 3

Description: Thermographic scans of electrical equipment are not completed.

Source of Findings: Visual Assessment: Thermographic scans report is not found.

Suggested Plan ofAction:

Complete thermographic scans on a minimum three year cycle.Thermographic scans should be completed in accordance with the Standardfor Infrared Inspection of Electrical Systems & Rotating Equipment and NFPA70B or a comparable standard.

Suggested DeadlineDate:

31 Oct 2016

Standard: Alliance Standards Part 10 Section 10.13.8 Electrical Inspections

Question: Transformers do not contain harmful substances such as PCBs.  

Priority Level: Medium

Non-Compliance Level: 3

Description: Harmful substances report for service transformer was not available.

Source of Findings: Visual Assessment: Transformer PCBs test report is not found.

Suggested Plan ofAction:

Conduct a complete oil analysis to determine the content of PCBs intransformer oil and consider replacing transformers found with harmful

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 6/22

Page 7: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

substances to reduce health hazards.

Suggested DeadlineDate:

31 Oct 2016

Standard: Not Applicable

Question: Are periodic safety inspections of the electrical system components completedand documented?

 

Priority Level: Medium

Non-Compliance Level: 3

Description: Periodic safety inspections of the electrical system components have not beencompleted and documented.

Source of Findings: Visual Assessment: Periodic safety inspection records are not found.

Suggested Plan ofAction:

Establish a periodic inspection program to ensure the electrical systems arefree from damage, debris, dirt, lint, etc. Maintain records regarding theinspections and follow up actions.

Suggested DeadlineDate:

31 Oct 2016

Standard: Alliance Standard Part 10 Section 10.13 Inspection and Testing and Part 13Section 13.6 Housekeeping

Electrical System Conditions

Question: All equipment is efficiently earthed and properly connected to the requirednumber of earth electrodes.

 

Priority Level: High

Non-Compliance Level: 2

Description: In efficient earthing present for electrical equipment in the factory andconnected improperly by inappropriate size of earthing cables.

Source of Findings: Visual Assessment: Earthing system for all equipment is not satisfactory.

Suggested Plan ofAction:

Provide efficient earthing for all equipment at required locations and properlyconnect using the required number of earth electrodes. Refer to the BNBC forrequired number of electrodes.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard Part 10 Section 10.13.7.1 Inspection of SubstationInstallations.

Question: Do switchboards and/or distribution boards have a minimum clearance of 1 m(39 in) in front?

 

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 7/22

Page 8: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

Priority Level: High

Non-Compliance Level: 2

Description: Clearance in front of switchboards and distribution boards have 1 m clearancein the operational areas. Other floors are under construction and will becompleted soon.

Source of Findings: Visual Assessment: Switchboards and distribution boards on the ground floorand only 1st floor have 1 m clearance in front.

Suggested Plan ofAction:

Provide minimum clearance of 1 m (39 in) in front of all panel boards inaccordance with the Alliance requirement.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standards Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

Question: Are all switchboards and/or distribution boards metal enclosed with a deadfront construction?

 

Priority Level: High

Non-Compliance Level: 2

Description: Switchboards and distribution boards are metal enclosed with a dead frontconstruction in operational areas, other floors are under construction.

Source of Findings: Visual Assessment: Dead front construction of switchboards and distributionfound on ground floor and 1st floor.

Suggested Plan ofAction:

Provide switchboards and/or distribution boards with metal enclosed deadfront construction.

Suggested DeadlineDate:

31 Oct 2016

Standard: Alliance Standards Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

Question: Are switchboards and/or distribution boards installed in compliant locations?  

Priority Level: High

Non-Compliance Level: 2

Description: Distribution boards are not installed in compliant locations.

Source of Findings: Visual Assessment: FDB - 01/ Gr. Floor and FDB - 02/ 1st Floor are installedon the IS-ELSE mark.

Suggested Plan ofAction:

Relocate distribution boards to suitable locations for operation andmaintenance.

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 8/22

Page 9: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

Suggested DeadlineDate:

31 Oct 2016

Standard: Alliance Standard Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

Question: Is electrical wiring/cables sized according to capacity of circuit breakers (Nohigher rated circuit breakers with lower rated wiring)?

 

Priority Level: High

Non-Compliance Level: 2

Description: Electrical wiring or cables are not sized according to capacity of circuitbreakers.

Source of Findings: Visual Assessment: Circuit breakers are used with the lower rated cable in thedistribution boards.

Suggested Plan ofAction:

Install proper sized wiring according to the breaker capacity.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard Part 10 Section 10.3.1 Electrical Connections.

Question: All metal in the building is connected to the building earthing/grounding systemsuch as metal rebar in concrete, metal frame of building, or metal water pipe.

 

Priority Level: High

Non-Compliance Level: 2

Description: Metals in the building are not connected to the building earthing system.

Source of Findings: Visual Assessment: Metal in the building like metal water pipe, metal rebar inconcrete are not found connected with the building earthing system.

Suggested Plan ofAction:

Connect all metal in the building to the building earthing system such as metalrebar in concrete, metal frame of a building, or metal water pipe.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard Part 10 Section 10.10 Earthing

Question: Light fixtures without protective covers are not installed in storage areas or inany area where the Inspector of the Factories Rules (1.5.3.5) Part 53 disallowsthese fixtures.

 

Priority Level: High

Non-Compliance Level: 2

Description: Light fixtures without protective covers are installed in storage areas and other

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 9/22

Page 10: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

required locations.

Source of Findings: Visual Assessment: In the storage area installed light fixtures withoutprotective covers was found.

Suggested Plan ofAction:

Ensure light fixtures without protective covers are not installed in storage areasand other required locations.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standards Part 10 Section 10.15 Naked Lights

Question: Shielding or additional insulation is provided for wiring exposed to externalheat sources.

 

Priority Level: High

Non-Compliance Level: 2

Description: Shielding or additional insulation is not provided for wiring exposed to externalheat sources.

Source of Findings: Photograph: In generator, exposed wiring is not provided with additionalinsulation.

Suggested Plan ofAction:

In order to avoid the effects of heat from external sources one of the followingmethods should be used to protect wiring systems: (1) shielding; (2) placing900 mm (36 in.) from the source of heat; (3) Selecting a system with dueregard for the additional temperature rise which may occur; (4) localreinforcement or substitution of approved insulting material.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standards Part 10 Section 10.3.4.2 External heat sources.

Question: Wiring systems are selected and erected so that no damage is caused by theingress of water.

 

Priority Level: High

Non-Compliance Level: 2

Description: Wiring systems erected may be damaged by ingress of water, the factoryconstruction work is going on.

Source of Findings: Visual Assessment: In transformer room and LT panel room electrical cableshave a possibility to submerge if it rains.

Suggested Plan ofAction:

Provide protection from water damage in accordance with the AllianceStandard. The completed wiring system shall comply with the IP degree ofprotection relevant to the particular location.

Suggested DeadlineDate:

30 Sep 2016

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 10/22

Page 11: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

Standard: Alliance Standards Part 10 Section 10.3.4.3 Presence of Water

Question: No circuits are drawn for loads without the incorporation of a overcurrentprotection device (circuit breaker).

 

Priority Level: High

Non-Compliance Level: 1

Description: Circuits were drawn for loads by the over current protection device in theoperational area and other area construction work is in progress.

Source of Findings: Visual Assessment: Loads are taken in substation room, generator room, gr.floor and 1st floor by circuit breakers.

Suggested Plan ofAction:

Provide circuit breaker (protective device) to control each circuit individually.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standards Part 10 Section 10.9 Protection of Circuits

Question: Indications of overheating, overloading, or signs of burning were not observed.  

Priority Level: High

Non-Compliance Level: 1

Description: Indications of overheating, overloading, or signs of burning were observed.

Source of Findings: Uploaded Document: Uploaded document in thermographic scan record FFCcontains more details, including the probable cause and recommendations.

Suggested Plan ofAction:

Consult with a qualified electrical engineer to determine the cause ofoverheating, overloading, or signs of burning and take proper action.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard Part 10 Section 10.3.5

Question: Do switchboards and/or distribution boards have capacity information labels?  

Priority Level: Medium

Non-Compliance Level: 3

Description: Switchboards and distribution boards have no capacity information labels.

Source of Findings: Visual Assessment: Capacity information levels were not founded of allpanels-boards.

Suggested Plan ofAction:

Provide capacity information labels (Maximum current rating, number of circuitbreakers, rated capacity of circuit breaker, etc.) for Switchboards and/ordistribution boards. Display panel schedule on panel door (inner side) printed

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 11/22

Page 12: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

on a sheet made of non-combustible material.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard Part 10 Section 10.7 Main Switch, Switchboards And MetalClad Switchgear and 10.13.7 Inspection of the Installation

Question: Are junction boxes and other electrical devices provided with covers?  

Priority Level: Medium

Non-Compliance Level: 3

Description: Junction boxes and other electrical devices are not provided with covers.

Source of Findings: Photograph: On 1st floor, junction boxes are not found with covers.

Suggested Plan ofAction:

Provide adequate covers for junction boxes and other electrical devicesaccording to Alliance Standard.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard Part 10 Section 10.3.5 and 13.6.2

Question: Power and telecommunication or antenna cables are led in separately.  

Priority Level: Medium

Non-Compliance Level: 2

Description: Telecommunication or antenna cables are not installed in the factory. Onlyground floor is operational, 1st floor is ready for operation and others floors areunder construction and will be complete soon.

Source of Findings: Visual Assessment: Telecommunication cables are not found in the factory.

Suggested Plan ofAction:

Lead telecommunication or antenna cables separately to the main point ofservice. Power and telecommunications cables must have separate entrance.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standards Part 10 Section 10.3.10 Service Entry

Question: Transformers are properly grounded (earthed).  

Priority Level: Medium

Non-Compliance Level: 2

Description: The transformer is not properly grounded (earthed).

Source of Findings: Visual Assessment: Improper size and insufficient quantity of earthingconductors connected to the transformer.

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 12/22

Page 13: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

Suggested Plan ofAction:

Provide two earthing (body earthing) connections to two different and distinctpoints on the transformer.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standards Part 10 Section 10.5 Substation

Question: Are all internal components of switchboards and/or distribution boards properlyconcealed (No missing circuit breaker or knockout covers)?

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Internal components of switchboards and distribution boards are not properlyconcealed.

Source of Findings: Visual Assessment: Panelboards are unconcealed in operation areas.

Suggested Plan ofAction:

Provide covers or blanks to conceal all live internal components ofswitchboards and/or distribution boards.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard Part 10 Section 10.3.9 Sub-Distribution Boards

Question: Are all switchboards and/or distribution boards properly grounded (earthed)?  

Priority Level: Medium

Non-Compliance Level: 2

Description: All the distribution boards are improperly grounded by inappropriate size ofearthing cables in operational areas.

Source of Findings: Visual Assessment: Distribution boards earthing are not made properly inoperation areas.

Suggested Plan ofAction:

Provide proper grounding for switchboards and distribution boards utilizingproper size of earthing cables and sufficient number of earth electrodes.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard Part 10 Section 10.10.2 Circuit and System Earthing

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 13/22

Page 14: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

Question: Do switchboards and/or distribution boards have clear identification markings?  

Priority Level: Medium

Non-Compliance Level: 2

Description: Switchboards and distribution boards have clear identification markings in theoperational areas, other areas are under construction.

Source of Findings: Photograph: In ground floor, 1st floor and others operational area panelboardshave identification markings.

Suggested Plan ofAction:

Provide clear and permanent identification marks on all distribution boards,switchboards, sub main boards and switches and post proper caution/dangersignage in all electrical panel boards.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard Part 10 Section 10.7 BNBC Part 8 Section 2.11.5.4

Question: Are switchboards and/or distribution boards provided with physical means toprevent the installation of more over current devices than that number forwhich the panel board was designed, rated, and listed.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Switchboards and distribution boards are not provided with locking devices toprevent insertion of more over current devices.

Source of Findings: Visual Assessment: Locking devices provided in ground floor and 1st floor'sdistribution boards in order that insert extra circuit breakers.

Suggested Plan ofAction:

For switchboards and/or distribution boards, provide the physical means toprevent the installation of more over current devices than that number forwhich the panel board was designed, rated, and listed following NFPA 70section 408.54. Verify the existing load does not exceed the panel rating.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standards Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

Question: Each circuit is provided with a dedicated neutral.  

Priority Level: Medium

Non-Compliance Level: 2

Description: Each circuit is not provided with a dedicated neutral.

Source of Findings: Visual Assessment: Dedicated neutral is not provided for all circuits inside thepanel-boards in substation room, generator room and production floors.

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 14/22

Page 15: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

Suggested Plan ofAction:

Consult a qualified electrical engineer to properly size the dedicated neutral foreach missing location. Provide a dedicated neutral for each circuit followingrespective phase cable size. Provide identification and marking of neutralcables to each circuit for maintenance.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standards Part 10 Section 10.3 Electrical Wiring and Cabling

Question: Are lighting and receptacle (socket) circuits segregated?  

Priority Level: Medium

Non-Compliance Level: 2

Description: Lighting and receptacle (socket) circuits segregated in operational areas andother areas are under construction.

Source of Findings: Visual Assessment: Lightning and socket circuits are segregated inside thePanelboards in operational area.

Suggested Plan ofAction:

Provide separate neutral use for each circuit and provide identification andmarking of neutral cables to each circuit for maintenance.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard Part 10 Section 10.3.7.2

Question: Are electrical wiring/cables properly identified?  

Priority Level: Medium

Non-Compliance Level: 2

Description: In operation areas floor distribution boards, electrical wiring are not identified.

Source of Findings: Visual Assessment: Identification of electrical wiring is not founded in insidethe distribution boards.

Suggested Plan ofAction:

Provide the means of identification is obtained by a separate color coding,marking tape, tagging, or other approved means.

Suggested DeadlineDate:

30 Sep 2016

Standard: Bangladesh Electricity Rules 1937 Rule 51 and 56

Question: Electrical wiring and conduit is properly supported.  

Priority Level: Medium

Non-Compliance Level: 2

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 15/22

Page 16: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

Description: Electrical wiring and conduit is properly supported in the operational area andothers area is under construction.

Source of Findings: Visual Assessment: In operational area electrical wiring and conduit aresupported.

Suggested Plan ofAction:

Provide supports for electrical wiring and conduit permanently after completionof construction work in other floors.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard Part 10 Section 10.3.2, 10.3.4.3, and 10.3.5

Question: Electrical connections at equipment, fixtures, etc are properly secured.  

Priority Level: Medium

Non-Compliance Level: 2

Description: Electrical connections are not secured in operational electrical equipment.

Source of Findings: Photograph: Secured electrical connection are not found in production areas.

Suggested Plan ofAction:

Properly connect and secure cables at equipment, fixtures, etc. in accordancewith Alliance standard.

Suggested DeadlineDate:

31 Oct 2016

Standard: Alliance Standards Part 10 Section 10.3.1 Electrical Connections

Question: Is all electrical wiring/cable properly terminated at its point of termination (Noun-terminated wires, lugs are provided at terminals, etc)?

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Electrical wiring is properly terminated at its point of terminations in operationalareas. Other areas are under construction.

Source of Findings: Visual Assessment: In operational areas electrical cable is properlyterminated.

Suggested Plan ofAction:

Provide proper termination of all wiring in accordance with the Alliancestandard. No un-terminated wires or cables are allowed.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standards Part 10 Section 10.3.9.2 Wiring of Sub-distribution Boards

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 16/22

Page 17: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

Question: Mechanical guards are provided for electrical equipment and wiring wherenecessary.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Mechanical guards are not provided for electrical equipment at requiredlocations.

Source of Findings: Photograph: Mechanical guards are not found for electrical cables supporters.

Suggested Plan ofAction:

Provide mechanical guards for electrical equipment where required.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard Part 10 Section 10.3 Electrical Wiring and Cabling, 10.6.5Cables, and 10.7 Main Switch, Switchboards And Metal Clad Switchgear

Question: Stranded conductors having a nominal cross-sectional area 6mm2 or greaterare provided with cable sockets. Conductors below 6 mm2 without cablesockets, all strands at the exposed ends are soldered together or are crimpedusing suitable sleeve or ferrules.

 

Priority Level: Medium

Non-Compliance Level: 1

Description: In operational floor, exposed ends of stranded conductors below 6mm2 arecrimped using suitable sleeve and others areas are under construction.

Source of Findings: Visual Assessment: Only gr. floor and 1st floor expose cables below 6mm2 arecrimped using a suitable sleeve.

Suggested Plan ofAction:

Provide 6mm2 strand conductor or greater for cable sockets in floor areas andexpose ends of all strand conductors below the 6mm2 shell be soldered orcrimped using a suitable sleeve after completing construction work in otherfloors.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standards Part 10 Section 10.3.8.3 Cable Ends

Question: Required equipment and safety signage is posted within the room.  

Priority Level: Low

Non-Compliance Level: 3

Description: Required equipment and safety signage is not posted at required locations.

Source of Findings: Visual Assessment: Safety signage is not found at required locations.

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 17/22

Page 18: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

Suggested Plan ofAction:

Provide required safety signage in switchgear, unit substations, transformers,pull boxes, connection boxes, and other similar associated equipment.Signage shall be marked with appropriate caution signs. Entrance to room andother guarded locations that contain exposed live parts shall be marked withconspicuous warning signs forbidding unqualified persons to enter.

Suggested DeadlineDate:

20 Oct 2016

Standard: Alliance Standard Part 10 Section 10.3.7, Section 10.7.3, and 10.13.7, NFPA70 Chapter 1 Article 110.21, and Bangladesh Electricity Rules of 1937 Rule 46

Question: Signage indicating the prohibition of light fixtures without protective covers isinstalled at required locations.

 

Priority Level: Low

Non-Compliance Level: 3

Description: Signage indication is not installed at required locations in the operational area.

Source of Findings: Photograph: Signage indication is not found at storage area and other requiredlocations.

Suggested Plan ofAction:

Ensure signage indicating the prohibition of light fixtures without protectivecovers is installed at required locations. Signs shall be posted in Bengali andEnglish, indicating this prohibition at all entrances to these areas.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standards Part 10 Section 10.15 Naked Lights

Question: Are meters and other electrical devices (Ammeter, Voltmeter, PFI AutoController, etc) installed on the main electrical equipment operational?

 

Priority Level: Low

Non-Compliance Level: 2

Description: Panel meters and other electrical devices on the main electrical equipment areoperational in production areas. Other floors are under construction and will becompleted soon.

Source of Findings: Photograph: Electrical devices on main electrical equipment on the groundfloor and only 1st floor which is ready for operation.

Suggested Plan ofAction:

Ensure meters and other electrical devices are installed on the main electricalequipment and are operational.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard 10.13.7 Inspection of the Installation

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 18/22

Page 19: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

Question: Phase separators are provided between terminals on circuit breakers.  

Priority Level: Low

Non-Compliance Level: 2

Description: Phase separators are not provided between terminals on circuit breakers.

Source of Findings: Photograph: In circuit terminals phase separator is not found.

Suggested Plan ofAction:

Install phase separators between terminal connections. Verify phaseseparators are installed at all remaining locations.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard Part 10 Section 10.3.1 Electrical Connections

Emergency Power System

Question: Is the building provided with an emergency power generator?  

Priority Level: High

Non-Compliance Level: 3

Description: An emergency power generation set was not provided in the building foremergency equipment.

Source of Findings: Visual Assessment: No emergency generator provided for running the firepump.

Suggested Plan ofAction:

Provision should be made for standby generating set to avert panic, hazard tolife and property or major production loss in case of interruption of electricalpower supply. The standby power supply may be a petrol engine or dieselengine or gas engine generator.

Suggested DeadlineDate:

30 Nov 2016

Standard:

Question: Are cable trenches properly covered?  

Priority Level: High

Non-Compliance Level: 2

Description: Cable trenches are not covered at required locations.

Source of Findings: Photograph: Cable trenches, cover not found in the LT Panel room,transformer room and others area.

Suggested Plan ofAction:

Provide cable ladder/cable trench to accommodate cable. If trench is provided,then provide the cable ladder/cable trench with a cover of non flammablematerial.

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 19/22

Page 20: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard Part 10 Section 10.13.7 Inspection of the Installation

Question: Are emergency power switchboards, distribution boards, and circuits properlyidentified?

 

Priority Level: High

Non-Compliance Level: 2

Description: Emergency power equipment and circuits are identified in operational areas.Others areas are under construction.

Source of Findings: Photograph: Emergency equipment is identified operational areas.

Suggested Plan ofAction:

Provide proper identification of all boxes and enclosures (including transferswitches, generators, and power panels) for emergency circuits. Providepermanently markings so they will be readily identified as a component of anemergency circuit or system. The required marking can be by color code, thewords “emergency system,” or any other method that identifies the box orenclosure as a component of the emergency system.

Suggested DeadlineDate:

30 Sep 2016

Standard: NFPA 70 Chapter 7 Article 700.10 Wiring, Emergency System

Question: Is the generator frame earthing (grounding) provided at two separate points?  

Priority Level: Medium

Non-Compliance Level: 2

Description: The factory has two diesel generators. Neither generator has appropriategrounding.

Source of Findings: Visual Assessment: Improper earthing found for both diesel generators.

Suggested Plan ofAction:

Provide generator frame earthing at two separate points with proper size ofconductors and sufficient number of earth electrodes.

Suggested DeadlineDate:

30 Sep 2016

Standard: Alliance Standard 10.8.2.2

Question: Are inspection, maintenance, and testing procedures of the UPS beingcompleted and documented?

 

Priority Level: Low

Non-Compliance Level: 3

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 20/22

Page 21: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

Description: Inspection, maintenance, and testing procedures of the IPS are not completedand documented.

Source of Findings: Visual Assessment: No inspection, maintenance and testing procedures of IPSsystem was found.

Suggested Plan ofAction:

Provide an inspection testing, and maintenance program for theUninterruptible Power Supply (UPS) and associated components. Theprogram must based on the following: (1) Manufacturer's recommendations (2)Manufacturer's instruction manuals (3) Minimum Requirements of NFPA 111Chapter 8 (4) Minimum Requirements of NFPA 70B Chapter 28

Suggested DeadlineDate:

31 Oct 2016

Standard: Alliance Standard Part 13 Section 13.11 NFPA 111 Chapter 8 NFPA 70BChapter 28

Question: Are inspection, maintenance, and testing procedures of the emergencygenerator being completed and documented?

 

Priority Level: Low

Non-Compliance Level: 2

Description: Inspection, maintenance, and testing procedures of the emergency generatorare not being completed or documented.

Source of Findings: Visual Assessment: No inspection, maintenance, and testing procedure foundthe fore existing generator.

Suggested Plan ofAction:

Establish a routine maintenance and testing program for the emergencygenerator. The program shall be based on all of the following: (1)Manufacturer's recommendations (2) Manufacturer's Instruction manuals (3)Requirements of NFPA 110 Chapter 8

Suggested DeadlineDate:

30 Sep 2016

Standard: NFPA 110 Chapter 8

Lightning Protection System

Question: Is a lightning protection system installed on the building?  

Priority Level: High

Non-Compliance Level: 3

Description: Design of lightning protection system is available at site. Need to submit forreview and approval from Alliance.

Source of Findings: Visual Assessment: The lightning protection system is not installed on thebuilding.

Suggested Plan of Install lightning protection system according to the approval drawing.

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 21/22

Page 22: INITIAL ELECTRICAL ASSESSMENT REPORTsfi.fairfactories.org/sfi_dev_files/1/Audit_Files/Fair Design Printing Ltd (New... · INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name:

Action:

Suggested DeadlineDate:

31 Oct 2016

Standard: Alliance Standards Part 10 Section 10.11 Lightning Protection. Calculate RiskIndex to determine if required.

 

 

FactoryName:

Fair Design Printing Ltd (New Location)

Address: Shi-140/1, Chandpara, Bason Sorok, Gazipur Sodor, Gazipur GazipurDhaka Bangladesh

Assessor: BD Technology

Date: 24 Jul 2016

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 22/22