5
W Water JL Research rj Foundation Attachment 1 Infrastructure-Related Projects

Infrastructure-Related Projects...2016/02/03  · Watertightness of CFRP Liners Used for Renewal of PCCP, Project 4592. To be completed in 2017. Workshop on Condition Assessment Inspection

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Infrastructure-Related Projects...2016/02/03  · Watertightness of CFRP Liners Used for Renewal of PCCP, Project 4592. To be completed in 2017. Workshop on Condition Assessment Inspection

W Water JL Research rj Foundation

Attachment 1

Infrastructure-RelatedProjects

Page 2: Infrastructure-Related Projects...2016/02/03  · Watertightness of CFRP Liners Used for Renewal of PCCP, Project 4592. To be completed in 2017. Workshop on Condition Assessment Inspection

1 Acoustic Signal Processing for Pipe Condition Assessment, Project 4360. Published in 2014.

Advanced Condition Assessment and Failure Prediction Technologies for Optimal Management of Critical Water Supply Pipes, Project 4326. To be completed in 2015.

Answers to Challenging Infrastructure Management Questions, Project 4367. Published in 2014.

Assessment of Non-Uniform Corrosion in Copper Piping, Project 3015. Published in 2008.

Best Management Practices for the Maintenance of Water Distribution Assets, Project 4237. To be completed in 2015.

Best Practices Manual for Prestressed Concrete Cylinder Pipe Condition Assessment, Project 4233. Published in 2012.

CFRP Renewal of Prestressed Concrete Cylinder Pipe: Part 2, Project4510. Published in 2014.

Chemical Permeation/Desorption in New and Chlorine-Aged Polyethylene Pipes, Project 4138. Published in 2010.

Commercialization of the Digital Leak Detector, Project 4041. Published on 2009.

Comparison of Zinc vs Non-Zinc Corrosion Control for Lead and Copper, Project 4103. Published in 2011.

Condition Assessment of Large-Diameter Iron Pipe, Project 4391. Published in 2014.

Condition Assessment of Water Main Appurtenances, Project 4188. Published in 2012.

Continuous System Leak Monitoring-From Start to Repair, Project 3183. Published in 2011.

Contribution of Service Line and Plumbing Fixtures to Lead and Copper Rule Compliance Issues, Project 3018. Published in 2008.

Corrosion and Metal Release for Lead-Containing Plumbing Materials: Influence of NOM, Project 182. Published in 1999.

Costs of Infrastructure Failure, Project 2607. Published in 2002.

Criteria for Valve Location and System Reliability, Project 2869. Published in 2006.

Decision Support System for Distribution System Piping Renewal, Project 2519. Published in 2002.

Development of an Effective Asbestos Cement Distribution Pipe Management Strategy for Utilities, Project 4480. To be completed in 2015.

Drinking Water Pump Station Design and Operation for Energy Efficiency, Project 4308. To be completed in 2015.

Page 3: Infrastructure-Related Projects...2016/02/03  · Watertightness of CFRP Liners Used for Renewal of PCCP, Project 4592. To be completed in 2017. Workshop on Condition Assessment Inspection

Durability and Reliability of Large Diameter HDPE Pipe for Water Main Application, Project 4485. To be completed in 2015.

Effects of Weather on Leakage and Bursts, Project 4392. Published in 2014.

Electromagnetic Inspection of Prestressed of Concrete Pressure Pipe, Project 2564. Published in2001.

Enhancement of Water Treatment Plant Infrastructure Assessment Manager, Project 2921. Published in 2001, updated in 2003.

Estimating Health Risks From Infrastructure Failures, Project 2773. Published in 2006.

Evaluating the Current Condition and Future Performance of Ductile Iron Pipe, Project 4361. To be completed in 2015.

Evaluation of Lead Line Sampling Strategies, Project 4569. To be completed in 2017.

Evaluation of Lead Service Line Lining and Coating Techniques, Project 4351. To be completed in 2015.

Extension and Advancement of Development of Design Equation for Large Diameter Steel Pressure Pipe, Project 4587. To be completed in 2017.

External Corrosion and Corrosion Control of Buried Water Mains, Project 2608. Published in 2005.

Failure of Prestressed Concrete Cylinder Pipe, Project 4034. Published in 2008.

Fracture Failure of Large Diameter Cast Iron Water Mains, Project 4035. Published in 2013.

Galvanic Corrosion Following Partial Lead Service Line Replacement, Project 4349. Published in 2013.

High Consequence Isolation Valve Placement and Operation for Effective Risk Management of Pipe Failure, Project 4624. To be completed in 2018.

Impact of Hydrocarbons on PE/PVC Pipes and Pipe Gaskets, Project 2946. Published in 2008.

Influence of Distribution System Infrastructure on Bacterial Regrowth, Project 2523. Published in 2003.

Installation, Condition Assessment, and Reliability of Service Lines, Project 2927. Published in 2007.

Interaction of Fracking and Crude Oil Contaminants with Water Distribution Pipes, Project 4579. To be completed in 2015.

Page 4: Infrastructure-Related Projects...2016/02/03  · Watertightness of CFRP Liners Used for Renewal of PCCP, Project 4592. To be completed in 2017. Workshop on Condition Assessment Inspection

Investigation of Grey Cast Iron Water Mains to Develop a Methodology for Estimating Service Life, Project 280. Published in 2000.

Key Criteria for Valve Operation and Maintenance, Project 2713. Completed in 2002.

Large Diameter Trunk Main Failures, Project 4076. Published in 2009.

Leakage Management Technologies, Project 2928. Published in 2007.

Legacy of Manganese Accumulation in Water Systems: Assessment, Consequence, Remediation, and Prevention, Project 4314. To be completed in 2015.

enewal, Project 4471. To be completed in 2015.

Life Expectancy of Cement Mortar Linings in Cast and Ductile Iron Pipes, Project 3126. Published in 2011.

Long Term Performance of Asbestos Cement Pipe, Project 4093. Published in 2013.

Long-Term Performance of Ductile Iron Pipes, Project 3036. Published in 2011.

Long-Term Performance Prediction of Steel Pipe, Project 4318. To be completed in 2015.

Main Breaks: State of the Science and Research Roadmap, Project 4374. Published in 2015.

Multi-Utility Buried Pipes and Appurtenances Location Workshop, Project 2882. Completed in2002.

New and Emerging Capital Provides for Infrastructure Funding, Project 4617. To be completed in 2018.

Non-Destructive Condition Assessment for Small Diameter Cast and Ductile Iron Pipe, Project 4230. Published in 2014.

Non-Intrusive Methodology for Assessing Lead and Copper Corrosion, Project 4317. Published in 2014.

Optimization of Phosphorus-Based Corrosion Control Chemicals and Flushing for Lead and Copper Control, Project 4586. To be completed in 2017.

Performance and Life Span of Polyethylene Wrap Materials for Ductile Iron Pipe, Project 4098. To be completed in 2015. ,

Pipe Location and Leakage Management for Small Water Systems, Project 4144. Published in 2014.

Potable Water Pipeline Defect Condition Rating, Project 4498. To be completed in 2017.

Potential Techniques for the Assessment of Joints in Water Distribution Pipelines, Project 2689. Published in 2006.

Practical and Visual Guide to Common Pipe Failure: Understanding and Classification of Pipe Failure, Project 4490. To be completed in 2017.

Page 5: Infrastructure-Related Projects...2016/02/03  · Watertightness of CFRP Liners Used for Renewal of PCCP, Project 4592. To be completed in 2017. Workshop on Condition Assessment Inspection

Retrofit and Management of Metallic Pipe with Cathodic Protection, Project 4618. To be completed in 2018.

Risk Management of Large-Diameter Water Transmission Mains, Project 2883. Published in 2005.

Secondary Impacts of Corrosion Control on Distribution Systems and Treatment Plant Equipment, Project 4029. Published in 2010.

Selecting Techniques for the Rehabilitation of Small Diameter Cast Iron Pipes, Project 4234. Published in 2013.

Service Life Analysis of Water Main Epoxy Lining, Project 2941. Published in 2006.

Smart Sensors for Buried Utility Location and Performance Monitoring, Project 3129. Published in2010.

Sustainable Infrastructure Management Program Learning Environment (SIMPLE), Version 1.1, Project 4013. Completed in 2008.

Synthesis Document on Distribution System Infrastructure, Project 2629. Published in 2001.

Techniques for Monitoring Structural Behavior of Pipelines Systems, Project 2612. Published in 2004.

The Assess-and-Fix Approach: Using Non-Destructive Evaluations to Help Select Pipe Renewal Methods, Project 4473. To be completed in 2015.

The Effect of Corrosion Pitting on Circumferential Failures in Grey Cast Iron Pipes, Project 2727. Published in 2005.

The Performance of Nonleaded Brass Materials, Project 4191. Published in 2014.

UKWIR National Mains Failures Database Modified for WaterRF, Project 4279. Completed in2011.

Utility Risk Management Methodologies for Buried Assets with Improved Triple Bottom Line Understanding of Pipe Failures, Project 4451. To be completed in 2015.

Water Treatment Plant Infrastructure Assessment Manager, Project 460. Published in 2001, updated in 2002 and 2003.

Watertightness of CFRP Liners Used for Renewal of PCCP, Project 4592. To be completed in 2017.

Workshop on Condition Assessment Inspection Devices for Water Transmission Mains, Project 2871. Published in 2004.