INFORME FINAL Perforación SAL-103i.pdf

Embed Size (px)

Citation preview

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    1/63

    I Fa Pa P SAL103 IPa 1

    INFORME FINAL DE PERFORACIN

    POZO SAN ALBERTO N 103 I

    (SAL-103 I)

    AFE No. BOSL1/0001.4.02.004.01

    NOVIEMBRE 2013

    SANTA CRUZ DE LA SIERRA - ESTADO PLURINACIONAL DE BOLIVIA

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    2/63

    I Fa Pa P SAL103 IPa 2

    INDICE

    1. INTRODUCCIN ................................................................................................................... 6

    2. DATOS DEL POZO ................................................................................................................. 7

    2.1 COORDENADAS DE SUPERFICIE ........................................................................................ 7

    3. GEOLOGA ........................................................................................................................... 8

    3.1 SECUENCIA ESTRATIGRFICA TOPES PROGRAMADOS Y REALIZADOS ................................ 8

    3.2 REGISTROS ELCTRICOS CON WIRE LINE ........................................................................... 9

    3.3 TESTIGOS ........................................................................................................................ 9

    3.4. CORTE SECCIN ESTRUCTURAL ..................................................................................... 10

    4. PERFORACIN ................................................................................................................... 11

    4.1 RESUMEN DE LA PERFORACIN ..................................................................................... 114.2 ESPECIFICACIONES DEL EQUIPO DE PERFORACIN SAI 320 ........................................... 16

    4.3 ESTADO SUPERFICIAL .................................................................................................... 17

    4.4 ESTADO SUB SUPERFICIAL ............................................................................................. 18

    4.5 CONJUNTOS DE PERFORACIN ...................................................................................... 19

    4.6 REGISTRO DE TRPANOS E HIDRAULICA DE PERFORACIN ............................................. 20

    4.7 FLUIDOS DE PERFORACIN ............................................................................................ 21

    4.7.1 TIPO Y PROPIEDADES DE LOS FLUIDOS ..................................................................... 21

    4.7.2 VOLUMEN DE LODO PRDIDO A FORMACIN .......................................................... 23

    4.7.3 PRUEBAS DE ADMISION DE LA FORMACIN (L.O.T) ................................................. 23

    4.7.4 CALIBRES DEL POZO ................................................................................................ 23

    4.8 CAERAS ...................................................................................................................... 28

    4.9 CEMENTACIONES DE CAERA ....................................................................................... 28

    4.8 DAS DE PERFORACIN VS PROFUNDIDAD ..................................................................... 34

    4.8.1 AVANCE .................................................................................................................. 35

    4.9 PERFORACIN DIRECCIONAL ......................................................................................... 364.9.1 VISTA VERTICAL ...................................................................................................... 36

    4.9.2 VISTA DE PLANTA ................................................................................................... 37

    4.9.3 PLANILLA DE DESVIACIN ....................................................................................... 38

    5. DISTRIBUCION DE TIEMPOS ................................................................................................ 40

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    3/63

    I Fa Pa P SAL103 IPa 3

    6. CONTROL DE COSTOS: AFE N. BOSL1/0001.4.02.004.01 ............................................... 42

    6.1 AFE DE PERFORACIN COSTO CONTABLE SAP / PROANI ....................................... 42

    7. SEGURIDAD Y MEDIO AMBIENTE ........................................................................................ 45

    7.1 RESUMEN DE ACTIVIDADES ...................................................................................... 45

    7.2 ACCIDENTES / INCIDENTES ....................................................................................... 46

    7.3 HORAS HOMBRE CON EXPOSICION AL RIESGO .......................................................... 47

    7.4 METODOLOGA DEL MONITOREO ............................................................................. 48

    7.5 MONITOREO DE LAS ACTIVIDADES DE SEGURIDAD INDUSTRIAL ................................ 48

    7.5.1 BRIEFING E INDUCCIONES DE (SMS) .................................................................. 49

    7.5.2 PERMISOS DE TRABAJO Y ANLISIS DE TRABAJO SEGURO .................................. 50

    7.5.3 REUNIONES DE SEGURIDAD INDUSTRIAL. .......................................................... 51

    7.5.4 APLICACIN DE TARJETAS ENFCATE Y AUDITORAS COMPORTAMENTALES ...... 527.6 SIMULACROS DE ENTRENAMIENTO .......................................................................... 54

    7.7 INSPECCIN DE EXTINGUIDORES .............................................................................. 55

    7.8 CONTROL VEHICULAR Y HOJA DE RUTA DE VIAJE ..................................................... 56

    7.9 EQUIPOS DE SEGURIDAD CONTRA INCENDIOS .......................................................... 56

    7.10 INSPECCIONES DE SMS ............................................................................................. 57

    8. CONCLUSIONES .................................................................................................................. 58

    9. RECOMENDACIONES .......................................................................................................... 59

    10. ANEXOS ............................................................................................................................. 61

    ANEXO A (FOTOGRFICO) .................................................................................................. 61

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    4/63

    I Fa Pa P SAL103 IPa 4

    Preparado por:

    Julio Csar Flores Vargas

    Ingeniero de Perforacin Jr.

    Ymbler Saldias.

    Ingeniero de Perforacin Ssr.

    Revisado por:

    Pascual Sandagorda

    (Coordinador de Pozos)

    Milton Gorena ___________________

    (Coordinador de Ingeniera de Pozos)

    Jorge Paz

    (Consultor Servicios en Pozo)

    Aprobado por:

    Marcelo Humberto Vasconcelos

    (Gerente de Servicios en Pozos)

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    5/63

    I Fa Pa P SAL103 IPa 5

    LISTA DE DISTRIBUCION

    NoCOPIA

    COMPAA PERSONA

    1Petrobras Bolivia S.A. / Gerencia de

    Servicios en Pozos

    Marcelo Humberto

    Vanconcelos

    2 Petrobras Bolivia / Gerencia de Exploracin Germn Fernndez

    3 Petrobras Bolivia / Activo San Alberto Juan Luis Pacheco

    4 Petrobras Bolivia / PLG / ACOJ Jorge Calla

    5 Petrobras Bolivia Archivo

    6 YPFB Andina S.A.Jorge Ortiz Paucara

    Mario Arenas

    7 Total E&P Bolivie Jos Ignacio Sanz

    8 Vicepresidente VPACF-YPFBLuis A. Snchez

    Fernadez

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    6/63

    I Fa Pa P SAL103 IPa 6

    1. INTRODUCCIN

    E a a SAL103 a a aa

    aa a Sa A a aa G Ta.

    Da a a aa aa

    aa, a a a aa 2550 (MD),

    a a a aaa 2605 .

    E SAL103 a a aaa SAL101 a

    aaa a aa a 5 aa . E

    a aa aaa a

    SAI320 SAL103I, a a a aa.

    La a a a a a

    a a 22 a a aa.

    S a a: 17, 12 8 aa a a a a 2550

    (MD). E a a 8 aa (Fa Ta)

    (D I) a a aa a.

    La a a aa a a

    a aa aa a aa aa a. La a

    Ta a aa a a a a a a aaa

    aa. E a aa a a 4, a a

    a 2150 a a a 2176 .

    La a a 11 2013, aa 94.757

    (HHER) aa a aaa / a

    aa.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    7/63

    I Fa Pa P SAL103 IPa 7

    2. DATOS DEL POZO

    BLOQUE: SAN ALBERTO.

    CAMPO: SAN ALBERTO.

    POZO DE INYECCION: SAN ALBERTO 103I (SAL103I)

    SOCIEDAD: PETROBRAS BOLIVIA S.A. (OPERADORA 35%), TEPB

    (15%) YPFB ANDINA S.A. (50%).

    CUENCA: TARIJA.

    DEPARTAMENTO: TARIJA .

    PROVINCIA: GRAN CHACO.

    UBICACIN FISIOGRAFICA: SUB ANDINO SUR.

    UBICACIN GEOLGICA EN SUPERFICIE:

    FLANCO OCCIDENTAL DEL SINCLINAL DECARAPARI

    UBICACIN GEOLGICA EN PROFUNDIDAD:

    FLANCO OCCIDENTAL DEL SINCLINAL DECARAPARI

    2.1 COORDENADAS DE SUPERFICIE

    SISTEMA UTM

    Z = 828.15 Z = 837.31

    SUPERFICIE

    DATUM PSAD 1956

    X= 413363,37

    Y= 7577140,25

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    8/63

    I Fa Pa P SAL103 IPa 8

    SISTEMA FORMACIN ESTRUCTURA Reservorio Tope MD Tope TVDCota

    EstructuralEspesor

    Atravesado

    m m mss mTariquia Planchada 837,31 837,3 1032,69Petaca 1870 1798 -961 20,00

    Falla 1 1890 1817 -931 310,00Petaca 2127 2036 -1199 17,00Tacur 2144 2052 -1215 437,00

    Ipaguazu 2581 2452 -1615 24,00PF 2605 2474 -1637

    SISTEMA FORMACIN ESTRUCTURA CUERPO Tope md Tope tvdCota

    EstructuralEspesor

    Atravesado

    Tariqua Planchada 837,3 2065Petaca 2065 1978,51 -1141,21 35Tacuru 2100 2010,87 -1173,56 394

    Ipaguazu 2494 2370,88 -1533,57

    2550 2422,05 -1584,74

    POZO SAL-103iSecuencia estratigrfica a ser investigada

    DATUM PSAD56 X=413.363,37 Y=7.577.140,25Zt= 828.15m Zr=837,31

    DATUM WGS84 X=413.210,08 Y=7.576.766,54

    Terciario

    Prof. Actual

    Terciario

    Devnico

    POZO SAL-103iSecuencia estratigrfica atravesada

    DATUM PSAD56 X=413.363,37 Y=7.577.140,25Zt= 828.15m Zr=837,31

    DATUM WGS84 X=413.210,08 Y=7.576.766,54

    LOCALIZACIN

    (D Aaa a Ra)

    C : 25 L ; P : 0503

    3. GEOLOGA

    3.1 SECUENCIA ESTRATIGRFICA TOPES PROGRAMADOS Y REALIZADOS

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    9/63

    I Fa Pa P SAL103 IPa 9

    3.2 REGISTROS ELCTRICOS CON WIRE LINE

    3.3 TESTIGOS

    E a a Ta, a 2320 2329 (9)

    a aa 8 a 6 aa a a,

    a a 7,21 (a a 81%).

    Carrera Tramo (mbbp.) Formacin Fase(pulg)

    Registro deTemperatura

    (F)

    Fecha

    2095,0 94,0

    40,0 2100,0 02-08-13

    2550,0 2104,0

    2547,0 2104,0

    Bajada 2: HDIP-MAC-GR

    Bajada 1: DLS-HDIL-6CAL

    Bajada 3: VDL-SBT-GR-CCL 2529,0 2034,0

    Bajada 3: VDL-SBT-GR-CCL

    2097,0 94,0

    Notas: La compaa registradora fue Baker Hughes

    Interpretacin Buzamientos

    Bajada 1: HDIL ZDL CN-GR

    Bajada 2: DSL STAR ORIT - XMAC

    Petaca/Tacuru

    Tacuru/Ipaguazu

    Carrera 1

    Carrera 2

    19-08-13

    28-07-13

    12 1/4"

    8 1/2"

    Tipo de Registro

    13-08-13

    158,7F @ 2100m

    159,30F @2550m

    REGISTROS EN AGUJERO ABIERTO

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    10/63

    I Fa Pa P SAL103 IPa 10

    3.4. CORTE SECCIN ESTRUCTURAL

    C Ea Baaa Sa Caaa

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    11/63

    I Fa Pa P SAL103 IPa 11

    4. PERFORACIN

    4.1 RESUMEN DE LA PERFORACIN

    La a SAL103 a 30 2013. L a

    a aa aa aa

    a aa a, a

    17 aa 96 a 8.8 ,

    a a a a. A a a aa a

    aa ROP, a a a a aa

    a a ROP.

    Ca a a 20 aa aa 13.3/8, 55, 54,5 , BTC aa 94 . Baa

    HWDP 5 a aa a. Ca aa 75

    aa , a 15,6 (a a 19

    ). Da a a a a a a,

    a a aa a. Da aa a

    . Ca a 13.3/8 a A a a MMA 13.5/83M.

    Aa a BOP 13.5/8 10M.

    E a 06 J 2013, aa a a a 12 ,a 88.5 a 96 (a aa 13 3/8 94 ). Raa

    a L 10.5 . Ia a a a

    12 aa 108 . Aa aa aa a a a PDC 12 , M

    F (MF) 8 (BH=1.15) aa 108 . Pa aa aa a

    a aa SO. Raa aa a aa 300

    a. Pa aa 699 , a a a MWD,

    a aa aa a , a a MWD a aa a a a

    MWD. Aa aa a a a PDC 12 MF 8

    (BH 1.25) aa 699 . Ca a a 12 aa 1462 , a a

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    12/63

    I Fa Pa P SAL103 IPa 12

    aa. Saa aa a a a a GAP

    (MF) 10 . Caa a 12 , 8

    a a a/a aa aa a.

    Ea a a Paa 2042 (MD), 1957.2 (TVD) G Ta

    2065 (MD), 1978.5 (TVD), a aa 2110 (TD Fa); 2091

    , 22.4/ 225.4. Ca a aa aaa a, aa aa aa

    .

    E a a a a a a aa 1,6% aa

    a aa a a a.

    Aa aa BHA aa a 12 2 aa 12 1/8 a

    0 30 , aa aa a a a aa

    390 a 2110 , a aa a , aa aa a .

    Ta a a a a:

    1 B:Sa DSLHDLI 6CAL ( a 24.29 ; OD a 4.83"), aa aa

    2095 a aa. Pa a a: 209594, Ta : 2095

    1970.

    2 B a: HDIPMACGR ( a 30.02 ; OD a 4.63"), a

    a: 2097 94 ; Ta 20971970 .

    Baa a aa aa aa 12 1/8 a 0 30 60 ,

    aa 2087 a 2110 . Raa a a a a a ,

    aaa 50 a a (D= 11,2 ; V= 200 /) . Saa

    aa a a aa a 1215 .

    E 30 2013, aa aa 9.5/8, N80, 43,50 /, BTC + 3a

    aa 9 5/8, N80, 43,50 /, BTC + a a 9 5/8,N80, 43.50 /,

    BTC + 164 a aa 9.5/8 , N80 , 43,5 // , BTC + XO 9.5/8"

    BTC (P) 9.5/8" Va T (B) + 18 a aa 9 5/8, P110, 53,50 /, VAMTOP

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    13/63

    I Fa Pa P SAL103 IPa 13

    aa 2105 . Ca 5.5 , aa a aa : PV

    (a)= 31, YP (a)=23 /1002. Ba 80 T Sa III + 400

    Ea (La) = 13 + 100 Ha (Ta), = 15,6 . Sa a

    , aa 10 aa a (8.33), aa a a

    a aa 503 = 11.2 , a .

    Da a 0, 1 a a a,

    a a a.

    Laa BOP, aa a aa 75. Raa ,

    aa B, a a a aa 2500

    10. Iaa BOP 13.5/8 10M

    Baa a a 8 aa 2047,5 . Ca + a

    a a aa 2100 . Ca aa aa a .

    Raa aa VDLSBTGRCCL 2100 a 2021 a CBL

    12V, a a aa aa. E a 2021950

    a CBL 25 V a a a aa. Fa 950 a

    CBL 35 V a aa aa.

    P a a a aa 2099 , a a

    a a a a aa 9.5/8 1050 a 10 . R

    a 2100 a 2110 , aa a =11.2

    =11 . , a a aa 2116. Laa aa aa

    aa a aa 9.5/8 a 2105 , a a a. Raa

    a L.O.T, a 8.6 a 0.4 , a aa 3840

    a a aa aa 1675, EMW =

    15,54 . Da , 3.6 ,

    a 5 .

    Baa a a a PDC 8, 6.3/4 (BH = 1.15 aa

    a a a) a aa 2320 . A a a 2146 a a a

    a a a a a, a a

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    14/63

    I Fa Pa P SAL103 IPa 14

    a a a 2 a 4 /, a a a

    a a. E 2320 , a, aa aa a

    , aa aa BHA aa a T 8 2

    aa a 30 60 aa a aa .

    E a 7 a 2013 aa a a 8 a 6 aa

    a a aa 2320 . Ca 2320 a 2329 a a

    Ta. Ia a a: 4 , 150, 65,

    a a aa a aa 14, 210, 80 a a

    a aa a 1/ a 2/ a a 2325 . Saa aa

    a a aa a , a 7.29 , a a

    81%.

    Baa a a a PDC 8, 6.3/4 (BH 1.25) , a

    a / a 2329 aa 2550 (TD ), a

    a Iaa 2494 (MD), 2370.8 (TVD). Ca, aa aa a a

    aa aa 9 5/8, a aa aaa a aa aa a .

    Raa 2a aa :

    1 B, : HDIL ZDL CNGR a a: 2550 2104 , a :25502450 .

    2 B:DSL STAR ORIT XMAC a a: 2547 2104 , a :

    2547 2400 . Ca 6 a : 8.68.

    Aa a 8 , aa 8 3/8 a 0 30 60

    , aa a a aa 2128 , a a aa aa

    aa a 21282165 , a aa a a aa 2550,

    a 50 a aa aaa a, aa aa aa .

    E a 14 a 2013, aa L 7: aa 498 42 a aa 7", 29

    /, L80, Sa D, Va T ( a a:

    1 a: aa a; 2a a: a a, 4a a: a a a

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    15/63

    I Fa Pa P SAL103 IPa 15

    ), a 24 aa C. Iaa L Ha F L IV

    (7 29 / 9 5/8 43.5 58.4 /), aa a L S, aa

    5 aa 2545. Iaa aa a, a aa a

    Ea aa, a aa aa 400 , a a ,

    aa aa Y 39 /1002, a 21 /1002.

    Laa a 1 aa aa aa a a, aa a

    a a a 2200 (3), a a 1100 , a

    aa aa a 40 , aa aa 40 a a 0

    . La 2700 , aa 1 a a

    7 45 , 20 aa, a a 4000 .

    Raa a 7 aa, a a : 40 III 8.4 a 4.8 + 40 G F III, 12 , a

    4.8, 10 aa a (Sa ) 12.5 a 4.5 + 55 aa

    a (HALCEM) 15.8 a 4.0 , a a ( a),

    aa 5 Ga F + 197.5 11 a 9 , 920 . A 140

    aa a a D . E 17.5 aa aa

    a 3 , a a 700 , 1300 , a

    2.5 , a a. Aaa aa a,

    aa 10 , a aa a aa aaa 5 , a

    a .

    Baa a a 8 , a a 7 (2040.2 ).

    Baa a 6 1/8, a + a 2489 a 2530 , a a

    a, a aa a . Raa aa P M 7.312 + Sa

    Ra 9 5/8, aaa E S S 7 (a 7) aa 9 5/8,

    a a, aa L T Pa 7 29

    / 9 5/8 43.553.5 / + PBR Sa A, aa 5 a a

    aa, a PBR a a , aa a 1 7/16, aa

    a a a 20002600. Pa a T Pa

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    16/63

    I Fa Pa P SAL103 IPa 16

    EA 2000 . La , aa 20 aa aa, a

    a 3480, aa a a , aa 60 . Pa

    Ba L 7: 2034.26 ; a a 7": 2039.1. Saa a

    .

    E a 19 a 2013, aa aa a CBLVDLSBTGRCCL, a 2529 a

    2034 , a a a aa a. E a a

    a: 25252250 21752105 a

    a 5 V.

    4.2 ESPECIFICACIONES DEL EQUIPO DE PERFORACIN SAI 320

    MASTIL

    O/Va

    TIPO

    Pa L

    CAPACIDAD

    1000000 (1)

    ALTURA

    142

    SUB ESTRUCTURA

    O/Va

    TIPO

    Pa TU R

    Fa

    CAPACIDAD

    1640000

    (SIMULATANEA)

    ALTURA LIBRE

    7,12

    CUADRO DE MANIOBRA

    O/Va

    POTENCIA

    2000 HP

    TIPO

    E

    DIAMETRO DEL CABLE

    1 3/8

    TOP DRIVE

    Naa

    TIPO

    PS 350/500 SINGLE

    SPEED

    CAPACIDAD

    500

    TORQUE

    30000

    Paa DP 5 OD

    BOMBA N 1

    Ga D PZ11

    POTENCIA

    1600 HP

    TIPO

    TRIPLEX

    CAMISAS

    5 a 7

    BOMBA N 2

    Ga D PZ11

    POTENCIA

    1600 HP

    TIPO

    TRIPLEX

    CAMISAS

    5 a 7

    BOMBA N 3

    Naa 12 P160

    POTENCIA

    1600 HP

    TIPO

    TRIPLEX

    CAMISAS

    5 a 7

    (1) La capacidad real del mstil es 1.100.000 lbs.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    17/63

    I Fa Pa P SAL103 IPa 17

    4.3 ESTADO SUPERFICIAL

    C BOP. Fa 8

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    18/63

    I Fa Pa P SAL103 IPa 18

    4.4 ESTADO SUB SUPERFICIAL

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    19/63

    I Fa Pa P SAL103 IPa 19

    BHA N.D

    A

    (P)

    F/H

    E

    F/H

    S C BHA

    1 17,5 30/06/2013 11:30 02/07/2013 01:30 TREP. TRICONO 17.1/2 (N) C/ BOQUILLAS 3X20, TFA: 0,92IN2 + BIT SUB (C/FLOAT VALVE +

    TOTCO RING) + 02 DC 9.1/2" + XO + 01 HWDP 5.1/2"

    2 17,5 02/07/2013 05:30 03/07/2013 18:00 TREP. TRICONO 17" (T XR+CPS, a PX9228, 313/32", TFA: 0.389) + MF 9.5/8" ( 6:7,

    BH=1.5, STB 17.1/4 ", 0.12 /a) + STB 17.3/8" + ALIGMENT SUB NM 9"+ MONELMWD

    9" + PONY MONEL 9" + 01 DC 9.1/2",

    3 12,25 06/07/2013 21:00 07/07/2013 09:00 TRP TRICONO 12.25" (N) ,(T XR+CPS; B 313/32; TFA: 0.3892) + BIT SUB C/ FLOAT

    VALVE + 3DC 8" + XO + 3DC 6 + XO + 3HWDP 5"

    4 12,25 07/07/2013 09:30 11/07/2013 11:59 TREP. PDC 12 , TIPO : SDI519HBPXO (B 7X12") + DHM 8 (C/FaVa, CAMISA STB

    12 1/8, BH 1.15 0.17/a) + STB 12 1/8 + A. SUB NM + MONEL (C/MWD) + PONY

    MONEL + 3DC 8 + JAR 8 + 1DC 8 + XO + 3DC 6 + XO + 15 HWDP 5

    5 12,25 11/07/2013 12:00 19/07/2013 13:00 TREP. PDC 12 , TIPO: SDI519HBPXO (B 7X11") + DHM 8 (N) (C/Fa Va, CAMISA

    STB 12 1/8, BH 1.11 0.17/a) + STB 12 1/8 + A. SUB NM + MONEL (C/MWD) + PONY

    MONEL + 3DC 8 + JAR 8 + 1DC 8 + XO + 3DC 6 + XO + 15 HWDP 5

    6 12,25 19/07/2013 16:00 26/07/2013 14:30 TREP. PDC 12 1/4" (N), TIPO : SDI519HBPX (B 7X11") + DHM 8 (N) (C/ VALV, CAMISA

    STB 12 1/8, BH: 1.15, 0.17/a, 6:7; 5) + STB 12 1/8 (U) + ALIGNMENT SUB NM 8" +MONEL 8" (C/MWDGR) + PONY MONEL8" + 3DC 8 + D. JAR 8+ 1DC 8 +XO + 3DC 6+

    XO + 5 TIROS HWDP 5 1/2"

    7 12,25 26/07/2013 14:30 28/07/2013 02:30 TREP. TRICONO 12 1/4" (U) (SIN BOQUILLAS, TIPO: XRCPS) + STBNEAR BIT12 1/8"(N) +1

    DC 8" + STB STRING 12 1/8" (N) + 2DC 8" + D. JAR 8"+ 1 DC 8" + XO + 3 DC 61/2" +XO + 15

    HWDP 5 1/2"

    8 12,25 29/07/2013 02:00 29/07/2013 20:00 TREP. TRICONO 12 1/4" (U) (SIN BOQUILLAS, TIPO: XRCPS) + STB NEAR BIT12 1/8" + 1 DC

    8" +STBSTRING121/8" + 1 DC 8" + STBSTRING 12 1/8" (N) + 1DC 8" + D. JAR 8"+ 1 DC 8" +

    XO + 3 DC 6 1/2" + XO + 15 HWDP 5 1/2"

    9 12,25 01/08/2013 04:00 01/08/2013 20:30 TREP. TRICONO 8 (TIPO=OHC1RC, TFA =2.356, S/B) + BIT SUB6 1/8 S/FLOAT VALV. +

    9DC 6 1/2 (ARMA X PZAS) + XO + 9HWDP 5

    10 8,5 02/08/2013 05:00 03/08/2013 04:00 TREP. TRICONO 8 (TIPO=OHC1RC, TFA =2.356, S/B) + BIT SUB 6 1/8 S/FLOAT VALV. +

    9DC 6 1/2 + XO + 9HWDP 5

    11 8,5 03/08/2013 07:00 06/08/2013 10:59 TREP. PDC 8 1/2 ( TIPO MS1516PX, BOQ 5X12", TFA=0.5522), DHM 6 3/4 (6:7, BH 1,15,STB8 3/8, C/FLOATVALVE, REL 0,28/a) + XO + STB 83/8 + A.SUB + MONEL 6 + XO

    SUB + P. MONEL 6 5/16 + XO + 15HWDP 5 1/2 + XO + JAR 6 + XO + 6HWDP 5

    12 8,5 06/08/2013 11:00 07/08/2013 03:00 TREP. TRICONO 8 1/2( TIPO OHC1RC, S/BOQ) + BITSUB (S/FLOATVALVE) + STAB 8.3/8"+

    1 DC 6.1/2" + STAB 8.3/8" + XO + 12HWDP 5 1/2 + XO + JAR 6 + XO + 6HWDP 5

    13 8,5 07/08/2013 04:00 08/08/2013 09:59 CORONA CORTA NUCLEOS (TIPO: CCPX913MBI; TFA 1,167INCH2) + STB 8 15/32 + BARRIL

    EXTERNO 6 + STB 8 15/32 + JUNTA DE SEGURIDAD 6 + XO + DC 6 + XO + 12 HWDP 5

    + XO + D. JAR + XO + 6 HWDP 5

    14 8,5 08/08/2013 10:00 13/08/2013 00:30 TREP. PDC 8 1/2 (U), (TIPO MSI516PX, BOQ 5X12, TFA=0.5522) + DHM 6 (BH 1,15;

    STB 8 3/8) + FLOAT VALVE + XO SUB + STB 8 3/8 (U) + A. SUB + MONEL (C/ GR+MWD) +

    PONY MONEL + XO + 15HWDP 5 1/2 + XO + JAR 6 + XO + 6HWDP 5

    15 8,5 13/08/2013 18:30 14/08/2013 17:30 TREP. TRICONO 8 1/2 (U), TIPO OHC1RC, S/BOQ + BIT SUB (C/FLOAT VALVE) + STAB

    STRING 8.3/8" (N) + 1 DC 6.1/2" + STAB STRING 8.3/8" + DC 6.1/2" + STAB STRING 8.3/8" +

    XO + 6HWDP 5 1/2 + XO + JAR 6 + XO + 6HWDP 5

    16 8,5 16/08/2013 13:00 16/08/2013 23:59 TREP. TRICONO 8 1/2 (U), TIPO OHC1RC, S/BOQ + BIT SUB (C/FLOAT VALVE) + XO +

    6HWDP 5 1/2

    17 8,5 17/08/2013 02:30 18/08/2013 14:30 TREP. TRICONO 6 1/8 (N), TIPO XR+, S/BOQ + BIT SUB (C/FLOAT VALVE) + 6DC 4 3/4 +

    9HWDP 3 1/2

    4.5 CONJUNTOS DE PERFORACIN

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    20/63

    I Fa Pa P SAL103 IPa 20

    N T F T N. S D

    ()

    F/H

    E

    F/H

    S

    E

    ()

    S

    ()

    A

    ()

    TFA

    ()

    M

    D

    ()

    M

    ROP

    (/)

    M WOB

    ()

    M WOB

    ()

    M RPM

    ()

    M RPM

    ()

    M

    P

    (

    1 SMITH XR+CPS PR8304 17,5 30/06/2013 11:30 02/07/2013 01:30 14 40 26 0,92 8,7 0,80 2 10 60 100 112 SMITH XR+CPS PR9228 17,5 02/07/2013 05:30 03/07/2013 18:00 40 96 56 0,39 8,8 2,18 8 10 40 40 13

    3 SMITH XR+CPS PY2701 12,25 06/07/2013 21:00 07/07/2013 09:00 96 108 12 0,39 10,5 2,00 8 10 70 70 10

    4 SMITH SD519HBPX JD9284 12,25 07/07/2013 09:30 11/07/2013 11:59 108 699 591 0,77 10,5 9,50 2 3 40 40 10

    5 SMITH SD519HBPX JE3887 12,25 11/07/2013 12:00 19/07/2013 13:00 699 1462 763 0,65 10,9 5,73 8 20 30 60 26

    6 SMITH SD519HBPX JF0465 12,25 19/07/2013 16:00 26/07/2013 14:30 1462 2110 648 0,65 11 6,37 14 25 50 50 29

    7 HALLIBURTON OHC1RC 8,5 02/08/2013 05:00 03/08/2013 04:00 2110 2116 6 0,55 11 5,20 8 9 30 30 16

    8 SMITH MSI516PX JE9546 8,5 03/08/2013 07:00 06/08/2013 10:59 2116 2320 204 0,55 11 5,00 7 20 30 30 18

    9 NOV CCPX913MBI 124485 8,5 07/08/2013 04:00 08/08/2013 09:59 2320 2329 9 1,17 11 1,29 10 14 65 80 55

    10 SMITH MSI516PX JE9546 8,5 08/08/2013 10:00 13/08/2013 00:30 2329 2550 221 0,55 11 3,00 8 12 30 30 19

    4.6 REGISTRO DE TRPANOS E HIDRAULICA DE PERFORACIN

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    21/63

    I Fa Pa P SAL103 IPa 21

    4.7 FLUIDOS DE PERFORACIN

    4.7.1 TIPO Y PROPIEDADES DE LOS FLUIDOS

    F 17: B E

    3336 /100 2 a a

    a a a a a a a

    a. E a a a aa

    a a, a a a a

    a a a , a a a aa a

    a aa a.

    Diametro del pozo (plg) 17,5 12,25 8,5Diametro Caeria (plg) 13 3/8 9 5/8 7

    Intervalo perforado (m) 14-96 96-2110 2110-2550Tipo de fluido Bent. Extend Polytraxx Drill N

    Densidad (lpg) 8,6-8,8 10,5-11,2 11Viscosidad Embudo (seg/qt) 55-58 50-108 72-90Viscosidad Plastica (cp) 7-10 19-37 35-42

    Punto Cedente (lb/100 ft2) 33-36 26-48 31-39Gel 10" - 10' - 30' (lb/100 ft2) 17-22/20-29/22-31 5-22/7-28/9-37 5-10/9-14/11-20

    Filtrado API (cm3) NC 4,6-7,4 3,8-4,2Revoque API (32nd plg) NC 1 1

    Solidos Correg (%) 1,7-3 8,17-12,92 18,65-18,73Arena (%) NC 0,2 0,2

    MBT (lbs eq) NC 2,25-13 2,5-5,5LGS (%) 1,69-2,78 0,44-4,45 0,06-1,24PH 9,5 8,7-9,5 9,5-9,7Pm (ml) NC 0,2-0,4 0,5-0,7Pf (ml) NC 0,1-0,2 0,15-0,25Mf (ml) NC 0,9-3,8 1,2-1,65

    Cloruros (mg/l) 350 500-1500 1000-1200Dureza total (mg/l) NC 80-640 200-260

    Diametro del pozo (plg) 17,5 12,25 8,5Intervalo perforado (m) 14-96 96-2110 2110-2550

    Tipo de fluido Bent Extend Polytraxx Drill NDensidad (lpg) 8,6-8,8 10,5-11,2 11

    Fluido Perdido a Formacin (bbl) 0 0 0

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    22/63

    I Fa Pa P SAL103 IPa 22

    F 12: Pa a

    aa. U a a aa a a a a

    a aa a a

    a a a , 10,5 a 11,2

    . Da a a a aa a

    a a a Sa Y

    a aa, a a a . Paa a

    a a a PAC LV a a

    a a 5 , a aa a aa

    aa a a a aa a a aa

    a a aa a H 9,5. C a a a a

    a a a 5 a.

    Da a a a a,

    a a a a aa a aa a, a aa a a a a

    a a aa aa a, a a a a

    aaa a aa.

    F 8: a aa a

    a, a aa a a a . A a a

    a a a aa a

    a aaa a a aa aaa

    aa, a aa aa a

    a a a a

    a a . Da a a a

    a a, a 11

    a a a a a a a

    , a a a aa a a 1,5 %

    a a a a a a a

    a a a , a a a a

    a a a a

    4,3. C a a a a a aa

    aa, a a aa aaa aaa aa a

    a a a.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    23/63

    I Fa Pa P SAL103 IPa 23

    4.7.2 VOLUMEN DE LODO PRDIDO A FORMACIN

    N a a a a a

    a a : 17 , 12 8 .

    4.7.3 PRUEBAS DE ADMISION DE LA FORMACIN (L.O.T)

    E a 2 A 2013 aa a a a

    a, a 8,6 a 0.4 (a), a aa

    aa 3840 . P a a

    aa 1675 30 a .

    CAERIA

    TIPO DE

    PRUEBA

    DENSIDAD

    (LPG)

    ZAPATO

    ()

    PRESION

    ESTABILIZACION()

    DENSIDAD

    EQUIVALENTE()

    9,5/8" L.O.T 10,9 2105 1675 15,54

    *V : 3,6 ; V : 5

    4.7.4 CALIBRES DEL POZO

    La a 17 aa a , M (BH= 1,5)

    aa 17 + MWD. S a a

    a a 8,6 8,8 . E a a

    a. P a 18,5.

    E aa a a

    aa.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    24/63

    I Fa Pa P SAL103 IPa 24

    La a 12 aa a

    PDC, (BH=1,111,15),

    aa 12.1/8 + MWDGR. Eaa

    a aa aa

    10,5 aa 11,2 . E a

    100 a 315 a

    a a. La

    a a a

    a.

    E a a 12 aa a a

    a Taa, Paa a

    a Ta. E

    a a 12,94

    E

    12.51.

    E a a

    a a a a 12

    96 2110. E a 13932100

    a aa

    aa aa a

    aa .

    Agujero de 12.1/4

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    25/63

    I Fa Pa P SAL103 IPa 25

    La a 8 a

    PDC, (BH=1,15),

    aa 8.3/8 + MWDGR. Ea a

    a aa a

    a a aa 11,0 .

    E a a aa a a

    a: Paa, G Ta 56

    a a Iaa

    a a a a a

    2550 . E a

    a 8,68; a

    a a

    a aa

    8,7.

    E a a

    a a a a

    2110 2550. S a

    a a

    (21502216) a aaa

    aaa.

    Agujero de 8

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    26/63

    I Fa Pa P SAL103 IPa 26

    4.7.5 CONTROL DE SLIDOS

    Paa a a a ,

    aa aa a, a a

    a aa a a a a

    .

    L a aa a

    a. S a aaa aa a SWACO, aaa

    aa aa D a, a aaa aa BRANDT

    a, a SWACO a Da

    12, D 24T4, a HS3400 a ,

    a a a aaa a a aa. La a, a

    aaa a a a. Paa a

    ( a aa), a a a a

    aa aa.

    E a , a

    aaa a 28 aa aa aa

    .

    L a a aa a

    a aa a a a ( aaa SAL103).

    E (a, a a aaa) aa a a

    aa , aa a a a aaa SAL103, aa

    aa aa aa a, aa a

    aaa aa a a aa.

    L , aa, a

    , aa a aa:

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    27/63

    I Fa Pa P SAL103 IPa 27

    V A G F

    V S G F

    C

    R F

    SECCIN AVANCE DEWATERING TRATAMIENTO IRRIGADA

    (plg) (m) (bbl) (bbl) (bbl)

    17 1/2 0 96 96 1650 2200 269012 1/4 96 2110 2014 2905 4135 43908 1/2 2110 2550 440 2785 6990 6015

    13.325 13.095

    INTERVALO

    (m)

    Total Agua tratada y dispuesta:

    SECCIN AVANCE VOLUMEN TONELADAS DIA. PROM

    (plg) (m) (bbl) (pulg)17 1/2 0 96 96 765 179 18,512 1/4 96 2110 2014 3406 1786 12,518 1/2 2110 2550 440 2002 666 8,7

    6173 2631TOTAL

    INTERVALO

    (m)

    SECCIONCosto

    qumicos

    Costo

    Mallas

    Costo

    Equipos

    Costo

    personal

    Costo

    movilizacin

    Total

    17 1/2 2873,1 1836 13686,2 9235 4500 32130,312 1/4 7529,25 13838 54992,8 34580 3500 114440,058 1/2 10817,6 4504 32911,4 23940 72173

    218743,35TOTAL

    SeccinDiesel(Lts)

    Polmero1143

    Polmero1148 Acido Ctrico

    Sulfato deAluminio

    Cal hidratadaHipocloritode Calcio

    Polmero1146

    17 1/2 1465 130 71 0 325 0 0 1312 1/4 2080 238 122 34 191 3036 3 268 1/2 2330 219 82 376 600 4991 0 8

    TOTAL 5875 587 275 410 1116 8027 3 47

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    28/63

    I Fa Pa P SAL103 IPa 28

    L a a aa a a a aaa SAL 103

    a aa a a , aa aa a

    a aa a a a , aa aa a aa

    a aaa 320, a a a a a a

    .

    D a a a aa SAL103 a a aa

    SAL101, a a a a a

    aa PEB, a a a aa a a a aa a

    a aaa aa a aa a a a a a

    a.

    4.8 CAERAS

    OD

    ()

    ID

    ()

    Sa 17 13 3/8 12,615 94,4 K55 54,5 BTC

    Ia 12 9 5/8 8,755

    8,535 2105

    N80

    P11043,5

    53,5

    BTC

    VAM TOP

    L 7"

    I 8 7 6,184 2545 L80 29 VAM TOP

    C

    C

    T D P

    ()

    Z

    () G

    P

    (/)

    * A la profundidad de 14m se encuentra una caera gua de 20.

    4.9 CEMENTACIONES DE CAERA

    CAERA 13 3/8 (04/07/2013) @ 96

    Caa: Ha

    C: 32 M F III 8,4

    Laa Pa: 75 aa, a 15,6 , aaa 340 a

    A.

    A: C Ca Aa 2% (750 ), Fa W L 150 a

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    29/63

    I Fa Pa P SAL103 IPa 29

    Oa:

    B aa a a a a aa a.

    A 56 a, a a . Paa

    a 75 a aa 100% . P a a aa

    T J.

    T a 1:00 .

    Eaa: N aa.

    CAERA DE 9 5/8 (31/07/2013) @ 2105

    Caa: Ha

    C: 80 T Sa III 12,2 (49,2 / T Sa + 173.5

    Baa + 0,12 a/ Da3000L + 34,51 a/ Aa)

    Laa R: 400 aa, a 13,0 , aaa 558 a

    a A.

    A: Ba 2% (2206), Da3000L 0,012 (30 a), HR800 0,5% (797),

    Aa 12,04

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    30/63

    I Fa Pa P SAL103 IPa 30

    Laa Pa: 100 aa aaa a A 15.6

    a.

    A: Haa300L 0,35a/ (153a), Da3000L 0,012 (30a), HR800 0,4%

    (797), Aa 12,04

    Oa:

    Taa BHST a , aa a a aa aa

    a aa.

    Ca aa a a aa: PV = 31, YP= 23

    /1002. E aa a 24 C 20 B, Ta

    44 aa.

    E aa a aa

    a. S a a 155 a aa a

    a a a 30 .

    P a aa a.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    31/63

    I Fa Pa P SAL103 IPa 31

    E aa a a aa a aa. E aa

    a a a a aa a

    a . Fa aa

    503 . P a a a

    a a a a. T a a 4,5 .

    Eaa: S a aa a a aa a

    a. E CBLSBT a 2100 2021 a a a

    12V a a aa aa a a aa. E

    a 2021950 a CBL 25V a a a aa.

    Fa 950 a CBL 35V a aa aa.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    32/63

    I Fa Pa P SAL103 IPa 32

    L 7 (16/08/2013) @ 2545

    Caa: Ha

    C: 40 MUD FLUSH III 8,4 + 40 GELLED FLUSH III 12

    (aa)

    Laa Daa: 10 aa a (SCAVINGER SLURRY) 12.5.

    A: 2.5 / , Da 3000L 0,012 , Ba 3 % (97), HR800 0,43 % (78),

    Aa 14.32

    Laa Pa: 55 aa 15,8.

    A: 1,36 /, Haa300L 0,45 (112a) , Da3000L 0,012 , HR800 0.24%.

    Oa:

    Ca aa a a aa a

    a: VP 29 YP 21 /1002. E aa

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    33/63

    I Fa Pa P SAL103 IPa 33

    aaa aa. S a a

    a 145 a aa 1100 . P

    a 57,5 a a a aa

    aa 1300. L a a

    a a a.

    T a a 1 .

    Eaa: E CBLSBT a a a: 2525

    2250 21752105 a a 5V. E

    aa a a a a a a

    aa .

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    34/63

    I Fa Pa P SAL103 IPa 34

    4.8 DAS DE PERFORACIN VS PROFUNDIDAD

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    35/63

    I Fa Pa P SAL103 IPa 35

    4.8.1 AVANCE

    M aa 2605,0

    M aa 2550,0

    E a 2550,0

    ROP 3,90 /

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    36/63

    I Fa Pa P SAL103 IPa 36

    4.9 PERFORACIN DIRECCIONAL

    4.9.1 VISTA VERTICAL

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    37/63

    I Fa Pa P SAL103 IPa 37

    4.9.2 VISTA DE PLANTA

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    38/63

    I Fa Pa P SAL103 IPa 38

    4.9.3PLANILLA DE DESVIACIN

    MD

    ()

    INC

    ()

    AZI

    ()

    TVD

    ()

    N

    ()

    E

    ()

    V. S

    ()

    D.L

    /30

    B

    /30

    T

    /30T

    0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    34.00 0.10 55.20 34.00 0.02 0.02 0.03 0.09 0.09 48.71 TOTCO

    46.00 0.20 117.80 46.00 0.01 0.05 0.05 0.44 0.25 156.50 MWD

    60.00 0.10 121.00 60.00 0.00 0.08 0.06 0.21 0.21 6.86 MWD79.00 0.40 170.30 79.00 0.08 0.11 0.03 0.54 0.47 77.84 MWD

    96.00 0.48 167.50 96.00 0.21 0.13 0.04 0.15 0.15 4.95 MWD

    99.00 0.50 167.10 99.00 0.23 0.14 0.05 0.15 0.15 3.96 MWD

    108.00 0.40 187.00 108.00 0.30 0.15 0.09 0.61 0.33 66.33 MWD

    124.00 1.00 202.70 124.00 0.49 0.08 0.26 1.17 1.12 29.44 MWD

    136.00 1.70 212.30 135.99 0.73 0.05 0.53 1.83 1.75 24.00 MWD

    151.00 2.90 212.30 150.98 1.24 0.37 1.10 2.40 2.40 0.00 MWD

    164.00 3.60 212.50 163.96 1.86 0.77 1.81 1.62 1.62 0.46 MWD

    180.00 4.50 211.00 179.92 2.83 1.36 2.90 1.70 1.69 2.81 MWD

    192.00 5.30 212.70 191.88 3.70 1.90 3.88 2.03 2.00 4.25 MWD

    221.00 6.10 209.30 220.73 6.17 3.38 6.63 0.90 0.83 3.52 MWD

    249.00 7.60 207.80 248.53 9.10 4.97 9.77 1.62 1.61 1.61 MWD

    278.00 10.10 208.70 277.19 13.03 7.09 13.96 2.59 2.59 0.93 MWD

    307.00 12.70 206.60 305.61 18.11 9.74 19.32 2.72 2.69 2.17 MWD

    336.00 14.90 204.30 333.77 24.36 12.70 25.69 2.35 2.28 2.38 MWD

    365.00 15.90 205.70 361.73 31.34 15.96 32.77 1.10 1.03 1.45 MWD394.00 16.40 205.60 389.59 38.61 19.45 40.22 0.52 0.52 0.10 MWD

    423.00 17.30 205.70 417.34 46.19 23.09 47.98 0.93 0.93 0.10 MWD

    451.00 17.10 205.70 444.09 53.65 26.68 55.62 0.21 0.21 0.00 MWD

    480.00 16.80 205.40 471.83 61.28 30.32 63.42 0.32 0.31 0.31 MWD

    510.00 16.50 205.10 500.57 69.05 33.99 71.33 0.31 0.30 0.30 MWD

    539.00 16.30 205.40 528.39 76.46 37.48 78.87 0.22 0.21 0.31 MWD

    568.00 17.10 205.50 556.17 83.98 41.06 86.55 0.83 0.83 0.10 MWD

    597.00 17.30 204.90 583.87 91.74 44.72 94.44 0.28 0.21 0.62 MWD

    629.00 17.20 205.20 614.43 100.34 48.73 103.16 0.13 0.09 0.28 MWD

    653.00 17.00 205.70 637.37 106.71 51.77 109.67 0.31 0.25 0.62 MWD

    682.00 16.90 203.90 665.11 114.38 55.31 117.42 0.55 0.10 1.86 MWD

    711.00 17.10 204.10 692.84 122.13 58.76 125.15 0.22 0.21 0.21 MWD

    741.00 17.10 203.50 721.52 130.20 62.32 133.18 0.18 0.00 0.60 MWD

    770.00 17.20 203.90 749.23 138.03 65.76 140.96 0.16 0.10 0.41 MWD

    799.00 17.20 204.80 776.93 145.84 69.29 148.80 0.28 0.00 0.93 MWD

    828.00 17.20 205.00 804.63 153.62 72.90 156.67 0.06 0.00 0.21 MWD857.00 17.20 205.00 832.34 161.39 76.53 164.55 0.00 0.00 0.00 MWD

    886.00 17.20 205.70 860.04 169.14 80.20 172.45 0.21 0.00 0.72 MWD

    914.00 16.90 206.20 886.81 176.52 83.79 180.04 0.36 0.32 0.54 MWD

    943.00 17.00 204.80 914.55 184.15 87.43 187.84 0.43 0.10 1.45 MWD

    972.00 16.80 204.80 942.30 191.81 90.97 195.57 0.21 0.21 0.00 MWD

    1001.00 16.50 205.30 970.08 199.33 94.48 203.21 0.34 0.31 0.52 MWD

    1030.00 16.40 204.90 997.89 206.77 97.97 210.76 0.16 0.10 0.41 MWD

    1059.00 17.30 203.50 1025.65 214.44 101.41 218.43 1.02 0.93 1.45 MWD

    1087.00 17.30 203.30 1052.38 222.08 104.72 225.99 0.06 0.00 0.21 MWD

    1087.00 17.30 203.30 1052.38 222.08 104.72 225.99 0.00 0.00 0.00 MWD

    1116.00 17.20 203.70 1080.08 229.97 108.15 233.80 0.16 0.10 0.41 MWD

    1145.00 17.10 204.10 1107.79 237.79 111.61 241.59 0.16 0.10 0.41 MWD

    1174.00 17.00 204.20 1135.51 245.54 115.09 249.35 0.11 0.10 0.10 MWD

    1203.00 16.70 204.30 1163.27 253.21 118.54 257.03 0.31 0.31 0.10 MWD

    1233.00 17.30 203.90 1191.96 261.22 122.12 265.03 0.61 0.60 0.40 MWD

    1262.00 17.30 204.70 1219.65 269.08 125.67 272.91 0.25 0.00 0.83 MWD1290.00 17.30 205.10 1246.38 276.63 129.18 280.56 0.13 0.00 0.43 MWD

    1319.00 17.10 205.70 1274.08 284.37 132.86 288.46 0.28 0.21 0.62 MWD

    1348.00 16.90 206.20 1301.82 292.00 136.57 296.30 0.26 0.21 0.52 MWD

    1377.00 16.60 204.80 1329.59 299.54 140.17 304.01 0.52 0.31 1.45 MWD

    1407.00 16.40 205.40 1358.35 307.26 143.78 311.84 0.26 0.20 0.60 MWD

    1435.00 16.10 205.70 1385.23 314.33 147.16 319.07 0.33 0.32 0.32 MWD

    1461.00 15.70 207.70 1410.24 320.69 150.36 325.69 0.78 0.46 2.31 MWD

    1491.00 16.40 208.80 1439.07 327.99 154.28 333.49 0.76 0.70 1.10 MWD

    1519.00 16.70 209.30 1465.91 334.97 158.16 341.02 0.36 0.32 0.54 MWD

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    39/63

    I Fa Pa P SAL103 IPa 39

    MD

    ()

    INC

    ()

    AZI

    ()

    TVD

    ()

    N

    ()

    E

    ()

    V. S

    ()

    D.L

    /30

    B

    /30

    T

    /30T

    1549.00 17.50 210.50 1494.58 342.61 162.56 349.39 0.87 0.80 1.20 MWD

    1578.00 17.70 211.30 1522.22 350.14 167.06 357.76 0.32 0.21 0.83 MWD

    1607.00 17.90 212.20 1549.83 357.67 171.72 366.26 0.35 0.21 0.93 MWD

    1635.00 17.80 212.20 1576.49 364.94 176.30 374.51 0.11 0.11 0.00 MWD

    1664.00 18.20 213.90 1604.07 372.45 181.19 383.15 0.68 0.41 1.76 MWD

    1693.00 18.50 214.90 1631.59 379.98 186.34 392.02 0.45 0.31 1.03 MWD

    1722.00 18.90 217.80 1659.06 387.46 191.86 401.11 1.05 0.41 3.00 MWD

    1895.00 21.60 225.80 1821.11 431.59 233.22 461.35 0.47 0.10 1.25 MWD

    1924.00 21.80 225.70 1848.06 439.07 240.90 472.06 0.21 0.21 0.10 MWD

    1952.00 22.10 225.70 1874.03 446.38 248.39 482.52 0.32 0.32 0.00 MWD

    1981.00 22.40 225.90 1900.87 454.04 256.26 493.49 0.32 0.31 0.21 MWD

    2010.00 22.30 226.10 1927.69 461.70 264.19 504.51 0.13 0.10 0.21 MWD

    2039.00 22.50 225.20 1954.50 469.42 272.10 515.55 0.41 0.21 0.93 MWD

    2044.64 22.48 225.33 1959.71 470.94 273.63 517.70 0.29 0.10 0.70 MWD

    2069.00 22.40 225.90 1982.23 477.44 280.27 526.99 0.29 0.10 0.70 MWD

    2091.00 22.40 225.40 2002.57 483.30 286.27 535.37 0.26 0.00 0.68 MWD

    2115.00 22.00 227.10 2024.79 489.57 292.82 544.43 0.95 0.50 2.12 MWD

    2144.00 22.80 226.70 2051.60 497.13 300.89 555.48 0.84 0.83 0.41 MWD

    2173.00 23.70 226.40 2078.24 505.00 309.20 566.92 0.94 0.93 0.31 MWD

    2202.00 24.20 226.40 2104.75 513.12 317.72 578.68 0.52 0.52 0.00 MWD2231.00 24.40 226.70 2131.18 521.32 326.38 590.61 0.24 0.21 0.31 MWD

    2260.00 24.20 227.30 2157.61 529.46 335.11 602.54 0.33 0.21 0.62 MWD

    2289.00 24.00 227.00 2184.08 537.52 343.79 614.38 0.24 0.21 0.31 MWD

    2317.00 23.70 227.00 2209.69 545.24 352.07 625.70 0.32 0.32 0.00 MWD

    2347.00 24.80 227.20 2237.04 553.63 361.10 638.02 1.10 1.10 0.20 MWD

    2375.00 24.70 227.50 2262.47 561.57 369.72 649.74 0.17 0.11 0.32 MWD

    2404.00 24.60 227.50 2288.83 569.74 378.64 661.84 0.10 0.10 0.00 MWD

    2433.00 24.40 227.30 2315.22 577.88 387.49 673.86 0.22 0.21 0.21 MWD

    2462.00 24.10 227.30 2341.66 585.96 396.25 685.77 0.31 0.31 0.00 MWD

    2491.00 24.00 226.90 2368.14 594.00 404.90 697.58 0.20 0.10 0.41 MWD

    2520.00 23.90 226.90 2394.64 602.04 413.50 709.35 0.10 0.10 0.00 MWD

    2531.00 24.10 227.10 2404.69 605.10 416.77 713.83 0.59 0.55 0.55 MWD

    2550.00 24.45 227.45 2422.01 610.40 422.51 721.64 0.59 0.55 0.55 MWD

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    40/63

    I Fa Pa P SAL103 IPa 40

    5. DISTRIBUCION DE TIEMPOS

    La a aa, aa

    .

    D aa (a) a aa a

    a a aa a.

    Paa SAL103 , a a 98%.

    L aa (a) a a

    a, a aa MWD a aa

    T D. E a aa, a 2%.

    E a a (

    ). La a a aa a aa

    (SAL101). A a a a a a aa a

    .

    T Pa (a):

    Paa 73 a

    Raa 51 a

    E Pa 51 a

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    41/63

    I Fa Pa P SAL103 IPa 41

    P98%

    U2%

    D0%

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    42/63

    I Fa Pa P SAL103 IPa 42

    6. CONTROL DE COSTOS: AFE N. BOSL1/0001.4.02.004.01

    E SAL103 aa a a a a a

    SAL101, aaaa a aa a

    a, a aaa.

    Ma aa aa YPFB Aa a 13 a 2013,

    a Pa a a a aa AFE SAL103 aa

    a a SAL101 (Pa B XX

    Taa O). S a a a aa aa AFE

    aa a a a aa aa a a

    . E a a a AFE, a

    aa a a a.

    La AFE 1 aa aa a a a US$ 1.209.103,00 (U

    00/100 a aa), a AFE

    aaa a 27 a 2013.

    La AFE 2 aa a a a US$ 6.383.508 (S

    a 00/100 a

    aa).

    6.1AFE DE PERFORACIN COSTO CONTABLE SAP / PROANI

    - AFE 1 de 2 (Valores en $us)

    COSTO

    SAPPROANI

    730206003 CABEZAL DE POZO 50.694 44.104

    730206009 TUBULARES 763.609 511.000

    730206010 ACCESORIOS Y REVEST. CAERIA 394.800 234.4341.209.103 789.538

    CUENTA DESCRIPCIONAFE

    APROBADO

    TOTAL AFE 1

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    43/63

    I Fa Pa P SAL103 IPa 43

    - AFE 2 de 2 (Valores en $us)

    COSTO

    SAPPROANI

    730201001 PROGRAMA DE PERFORACION Y EVALUACION 73.549 73.200

    730201002 CONTRATO EQUIPO PERFORACION 0 0

    73.549 73.200730203001 TARIFA DIARIA 1.836.170 1.320.836

    730203002 MOV/DESMOVILIZACIN 360.000 360.000

    730203099 OTROS 0 0

    2.196.170 1.680.836

    730204001 PERSONAL 0 0

    730204002 ALQUILER EQUIPO Y VEHICULOS 61.343 18.370

    61.343 18.370

    730205001 SERV./CEMENTACIONES 53.268 53.500

    730205002 SERV./REGISTRO DE PERFORACION 800.000 224.825

    730205005 SERV. /INGENIERIA DE LODOS 103.840 111.449

    730205006 MUD LOGGING 350.000 110.974

    730205007 CORONEO 60.000 21.054

    730205009 ENTUBACION 171.000 331.457

    730205010 CONSULTORES DIRECCIONAL 99.919 184.500

    730205011 HERRAMIENTA DIRECCIONAL 335.153 344.595

    730205014 HERRAMIENTAS DE PERFORACION 74.160 12.340

    730205016 CONTROL DE SOLIDOS 150.859 255.170

    730205020 SERVICIO DE ALIMENTACION 65.286 12.673

    730205021 INSPECCION 34.473 15.040

    730205022 ANLISIS ESTRATIGRFICO 80.000

    730205028 REGISTRO GYRODATA 59.929

    730205029 TORQUEADO DE BRIDAS 25.000 11.965

    730205030 SOLDADURA DE CABEZAL 30.500 4.550

    2.493.387 1.694.093

    730206001 DIESEL LUBRICANTES 0 0

    730206004 TREPANOS 302.000 74.000

    730206006 MATERIAL DE LODOS 383.538 399.620730206007 CEMENTO Y ADITIVOS 288.183 198.139

    973.721 671.759

    730207001 GERENCIA OPERACIONES OFICINA SP & EXP 156.159 156.000

    730207003 SUPERVISION OPERACIONES TALADRO SP & EXP 178.570 181.547

    334.730 337.547

    730208001 MANIPULEO DE VEHICULOS Y EQUIPOS 0 0

    730208002 TRANSPORTE AEREO 88.405

    730208003 TRANSPORTE TERRESTRE 89.128 60.685

    177.533 60.685

    730209002 TELECOMUNICACIONES 22.048 13.335

    22.048 13.335

    730250102 CONSULTORES MONITOREO 31.028 862

    730250103 RESTAURACION ABANDONO 15.000

    730250303 OTROS ACCION SOCIAL 5.000

    51.028 862

    6.383.508 4.550.687TOTAL AFE 2

    MISCELANEOS

    CUENTA DESCRIPCION

    MEDIO AMBIENTE Y SEGURIDAD

    PRELIMINARES

    EQUIPO DE PERFORACIN

    CAMPAMENTO BASE

    SERVICIOS

    MATERIALES Y CONSUMIBLES

    SUPERVISION

    MANIPULEO Y TRANSPORTE

    AFE

    PROPUESTO

    AFE PROPUESTO (AFE 1 + AFE2) 7.592.611

    COSTO SAPPROANI TOTAL 5.344.756

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    44/63

    I Fa Pa P SAL103 IPa 44

    6.2COMENTARIOS

    E a a a a a SAPPROANI

    aaaa aa 7 2013 a a

    a.

    La a a (SAPPROANI) US$ 5.344.756 a

    a (AFE 1 + AFE 2) US$ 7.592.611 , US$ 2.247.855

    a a 30%. Ea a a

    aa 22 a a a aa a.

    Haa a a aaa AFE 2 a,

    a a aa a a .

    La a a 19 a 2013.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    45/63

    I Fa Pa P SAL103 IPa 45

    7. SEGURIDAD Y MEDIO AMBIENTE

    7.1RESUMEN DE ACTIVIDADES

    B I SMSRS a a a a SAL103

    a a a aa / a.

    Va A Taa S

    (ATS), P Taa (PT).

    M Sa, M A Sa Oaa

    a a aa aaa a a :

    a/a ( a a) a,

    a a a, a a aa

    aa .

    R a aa a a

    aa, : aaa aa, a, aaa a TCP,

    aaa a a a, a a.

    Paa, a aa aa, a

    aa aa a aaa.

    Va a, SMS aa/aa

    aaa .

    Va a a a,

    a aa/ a .

    Fa a a a a a

    aa, aa a a a a a.

    I aaa a, : a, aaa,a, a a) a, aa, aa, ,

    aaa.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    46/63

    I Fa Pa P SAL103 IPa 46

    I aaa a a, a

    aaa , a aaa

    , aaa a/a.

    I aaa aa aa a.

    I a a SMS a aa a

    aa.

    Raa aa aa, a aa

    a a SAL103, a, , a

    a a aa.

    S a aa, :, , a a ,

    a a.

    Aaa a a a a

    a , a a a, aa

    a.

    S a a a a aa a

    a.

    I a a a: a, a,

    aa a, , aa, a.

    S a aa a a a

    aa aa.

    Caaa a a, a a aa, a

    a a a a a.

    7.2ACCIDENTES / INCIDENTES

    E a SAI 320 a a (

    a, ) aa a a a,

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    47/63

    I Fa Pa P SAL103 IPa 47

    aa 74 a a aa

    SAL 103.

    R a a

    SMS :

    P: A a a a a

    a Yaa. (NSA)

    A: Da a

    / a aa.

    ME:

    Da a a a a a

    Yaa.

    7.3HORAS HOMBRE CON EXPOSICION AL RIESGO

    Da a J a S 2013, a a

    a aa aa a SAL103

    96 a, a a 94757 (HHER) a

    a a aaa . E a

    a a a

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    48/63

    I Fa Pa P SAL103 IPa 48

    7.4METODOLOGA DEL MONITOREO

    Paa a aa a , a a

    :

    E Paa P Ma Pa Aa

    S Aa (PPMPASA), a EEIA a

    PETROBRAS a a AAC a aa a DIA (Daaa

    Ia Aa), a aa Pa I SAL 103I

    SAL 102I, La I Faa a a MMAA

    VMABCCGDFDGMACCEEIA 1313 N2532/13.

    La L M A Ra.

    o E Ra Aa aa S Ha (RASH, D.S.

    N 24335).

    o La L Ha.

    o L Ea Taa Sa G Iaa (SGI)

    PEB.

    Na Iaa.

    7.5MONITOREO DE LAS ACTIVIDADES DE SEGURIDAD INDUSTRIAL

    Da a aa a, a aa

    a a a a , aa aa a

    a/ a aa a,

    aa a a

    SMS a a.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    49/63

    I Fa Pa P SAL103 IPa 49

    7.5.1 BRIEFING E INDUCCIONES DE (SMS)

    La SMS, a a a aa

    a Sa, Ia, M A, Sa

    Oaa, a a a a a a ,a a aa / a. A aa :

    Ua a a aa aa aaa

    a.

    Oa aa a a: , aaa

    a, a aa a.

    Ua a a a .

    Ra a a a

    a aa, a aa a

    aa.

    Oa a aa aa , a

    , a aa, a aa aa.

    Na Ba SMS B Sa A.

    Ga a

    aa a.

    R Sa Sa aa a A Sa A,

    : a aa, aa, , a

    a a.

    La a aa , a

    a a a, a

    aa a a.

    P a Fa, a Sa

    A, aa a a a A. 27, a)

    RASH.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    50/63

    I Fa Pa P SAL103 IPa 50

    E a a aa

    a a aa a aa .

    E a : Ca, a; a, a

    a aa a Aa Naa (AN),

    Aa Daaa (AD) .

    Ra a a aa a aa

    a a.

    7.5.2 PERMISOS DE TRABAJO Y ANLISIS DE TRABAJO SEGURO

    E aa (PT) a aa aa , aa a

    aa a a aa aa, : a, a aa,

    a , a, a , a aa,

    a, a , aaa a

    a, a , a,

    a a a a a a aa, a, a

    a a aa a a aa.

    A aa aa aa a, : aa

    aa, a a, a, aa aa

    a, aa aa a a a.

    La aa PT aa a a aa,

    , PT.

    E a aa (ATS) a a PT,

    aa a aa a a aa aa, a a a

    a a aa, a a

    aa a a / a

    a.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    51/63

    I Fa Pa P SAL103 IPa 51

    E a a aa a aa aa

    a aa a a a :

    220

    324

    218

    632

    759

    406

    0

    100

    200

    300

    400

    500

    600

    700

    800

    JULIO AGOSTO SEPTIEMBRE

    PT ATS

    PT

    ATS

    7.5.3 REUNIONES DE SEGURIDAD INDUSTRIAL.

    La a a aaa ,

    a, a a , a

    a a a a, a a

    a a a a a a a

    SAL103, a a a a a a a,

    a :

    R P: Ea a a, a

    aa aa, a aa a a, aa,

    a a aa Ea a a SAI, a

    aa, a a a, aa a,

    a a a a.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    52/63

    I Fa Pa P SAL103 IPa 52

    R Saa: La aa, aa a aaa

    a a aa a aa, a aa

    a a a aa

    aaa a a a, a a

    aa.

    La R a Oa Raa: Ea

    a a a a a aa a a,

    a aaa a a a a, a ATS

    a a a aa.

    0

    100

    200

    300

    400

    500

    JULIO AGOSTO SEPTIEMBRE

    209

    476

    91

    H H E TSMS

    7.5.4 APLICACIN DE TARJETAS ENFCATE Y AUDITORASCOMPORTAMENTALES

    La aa aa SAI 320, a aa

    a a, a a Ea.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    53/63

    I Fa Pa P SAL103 IPa 53

    Sa Ea: La aa aaa aa aaa

    aa a. Paa a P

    I SAL 103 a a 687 aa a,

    a a aa, a a

    a a, a a. La

    aa a, a a a a/,

    aa aa a .

    La Aa Caa, aaa a Pa,

    a a aa aa aa

    , a aa,

    a aa a a aa aa

    a .

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    54/63

    I Fa Pa P SAL103 IPa 54

    T O

    D & R

    7.6SIMULACROS DE ENTRENAMIENTO

    E a SAL103, a a aa

    aa a a, a aa a a

    a a aa aa a aa a a

    a, a a a a a, a

    a a a, a a a aa :

    a, , a a.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    55/63

    I Fa Pa P SAL103 IPa 55

    E a a a a a a

    a a a aa, aa a a

    2013.

    7.7INSPECCIN DE EXTINGUIDORES

    L a a a aa, a

    a , a aaaa a a aa aaa

    aa aa aa, aa a a

    aaa, a a . D a a a a

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    56/63

    I Fa Pa P SAL103 IPa 56

    a a aa

    aa. La a a a,

    aa a a a a aa

    Pa.

    7.8CONTROL VEHICULAR Y HOJA DE RUTA DE VIAJE

    E SAL 103 a aa a aa a

    , aa a a / aa

    a, a aa / a. L a a

    aaa a aaa / aa, a a a a

    a, a , a

    a a aa Pa. E a a a a , , a, a ,

    aa , aa a aa a a

    a a aa Pa.

    E a a , a a a

    .

    7.9EQUIPOS DE SEGURIDAD CONTRA INCENDIOSC a

    a a a aa a a a ,

    a a , aaa a , a

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    57/63

    I Fa Pa P SAL103 IPa 57

    a a, a a a a

    a a a, a a

    a aa:

    Ma N1 C a, a a a

    a a a aa 20

    a AFFF a 3% aa a a 3 aa aa

    3, a a aa aa 2 aa a

    aa aa 2 40 a aa.

    Ma N2 a aSCR. L

    a a a N1.

    Ma N3 a a aaa

    a , a a

    a a N1.

    E aaa aa aa a a , a

    a a aaa 200 aa , a a 1200 .

    Ta a , a

    a, aa a a a a 30 .

    E a a a aa a

    .

    S K a a a a a a

    7.10 INSPECCIONES DE SMS

    E a SAL 103, aaa

    aa a a, a a

    aa, a a: aa, a a , a,

    aaa a a.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    58/63

    I Fa Pa P SAL103 IPa 58

    8. CONCLUSIONES

    E SAL103 a a aa a aa

    a Sa A. E aa aa a

    a Sa A a aa a

    .

    La a 17 a a a 7 a. S a a

    (13/32) TFA 0,39 (2) a a aa

    a aa 3/. Ta a

    a a a a a.

    La a 12 34 a. E a a a aa a

    a aa 11,2 a a. Da a

    a a a a a a aa 1,6%

    , a a a a

    a a aa a. E aa a a a

    a a a SAL101.

    Fa a a a a

    aa 2110 (TD a a), a aa a.

    La a 8 a 10 a. S a 2320

    2329 (9) a a Ta a aa 8 . S

    7,21 (a a 81%). Da a a a

    a a, a a a 11 . S

    a a a a aa a a 1.5% , a a a

    a a a a a

    a a a. Fa a a aaa a aa 2550 (TD ). La aa a

    SAL101 SAL103 963.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    59/63

    I Fa Pa P SAL103 IPa 59

    La a a a a a a

    aa aa 22 a. E aa a

    a a aa

    a ROP 3.96 / aa SAL101. La

    a aa a a 30%

    a.

    9. RECOMENDACIONES

    FASE DE 17

    La aa 9 5/8, aa a a a aa

    aa a a a aa a a .

    FASE DE 12

    S a a a aa 9.5/8 a a, aa a

    a a aa aa a a a aa .

    S a a A Sa , a

    PAC LV R a a SAL 101 a a a

    a a a a aa a a

    a a a aaaa.

    Ia a a a a a

    a a aa 1,6% , aa a a a

    aa a.

    FASE DE 8

    S a a a aa a aa

    a , a a a a a

    a a aa a a aaa a

    a aa a a.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    60/63

    I Fa Pa P SAL103 IPa 60

    Aa aa a a aa . E a a

    SAL103 a a aa SAL101 a a

    . Fa a a a a aa a a a aa a

    a aaa.

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    61/63

    I Fa Pa P SAL103 IPa 61

    10. ANEXOS

    ANEXO A (FOTOGRFICO)

    Baaa M, E SAI 320

    R E SAI 320 SAL101 aSa103

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    62/63

    I Fa Pa P SAL103 IPa 62

    Ca aa T 8 Ca aa 8+ Ba 6

  • 7/25/2019 INFORME FINAL Perforacin SAL-103i.pdf

    63/63

    Saa Ba 6 a Fa Ta

    Paa aa a a 6 a a.