Upload
nusa
View
20
Download
0
Tags:
Embed Size (px)
DESCRIPTION
INFOMØTE 22.MARS. INNFØRING AV ASAP NYTT VFR MØNSTER RY. 7. April 2011. Oslo ASAP AIRSPACE Operational objectives:. Oslo ASAP is intended to develop a new airspace structure within the Oslo AoR, including SIDs and STARs for Oslo and Farris TMA. - PowerPoint PPT Presentation
Citation preview
INFOMØTE 22.MARS
INNFØRING AV ASAP
NYTT VFR MØNSTER RY
7. April 2011
Oslo ASAP AIRSPACE Operational objectives:
• Oslo ASAP is intended to develop a new airspace structure within the Oslo AoR, including SIDs and STARs for Oslo and Farris TMA.
• Ensure adequate capacity in Oslo and Farris TMAs and in Oslo ACC while keeping:– Safety at a high standard;– Controllers’ workload at an acceptable level.
• Ensure efficiency of operations so as to:– Reduce CO2 emission;– Accommodate Noise Abatement Procedures (ENGM).
Proposed Sectors and Positions
OSLO and Farris TMAs
APPWEST APP
EAST
FIN
DIR(DIRW / DIRE)
FARRISWEST
FARRISEAST
Sectorisation ACC
S1
S2
S3
S4
S5
S6
S7
S8
(FARRIS) 124,35134,05
Principles of Point Merge
STRUCTURE
AB
M
STRUCTURE
AB
M
STRUCTURE
AB
M
333
444
555
666
777
FL100 FL110
FL120
ENTO RWY 36
ENRY RWY 30
BUKTEN
SALTNES
MAX
1000
MAX
1500
MAX 1500
BEVØYA592941N
0103745E
TOR R 030 22,5NM
592702N
0105116E
TOR R 047 24,7NM
591740N
0104458N
TOR R 063 16,7 NM