Infiltration Technologies for Mitigating Stormwater Runoff for Commercial Retail Properties Erik Petrovskis, PhD, PE, Meijer Don Carpenter, PhD, PE, Lawrence Tech 1

Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

Infiltration Technologies for Mitigating Stormwater Runoff for Commercial Retail Properties Erik Petrovskis, PhD, PE, Meijer Don Carpenter, PhD, PE, Lawrence Tech

1

Page 2: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

• Background • Due diligence - Site suitability • Guidance Manual • Parking lot retrofit study

2

Agenda

Page 3: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

Meijer Background

• 237 stores in six states • 5 distribution centers and 6 food manufacturing plants

Page 4: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

Current LID/GI Practice ST279 Manistee: • Test site for porous pavement • Additional LID/GI practices • Cost competitive • Comparable maintenance

4

ST279

ST279

Page 5: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

• Document desired site data requirements for incorporating GI into the environmental site screening process. – Minimize overall data collection efforts and expenses during

site screening and assist early site design efforts. • Develop a “kit-of-parts” for integration into other Meijer

design documents. • GI Site Suitability Manual, GI Design Guidance Manual, and

Supporting Documents and Tools.

5

Project Goals

Page 6: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

6

Site Suitability – WI site

Page 7: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

7

Site Suitability – WI site

Page 8: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

• Even number of green and yellow boxes. • Local and WDNR SW requirements and accepted

techniques makes this a good candidate. • Poorly infiltrating soils and the site exemption from

required infiltration makes this a marginal candidate. • Final design decision was a wet pond.

8

Site Suitability – WI site

Page 9: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

• Introduction to GI Techniques and Tools for Meijer Site Adapt Civil Consultants

• Infiltration Based GI Design Guidance and Prototype Elements

• Cost Estimate Information • Maintenance Information

9

Guidance Manual

Page 10: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

• Two Green Infrastructure Detail Sheets – Conform to Meijer Specification

• GI Sizing Spreadsheets • GI Cost Estimating Spreadsheets

10

Design Templates & Tools

Page 11: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

11

Unilock® Optiloc®

Page 12: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

12

PaveDrain®

Page 13: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

• General Installation Notes • CSI Section 32 14 13.19 Permeable Interlocking

Concrete Unit Pavement Specifications

13

Porous Paver – Construction Notes

Page 14: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

14

Bioretention Cells

Page 15: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

15

Bioswales

Page 16: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

16

Infiltration Basins

Page 17: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

• Construction Sequencing and General Considerations • Planting Soil Mix

– Topsoil, Sand, Compost • Mulch

– Aged Double Shredded Hardwood • Geotextile • Underdrain • Stone

17

Bio BMPs – Construction Notes

Page 18: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

• Pave Drain

• Unilock

• Bioswale 18

Example – MI site

Page 19: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

19

Columbus Parking Lot Retrofit

Page 20: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

20

Columbus Parking Lot Retrofit

Page 21: Infiltration Technologies for Mitigating Stormwater Runoff ... · • Guidance Manual • Parking lot retrofit study 2 Agenda . Meijer Background ... GI Design Guidance Manual, and

21

Columbus Parking Lot Retrofit