24
Industry BCP/DR Test Test: October 26, 2019 All Participants Meeting and Project Overview - April 3, 2019

Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Industry BCP/DR Test

Test: October 26, 2019

All Participants Meeting and Project Overview -April 3, 2019

Page 2: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Meeting Agenda

• Introduction

• Mandatory Participation (Part 12.4.1 of NI 21-101)

• Project Structure and Overview

• Road Map, Milestones & Deliverables

• Participant Responsibilities and Information requirements

• Project iMeet Central Desktop Portal Demo

• Question Period

Page 3: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Introduction

• Dealer Members perform annual BCP tests as required by IIROC Rule 17.16 and, if applicable, Part 12.4.1 of NI 21-101

• Dealer Members perform annual connectivity tests with key suppliers, vendors and market infrastructure utilities

• Utilities perform failover tests and provide access for members to test on backup site

• 2019 Industry Test is one component of the BCP/DR tests carried out by Dealer Members and utilities to demonstrate their ability to operate during a significant disruptive event

• 2019 Industry Test is the 6th such event in a multi-year plan to test potential disruptions in the Canadian capital markets

Page 4: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Mandatory Participation

• IIROC Notice 18-0237, Industry Business Continuity Planning Test dated December 17, 2018

• Market participants subject to Part 12.4.1 of NI 21-101 must participate in IIROC’s BCP test on October 26, 2019

• “Participant dealers” with trading volumes above $1 billion net trades/year required to process test scripts to simulate trading activity and participate in the Crisis Communication Centre (CCC)

• “Participant dealers” with trading volumes below $1 billion net trades/year required to participate in the CCC and may elect to also process test scripts to simulate trading activity

• All other IIROC Dealer Members may participate on a voluntary basis

• Major service providers (exchanges, ATSs, etc.) have confirmed their participation

Page 5: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Test Project Oversight Structure

Steering Committee for Contingency Planning and Business Continuity Requirements

Includes participants from:Dealer Members, Utilities and IIROC

IIROC Financial and Operations Advisory Section (FOAS)

Page 6: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Test Scenario

The scenario for 2019:

• The test scenario for the 2019 industry test is for IIROC's Dealer Member participants to test out of their production/primary data processing sites.

and

• Service providers will be testing out of their DR data processing sites.

Page 7: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Test Goals and Objectives

• The goal for Dealer Members is to validate their ability to process transactions from normal trading and back office locations via their primary data processing sites, connecting to service providers who will be operating in their respective back-up (DR) sites.

• The goal for service providers is to validate their ability to process transactions without access to their main data centres.

• The objectives are to:

• Confirm connectivity between Dealer Member primary facilities and service provider alternate facilities

• Confirm test transactions can be completed from Dealer Member primary work locations to service provider alternate data centres

• Complete a set of pre-arranged transactions

• Identify any issues or impediments

Page 8: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

We will not:

• Test failover from production to DRP sites for Dealer Member participants

• Test the capacity of the markets or member backup sites

• Test every transaction variant used in normal markets

• Test MQ with CDS

• Test redundancy of telecommunications infrastructure

• Perform latency testing for equity transactions

• Perform any batch processing for transactions executed during the test

• Settle trades or move money

Page 9: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Project Scope

• Test transactions including for Equities, Mutual Funds, Fixed Income, ETF, GICs, Futures and Options, selected Back Office transactions

• Retail and Institutional functionality

• Manual order routing and selected smart order routing

• IIROC Crisis Communication Centre (CCC)

• IIROC Market Surveillance

Page 10: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

2019 IIROC Industry Test Market Infrastructure

CDCC

Member2Member1Carr.

Member3CARR.

Member4Member5 Member 60

ITS IRESS Fidessa

Alpha

TSXTSX V

PURE

NASDAQ

Omega

Tri-Act

CSE

Broadridge

MX

Intro Member2

Intro Member1

FundSERV

SS&C

CannexCandeal

IIROC Surveillance

IIROC CCC Message

CBID

IBM CDS

Aequitas

Page 11: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Differences from normal trading

• TSX Trade Date Saturday October 26, 2019

• Test symbols used for Equities, Mutual Funds, Options, Futures, ETF

• Smart Order Routing no longer provided by TSX (SOR provided by other utilities will be available)

• Datalinx feeds from TSX not available:

– Consolidated Data Feed (CDF)

– Canadian Best Bid and Offer (CBBO)

– Consolidated Last Sale (CLS)

– Consolidated Depth of Book (CDB)

Page 12: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Project High-level Road Map

Jan - April May - Sept October 26 Nov - Dec

Design Build Perform Assess

Establish scenario Set objectives Enlist Participants Document test

structure Gather participant data

Create data matrix Create/update test scripts Develop success criteria Create test plan Pretesting

Open conference bridge Send CCC communication Implement test support Perform test

Gather test result forms Gather feedback forms Document test results Create test report

Page 13: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Project Milestones & Deliverables

Design Phase

Date DeliverableCompleted Scenario, ObjectivesCompleted Participant list (members & service providers)Completed Participants questionnaire templates created (in Word and in Portal)Completed Transaction profiles (Appendix A)

April 3: All participants meeting

Build Phase

Date DeliverableApril 30: Participant questionnaires to be completed and submitted in the portalJune 30: Participants Matrix – including mapping service providers to membersJune 30: Test details - date, timeline, securities, transactions, counterpartiesJune 30: Test Scripts vetted with utilities for feasibilityJuly 31: Final Test Scripts distributed Aug. 31: Support Plan draftedSep. 11: Second all participants meetingOct. 16: Third all participants meeting

Page 14: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Project Milestones & Deliverables

Perform Phase

Date Deliverable

Sept - Oct: Pre-test connectivity test (subject to service provider availability)

Sept - Oct: Finalize and distribute test day documentation

October 26: Perform test

Assessment Phase

Date Deliverable

Nov 15: Gather test results

Nov 22: Gather feedback

Dec 20: Finalize test results report

Dec 31: Archive project artifacts

TBD Stakeholder reception

Page 15: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Participants Responsibilities & Information Requirements

1. Assemble internal project team (business, IT, other), as applicable

2. Determine which transaction profiles to be tested

3. Determine counter party requirements (CDS MM)

4. Determine the extent of the internal tests

a) Service provider failover included on test day

b) Carrying – Introducing Broker arrangements

c) Business IT involvement

d) Arrange and execute any tests in addition to IIROC test

5. Complete test information questionnaire provided by IIROC

6. Schedule connectivity pre test with utilities as available / required

7. Inform telecom supplier of test date to ensure availability on test day

8. Mobilize test resources on test date - October 26, 2019

9. Provide response for the CCC communication test

10. File test results and feedback forms after the test

Page 16: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

iMeet Central Desktop Portal Overview

• iMeet Central Desktop 2019 Workspace

• Functionality is unchanged from 2017

• Project portal is available to all test participants

• Single User ID has been assigned to a primary contact for each firm

• Single user ID is to be shared with all those involved in your company

• Multiple concurrent sessions for one account are permitted

• Participants can read and print material from the Portal

A conference bridge will be the primary communication tool for support on test day

Project portal will be used for:

• Project team communications to participants

• Contact lists

• Project announcements

• Dealer Members and service providers to review counterparty filings and information

Page 17: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Portal Demonstration

Des O’Callaghan

Page 18: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Appendix A

Test Transaction Profiles

Page 19: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Equity Order Routing

Carrying

Member

TSX V

TSX

CSE

Omega

Others

Service

Bureau(IBM,

Broadridge)

Aequitas

Order

Routing Service

(IRESS,

Fidessa, ITS)

Equity Order Routing- primary market

- secondary markets

Introducing

Member

Page 20: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Equity Order Fill Routing

Page 21: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Mutual Fund Order Routing

Mutual Fund Order Routing

Carrying

Member

Service

Bureau(IBM,

Broadridge)

Introducing

Member 1, 2 Fundserv

1. Orders routed in real time

2. Orders routed in batches at the discretion of the member

3. Orders entered directly on Fundserv WEBSITE (< 2%)

Fundserve

Website3

Reject

Information

Contract

Information

Page 22: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Fixed Income Trade

CDS MM Trade Trade

FI Trade

CDS

Service

Bureau(IBM,

Broadridge)

Member2 1

1. Orders entered directly on CDS market

2. Product uploaded to CDS by members

Member12. Create FI Product

Contract

Information

Page 23: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal

Fixed Income Agency Trade

FI Agency Trade

CBID

Service

Bureau(IBM,

Broadridge)

Member 1

1. Orders entered directly on CBID market

Contract

Information

Batch File

Contract

Information

Manual Entry

Page 24: Industry BCP/DR Test › industry › member-resources...IBM CDS Aequitas. Differences from normal trading • TSX Trade Date Saturday October 26, 2019 ... iMeet Central Desktop Portal