Upload
ngotuyen
View
230
Download
7
Embed Size (px)
Citation preview
byB.S. NEGI Member
Petroleum and Natural Gas Regulatory Board, India
1
• Oil & Gas Sector Overview Infrastructure
• Market Position• PNGRB
Regulations Notified Safety Related regulations
• Roll out plans Pipelines CGD
• ERDMP Provisions Accreditation
2
• Refining capacity – 148 MMTPA• Pipeline infrastructureNatural Gas –11000 km (including regional Network)Petroleum Product pipelines – 10000 km• CGD networks – 35 cities having gas supply, 13 Cities in Project stage 1.01 million house hold connected 1.12 million vehicle on CNG
Total infrastructure inadequate to meet the country’s requirements except oil
3
Govt. Controlled Liberalized
Mature
Nascent
OIL
GAS
MARKET
MARKET OPENING
Enforce retail & marketting service
obligation
Monitor prices & prevent restrictive
trade practices
Register & Authorise entities
Declare pipeline as common / contract
carrier
Perform other functions entrusted
by Central Government
Protect consumer interest by fostering
fair trade & competition
Regulate access & transportation rate
on common / contract carrier /
CGD network
Ensure adequate availability, and
equitable distribution
Functions of the Board
Lay down technical standards ,
specifications including safety
standards
Maintain databank of information
5
6
S No. Regulation Notified on
1 Levy of Fee and Other Charges 26-11-20072 Meetings of the Board 26-11-20073 Appointment of Consultants 30-11-20074 Conduct of Business, receiving and investigation
of complaints30-11-2007
5 Authorizing entities to Lay, Build, Operate or Expand City or Local Natural Gas Distribution networks
19-03-2008
6 Determination of Network Tariff for CGD Network and Compression Charges for CNG
19-03-2008
7 Exclusivity for City or Local Natural Gas Distribution Networks
19-03-2008
7
S No.
Regulation Notified on
8 Authorizing entities to Lay, Build, Operate or Expand Natural Gas Pipelines
06-05-2008
9 Affiliate Code of Conduct for Entities Engaged in Marketing of Natural Gas and Laying, Building, Operating or Expanding Natural Gas Pipeline
17-07-2008
10 Access Code for Common Carrier or Contract Carrier Natural Gas Pipelines
17-07-2008
11 T4S for City or Local Natural Gas Distribution Network
27-08-2008
12 Determination of Natural Gas Pipeline Tariff
20-11-2008
8
S No.
Regulation Notified on
13 T4S for Natural Gas Pipelines 22-8-08
14 Emergency Response and Disaster Management Plan 18-1-2010
15 Declaring pipeline as Common Carrier or Contract Carrier
21-04-09
16 Procedure for Standards Development Notified 17 Authorizing entities to Lay, Build,
Operate or Expand Petroleum Product Pipelines
1-9-2010
18 Methodology for determination of capacity for pipeline and CGD Networks
7-6-2010
19 Quality of Service for CGD Networks 1-9-2010
9
S No.
Regulation Notified on
20 Determination of Tariff for Petroleum Product pipelines
10-12-2010
21 Access Code for Petroleum Product pipelines
Under Preparation
22 Integrity Management System for Natural gas Pipelines
Under Preparation
23 Integrity Management System for Product Pipelines
Under Preparation
24 Integrity Management System for CGD Under Preparation
Sr No.
Entity GA(Operating) GAs (Construction)
Total
1 MGL 2 - 22 IGL 2* 2* 43 Aavantica 1 1 24 CUGL 2 - 25 Green Gas 2* - 26 Gujarat Gas 1 1* 27 MNGCL 1 - 18 TNGCL 1 - 19 BGL 2 1 310 Sabarmati 1 111 GAIL 1* - 112 HPCL 1* - 113 Gail Gas 2 2 4
Sr No.
Entity GA(Operating)
GAs (Construction)
Total
14 Charotar Gas 1 - 115 VMSS 1* - 116 Adani Eenergy 2* 6* 817 GSPC Gas 8 2* 1018 Siti Energy 1 0 119 Harayana City Gas 1 1 220 AGCl Assam 4 421 GEECL 1 122 G CGS Kolkata # 1 0 123 Saumya DSM 1 0 1
Total 40(35*) 16(13* ) 56(48)*Common GAs # Coal Gas
• Natural Gas Pipelines Existing 11000 Km expected to reach 25,000Km within next 4-5 years
• Product Pipelines Existing 10,000 Km expected to reach 12,000Km within next 4-5 years
• LNG Terminals From existing 2 operating terminals, expected to reach 10 by 4-5 years
• CGD Existing 48 GAs expected to reach 100 within next 2
years(2012) y next 5 years.(2016) 200 GAs
13
05/04/23 Email: [email protected] 14
State Gas Supply GA in Roll out Plan
Connecting P/L
Andhra Pradesh Existing 27 RNW, EWPL
Arunachal Pradesh
2014 01 Guwahati- Itanagar/Local NW
Assam Existing 13 RNWBihar 2013 11 JHPL, KBPLChhattisgarh 2014 05 SPPLDelhi NCT Existing 01 HVJ
Goa 2012 01 GPPLGujarat Existing 24 HVJ,RNW
Haryana Existing 13 HVJ
05/04/23 Email: [email protected] 15
State Gas Supply GA in Roll out Plan
Connecting P/L
Jharkhand 2013 08 JHPL, KBPL
J&K 2013 03 BSPL
Karnataka 2012 31 DBPL,CBMPLKerala 2012 14 KCBPLHimanchal Pradesh
2011 02 BNPL
MP Existing 22 HVJMaharashtra Existing 32 EWPL,DUPL,RNW
Manipur 2015 01 RNW
Meghalaya 2014 01 RNW
05/04/23 Email: [email protected] 16
State Gas Supply GA in Roll out Plan
Connecting P/L
Nagaland 2014 01 RNW
Orissa 2013 10 KBPL,SPPL
Pondicherry 2011 03 EWPL,RNW
Punjab 2011 11 DNPL,MBPL,BSPL
Rajasthan Existing 14 HVJ,MBPL,MBPLSikkim 2015 01 RNWTamilnadu Existing +2011 27 KCPL,CBPL,RN
WTripura Existing 01 RNWUP Existing 47 HVJ
05/04/23 Email: [email protected] 17
State Gas Supply GA in Roll out Plan
Connecting P/L
Uttarakhand 2011 09 HVJ
UT-Chandigarh 2011 o1 DNPL
UT-Daman 2011 02 DUPL
West Bengal 2012 11 JHPL,KBPL,DKPL
• Applicability Hydrocarbon processing units- Refinery, Gas Processing,
Pipelines- Natural Gas, Propane, Butane, LPG
Petroleum Product Pipelines LNG Terminals Commercial Petroleum Storage
Bottling Plants
CGD POL dispensing Stations Transportation of Petroleum products by road tankers
ERDMP Scope Identification of Emergencies
Mitigation measures attempt to reduce/ eliminate Risks/ Disaster
Develop plans for actions in case of Emergency or Disaster
Response in the event of Emergency or Disaster
Recovery plans- Post Emergency or Disaster
ERDMP Intent To develop an ERDMP as a ready reckoner for the team to act during
any emergency or disaster
To manage an emergency to- provide incidence management
organization, prevent casualties, reduce damage, maintain good and
effective public relations
Contents of ERDMP Regulations Classification of Emergencies; Regulation-6
Implementation of Schedules; Regulation-7
Consequences of defaults or non-compliance; Regulation-8
Statutory Requirements; Regulation-9
Pre-Emergency planning; Regulation-10
Emergency mitigation measures; Regulation-11
Emergency preparedness measures; Regulation-12
Emergency response procedures and measures; Regulation-13
Emergency organization and responsibilities; Regulation-14
Infrastructure requirements; Regulation-15
Declaration of on-site and off-site emergency; Regulation-16
Contents of ERDMP Regulations contd… Resources for controlling Emergencies; Regulation-17
Demographic information; Regulation-18
Medical facilities; Regulation-19
Evacuation; Regulation-20
Public relations and information to public; Regulation-21
Reporting of the incidence; Regulation-23
Emergency recovery procedures; Regulation-26 ERDMP for Tank trucks and Pipelines carrying petroleum products; Regulation-27
Integration of the ERDMP with NDMA guidelines and action plan; Regulation-29
Security threat plan and action plan to meet the eventualities; Regulation-30
• The Regulations Code of Practice for Emergency Response and Disaster management Plan
Various Regulations Various Schedules Schedule-I; Implementation Schedule (Reg. 7) Schedule-II; List of relevant statutes on management of Hazardous
substances (Reg.9(1))
Schedule-III; Basic Requirements of ERDMP(Reg.11.1)
Schedule-IV; Resources Mobilization (Men and Equipments)(Reg.11.2)
Schedule-V; Roles and Responsibilities of various stakeholders(Reg.22.0)
Schedule-VI; Incidence reporting Format (Reg. 23.0)
Schedule-VII; ERDMP for Pipelines carrying Petroleum Products(Reg.27.0)
• The Schedules Contd… Schedule-VIII; Incidence reporting Format(Reg.28.1)
Schedule-IX; ERDMP for Pipelines carrying Petroleum Products(Reg.28.2)
Various Chick Lists Check List-I; Emergency Response and Disaster Management Plan
Hazards Identification( Reg.10.1(d)) Check List-II; Incident Prevention Measures (Reg.11.3(xii))
Check List-III; Mutual Aid and Mock-drills ( Reg.12.1(j))
Check List-IV;ERDMP Resource Measures/ Infrastructure(Reg.13.0)
Check List-V; Review and Updation of ERDMP(Reg.14.2.1(a))
Check List-VI; Availability of Resources(Internal/External) (Reg.17.0(5))
Check List-VII;ERDMP Recovery Measures (Reg.26.0(2))
• Preparation of ERDMP document by concerned entity Applicability as per Regulation-3
Format given in ERDMP Regulations
• Accreditation by TPA approved by PNGRB On the recommendation of QCI
• Check list for TPA1. Check-list the related Regulations applicable to an entity as specified in
Regulation-3
2. ERDMP Document prepared by entity is ( Conformity with provisions of
concerned ERDMP Regulations( as check-listed at (1) above)
3. Check for the contents in the ERDMP document w.r.t. Regulations listed at (1)
above
4. Does in TPA’s opinion the ERDMP document prepared by the entity meet the
intent of the Regulations ?