25
TUV Nord Asia Pacific 1 TÜV NORD Group INDUSTRIAL SERVICES PRESENTATION INDUSTRIAL SERVICES PRESENTATION 2011 2011 TUV NORD (M) SDN. BHD.

Industrial Services TUV Nord Malaysia

Embed Size (px)

Citation preview

Page 1: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 1TÜV NORD Group

INDUSTRIAL SERVICES PRESENTATION INDUSTRIAL SERVICES PRESENTATION 20112011

TUV NORD (M) SDN. BHD.

Page 2: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 2TÜV NORD Group

TUV NORD – International business

America• Argentine

• Brazil

• USA

Western Europe• Cyprus• Denmark• Finland• France• Germany• Great Britain• Greece• Italy• Netherlands• Spain• Sweden

Central & Eastern Europe• Bulgaria• Croatia• Czech Republic• Estonia• Georgia• Hungary• Latvia• Lithuania• Poland• Romania• Russia• Slovakia• Turkey• Ukraine• Yugoslavia

Asia• China• Hong-Kong• India• Indonesia• Iran• Korea• Malaysia• Brunei• Pakistan• Philippines• Taiwan• Thailand• Uzbekistan• Vietnam

Middle East• Jordan• Lebanon• Saudi Arabia• Syria• United Arab

EmiratesAfrica• Ghana

• Kenya

• Tanzania

Page 3: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 3TÜV NORD Group

TUV NORD MALAYSIA – Industrial services overview

Steam boilers,pressure vessels and tank installations

Electrical engineering,machinery and mining

Material testing and quality management systems, product testing

Page 4: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 4TÜV NORD Group

TUV NORD – Industrial services details

Steam boilers,pressure vessels and tank installations

• Steam boilers• Pressure vessels• Gas pressure vessels

and filling plants forpressurized gases

• Pipelines• Facilities for the storage

and transportation offlammable and non-flammablewater-polluting substances

• Fire protection

TUV Nord Asia Pacific

TUV Nord Asia Pacific 4TÜV NORD Group

Page 5: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 5TÜV NORD Group

TUV NORD – Industrial services details

Materials technology and quality management systems, product testing

• Non-destructive testing• Material testing and failure

analysis• Manufacturer approvals and

materials assessments• Metal products for use in buildings• Examinations of synthetic materials• Cutting and welding technology• Supervision and inspection of

construction and manufactoring• Noise and vibration technology• Quality management consultancy

5TUV Nord Asia PacificTÜV NORD Group

Page 6: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 6TÜV NORD Group

TUV NORD – Industrial consulting

Service for Availability and Reliability of Industrial Facilities broken down into:

• Plant layout• Component construction• Component production• Plant erection and start-up• Operation and maintenance• Availability, Safety and

Maintenance (ASM)• Tear-down and total life cycle

reports• Decommissioning and teardown

6TUV Nord Asia PacificTÜV NORD Group

Page 7: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 7TÜV NORD Group

Product - Operation & Maintenance

Scope of Services:•• In service inspections for power plants, chemicaland petrochemical plants, steel plants and steelmills, pipelines and piping systems

• life time estimation• corrosion detection• evaluation of safety concepts, optimization • safety and hazop studies, evaluation ofsafety systems

• evaluation of measure and control systems,pressure relieve systems

• Energy-related investigations in the field ofacceptance and performance tests on installationsand machinery in plants for public and industrial use

• Damage investigations• Evaluation of the process-related design of technicalinstallations

Page 8: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 8TÜV NORD Group

Product - Design

Scope of Services:• Pressure equipment• commercial design software DIMy, developed by

TÜV NORD• design approval acc. to PED, AD, ASME, BS, etc.• remnant life determination

• Machinery• optimization by finite elements• fatigue assessment acc. to Eurocode, IIW, FKM

• Steel structures and cranes• design approval acc. to DIN, DAST, Eurocode• fatigue assessment acc. to Eurocode, IIW, FEM• remnant life determination

Page 9: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 9TÜV NORD Group

Product - Risk Based Inspection (RBI)

Our RBI method is based on an in-depth evaluation of the risk of loss of integrity of confinements (RBI analysis) and an integration of RBI inspection measures into the inspection plans of the plant (RBI application).Our RBI follows procedures defined by TISCHUK or SHELL Global Solutions and used for oil & gas as well as chemical plants and other industrial plants.However, other specific procedures are followed if defined by the client.Our approach is based on a strong co-operation between the plant personnel and TUV experts. The process, which we follow is what we call a guided expert judgement, which is based on operational experience as well as a sound basis for the evaluation of possible degradation mechanisms. The RBI process is backed by appropriate software tools.

Page 10: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 10TÜV NORD Group

Purpose:

•Determination of actual life time

•Increase of plant safety

•Enhancement of plant availability

•Modernization instead of erection of a new plant

Product - Remaining Life Time Assessment

Page 11: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 11TÜV NORD Group

Product - Remaining Life Time Assessment

Phases:

A: Determination of the condition of the plant

• Examination of documentation

• Calculation of exhaustion

• Tests at site

B: Assessment of the plant condition

• Status report

C: Recommendations for continuance

of operation

• Extension of service life

• Increased availability

• Improved economic efficiency

Page 12: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 12TÜV NORD Group

Product - Fairground Rides

Scope of Services:•• Design approval; review of design documents• Production control; welding inspection, factory and

material certificates• Shop inspection; inspection of manufacturing process• Shipment control; inspection of completeness and properpacking

• Acceptance tests; initial tests including trial run with specificload conditions, test of all safety systems, safety features

• In service inspections; re-inspection after prescribed timeperiods, non-destructive testing

• Accident investigations; assistance for authorities,prevention of similar events

Page 13: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 13TÜV NORD Group

Why are our services necessary for you?

Preventive MaintenancePreventive Maintenance

10 $ design review100 $ manufacturing

1,000 $ quality control10,000 $ commissioning

100,000 $ scheduled>1,000,000 $ unscheduled

Page 14: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 14TÜV NORD Group

Why are our services necessary for you?

Such events should not happen to your plant!

Page 15: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 15TÜV NORD Group

Which components do need our services?

•High stressed

•High temperature

•Natural aging (erosion,corrosion,cavitations,abrasion…)

•Additional loads

•Safety related

Page 16: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 16TÜV NORD Group

References:

Sarawak Shell Berhad, Sabah Shell Petroleum Co. Ltd., Petronas CarigaliSdn.Bhd., Nippon Oil Exploration, Murphy Oil, Miri, Malaysia

Periodical investigation of statutory equipment on- and off-shore since 1994

Your partner in the world of technology

Page 17: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 17TÜV NORD Group

Your partner in the world of technology

References:

Petronas Carigali / Premier Oil Myanmar, Myanmar

Base line inspection of pressure equipment on train 2, Yetagun Gas Platform B, 2004

Page 18: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 18TÜV NORD Group

Your partner in the world of technology

References:

Kapar Energy Ventures Sdn. Bhd., Malaysia

Periodical Inspection and Condition assessment of Boilers from 2004 -current

Page 19: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 19TÜV NORD Group

Your partner in the world of technology

References:

Jimah Energy Ventures Sdn. Bhd., Malaysia

- 0 hour inspection of Unit 2 2008

- 1 Cycle RBI Inspection of Unit 2 2010

Page 20: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 20TÜV NORD Group

Your partner in the world of technology

References:

Kuala Langat Power Plant, Malaysia

Condition assessment of HRSG 2006

Page 21: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 21TÜV NORD Group

Your partner in the world of technology

References:

Lumut Power Plant, Malaysia

Condition assessment of HRSG 2004 - current

Page 22: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 22TÜV NORD Group

Your partner in the world of technology

References:

Prai Power Plant, Malaysia

Condition assessment of HRSG 2004 - current

Page 23: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 23TÜV NORD Group

Your partner in the world of technology

References:

Petronas Gas Berhad, Malaysia

Failure investigation on economisertubes and consultancy on boiler water treatment, 2002

Page 24: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 24TÜV NORD Group

Your partner in the world of technology

References:

TÜV NORD Malaysia has more than 20 years experience with pipe stress analysis as well as on transient fluid flow analysis for a broad range of applications. Our huge relevant work experience is based on calculations performed for electric power plants, flare gas systems, ship loading lines and water, gas and commercial oil pipelines.

Page 25: Industrial Services TUV Nord Malaysia

TUV Nord Asia Pacific 25TÜV NORD Group

Looking forward to provide quality

services to your company!

Thank youfor paying attention !

TÜV NORD Group