EQUIPMENTSFABRICATION & COATING PROJECTSROLLS ROYCE MARINE (2009-2017)
> Project: OBW, ARF, KDE 40, KDE 60, CGGV, KDE 80, SINOPEC, BAKER HUGHES, CRC 150, IOCAS, OIL TANKS, KDE 400, NIO, WESTERN GECO, STX LANGSTEN, ARF STM, CTD JACKING FRAME
> Works description:• Blasting & protective coating • Thermal spray coating
COMMON GROUND RESOURCES (2011-2018)
> Project: Waste Water Treatment Containers
> Works description:• Fabrication• Blasting and anti-corrosion treatment
METACOR (2013-2017)> Project: - Stejasa Project- Bergemann Project- NEM Beni Suef Combined Cycle Project- Hamitabat Project- Baltec Project- Babcock & Wilcox cleaning, Pathway,
Nooter/ Eriksen Project> Works description:• Blasting and Painting for dampers,
diverter, steel structureDK ENGINEERING JSC (2014-2016)
> Project: CIS Skid, Rig Laucher, Tote Tank, Hot Water Skid
> Works description:• Surface preparation with 3 & 4 coating
appplication• Insulation installation
BPE THAILAND (2017)> Project:
Seperator skid, Valve and Casing> Works description:• Surface preparation with 3 coating
appplications
Other equipments & structural steel anti-corro-sion protection Projects
• Zamil Steel Vietnam• Bluescope Steel• Universal Steel Fabrication
Vina-Japan• Atlas Copco• Cao Duong• Quang Trung mechanical• Truong Vinh• J&V Engineering• REE• Star Engineering
INDUSTRIAL PLANTS & INFRASTRUCTURE CONSTRUCTION PROJECTSBLUESCOPE STEEL (2004-2018)
> Project: Phu My Cold Rolling Mill Project> Works description:• Equipments, sheet cladding, metal
doors & frames surfaces surface preparation & coating
> Project: facility Refractory > Works description:• The revamping of Refractory linings in
a well-recognized steel manufacturer’s facility
TOTAL (2004 - 2018)> Project: Tanks, sphere tanks refurbishment> Works description:• Various surface preparation
& painting works• Provide Scafollding, Rope Access
URC VIETNAM (2008-2018)> Project: Food Plant > Works description:• Floor coating• Mold, baker cleaning by CO2 Dry Ice
NESTLE (2013-2014)> Project: Cleaning and Insulation> Works description:• CO2 dry ice cleaning coffe drier• Acoustic Insulation for settling Tank
system (Noise Insulation)• Hot insulation and painting
DONAFOOD - DONG NAI (2014)> Project: Floor Coating Repairs> Works description:• Floor repair and Coating application
VINATABA - BAT (2017)> Project: Fire Fighting System Repair> Works description:• Replace teflon fire proofing
FARGO - CHINA (2017)> Project: Mercedes Benz factory> Works description:• Surface preparation & repainting
FAIST - CHINA (2017)> Project: Factory Construction Phase> Works description:• Surface preparation• Painting application
RESINOPLAST - DONG NAI (2018-2019)> Project: Factory Upgrade EPC> Works description:• Site survey for inspection and detailed
technical solution• Concrete floor surface preparation and
coating• Re-engineering of Production processes• Overall factory upgrade for production
optimization
Other industrial plants construction projects• FANNY VIETNAM Food Plant (2005)• DUTCH LADY Plant (2005)• DSM NUTRI PRODUCTION Plant
(2005)• VISIPAK PLANT (2005)• HEINEKEN Ha Tay Brewery (1997)• UNILEVER Hanoi Factory (1996)
INDUSTRIAL PLANTSMAINTENANCE PROJECTS CARGILL (2005 - 2016)
> Project: Bien Hoa Factory Maintenance> Works description:• HP water cleaning, painting works, logo
coating, cladding replacement, rope access
• Floor coating & Road Marking
VINAKRAFT SCG (2012-2018)> Project:
Shutdown and Equipment Coating> Works description:• Scaffolding Provision• Boiler pipe & Gear box external coating
& internal blasting• Nash Pump blasting
MASAN RESOURCES (2014 - 2019)> Project: Nui Phao Mining> Works description:• Surface preparation, UHP cleaning,
touch-up painting.• Daily general maintenance• Cable tray CO2 cleaning and Cable
PFP coating• BS1139 Scaffolding
TRUST FARMA (2016)> Project: Alumnium Panels Recoating> Works description:• Surface preparation and painting
TPC VINA (2016-2018)> Project: Cleaning> Works description:• Heat Exchanger Cleaning Tube• Jet clean the reflux condenser
BUNGE/VAL (2018-2019)> Project: Equipment Maintenance> Works description:• Acid Floor Tiles• Silo tank bottom repair & Water proofing
SAIGON PAPER (2018)> Project: Equipment Repair> Works description:• Shaft Repair and Pump Repair
BARIA SERECE (2018-2019)> Project: Concrete Column Repair
& Daily Maintenance> Works description:• Access Method: Scaffolding, Rope
Access, Man-lift• Surface Preparation: Power tool
cleaning, HP Water Cleaning, Steel Grit Blasting
• Concrete column repairing & coating
PV - CA MAU FERTILIZER (2018-2019)> Project: Maintenance Campaign> Works description:• Provision of Manpower, Material, and
Equipment for Anti-corrosion Coating Work at the plant in Shutdown period and Production time.
• TSA coating performance
BACONCO FACTORY (2018)> Project: Conveyor Repair> Works description:• Conveyor Fabrication and Coating
>44
Industrial assetsPROJECTS
>46 >47
> Professional anticorrosion solutions for equipments to be exported to the world’s largest shipyards including steel grit blasting & application of protective, polysiloxane & other special coatings.
> Equipments metalizing through electric arc wire and flame wire spray processes as per NACE standard RP0287 for surface preparation & ISO 4624 for coating quality control
> A60 rated decks & bulkheads rock wool spray on insulation services for accommodation modules built for offshore purpose
CONTAINERS A60 FIREPROOFING INSULATION
>
> Execute fabrication works for equipment both at site and at workshops such as waste water containers
EQUIPMENT FABRICATION
>
SURFACE PREPARATION AND PROTECTIVE COATING
> THERMAL SPRAY COATING
>
Equipment FABRICATION AND COATING PROJECTS
> ROLLS ROYCE MARINE> Duration: 2009-2017 > Project: OBW, ARF, KDE 40, KDE 60,
CGGV, KDE 80, SINOPEC, BAKER HUGHES, CRC 150, IOCAS, OIL TANKS, KDE 400, NIO, WESTERN GECO, STX LANGSTEN, ARF STM, CTD JACKING FRAME
> Works description:• Blasting & protective coating • Thermal spray coating
> BEST PERFORMANCE ENGINEERING> Duration: 2017> Project: Seperator Skid, Valve and Casing> Works description:• Surface preparation and apply 3-layer coating
> ZAMIL STEEL VIETNAM BLUESCOPE STEEL USF ORIENTAL SHEET PILING CHINA HARBOUR ENGINEERING SAMSUNG SIEMENS VAI HYUNDAI MOBIS> Duration: since 1994 > Works description:• Steel structures, sheet piles, piping, equipments
blasting & anti-corrosion protection
>48 >49
Industrial plantINFRASTRUCTURE CONSTRUCTION PROJECTS
> Design & manufacturing of tailor-made flexible insulation pillows & conventional insulation systems for all types of industrial equipments and piping
FLEXIBLE & CONVENTIONAL INSULATION
>
> Supply and installation of APP, SBS and other types of waterproofing membranes for roofs as well as application of cementitious mortars for concrete waterproofing and HDPE membrane for ground site soil improvement
WATERPROOFING & HDPE MEMBRANE INSTALLATION
>
> Provision of specialized equipments for concrete floor surface preparation and various flooring systems application for all types of industrial purposes
> Mobilize & operate heavy-duty equipments at VB workshops & on site for all types of professional surface preparation & painting works
PROTECTIVE COATING (SHOP & FIELD)
>
INDUSTRIAL FLOORING SYSTEMS
>
> RESINOPLAST> Project: Factory Upgrade> Duration: 2018 - 2019 > Works description:• Site survey for inspection and
detailed technical solution.• Concrete floor surface prepara-
tion and coating.• Re-engineering of Production
processes• Overall factory upgrade for
production optimization
MECHANICAL WOKS STEEL REPLACEMENT / RE-ENGINEERING
>
> Provide cuting, welding and replacement works for steel structure at industrial plants in construction phase
> FAIST> Project: Mercedes Benz factory> Duration: 2017 > Works description:• Surface preparation with solvent
cleaning, fresh water usage to neutralize all solvents, sufficient surface roughness creation
• Repainting application• Access method: Cherry picker
and Scissor lift
> VINATABA - BRITISH AMERICAN TOBACCO
> Project: Fire Fighting System Repair
> Duration: 2017 > Works description:• Replaceing Teflon by Eco-friendly
material• Hydro testing after completion• Access method: Boom lift, BS
Scaffolding, Ladder
> NESTLE> Project: Nestle Tri An / Route 66 Coffee
> Duration: 2012
> Works description: • Main subcontractor for all piping
equipment and thermal insulation works• Waste to Energy Boiler: ESP, boiler, ducting
and piping • Roasting, Extraction, Evaporation & Egron
Buildings: Equipments and piping insulation• Roasting & Egron Building: Valves and
flanges flexible insulation pillows design and supply
• Gensets & Blowers Rooms: Acoustic spray-on insulation
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC)
>
> Provide full package for industrial factory upgradation including survey, floor coating, re-engineering.
>50 >51
> High pressure and ultra high pressure water jetting systems allow from 300bar to 2,500bar of pressure (4,300 to 36,250PSI) for cleaning, paint removal and surface preparation.
HP/UHP WATER JETTING CLEANING
>
COATING MAINTENANCE PROGRAMS
>
> Our coating Inspectors deliver corrosion surveys to define and execute all types of protective coating application for repairs and renewals.
Industrial PlantMAINTENANCE PROJECTS
> PV CAMAU FERTILIZER> Project:
Maintenance Campaign
> Duration: 2018-2019
> Works description:• Provision of Manpower, and
Equipment, Material for anti-corrosion coating at plant
• TSA Coating
> MASAN RESOURCES> Project: Nui Phao Mining
> Duration: 2014 - 2018
> Works description:• Surface preparation, UHP
water cleaning, touch-up painting
• Daily general maintenance• Cable tray CO2 cleaning • Cable PFP coating• BS1139 Scaffolding
> BARIA SERECE> Project: Equipment Daily
Maintenance
> Duration: 2018 - 2019
> Works description:• Access Method: Scaffolding,
Rope Access, Man-lift• Surface Preparation: Power
tool cleaning, HP Water Cleaning, Steel Grit Blasting
• Painting Application
> Provide cuting, welding, replacement works for steel structure to repair damages after long term usage.
MECHANICAL WORKS MAINTENANCE AND REPAIR
>
> VINAKRAFT SCG> Project: Shutdown and
Equipment Maintenance
> Duration: 2012 - 2018
> Works description:• Scaffolding Provision• Boiler pipe external coating
& internal blasting• Gear box internal lining &
external coating• Nash Pump blasting