32

Indonesia - Amazon Web Services...Battery Box is suitable for deployment in remote and isolated locations where grid power is not readily available. Diesel generators can be coupled

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Manufacturers

Distributors(Agent for many brands across Sg & Indonesia)

Engineering (Advisory, Consulting & Design Services)

Procurement(Proper Indonesia Import and Company Licenses)

Construction(Leverage on existing manpower company)

Clients

Target Customers:

● Customers paying

high tariff for energy

● Diesel Genset Users

○ Plantations

○ Island

Resorts

○ Farms

○ Buildings

Our Solutions

Operations & Maintenance(Leverage on IOT & smart drone technology)

Current Situation in

Indonesia

Market - Electrification Ratio in Indonesia

HELPING CLIENTS

Financing in Indonesia

● High interest rates in Indonesia banks

● Difficult or near impossible to sue a client in Indonesia when client don’t pay

● Some companies are not willing to open their books for a loan or checks

Different Payment Options to suit your businessDirect Purchase (DP) Instalment Plans (IP) Solar Leasing

Total Cost Large Upfront Payment

(no financing costs)

Medium sized payments (due to

financing costs)

Small recurring payments over 20 years

(high financing costs)

Options: Payment in SGD/USD/IDR 1-5 year instalment plans Fixed or Floating price agreed in a 15-25

year PPA

Advantages 1. Direct ownership

2. No instalment interest

involved

3. Not affected by tariffs

1. Direct ownership

2. Allow you to manage your

cash flow yearly.

3. Not affected by tariffs

1. Lower monthly payments vs IP

2. No burden on your finance

Disadvantages 1. High capital expense at

the outset

1. Instalment interest involved 1. No direct ownership (until you buy

over)

2. Affected by discounted tariffs (for

floating price)

Ideal for: 1. Small-sized solar

systems

1. Medium-sized solar systems 1. Plantations (palm oil, etc)

2. Factories

3. Solar farms

Direct Purchase Instalment Plan Solar

Leasing

Legend

Total Diesel Energy Expenses

Solar Investment/Leasing

Operations and Maintenance

Company A

Sulawesi Luxury Dive Resort

Current Single Line Diagram (SLD)

Resort Lobby and

Office

Villas/Bungalows/

Rooms

Kitchen,

Restaurant and

Dining Hall

Existing Diesel Gensets:

1. 250kw

2. 250kw

3. 250kw

4. 100kw

DB

Install PV

Restaurant/

Kitchen

Water Maker

Air Conditioner

DB

DB

DB

DB

2 x 150 KWP

INVERTERS

3 MWh

Batteries

1 MWP Solar

Panels

Compressor

DBDB

Diesel Gensets

100 kw

Diesel Gensets

250 kw

Diesel Gensets

250 kw

Diesel Gensets

250 kw

Sell/Donate Genset to Village

Restaurant/

Kitchen

Water Maker

Air Conditioner

DB

DB

2 x 150 KWP

INVERTERS

3 MWh

Batteries

1 MWP Solar

Panels

Compressor

DBDB

Diesel Gensets

100 kw

Diesel Gensets

250 kw

Diesel Gensets

250 kw

Diesel Gensets

250 kw

Battery Box is suitable for deployment in remote and isolated locations where grid

power is not readily available.

Diesel generators can be coupled with Battery Box to cover peak demands.

Management and monitoring of Narada E-box can easily be done remotely

Battery Box can be used as an independent power source or as a backup power

system.

One Battery Room or Multiple Battery Boxes

Financial SummaryPast Energy Expenses

● Daily Diesel Expense = $ 1,000

● Annual Diesel Expense = $365,000

● 20 Year History = $365,000 x 20 years = $7,300,000

Investment into Solar PV System: $1,300,000

● Break Even is $1,300,000/$365,000 = 3.6 years

If you don’t do anything:

Energy Bill for the next 20 years: $7,300,000 (before inflation, assuming price stays the same)

Energy Savings over 20 years: $7,300,000 - $1,300,000 = $6,000,000

Payment Plan

Payment Options: 1) Cash Payment Total Price before tax

USD 1,300,000

20% Payable upon confirmation USD

260,000

60% Payable before Procurement USD

780,000

20% Upon Completion

USD 260,000

Or

2) Instalment Plan

20% Downpayment USD 260,000

Balance will be paid in Instalments:

48 Months USD ~27,100 per month (total

USD1,560,000)

60 Months USD ~22,800 per month (total

USD1,628,000)

(5% p.a. interest is included in the instalment plan)

Company B

Manado Dive Resort & SPA

Current Single Line Diagram (SLD)

Resort Lobby and

Office

Villas/Bungalows/

Rooms

Kitchen,

Restaurant and

Dining Hall

Existing Diesel Gensets:

1. 195 kw

2. 205 kw

3. 250 kw

DB

Phase 1a

Resort Lobby and

Office

Villas/Bungalows/

Rooms

Kitchen,

Restaurant and

Dining HallDB2 x Hybrid Inverter0.6 MWh Batteries

Existing Diesel Gensets:

1. 205 kw

2. 250 kw

(Run all day,

4-6 hrs/night)

Phase 1b

Resort Lobby and

Office

Villas/Bungalows/

Rooms

Kitchen,

Restaurant and

Dining HallDB

204kWp Solar Panels

2 x Hybrid Inverter0.6 MWh Batteries

Existing Diesel Gensets:

1. 205 kw

2. 250 kw

(Only 2-3 hrs/night)

Financial SummaryPast Energy Expenses

● Daily Diesel Expense = $ 300

● Annual Diesel Expense = $ 109,500

● 20 Year History($109,500 x 20 years) = $ 2,190,000

Investment into Solar PV System: $510,000

● Break Even is $510,000/$109,500 = 4.7 years

If you don’t do anything:

Energy Bill for the next 20 years: $2,190,000 (before inflation, assuming price stays the same)

Energy Savings over 20 years: $2,190,000 - $510,000 = $1,680,000

Payment Plan

Indicative Pricing: Cash Payment USD 510,000 for Cash Payment

Or

Instalment Plan

20% Downpayment USD 102,000

Balance will be paid in Instalments:

48 Months USD ~10,200 per month (USD 591,600)

60 Months USD ~8,500 per month (USD 612,000)

(5% p.a. interest is included in the instalment plan)

Includes: Project Management & Commissioning and up to 20 years warranty.

Excludes: Local Labour, Structures, International & Domestic Freight and Import Tax

& Duties.

Medan

Background

● The building which client is in, is in the city of Medan but the national grid is

unable to supply electricity to them

● The building’s electricity is supplied by a Diesel Generator.

● The diesel genset is supplying them electricity at approx. IDR 3000/kWh

Right People Team

Work with us RPRE

Help us Help:

1. People

2. Planet

3. Profit

Contact details

Darryl Lim

Operations Manager

[email protected]

HP: +65 91132014

www.RPREasia.com

Robin Pho

CEO, Executive Director

[email protected]

HP: 93634449

www.RPREasia.com

Thank you

Q&A