Upload
dev-asawla
View
220
Download
0
Embed Size (px)
Citation preview
8/13/2019 Individual Processes Report Plan
1/24
8/13/2019 Individual Processes Report Plan
2/24
PRE PROJECT
I saw the project as an opportunity to map thedesign process. Inspired by graphic designerNicholas Feltrons annual report inwhichhe documents a year of his life throughinfographics I set up a short online surveyusing Google Forms. This survey could then be
lled in from each members smart phone.
The survey mapped group moral, what tools we used and the food we ate. By the end of theproject together we had 766 entries.
See the survey at:
http://bit.ly/1goBUcl
mapping the project
8/13/2019 Individual Processes Report Plan
3/24
WHO ARE YOU?WHAT ARE DOING
RIGHT NOW?
workingrefuelingplayingresting
otisolicharlotteharry
WHERE ARE
WHAT ARE Y
WHAT TOOL
HOW DO YO
DESCRIBE IN
DESCRIBE IN
HOW DO YO
HOW DO YO
HOW DO YO
8/13/2019 Individual Processes Report Plan
4/24
PROJECT TIMELINE
I want to rst tell the overal story of how themarket developed, then discuss key aspects ofthe project.
project summary
Graph of team m
timeline of projec
8/13/2019 Individual Processes Report Plan
5/24
8/13/2019 Individual Processes Report Plan
6/24
I want to rst tell the overal story of how themarket developed, then discuss key aspects ofthe project.
CONCEPT conception
create a crossroadsonwhich a market forms
8/13/2019 Individual Processes Report Plan
7/24
interim
8/13/2019 Individual Processes Report Plan
8/24
SITE
conception: we established that their was a clear desire line through thesite and Bristol however the train station was acting as a barrier and dividing bristol. This became the key driver ofour site responce.
development:
initially we developed two opposing site responces. Use the building to form the path through the site but build ontopof the basement of the parcelforce building.
detail: we wanted to improve the temple meads user experienceand strengthen the desire line through the site. Weproposed a footbridge linking all platforms and the market.
interim: by interim our core responce to site was resolved
resolution:
we gave the route through an end point, creating a place forpublic gathering and performance by the water.
conception
desire line blocked by station
establish desire line and form crossroads at market
8/13/2019 Individual Processes Report Plan
9/24
interimdetail
a site visit to survey of the station helped us decide the best location for the bridge
the bridge relieves the station and frees up the subway as a service route
establish the route desire line, create newservice the market off site via subway
use market as route through site with eve
8/13/2019 Individual Processes Report Plan
10/24
UNDERCROFT
I want to rst tell the overal story of how themarket developed, then discuss key aspects ofthe project.
8/13/2019 Individual Processes Report Plan
11/24
8/13/2019 Individual Processes Report Plan
12/24
BOOKENDS
I want to rst tell the overal story of how themarket developed, then discuss key aspects ofthe project.
8/13/2019 Individual Processes Report Plan
13/24
8/13/2019 Individual Processes Report Plan
14/24
TERRACES
I want to rst tell the overal story of how themarket developed, then discuss key aspects ofthe project.
8/13/2019 Individual Processes Report Plan
15/24
8/13/2019 Individual Processes Report Plan
16/24
LOOP
I want to rst tell the overal story of how themarket developed, then discuss key aspects ofthe project.
8/13/2019 Individual Processes Report Plan
17/24
8/13/2019 Individual Processes Report Plan
18/24
CLOUD
I want to rst tell the overal story of how themarket developed, then discuss key aspects ofthe project.
8/13/2019 Individual Processes Report Plan
19/24
8/13/2019 Individual Processes Report Plan
20/24
TEAM
I want to rst tell the overal story of how themarket developed, then discuss key aspects ofthe project.
8/13/2019 Individual Processes Report Plan
21/24
8/13/2019 Individual Processes Report Plan
22/24
CONCLUSION
I want to rst tell the overal story of how themarket developed, then discuss key aspects ofthe project.
8/13/2019 Individual Processes Report Plan
23/24
8/13/2019 Individual Processes Report Plan
24/24