Indian Railways

The 5-year Action Plan

June 18, 2015

Page 2: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

Background • World’s largest rail network under a single management

with 66,000 route kilometers

• Supports 1.3 million people through employment

• IR operates over 20,000 trains daily of which:

– Over 12, 000 passenger trains; more than 7,500 freight trains

– connecting over 8,000 stations

– carrying over 23 million passengers

– transporting over 3 mn tonnes of freight

• IR carried: – 518 mn tonnes p.a. from year 1853 to 2003

– 1,054 mn tonnes from 2003 to 2013-14

• Now network stretched to its limit; expansion required immediately

2

IR achieved in last decade what was accomplished in 150 years

Page 3: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

Challenges

• Committed liabilities on Revenue Generation

Revenue expenditure (2013-14):

• Staff with Pension - 52%

• Fuel bill - 19%

• IRFC payments – 5%

• Stores- 3%

• Other - 9%

Social service obligations

• Essential commodities carried below cost

• Passenger and other coaching services (€4286 mn p.a.)

• Operation of uneconomic branch lines

• Concessions

Little surplus for investment in capital

3

Page 4: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

Challenges (contd.)

4

• Project planning and execution

– Projects worth Rs 4.91 lakh cr / € 70143 million (at

original cost) sanctioned and pending

– Ensuring assured funding to prevent cost /time overruns

Page 5: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

Under-investment

Under-investment

Poor quality

services, delays

Inability to increase

fares

Lower resource

generation

Lower surplus for investment

5

Page 6: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

6

SONNAGAR

VARANASI

MANDAR HILL

KIUL

KATRA

SULTANPUR

MAUINDARA

PARASIA

ARJUNITALCHER

CHAMPA

SALUR

SECUNDERABAD

BIBINAGAR

WARANGAL

KIRANDUL

SOLAPUR

PURNA

LATUR RD.

GADCHANDUR

MANIKGARHFORT

TRIVANDRUM

COCHIN

ERNAKULAM

SHORANUR

TRICHUR

PANAMBUR

PIPAVAV

RAJKOT

VERAVAL

NALIYA BHUJ

PORBANDARJUNAGARH

WANKANER

KUDAMIYANA

SABARMATI

MARWAR

BILARA

JAISALMER

MUNABAO

SAMDARI

POKARAN

DELHI

SRI-GANGANAGAR

AMBALA

KOTKAPURAKALKA

SHIMLA

NAGAL DAM

UNA

JALANDHAR

LUDHIANA

PATHANKOT

RAJPURA

TALWARA

KRDE

JIND

BEAS

JAKHAL

HPU

BATHINDA

HISAR

GZB

PANIPAT

DEHRADUN

LAKSARKOTDWARA

MORADABAD

JOGINDER NAGAR

FIROZPURGOVINDWAL

ATARI

AMRITSAR

SURATGARHANUPGARH

SARUPSAR

LALGARH

BIKANERKOLAYAT

BHIWANI

REWARI

ALWAR

RINGUS

SIKAR

RAM

PUR

JAIPUR

DHOLPUR

AGRA

MATHURA

KOTA

AJMER

JHANSISHIVPURI

SHEOPURKALA

NIMACH

CHITTAURGARH

RATLAM

DAHOD

UJJAIN MAKSI

DEWAS

INDOREITARSI

BHOPAL

AMLAKHANDWA

MANMADAKOLA

AMARVATI

PARBHANI

ROHAPUNE

DAUND

WADI HYDERABAD

DONAKONDA

MYSORE

BANGOLORE

MANGLORE

BIRUR

CHENNAI

TANAKPUR

HATHRAS

TUNDALA

GWALIOR

BHINDKANPUR

KHAJURI

PANIHAR

GUNA

BINA

MANIKPUR

SATNAREWA

CHUNAR

ALLAHABAD

GEVRA ROAD

ANUPPUR

SHAKTINAGAR

BISHRAMPUR

MANPUR

GAYA

SILIGURI

MUZAFFARPUR

RAIPUR

GONDIA

BILASPUR

TITLAGARH

GUNUPUR

MANUGURU

LATUR

AURANGABAD

JAGTIAL

CHANDA

HARBOUR

HARBOUR

MARMAGAO

UDHNA

ALANG

OKHA

GANDHIDHAM

VIRAMGRAMMALIYA

AHMADABAD MODASA

KAPADVAJJ

UDAIPURCITY

PALANPUR

BHILDI

JODHPUR

LUNI

MERTA RD.

FAZILKA

ROHTAK

PALWAL

LOHARU

ALIGARH

HARDUAGANJ

BAREILLYKASGANJ

KHURJA

KATHGODAM

LALKUA

LKO

UNNAO

SHIKOHABADETAWAH

GONDA

MANKAPUR

FD

KHRIRAR

MUGHAL SARAI

CHHAPRA

NAINI

BILLICHOPAN

MAHADIYA

SHAHGANJ

ZBD

BHATNI

NONERA

BANDIKUI

AIT

PHULERA

DEGANA

MERTACITY

SAWAI MADHOPUR

RANCHI

LOHARDAGA

NAWAGAON

RAJKHARSWAN

MURI

CHANDIL

TATANAGAR

PURULIYABANKURA

ADRA

BNDM

ROURKELA

BARSUAN

BANSPANIJORURI

BANGRIPOSI

DAITARI

SUKINDARD.MANDIRHASAUD

SAMBALPUR

JHARSUGUDA

BOLANGIR

LANJIGARH BHUBANESWAR

ANGULBUDHAPANK

RAJATHGARH

MANESNAR

PARADEEP

KAPILAS RD.

NERGUNDICUTTACK

KHURDA RD.

PURI

NAUPADA

RAYAGADA

JUNAGARH

BARASATBANGAON

PETRAPOL

KATWA

AZIMGANJ

LALGOLA

BANDEL

KHANA

SITARAMPUR

MADHUPUR

SAINTHIAGIRIDIH

DHANBADBARKAKANA

GARHWA ROAD

PATNA

DARBHANGA

SAMASTIPUR

JOGBANI

KUMARGHAT

SAGAULI

BALURGHAT

SINGHABAD

HALDIBARI

NEW JALPAIGURI

RUPSADIGHA

NISCHINTPURNAVIKWANA

LAKSHMIKANTAPUR

CALCUTTAHOWRAHKHARAGPUR

ANDAL

RAMPURHUT

GORAKHPUR

KAPTANGANJ

VALMIKINAGAR

NARKATIAGANJ

RAXAUL

SITAPURSITAPUR

CANTT.

BURHWAL

BHIMSEN

KATNI

JABALPUR

CHHINDWARA

WADSA

NAGBHIRMAJRIRAJUR

BALLARSHAH

PEDDAPALLI

MUDKHEDNANDED

NIZAMABADKARIM NAGAR

ADILABAD

UMRER

NAGPUR

NARKHER

BHILAI

MHOWCHOTAUDEPUR

PRATAPNAGAR

GODHRA

NADIAD

BHAVNAGAR

NAGDA

PIMPALKUTTI

LONAVALA

BARAMATI

PANDHARPUR VIZIANAGARAMKOTTAVALASA

MIRAJ

HOTGI

KURDUWADI

PARLI VAIJNATH

VIKARABAD

GUNTAKAL

DHARMAVARAM

RAYADURG

LONDA

AMBEWADI

MADGAON

SALEM

VILLUPURAMUDAGAMANDALAM

SAKLESHPUR

JOLARPETTAI

TIRUPATI

PAKALA

KATPADI

BODINAYAKKANUR

VIRUDUNAGAR

ERODE

GUDUR

GUNTUR

REPALLE

MACHERLA

VIJAYAWADA

MACHILIPATNAM

GUDIVADA

DORNAKAL

MOTUMARI

BOLARUM

VISAKHAPATNAM

JAGDALPUR

KORAPUT

LAKSHMIPUR

DAMANJODI

BOBBILI

KANNIYAKUMARI

DANGARIMURKONGSELEK

TINSUKIA

DIBRUGARH

LEKHAPANIMORANHUT

NAGINIMORA

TULI

AMGURIJORHAT

FURKATING

DIPHULUMDING

MIGRENDISA

BADARPUR

JIRIBAMSILCHAR

BHAIRABIKUMARGHAT

DITOKCHERRA

AGARTALA

BALIPARA

BHALUKPONG

NEW BONGAIGAONSILGHAT

HAIBARGAON

SENCHOACHAPARMUKH

RANGIYA

GUWAHATI

DUDHNOI

JOGIGHOPA

GOLAPARA

TIRUNELVELI

QUILONTENKASI

MADURAI

COIMBATORE

IRUGUR

TIRUCHCHIRAPPALLI

PODUCHERRY

CHAMARAJA NAGAR

ARAKKONAM CHENGALPATTU

PENUKONDA

KALLURU

NANDYAL

ONGOLE

RAICHUR

RAJAMUNDRY

NARASPUR

TENALI

KAKINADA

SAMALKOT

BHADRACHALAM ROAD

PEN

KAZIPET

JALGAON

BHUSAVAL

JAMNER

CHALISGAON KHAMGAON

ACHALPUR

PULGAONYAVATMAL

WARDHA

TADALI

NAINPUR

MANDLA FORT

BALAGHATRAMTEK

TUMSAR

GUA

BIMLAGARH

BADAMPAHAR

JAKHAPURA

SINGAPURAM

GOPALAPATNAM

DALLI RAJHARA

DHAMTARI

RAJIM

URKURA

RISHIKESH

SA

HA

RA

NP

UR

KANDLA

WANSJALIYA

JETALSAR

SURENDRANAGAR

BILIMORA

DAHEJ

TANKHALA

GANDHINAGAR

TARANGA HILL

PANIMINES

MAVLI

BARI SADRI RUTHIYAI

SARDAR SHAHR

PILIBHIT

CHANDAUSI

ETAH

RAE BARELI

TANDA

CHHOTA AMBANA

JASIDIH

HARMUTI

RANGAPARA

ALIPURDUARDARJEELING

SAKRI

SAHARSA

KHAGARIA

KATIHAR

BHAGALPUR

RADHIKAPUR

RAJGIR

SONPUR

NAMKHANA

KAKDWIP

SEALDAH

NEPAL GANJ

BALAMAU

ROSA

DURG

SAMAKHIALI

UMARPADA

MAHESANA

BAYANA

MAILANI

BARSOI

DHUBRI

DULLABCHERRA

KATAKHAL

KOTSHILA

HAZIPUR

CHHITAUNI

(POSITION AS ON 31-03-2013)

JHAJHA

Ariyalur

Lalgudi

Ponmalai

Sanehwal

Daurai

Ramnagar

Chauri Chaura

Rengali

PALASA

BHADRAK

DHAMRA PORT

Samuktala Rd.

BHIGWAN

MOHOL

GAMHARIASINI

MANOHARAPUR

Gooty

VIRAR

VANCHI MANIYACHCHI

LINE CAPACITY AND UTILISATION ABOVE 100%

CONGESTED NETWORK

65% of sections on High Density Network (HDN) routes are saturated. 7 HDN Routes connecting major urban conglomerates . Indian Railways (IR) has 1219 sections of which 492 sections (40%) are saturated. 18% network carrying 56% traffic

Page 7: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

Spin-offs of Network Augmentation

Impact on GDP

Employment generation

Remote area connectivity

Increased rail share in transport sector- more

environment friendly means of transport

Impetus to manufacturing

National integration

Page 8: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

FIVE-YEAR ACTION PLAN

8

Page 9: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

Goals

Deliver a sustained & measurable improvement in customer service

Make rail a safer means of travel

Expand IR’s capacity substantially & to modernize infrastructure

Make IR financially sustainable

Drivers Adopting a medium-term perspective

Building partnerships

Leveraging additional resources

Revamping management practices, systems, processes, & re-tooling of human resources Setting standards of governance & transparency

Page 10: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

Thrust areas

– Quality of life in journeys

– Station redevelopment

– Capacity augmentation

– Safety

– Technology upgradation

– Partnerships for development

– Improvements to management processes & systems

– Resource mobilization

– Human resources

– Energy & sustainability

– Transparency & governance initiatives

Page 11: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

Investment focus

• High density corridors prioritized based on revenue generation capacity

• Station redevelopment & logistic parks • Passenger Amenity works • Safety works

– Track renewal – Signalling – Level crossings

• Traffic Facilities • Private participation:

– Liberalised Wagon Incentive Scheme – Logistic parks – Review Private Freight Terminal Operators’ scheme;

modernisation of existing terminals – Encouraging development of alternate routes

11

Page 12: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

INVESTMENT PLAN

12

Item 5 years

Rs. In mn € in mn Network Decongestion (including DFC + electrification, Doubling + electrification & traffic facilities)

1993200 28474.3

Network Expansion (including electrification)

1930000 27571.4

National Projects (North Eastern & Kashmir connectivity projects)

390000 5571.43

Safety (Track renewal, bridge works, ROB, RUB and S&T)

1270000 18142.9

Information Technology / Research 50000 714.286 Rolling Stock (Locomotives, coaches, wagons – production & maintenance)

1020000 14571.4

Passenger Amenities 125000 1785.71 High Speed Rail & Elevated corridor 650000 9285.71

Station redevelopment + logistic parks 1000000 14285.7

Others 132000 1885.714

TOTAL 8560200 122289

Page 13: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

2015-19

New LineGauge

ConversionDoubling

2014-15 380 880 723

2015-16 500 800 1200

2016-17 400 800 1800

2017-18 400 800 2300

2018-19 400 800 2800

0

500

1000

1500

2000

2500

3000Targets for commissioning (kms)

About 500-600 km doubling & 100 km gauge conversion to be commissioned every year involving Railway PSUs

Investment focus (contd.)

Page 14: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

Station Development

– Developing identified stations to international standards with modern facilities & passenger amenities on lines of PPP airports

– Land and air-rights of station buildings to be leveraged

– All costs of redevelopment to be met from proceeds of commercial revenues

– To seek participation of private entities

– Technology collaboration with Foreign railways for development of world class terminals

14

Page 15: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

30%

13%

14%

15%

28%

GBS INTERNAL GENERATION STATE JVs PPP DEBT

(Rs. in lakh crore/ million €)

Gross Budgetary Support

2.56/ 36571

Internal generation

1.00/ 14286

State JVs 1.20/

17143

PPP 1.30/

18571

Debt 2.50

/35714

Total

8.56/ 122,286

Five year Fund requirement

Page 16: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

Initiatives – Resource Mobilisation

•JVs with State Governments

–Railway & State Governments to be shareholders

–Revenue streams from tariff and commercial exploitation of air rights; institutional structure being developed

•JVs with Public Sector Units (PSUs)

–For construction/expansion of lines, JVs to be set up with key customers of IR

–PSU companies to provide funds upfront for undertaking projects

•Off-budget debt

–IR PSUs to leverage free reserves/ equity by IR for raising debt

–IR to help PSUs tap international low cost pension & insurance funds for 20/30 year paper

–IR to repay debt to PSU over loan repayment period

16

Page 17: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

Initiatives – Resource Mobilisation

• Innovative financing including PPP • Areas: Redevelopment of railway stations (PPP – BOT),

Electrification & Signalling (EPC; PPP-annuity) , Construction of freight lines/elevated corridor (PPP - BOT or Annuity), Own your train (suppliers’ credit), Port & Mine connectivity projects; (JVs or PPP - annuity), Technical Training Institutes for providing certificates to qualified drivers/ technical staff

• Models for private participation rolled out for freight terminals, wagon investment etc; to be reviewed to ensure flow of funds

• Private investment projects identified; to be bid out

• Non-tariff revenues • Revenues from advertisements, exploiting air rights over stations

& other buildings, land along tracks, OFC for Digital India, export of products & services, tap solar energy along tracks, buildings, etc

17

Page 18: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

Initiatives – Efficiency & Productivity

• Efficiency & Productivity – Review of approval processes; timelines & targets to be set; Global

benchmarking of KPIs

– Delegation , Decentralization and De-regulation

– Mechanised maintenance of track

– Audit – systems, HR, energy, water, operations

– Long term PPAs for power procurement

– Project execution

– Special Projects: Bullet trains, Semi-high speed trains, Elevated rail corridors, Satellite towns connectivity

– Dedicated Freight Corridor to be completed on war-footing

– Project prioritisation; high density networks to be taken up, doubling, third line, elevated tracks

– EPC form of contracting to be adopted as far as feasible

18

Page 19: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

Initiatives - Customer satisfaction

• Helplines

• Developing world’s best coaches and retrofitting existing coaches

• Introducing Wi-Fi at all major stations

• Development of a Customer Portal integrated with helpline

• Expanding e-catering

• Establishing modern and mechanised base kitchens & base laundries

• Operation 5 minutes for unreserved tickets; introducing mobile ticketing on Smartphones for unreserved tickets.

• Provision of CCTVs in coaches to provide better security to women passengers

• Executive lounges to be developed at all major stations.

19

Page 20: Indian Railways 01, 2012 · indore itarsi bhopal khandwa amla manmad akola ... allahabad gevra road anuppur shaktinagar bishrampur ... train (suppliers’ credit

Reforms

• Policy reforms

– Regulator for tariff setting, private participation &

other activities

– Empowerment at functional level

– Creation of strategic business units for parcels,

suburban , station management and Logistics

– Liberalization of Wagon ownership

– Accounting reforms

– Creating world class railway universities to impart

quality training

20