2300

Indian Power Scenario – At a glance

Installed Capacity : 1,18,000 MWPeak Demand : 87,000 MWPeak Availability : 77,000 MWEnergy growth : 8-9% per annum

30,860 MW

32,700 MW16,000

30,500 MW

2300

Surplus Regions

Deficit Regions

Page 3: Indian Power Scenario – At a glance - Homepage SC …b4.cigre.org/content/download/2068/25760/version/2/file/...2300 Indian Power Scenario – At a glance Installed Capacity : 1,18,000

Future Power Supply Scenario

• Peak demand (expected)- 157,000 MW

• Capacity addition envisaged-100,000 MW

• Installed Capacity envisaged - 212,000MW

By the year 2011-12

Per Capita Energy consumption

• Present - 592 kWh

• Expected by 2012 - 932 kWh

• World Average - 2326 kWh (China – 1019 kWh)

Page 4: Indian Power Scenario – At a glance - Homepage SC …b4.cigre.org/content/download/2068/25760/version/2/file/...2300 Indian Power Scenario – At a glance Installed Capacity : 1,18,000

Energy Resource Map

NR

WR

SR

ERNER

Ennore

KudankulamKayamkulam

Partabpur

Talcher/Ib Valley

Vindhyachal

Korba

LEGEND

Coal

Hydro

Lignite

Coastal

Nuclear

VizagSimhadri

Kaiga

Tarapur

Mangalore

Krishnapatnam

RAPP

SIKKIM

MYA

NMM

AR

CHICKEN NECK

Cuddalore

SRI LANKACOLOMBO

NEPALBHUTAN

DESHBANGLA

South Madras

Pipavav

Generation Load-Centre

Kolkata

Bhubaneswar

PatnaLucknow

Delhi

Mumbai

Chennai

Bangalore

Bhopal

Guwahati

Jammu

Ludhiana

Jaipur

Gandhinagar

Indore

Raipur

Thiruvananthapuram

Kozhikode

Hyderabad

Coal

Hydro• Hydro potential in NER and

upper part of NR

• Coal reserves mainly in ER

• Distribution of energy resources and consumption centres are extremely unbalanced

• To achieve economy of scale in the delivered cost, power transportation from pit-head generating stations is cheaper option

Necessitate establishment of large no. long distance lines & interconnection of all the five(5) Regional Grids

Page 5: Indian Power Scenario – At a glance - Homepage SC …b4.cigre.org/content/download/2068/25760/version/2/file/...2300 Indian Power Scenario – At a glance Installed Capacity : 1,18,000

• National Grid planned in a phased manner• Phase-I envisaged Interconnection of Regional Grids

through HVDC Back-to-Back links having cumulative capacity of 5000 MW has been completed in 2002

• Present inter regional capacity is 9500 MW• It is envisaged to have 37,000 MW inter regional

capacity by 2012 comprising of high capacity HVDC and HVAC lines (both 765kV and 400kV) and 50,000MW by 2016

Development of National Grid

Page 6: Indian Power Scenario – At a glance - Homepage SC …b4.cigre.org/content/download/2068/25760/version/2/file/...2300 Indian Power Scenario – At a glance Installed Capacity : 1,18,000

• To conserve the Right-of-Way while meeting the power transfer requirement of immediate as well as long-term – Technology adopted for progressive enhancement of

transmission capacity of same Tr. corridor through –• High capacity 400kV (quad) lines• 800kV EHVAC line initially operated at 400kV• High capacity 800kV HVDC systems initially operated at

600kV• Series compensation and TCSC• High temperature endurance conductor like INVAR• Multi-ckt. line and compact towers (ROW for 800kV line 85 m to 64 m)

– Optimal utilisation of existing infrastructure through –• Series Compensation• Uprating/Upgrading of lines• Enhancement of thermal capacity of line (75 -850 /950 C)

Technology Integration

Page 7: Indian Power Scenario – At a glance - Homepage SC …b4.cigre.org/content/download/2068/25760/version/2/file/...2300 Indian Power Scenario – At a glance Installed Capacity : 1,18,000

HVDC Systems• Existing

– Rihand – Dadri 1500 MW, +500 kV – about 800 km– Talcher – Kolar 2000 MW, +500 kV – about 1450 km– HVDC Back to Back links

• Vindchyachal 500 MW : North-West• Gazuwaka 1000 MW – East – South• Chandrapur 1000 MW : West – South• Sasaram : East : North

Page 8: Indian Power Scenario – At a glance - Homepage SC …b4.cigre.org/content/download/2068/25760/version/2/file/...2300 Indian Power Scenario – At a glance Installed Capacity : 1,18,000

HVDC System – For Future• Balia – Bhiwadi 2500 MW, +500 kV : Under

advance stage of investment approval. To be implemented by 2009-10.

• Upgradation of Talcher – Kolar by 500 MW• To transfer power from NER, feasibility of

HVDC bipole of 6000 MW, +800 kV is being explored.

• More HVDC links envisaged from NER

Page 9: Indian Power Scenario – At a glance - Homepage SC …b4.cigre.org/content/download/2068/25760/version/2/file/...2300 Indian Power Scenario – At a glance Installed Capacity : 1,18,000

NER

ER

NR

WR

SR

Legend

500MW

500 MW

MW1000

MW500

GAZUWAKA

CHANDRAPUR

VINDHYACHAL

SASARAM

HVDC BACK-TO-BACK

400 kV

220 kV

BONGAIGAONBIRPARA

MALDA

KORBA BUDHIPADAR

KOLHAPUR

BELGAUM

U.SILERU

BALIMELA

DEHRISAHUPURI

MALANPUR

AURAIYAAN

DAM

AN &

NIC

OBAR

LAKSHADWEEP

ROURKELARAIPURTALCHER

KOLAR

HVDC BIPOLE

Present National Grid - Mainly HVDC Interconnections

Page 10: Indian Power Scenario – At a glance - Homepage SC …b4.cigre.org/content/download/2068/25760/version/2/file/...2300 Indian Power Scenario – At a glance Installed Capacity : 1,18,000

FACTS Technologies• Existing

– SVC at Kanpur ( 2x +140 MVAr) – CSR at Itarsi (50 MVAR)– TCSC on Rourkela – Raipur 400 kV (40% fixed, 5-

15% variable)– TCSC on Kanpur – Ballabhgarh 400 kV

• Future (Under Implementation)– TCSC on Purnea – Muzzafarpur 400 kV (40% fixed,

5-15% variable)– TCSC on Muzzafarpur - Gorakhpur 400 kV (40%

fixed, 5-15% variable)

Page 11: Indian Power Scenario – At a glance - Homepage SC …b4.cigre.org/content/download/2068/25760/version/2/file/...2300 Indian Power Scenario – At a glance Installed Capacity : 1,18,000

RAIPUR

SAHU

HVDC BACK-TO-BACK

VINDHYACHAL

LAKSHADW

EEP

KOLAR

BELGAUM

KOLHAPUR

WR

U.SILERU

CHANDRAPUR

1000 BALIMELAMW

KORBA

AURAIYA

MALANPUR

NR

MALDABIRPARAN

ICO

BAR

A

ND

AMAN

&

220 kV

HVDC BIPOLE

BUDHIPADAR

400 kV

SASARAM

ER

GAZUWAKA

TALCHER

ROURKELA

DEHRI

Legend

BONGAIGAON

NERFATEHPUR

AGRA

GWALIOR

GORAKHPUR MUZAFFARPUR

PATNAB'SHARIFF

BARHNABINAGAR

PURI

KOTA

UJJAIN

KANKROLI

ZERDA

RAPP

NAGDA RANCHISIPATNORTH KARANPURA

SIPAT

SALAKATI

765 kV

BALIA

SR

NAGJHARI

PONDA

By 2012Inter-regional capacity – 37,150 MWHybrid System of EHVAC & HVDC with FACTS Devices

Page 12: Indian Power Scenario – At a glance - Homepage SC …b4.cigre.org/content/download/2068/25760/version/2/file/...2300 Indian Power Scenario – At a glance Installed Capacity : 1,18,000

R O U R K E LA

R A IP U RH IR M A

T A LC H E R

JA IP U R

N E R

E R

W R

N R

S R

B 'S H A R IF

A L LA H A B A D

S IP A T

G A Z U W A K A

JE Y P O R EC H A N D R A P U R

S IN G R A U LI

V IN D H Y A -

2000

MW

2000MW

2500M W

100 0M W

500M W

L U C K N O W

D IH A N G

C H IC K E N N E C K

T E E S T A

T IP A IM U K HB A D A R P U R

M IS A

D A M

K A TG U

LE G E N D

765 K V L IN E S 400 K V L IN E S

H V D C B /B

H V D C B IP O LE

E X IS T IN G / X P LA N N A T IO N A L

Z E R D A

H IS S A R

B O N G A IG A O N

K O LH A P U R

N A R E N D R A

K A IG A

P O N D A

IX P L A N

M A R IA N I

N O R T H

K A H A LG A O N

R A N G A N A D I

S E O N IC H E G A O N

B H A N D A R A

D E H G A M

K A R A D

L O N IK A N D

V A P I

G A N D H A R /

T A LA

B A N G LA

B A LLA B G A R H A 'P U R(D E LH I R IN G )

B A N G A LO R E

K O Z H IK O D E

C O C H IN

K A Y A M K U LA M

T R IV A N D R U M

P U G A LU R

K A Y A T H A R

K A R A IK U D I

C U D D A LO R E

S O U T H C H E N N A I

K R IS H N A P A T N A M

C H ITT O O R

V IJA Y A W A D A

S IN G A R P E T

P IP A V A V

L IM B D I

K IS H E N P U R

D U LH A S T IW A G O O R A

M O G A

U R I

B H U T A N

R A M A G U N D A M

S A T LU JR A V I

JU L LA N D H A R

D E S H

V A R A N A S I/U N N A O

M 'B A D

P U R N E A

K O R B A

N A G D A

S IL IG U R I/B IR P A R A

LAKSHAD

WEEP

T E H R I

M E E R U T

B H IW A D I

B IN A

S A T N A

M A L A N P U RS H IR O H I

K A W A S

A M R A V A T I

A K O LA

A G R A

S IR S I

C H A L

JE T P U RA M R E LI

B O IS A RT A R A P U R

P A D G H E

D H A B O L

K O Y N A

B A R H

G 'P U R

H O S U RM Y S O R E

K U D A N K U LA M

M 'P U R

K A R A N P U R A

M A ITH O N

JA M S H E D P U R

P A R LI

W A R D A

B E A R ILLY

S A L E M G R IDX I P L A N

National Grid by 2012THE POWER ‘HIGHWAY’