Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
ICHMONDR
VIRGINIA
$FIL
EL
$
INDEX OF SHEETS
3
3A
4
4A
5
5A
5B
6
6A
7
7A
8
8A
9
9A
10
10A
14(1)
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Title Sheet
Revision Data Sheet
1
1A
1C
1D
1E
2
2A
2B
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
3B
Sheet No.
4B
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
1A
1G(1) - 1G(2)
Sheet No.
Sheet No.
Underground Utilitiy Test Hole Data Sheet
Survey Data Sheet
Typical Sections (Connections)
General Notes Sheet
Stormwater Management Detail
Manhole with Restrictor Plate Detail
Drainage Description Sheets
Sheet No.
Sheet No.
Sheet No.
2E(1) Stormsewer Profiles System 1
Sheet No.
Sheet No.
Sheet No.
Stormsewer Profiles System 2
Stormsewer Profiles System 3
Stormsewer Profiles System 4
2E(5)-2E(8)
2E(2)-2E(4)
2E(9)-2E(11)
2E(12) Stormsewer Profiles: Culverts East and West of CSX Rail Crossing
Radial Staking Details for Curb Returns
Underdrain Summary Sheet
Plan Sheet Station 18+00 to 22+00
Profile Sheet Station 18+00 to 22+00
Plan Sheet Station 22+00 to 29+00
Profile Sheet Station 22+00 to 29+00
Plan Sheet Station 29+00 to 36+00
Profile Sheet Station 29+00 to 36+00
Plan Sheet Station 36+00 to 43+00
Profile Sheet Station 36+00 to 43+00
Plan Sheet Station 43+00 to 50+00
Profile Sheet Station 43+00 to 50+00
Plan Sheet Station 50+00 to 57+00
Profile Sheet Station 50+00 to 57+00
Plan Sheet Station 57+00 to 64+00
Profile Sheet Station 57+00 to 64+00
Plan Sheet Station 64+00 to 71+00
Profile Sheet Station 64+00 to 71+00
Erosion and Sediment Control Plan
Entrance Profiles
Erosion and Sediment Control Plan
Erosion and Sediment Control Plan5C
Entrance Profiles
Erosion and Sediment Control Plan6C
6B
Entrance Profiles
Erosion and Sediment Control Plan7C
7B
Entrance Profiles
Erosion and Sediment Control Plan8C
8B
Entrance Profiles
Erosion and Sediment Control Plan9C
9B
12
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Entrance Profiles
Erosion and Sediment Control Plan
10B
10C
12A
11Sheet No.
Sheet No.
Plan Sheet Station 71+00 to 78+00
Profile Sheet Station 71+00 to 78+0011A
Plan Sheet Station 78+00 to 82+64.90
Profile Sheet Station 78+00 to 82+64.90
13(1)-13(5)
13(6)-13(7)
13(8)
16(1)
14(2)Sheet No.
14(3)Sheet No.
14(4)Sheet No.
Traffic Signal Plans - Jahnke and Forest View School Drive - Quantity Summary Sheet
Sheet No. Landscape Plans
Sheet No.
Index of Sheets
2F(1)-2F(2)
2H
1F(1) - 1F(2)
R
2G
2J
Sheet No.
Sheet No.
Sheet No.
Grading Diagram and Summary
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No. 15(25)
15(2)
15(1)
Utility Relocation Plans - Plan Sheets
Sheet No. 2E(13) Stormsewer Profiles System 5
Traffic Signal Plans - Jahnke and Forest View School Drive - General Notes
Traffic Signal Plans - Jahnke and Forest View School Drive - Sign Details
2K-2K(3)
16(2)-16(9)
Landscape Notes
Sheet No. 16(1A) Landscape Details and Summary
Jahnke Road Cross Sections
Oakhurst Lane Cross Sections
Forestview School Drive Cross Sections
Faye Street Cross Sections
Sheet No. 17(1) CSXT Crossing Plan
1J - 1J(21)
Radial Offsets Data Sheets
Pavement and Incidental Summary
Siging and Pavement Marking Sheets
Sign Schedules
Signing and Pavement Marking Notes, Legends and Summary
Traffic Signal Plans - Jahnke and Forest View School Drive - Signal Plan Sheet
Utility Relocation Plans - Notes, Legend & Sheet Index
Utility Relocation Plans - Notes & Detail Sheet
15(13)-15(24)
15(3)-15(12)
Sheet No. 15(1A)
MOT/Sequence of Construction
Alignment Data Sheets
Right of Way Data Sheets
Roadside Development Sheet
Sheet No. 13(9)-13(10) Sign Details
Utility Relocation Plans - Notes (Cont.)
Utility Relocation Plans - Quantity Summary
Utility Relocation Plans - Profile Sheets
Drainage Summary Sheets
R
ICHMONDR
VIRGINIAIMPROVEMENTS
JAHNKE ROAD INDEX OF SHEETS
$FIL
EL
$
Technical
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
Administrative
Capital Project Administrator
Deputy Director for
Transportation / Public Works
Director of Public Works
DEPARTMENT OF PUBLIC WORKS
RICHMOND, VIRGINIA
CIP: 040-291-8949
CH2M HILL. INC.
CH2M HILL, INC.
CH2M HILL, INC.CHECKED BY:
DRAWN BY:
DESIGN BY: REVIEWED BY FIELD NOTES SCALE DATE
9/18/2018
DRAWING FILE NAME
D38633001A.dgn
DRAWING NO.
Typical Sections (Mainline)
97
96
94-95
93
91-92
90
88-89
86-87
85
84
83
82
81
79-80
77-78
1-76
Spruance Road North Cross Sections
Spruance Road South Cross Sections
Spruance Road South (2) Cross Sections
Byswick Drive Cross Sections
Leichester Road North Cross Sections
Leichester Road South Cross Sections
Boroughbridge Road Cross Sections
Blandy Avenue Cross Sections
Newell Road North Cross Sections
Newell Road South Cross Sections
Irby Drive North Cross Sections
Irby Drive South Cross Sections
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Sheet No.
Cross Sections2M Existing Tree Survey
Sheet No. 2M(1)-2M(3) SWPPP Sheets
Sheet No. 2N(1)-2N(9) Underdrain Plan Sheets
1B(1) - 1B(3)
2D(1)-2D(3)
2D(4)
2D(5)
Sheet No. 3A(1) Erosion and Sediment Control Notes
Sheet No. 2M(4) Pollution Prevention Plan Sheet
2L(1)
Sheet No. 2C Open Cut Trench Restoration Details
Sheet No. 14(5) Traffic Signal Plans - Fiber Optic Splice Detail "A"
REVISION DATA SHEET
SPECIAL DESIGN SECTION
DRAWING NO. A-14
REV. 9-23-93
VERT. 1"=25'
ICHMONDR
VIRGINIA
$FIL
EL
$
1C
RR
ICHMONDR
VIRGINIAIMPROVEMENTS
JAHNKE ROAD REVISION DATA SHEET
$FIL
EL
$
Technical
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
Administrative
Capital Project Administrator
Deputy Director for
Transportation / Public Works
Director of Public Works
DEPARTMENT OF PUBLIC WORKS
RICHMOND, VIRGINIA
CIP: 040-291-8949
CH2M HILL. INC.
CH2M HILL, INC.
CH2M HILL, INC.CHECKED BY:
DRAWN BY:
DESIGN BY: REVIEWED BY FIELD NOTES SCALE
NOT TO SCALE
NOT TO SCALE
DATE
9/20/2018
DRAWING FILE NAME
D38633001C.dgn
DRAWING NO.
Sheet 14(5): Removed VDOT Insertable Details from Sheet 14(5). Added FIBER OPTIC SPLICE DETAIL “A”.
S-4 located at Poles “D” and “E” for crossing Forestview School Drive only.
Removed the following items: Pedestrian Pushbutton cable for Cable Runs “G”, “I”,“J” and proposed Sign
controller installation, and Coaxial Cable with Category 5e Cable for Video Detection Camera communication.
following items: Construction Note 12 with Fiber Optic Splice and Fiber Optic Cable to Traffic Signal
which includes Mast Arm Pole, 15’’ Mast Arm, Signal Heads 3 and Video Detection Camera. Replaced the
Signal Head 1-Flashing Arrow, Luminaire Junction Boxes and Conduit, Disconnect Switch, Pole Legend “E”
Sheet 14(3):Updated reference to current VDOT Standard Sheets. Added the following items: Signal Head 6,
VDOT Standard Sheets.
Sheet 14(2): Updated Items, Quantities and Summary Notes to reflect revisions to Sheet 14(3) and current
Sheet 14(1): Updated General Notes to reflect revisions to Sheet 14(3) and current VDOT Standard Sheets.
Sheet 4: Added entrance call outs to two entrances along Newell Road (East direction).
Sheet 2J: Added Grading Diagram and Summary Sheet
Sheet 2H: Updated quantities and quantity items in both the incidental, pavement and ESC summary tables.
Sheet 2C(1): Added new plan sheet City of Richmond Detail (Open Cut Trench Restoration) for utility relocations.
Sheet 2B: Removed Grading Note # G-5 from General Notes Sheet.
on existing surfaces and overlaid with 2” of SM 9.5.
Sheet 2: Revised milling and overlay note under the pavement insert details to read 2” milling required
Sheet 1A: Updated Index of Sheets to reflect plan sheet adjustments described under this revision
R1 Date: Sept. 10, 2018 CIP: 040-291-8949
1'
13' 5'
SIDEWALK
2.25' 2.25'
69.5'
2 %2 %
Curb and Gutter
City Standard MonolithicCurb and Gutter
City Standard MonolithicP.G.L.
1'1'
See Insert No. 1
6'11'11'
St'd UD-4 Reqd. ** St'd UD-4 Reqd. **
locations of standard underdrains**NOTE: Please see plan sheets for detailed
TOSTATION STATION
P.G.L.
TOSTATION STATION locations of standard underdrains**NOTE: Please see plan sheets for detailed
1'
11'
1'
11' 16'
2 %
See Insert No. 1
St'd UD-4 Reqd. **St'd UD-4 Reqd. **
St'd. MS-2
2 %
St'd UD-2 Reqd. **
NOT TO SCALE
1
2 3
Insert No. 1
5
6
1
2
3
4
Surface - 1.5" Asphalt Concrete, Type SM - 9.5 @ 165 lb/ sq.yd.
4" Hydraulic Concrete Sidewalk
Base - 4" Asphalt Concrete, Type BM - 25.0
4
NOT TO SCALE
5
Insert No. 2
6
PRIVATE AND COMMERCIAL ENTRANCES
Aggr. 25 or 26
Asphalt Commercial
TYPE II
Concrete
Concrete Entrance Pavement
TYPE III
Asphalt
Crusher Run Aggr.
The type of entrance (I , II , III , IV) to be constructed
will be determined by the existing condition at thetime of construction.
TYPE IV
TYPE I
No. 21A or 21B
No. 21A or 21B
No. 21A or 21B
6" Crusher Run
7" HES
4" Aggr. Base Mat'l. Ty. I
Asphalt Conc. Type
4" Aggr. Base Mat'l. Ty. I
Asphalt Conc. Type
4" Asphalt Conc. Base Course
6" Aggr. Base Mat'l. Ty. I
(Not to Scale)
BM-25.0A
Right of
Way
Minim
um Req'd.
Right of
Way
Minim
um Req'd.
2" Asphalt Concrete, Type SM - 9.5D @ 220 lb/ sq.yd.
STD. CG-3 STD. CG-3
8' 8' 1'
5'6' 1'2.25'
SIDEWALK
2:1 Fill Slope
2:1 Cut Sl
ope
Right of
Way
Minim
um Req'd.
Curb and Gutter
City Standard Monolithic
8'8'3'
SHARED USE PATH
2.25'
Curb and Gutter
City Standard Monolithic
2:1 Fill Slop
e
2:1 Cut Slope
1'
See Insert No. 2
Right of
Way
Minim
um Req'd.
75.5'
13' 5'
SIDEWALK
2.25' 2.25'
63.5'
2 %2 %
Curb and Gutter
City Standard MonolithicCurb and Gutter
City Standard Monolithic
2:1 Fill Slop
e
2:1 Cut Slope
2:1 Fill Slope
2:1 Cut Sl
opeP.G.L.
1'1'
See Insert No. 1
5'
SIDEWALK
5' 5' 13'13'
St'd UD-4 Reqd. ** St'd UD-4 Reqd. **
locations of standard underdrains**NOTE: Please see plan sheets for detailed
TOSTATION STATION
Commercial Section
Right of
Way
Minim
um Req'd.
Right of
Way
Minim
um Req'd.
Subbase - 8" Aggregate Base Material, No. 21B
PAVEMENT DESIGN
61+08.03 71+25.58
1'Sawcut1' Sawcut
4" Aggregate Base Material, No. 21B
6
26+47.48 61+08.03
St'd UD-3 Reqd.
St'd UD-3 Reqd.
Exist. Pavement
2
18+50.00 26+47.48
2:1 Fill Slope
2:1 Cut Sl
ope
St'd UD-3 Reqd.
SHARED USE PATH
2:1 Fill Slop
e
2:1 Cut Slope
See Insert No. 2
St'd UD-3 Reqd.
8'8'3' 1'
STD. CG-3 STD. CG-3
BL
Construction
5'3'
TOSTATION STATION
P.G.L.
STD. CG-3STD. CG-3
BL
5' 3'
TO STATIONSTATION
52+74.4551+29.45
53+62.3046+62.1426+12.42
55+12.3048+11.64
27+62.42
SIDEWALK
2%
2%
2%
2%2%
2%2%
2:1
2:1
5' 4'1'
TOSTATION STATION
69+96.79 71+25.58
Exist. Pavement
BL
BL
BL
1' Sawcut 1'Sawcut
Travel lane
11'2'
Group 'A' Bike Lane
Travel lane
11' 2'
Group 'A' Bike Lane
Travel LaneTravel Lane Raised Median
Pavement Marking
Buffer and
Pavement Marking
Buffer and
Travel Lane Travel LaneContinuous Left Turn Lane
St'd UD-3 Reqd. St'd UD-3 Reqd.
Jahnke Road Construction
Jahnke Road Construction
Jahnke Road Construction
Construction
5%
2:1
4'
TOSTATION STATION
69+32.66 69+94.24
35.75'
Slab
Monolithic
TO STATIONSTATION
69+74.6069+17.65
Varies
BL
Construction
5%2:1
4'30.75'
Slab
Monolithic
Varies
BL
Construction
R
ICHMONDR
VIRGINIAIMPROVEMENTS
JAHNKE ROAD TYPICAL SECTIONS - MAINLINE
$FIL
EL
$
Technical
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
Administrative
Capital Project Administrator
Deputy Director for
Transportation / Public Works
Director of Public Works
DEPARTMENT OF PUBLIC WORKS
RICHMOND, VIRGINIA
CIP: 040-291-8949
CH2M HILL. INC.
CH2M HILL, INC.
CH2M HILL, INC.CHECKED BY:
DRAWN BY:
DESIGN BY: REVIEWED BY FIELD NOTES SCALE
NOT TO SCALE
NOT TO SCALE
DATE
9/18/2018
DRAWING FILE NAME
D38633002.dgn
DRAWING NO.
TYPICAL SECTIONST
CO
MM
O
NW
EAL H OV
RG
N
I
FI
IA
PR
O
E
FSSIONAL EN
G
NI
EE
R
Lic. No. 023201
SUSAN WITH
ENGINEER
Richmond, Virginia
CH2M
See plans for designated mill and overlay areas.
to be milled to a depth of 2" and overlayed with 2" of SM-9.5.
Existing asphalt pavements sections that are to be left in place are
2" SM-9.5A or SM-9.5 @ 220 Lbs. per S. Y. 1.5" SM-9.5 @ 165 Lbs. per S. Y.
GENERAL NOTES
2B
GRADING
The grade line denotes top of finished pavement unless shown otherwise G-1
on typical sections or plans.
G-3 Earthwork quantities on this project are based on anticipated settlement
only for quantities actually moved.
and may require adjusting during construction. Payment will be made
G-5
DRAINAGE
D-1
stations, special design bridges and storm sewer systems.
The horizontal location of all drainage structures shown on these plans
is approximate only, with the exception of structures showing specific
D-2 The horizontal location and invert elevations shown for proposed culverts
and storm sewer outfall pipes are based on existing survey data and
required design criteria. If during construction, it is found that the
from the horizontal location or elevations of the stream or swale in
which the culvert or storm sewer outfall pipe is to be placed, the
Engineer shall confer with, and get approval from, the applicable District
Drainage Engineer before installing the culvert or storm sewer outfall pipe.
horizontal location or invert elevations shown on the plans differ significantly
D-3
purposes and are based on the proposed invert elevations shown forthe structure and the anticipated top (rim) elevation based on existing
and the "L.F. " dimensions shown for manholes are for estimating
or proposed finished grade. The actual "H" or "L.F. " dimensions are
to be determined by the contractor from field conditions.
The "H" dimensions shown on plans for drop inlets and junction boxes
D-12 All existing drainage facilities labeled "To Be Abandoned" shall be left in
place, backfilled and plugged in accordance with the VDOT Road and
Bridge Standard PP-1. Basis of Payment will be C.Y. of Flowable Backfill.
D-13 Existing drainage facilities being utilized as a part of the drainage system,
and designated on the plans "To Be Cleaned Out" shall be cleaned as
directed by the Engineer. The cost incidental to this shall be included in
the contract price for other items.
D-15 Where the plans specify the installation of standard curb drop inlets
Standard Drop Inlets (as shown in the VDOT Road and Bridge Standards)
D-17 St'd. SL-1 Safety Slab locations are based on the assumed use of precast
structures. If cast-in-place structures are utilized, and the interior chamber
PAVEMENT
P-2 The pavement materials on this project will be paid for on a tonnage basis.
The weight will vary in accordance with the specific gravity of the
aggregates and the asphaltic content of the mix actually used to secure
the design depth. The weight of the asphalt concrete is based on 95%
of the theoretical maximum density.
INCIDENTALS
Two Reflectorized Railroad Grade Crossing Crossbuck Signs, complete with I-1
posts, SHALL BE FURNISHED AND ERECTED BY THE RAILROAD COMPANY.
I-5 That portion of the right of way lying within the Clear Zone or within a
minimum of 10 feet from the edge of pavement or surfacing or within
the limits of the construction slopes beyond 10 feet, shall be cleared and
Section 301, where sufficient right of way or construction easement is provided.
grubbed in accordance with the applicable VDOT Road and Bridge Specifications,
I-6
the Engineer.
Certain trees shall be preserved as noted on plans or as directed by
Clearing and grubbing shall be confined to those areas needed for con-
struction. No trees or shrubs in ungraded areas shall be cut without
I-8A
I-9
shall be constructed in the same location as the existing entrance.
When no centerline alignment is shown for a proposed entrance, the entrance
I-12 St'd. RM-2 right of way monuments shall be set by the Contractor.
I-16 The "underground utilities" survey data on this project has been provided
by consultant and copies are available from the Department.
I-17 For method of constructing Straight-Line Taper Lanes in curb and/or
All pavement markings and traffic flow arrows shown on the roadway con-
struction plans are schematic only. The actual location and application
I-18
VDOT Road and Bridge Specifications, MUTCD, sequence of construction/
of pavement markings shall be in accordance with Section 704 of the applicable
I-19
If questions or problems arise during construction, please contact the
Project Designer. DO NOT CONTACT THE OUTSIDE SOURCES.
EROSION AND SEDIMENT CONTROL (ESC)
E-2
G-4 The cost of removal of all existing concrete items located in the area to be
graded, including, but not limited to the following, shall be included in the price
bid for regular excavation: Combination curb and gutter, curb, sidewalk.
The following sources, under contract with the City of Richmond, have provided information on this project:
Roadway Design:
Hydraulic Design:
Utility Design:
Utility Designation: NXL, INC.
Survey:
Utility Location:
Bridge Design:
NXL, INC.
NXL, INC.
adjacent to the City of Richmond Standard Curb and Gutter, the
shall be modified in accordance with details shown on sheet number 2A.
These drop inlets shall be considered and paid for as Standard Drop
Inlets for the type specified.
VDOT Road and Bridge Specifications.
of brush shall be in accordance with Section 109 of the applicable
or required by the Engineer, the cost of removal and disposal
If the removal of Brush Silt Barrier is specified by the plans
VDOT Road and Bridge Specifications.
shall be in accordance with Section 203 and Section 414 of the applicable
Rock for Check Dams, Inlet Protection, Erosion Control Stone and Riprap
E-1
DRAINAGE (CONT.)
D-14
D-4
Section 303 of the applicable VDOT Road and Bridge Specifications.
drainage structure will be measured and paid for in accordance with
below the original ground necessary for the installation of the permanent
shall be included in the unit price bid for regular excavation. Excavation
for installation of permanent drainage structure and the cost of backfill
drainage facility, the cost of removing the fill above the original ground
structure placed. The cost of installing and removing the temporary
permanent drainage structure is to reside shall be removed and the
installed. When directed by the Engineer, that part of the fill where the
and displace all soft materials. Any necessary temporary drainage shall be
At Stations 69+26 and 69+83, the fill shall be placed and allowed to settle
Standard Drop Inlets for the type specified.
in the VDOT Road and Bridge Standards shall be considered and paid for as
Proposed drop inlets with a height (H) less than the standard minimum shown
slabs shall not be installed.
dimensions (length and width, or diameter) are less than 4 feet, the safety
traffic control plans, pavement marking plan and as directed by the Engineer.
curb and gutter sections, see typical details.
the permission of the Engineer.
.pdf files and MicroStation format (.dgn) files. Only the .pdf files will be
considered as part of the official plan assembly.
I-21
The MicroStation format (.dgn) files are furnished only as information for the
contractor. These plans are developed in layers (levels) to aid in readability.
However, the construction items may or may not be in the proper layering
scheme as described in the VDOT CADD Manual. The MicroStation files
will only match the scanned files if all levels are turned on. A MicroStation
Software license is required to be able to read these files.
All electronic plan assemblies will include the construction plans in two formats:
R
ICHMONDR
VIRGINIAIMPROVEMENTS
JAHNKE ROAD GENERAL NOTES
$FIL
EL
$
Technical
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
Administrative
Capital Project Administrator
Deputy Director for
Transportation / Public Works
Director of Public Works
DEPARTMENT OF PUBLIC WORKS
RICHMOND, VIRGINIA
CIP: 040-291-8949
CH2M HILL. INC.
CH2M HILL, INC.
CH2M HILL, INC.CHECKED BY:
DRAWN BY:
DESIGN BY: REVIEWED BY FIELD NOTES SCALE
NOT TO SCALE
NOT TO SCALE
DATE
9/18/2018
DRAWING FILE NAME
D38633002B.dgn
DRAWING NO.
approved by the Materials Engineer.
The borrow material for this project shall be a minimum CBR 13 or as
N/A
Landscape Design:Traffic Design:
CH2M
CH2M CH2M
CH2M SNEAD ASSOCIATES
D-16 When curb and gutter is specified on a radius (such as at a street inter-
section), the Engineer may approve a decrease in the cross slope of the
gutter to facilitate proper drainage.
E-3 The following symbols are used to depict Erosion Control items in the
plan assembly:
DD
TC-1
TDC
TC-P
RCD-1
RCD-2
Denotes Temporary Diversion Channel, St'd EC-12
Denotes Temporary Diversion Dike, St'd EC-9
Denotes Turbidity Curtain, Type - Impervious
Denotes Turbidity Curtain, Type - Pervious
Denotes Rock Check Dam, Type I; St'd EC-4
Denotes Rock Check Dam, Type II; St'd EC-4
IP-A
IP-B
Denotes Inlet Protection, Type A; St'd EC-6
Denotes Inlet Protection, Type B; St'd EC-6
EC-2, Ty. 1
EC-2, Ty. 3
EC-2, Ty. 2
Denotes Rolled Erosion Control Product, Permanent, St'd. EC-3 Type 1, 2 or 3
Denotes Rolled Erosion Control Product, Temporary, St'd. EC-2 Type 1, 2, 3 or 4
EC-2, Ty. 4
EC-3, Ty. 2 EC-3, Ty. 1
EC-3, Ty. 3
Denotes Temporary Silt Fence, St'd EC-5 Type A or BTSF-A TSF-B
TSI Denotes Slope Interrupter; St'd EC-15
D-7
thickness, or class designation; available sizes; height of cover limitations;
the applicable sections of the VDOT Road and Bridge Standards PC-1.
and other restrictions for a particular pipe type or height cover, see
All pipe on this project shall be concrete. For strength, sheet
Plastic. See detail sheet 2D(5) for location.
Corrugated storage pipes for underground detention may be RCP or
*
*
R
ICHMONDR
VIRGINIAIMPROVEMENTS
JAHNKE ROAD
$FIL
EL
$
Technical
Director of Public Works
DEPARTMENT OF PUBLIC WORKS
RICHMOND, VIRGINIA
CIP: 040-291-8949
DRAWN BY:
DESIGN BY:NOT TO SCALE
NOT TO SCALE
DRAWING FILE NAME
ENGINEER
Richmond, Virginia
CH2M
OPEN CUT TRENCH RESTORATION DETAILS
CITY OF RICHMOND
2CD38633002C1.dgn
OPEN CUT TRENCH RESTORATION DETAILS
construction traffic will run on pavement base course.
are relocated and placement of the 8" BM-25 Asphalt Concrete and milling. During
placed during Phase V of the MOT and Sequence of Construction plans after all utilities
Final surface course of proposed pavement (1.5" Asphalt Concrete, Type SM-9.5) to be 2.
under existing roadway pavement. See plan sheets 15(1) through 15(25) for utility relocations.
City of Richmond Details pavement restoration for the open cut utility relocations that occur 1.
Notes:
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
Administrative
Capital Project Administrator
Deputy Director for
Transportation / Public Works
CH2M HILL. INC.
CH2M HILL, INC.
CH2M HILL, INC.CHECKED BY:
REVIEWED BY FIELD NOTES SCALE DATE
9/18/2018
DRAWING NO.
T
CO
MM
O
NW
EAL H OV
RG
N
I
F
IIA
PR
O
E
F
SSIONAL EN
G
NI
EE
R
Lic. No. 023201
SUSAN WITH
ICHMONDR
VIRGINIA
$FIL
EL
$
2H
RR
ICHMONDR
VIRGINIAIMPROVEMENTS
JAHNKE ROAD PAVEMENT & INCIDENTAL SUMMARY
$FIL
EL
$
Technical
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
Administrative
Capital Project Administrator
Deputy Director for
Transportation / Public Works
Director of Public Works
DEPARTMENT OF PUBLIC WORKS
RICHMOND, VIRGINIA
CIP: 040-291-8949
CH2M HILL. INC.
CH2M HILL, INC.
CH2M HILL, INC.CHECKED BY:
DRAWN BY:
DESIGN BY: REVIEWED BY FIELD NOTES SCALE DATE
9/20/2018
DRAWING FILE NAME
D38633002H.dgn
DRAWING NO.
*Note: Not a Pay Item
Excavation
Min
or Str
ucture
C. Y.C. Y.C. Y.C. Y.C. Y.C. Y.
Cut FillFillCut
Fill
Total
C. Y.
Entr
ances
Material
Unsuitable
Subgrade
Below
Subgrade
Above
C. Y.
Cut -
Ditches
Fill -
Ditches
Sections
in Fill
Root Mat
Sections
in Cut
Root Mat
Cut
Roadway
Pave
ment
De
molition of
Location
TOTALS
quantities.
Denotes Surplus Material .
included in Regular Excavation quantities.
Denotes C. Y. root mat material in cut areas which is
fill with Regular Excavation and/or Borrow Excavation )
tions and backfilled with (specify material ) (Back-
Denotes C. Y. root mat material removed from fill sec-
Denotes C. Y. Regular Excavation from private entrances.
Denotes C. Y. fill for private entrances.
backfilled with (specify mat'l. )
"Demolition of Pavement" from fill sections and
Denotes C. Y. existing pavement to be removed as
limits and is not included in the Regular Excavation
Demolition of Pavement in cut sections within construction
Denotes C. Y. existing pavement to be removed as
Denotes C. Y. fill for drainage ditches.
C. Y. C. Y. C. Y. C. Y. C. Y. C. Y. C. Y. C. Y.
of mat'l. not compacted. )
Denotes C. Y. Haul . (Haul Material shown will be C. Y.
Fill
Roadway
Excavation
Regular
Total
Denotes C. Y. of excavation of unsuitable mat'l. below
subgrade and backfilled with (specify material )
Denotes C. Y. Minor Structure Excavation.
Denotes C. Y. unsuitable material above subgrade which
is included in Regular Excavation.
FORMULAS C D E F G H I J K L M N O P Q R S
Denotes Borrow Material (Min. CBR, specify)
ditches.
Denotes C. Y. Regular Excavation from drainage
cross-sections.
Denotes fill quantity from computer listings and/or manual
pavement.
cross-sections. Quantity adjusted for demolition of
Denotes cut quantity from computer listings and/or manual
the actual quantity of embankment material needed to complete this project.
will be made in pay quantities for this factor. The contractor shall determine
of the shrinkage or swell factor of the embankment material, and no adjustment
swell factors. The contractor will be responsible for determining the effect
The embankment quantity shown has not been adjusted for shrinkage or
10
15
20
25
30
35
40
45
50
55
60 65
70
75
80
Newell
Rd.
Spruance Rd.
Spruance Rd.
Bla
ndy Ave.
New
ell Rd.
Spruance R
d.
Irby Dr.
Irby Dr.
Faye St.
Bys
wic
k Lane
Leic
ester Rd.
Leicester Rd.
Boroughbrid
ge Rd.
Clarence St.
Forest Hill Ave.
Bla
kemaore Rd.
Oakhurst
Ln.
26
83
9
96
28
162
78
102
98
6
4468
3
11
0
10
3
3
4
24
15
45
5573
C. Y.
Boroughbridge
Leichester
Byswick
Faye
Irby
Forestview
Oakhurst
Spruance
Blandy
Newell
Jahnke Rd.
3
12
0
1
1
29
9
2
3
6
159
3
3
0
3
3
1
5
14
19
24
1555 30011
39
86
9
99
31
163
83
116
117
30
6034
6
14
0
13
6
4
9
38
34
69
7428 2013
201376216807569116302255156 11 300
R
ICHMONDR
VIRGINIAIMPROVEMENTS
JAHNKE ROAD GRADING DIAGRAM
$FIL
EL
$
Technical
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
Administrative
Capital Project Administrator
Deputy Director for
Transportation / Public Works
Director of Public Works
DEPARTMENT OF PUBLIC WORKS
RICHMOND, VIRGINIA
CIP: 040-291-8949
CH2M HILL. INC.
CH2M HILL, INC.
CH2M HILL, INC.CHECKED BY:
DRAWN BY:
DESIGN BY: REVIEWED BY FIELD NOTES SCALE DATE
9/18/2018
DRAWING FILE NAME
D38633002Jgn
DRAWING NO.
Str
ucture
Manage
ment
Stor
mwater
482
482
ment
Embank-
2258
2189
69School
Dr.
Forestvie
w
Fill
Fill
Cut
Cut
4468
5573
159
1555
C 11
F 300482
CUT=6
FILL=45
CU
T=9
8FIL
L=15
CU
T=102
FIL
L=2
4
FIL
L=4
CU
T=7
8
CUT=102
FILL
=4
FIL
L=3
CU
T=162
CUT=2
8
FIL
L=3
CU
T=9
6
FIL
L=10
CU
T=9
CU
T=8
3
FIL
L=11
CU
T=2
6
FIL
L=3
6
24
3
19
2
14
9
5
2
14
29
1 1
3
1
3 12
3
3
3
448
F
Fill130
130 Cut
C
448
448
GRADING DIAGRAM AND SUMMARY
Denotes C. Y. fill for S. W. M. (Stormwater Management Structure)
Denotes C. Y. cut from S. W. M. (Stormwater Management Structure)
Gravel Drive
2.5' C
&
G0.5' Cur
b
Gravel Drive
Asphalt Drive
0.5' C
urb
Asphalt
2.5' C & G
0.5' Curb
Asphalt
Asphalt
2.5' C & G
0.5' Curb
0.5'
Curb
Asphalt Drive
Asphalt Drive
Asphalt
Asphalt
Asphalt
N
E
W
E
L L R
O
A
D
N E
W
E
L L R
O A D
Asphalt
Asphalt
J A H N K E R O A D
2.5'
C
&
G
Asphalt
Asphalt
Conc. Apron
Conc. Apron
Conc. ApronConc. Apron
Asphalt
Conc. A
pron
Asphalt
Asphalt Drive
Shrubs
Gravel
Ditch
Inv. Out = 235.98'
Inv. In = 236.01'
15" CMP
In Pl. 26' x
Shr
ubs
3' Wood F
ence
12" Twin Spruce1" Cedar12" Oak
Asph.
Con
c. Sidew
alk
Timber Boarders
Inv. Out = 235.45'
Inv. In = 236.29'
12" RCP
In Pl. 17' x
Inv. Out = 232.54'
Inv. In = 232.94'
12" RCP
In Pl. 17' x
Inv. Out = 234.80'
Inv. In = 235.06'
12" CIP
In Pl. 7' x
Inv. Out = 233.43'
Inv. In = 234.15'
12" RCP
In Pl.
21' x
Inv. O
ut
= 238.3
6'
Inv. In =
238.6
2'
12"
CIP
In Pl. 21' x
Inv. O
ut
= 238.7
5'
Inv. In =
238.7
5'
12"
CIP
In Pl. 20' x
Inv. O
ut
= 238.8
7'
Inv. In =
239.0
3'
12"
CIP
In Pl. 21' x
Asphalt Sidewalk
Metal Sign
Grass
Conc.
Wood Fence
1 Sty. Brick
Dec
k
Woo
d
Conc.
Conc.
Conc.Conc.
Conc.
Asphalt
Grass
Grass
Ornamental
20"
Ornamental
22"
Pine
24"
Conc.
6' Wood
Fenc
e
Grass
Shrubs
6'
Wood Fence
Conc.
Grass
Grass Grass
Trailer
16
17
18S76°09'23"E
Route 686 Survey CenterlineIRF
IRF
IRF
IRF
IRF
IRF (Dist
urbed)
IRF
11.15'
63.24'
56.98' 59.2
9'
14.98'
5.16'
154.45'
Conc. Sidewalk
Air Pump
Ditch
Ditch
4' Chain Link Fence
Wood Sig
n
Metal Sig
n
Grass
Trashcan
6" Crepe Myrtle
& Shrubs
Mixed Trees
Wells, Valves, & MH's
Gas Station
Alu
m. A
wnin
g
"Citgo Gas Station"
#6101
1 Sty. Block
Carport
Alu
m.
Conc. Sid
ewalk
Conc. Sid
ewalk Metal
Gate
24" Pine
#12
07
1 Sty. B
rick
M
Conc.
ShedWood
M
#60241 Sty. Brick
Asphalt Sidewalk
40" Oak
Mulch Bed&
Timbers
Wheel Stops
Asphalt Sidewalk
"Sunny Day Daycare"
#60111 Sty. Vinyl
6' Wood Fence
24" Oak
PI 18
+93.9
2
19 20
21
22
(N34°5
0'5
0"E 19
4.3
0')
(N10°5
6'0
0"E)
(R = 3810.00')
(L = 193.67')
Ex. 16' Alley Ea
sement
(L = 5
4.11')
(R = 2
5.00')
(L = 132.93')
(R = 3730.00')
(L = 84.03')(R = 3730.00')
(S17°2
6'5
6"W 16
3.9
5')
(S34°5
8'5
6"W 17
2.0
6')
(S72°33'04"E 111.00')
(14.8
9')
(15.4
9')
(15.71')
(15.9
9')
(L = 158.54')
(R = 3795.00')
Existing R/
W
Existing R/
W
Existing R/
W
Existing R/W
PL
PL
PL
PL
PL
(L = 2
5.32')
(R = 2
5.00')
(L = 42.48')
(R = 3730.00')
Ex. 8'
Alley Ease
ment
(3.15')
PL
PL Existing R/
W
+22.115
+74.641
+86.651 +70.
408
+57.334
+6.905
+1.095
PL
Clearance = 19.11'
Clearance = 13.44'
Clearance = 18.98'Clearance = 18.21'
Clearance = 22.73'
Clearance = 22.82'
Clearan
ce = 10.33'
WM
WV
FH
WV
WV
WM
WM w/ BOV
WV
WM
WMWM
WM
WM
Physical
Verifica
tion.
Nothing
Leaves M
H On East
Wall.
TMH #292
4
Tele. HandholeTele. Pedestal
EOI
OV
H
E
OV
H
E
OV
H
E
OVH E
OVH E
OV
H
E
OV
H
E
LP
TB
TB
OVH E
OV
H
E
OVH E
OV
H
E
OVH EOVH E
OVH E
OV
H
EOV
H
E
S
S
U
LPSpigot
EOI
EOI
EOI
EOI
EOI
EOI
T T
FO @ Drop
EOI
FO @ Drop
FO
T
CATV @ DropElec. @ Drop
EOI
EOI
Old 8" CI
Gas Laid
Above
New 4" (P
E)
Note:
OVH
E
OVH E
GT
GT
GTGT
GT
JRCC MANAGEMENT LLC
INST. #200740423
C0050508026
1.58 Ac.
UNCLE PROPERTIES LLC
INST. #200811973
C0050542010
1.06 Ac.
R. DONALD CALLAHAN
DB 135 PG 1593
C0050508022
(No Recorded Acreage)
MARIAN W. HOWARD
DB 112 PG 817
C0050508024
(No Recorded Acreage)
& MARGARET W. STAFFORDGLENN W. STAFFORD JR.
DB 180 PG 1732
C0050544032
(No Recorded Acreage)
ESTATE OF WILLIE FARRAR
JAHNKE ROAD BAPTIST CHURCH
C0050578036
1.25 Ac.
AFTERCARE PROGRAM LLCFLAMINGO BEFORE AND
C0050578038INST. #2010-23150
(No Recorded Acreage)
& UNION FIRST MARKET BANKSHORT W. SPILMAN, JR.
DB 833 PG 329INST. #2011-837
C0050544002
(No Recorded Acreage)
22
23
24
25
26
27 2
8
29
4-14-2
4-3
4-4
4-5
4-6
4-7
4-8 4-9
4-10
4-11
4-12
4-13
4-14
4-16 4-174-18 4-19
3
3
1
1
4
5
Ent. R
eq'd. (W
=30')
St'd.
CG-11 Ty. III
Ent. R
eq'd. (W
=30')
St'd.
CG-11 Ty. III
Ent. R
eq'd. (W
=50')
St'd.
CG-11 Ty. III
Ent. R
eq'd. (W
=35')
St'd.
CG-11 Ty. III
Ent. R
eq'd. (W
=35')
St'd.
CG-11 Ty. III Ent. R
eq'd. (W
=36')
St'd.
CG-11 Ty. III
C FF C
6
6
6
6
63 6 10
66
3
66
3
10
3 6 1 66 6
FC
7
C
FC
C
FF
F
F
FC
CC
C
F
C
C
C C
C
Sta. 28+11.79 Lt.
Ent. R
eq'd. (
W=2
0')
St'd.
CG-11 Ty. III
Sta. 28+9
5.3
6 Lt.
Ent. R
eq'd. (
W=12')
St'd.
CG-9
D
Ty. III
4-21
+12.42
3.00'
(TB
R)
(TB
R)
4-20
4-15
Existing Sign
Do Not Disturb
Existing Sign
Do Not Disturb
Existing Sign
Do Not Disturb
PC 25+6
7.7
8
26
PI
12POT 12+00.00
POT 12+00.00
Delta = 5
7° 48' 3
3.48" Lt.
P.O.T. Sta. 2
5+56.85 Jahnke R
oad Const. B
P.I. Sta. 10
+00.00 New
ell Road Const. LB
L
Delta = 10
7° 2
6' 18.60" Rt.
P.O.T. Sta. 2
5+5
2.39 Jahn
ke R
oad Const. B
P.I. S
ta. 10
+00.00
New
ell Roa
d Const. LB
L
New
ell Rd. Const. BL
Newell R
d.
Const. B L
BJahnke Rd. Const. L
Sta. 10+23.63
Beg. Const.
Sta. 11+56.00
End Const.
Sta. 10+20.90
Beg. Const.
3.00"
+12.42
Sta. 11+01.00
End Const.
Exist. Parking
Do Not Disturb
10
34-22
6
6
Ent. R
eq'd. (W
=40')
St'd.
CG-11 Ty. III
4-23
4
3
3
Ent. Req'd. (W=50')
ST'd. CG-9D Ty. IIIType III Entr. Req'd.St'd. PE-1 Req'd.
11
12POT 12+00.00
11
12POT 12+00.00
4-2 4-3
4-5
4-6
4-7
4-8
4-9
4-10
4-11
4-12
4-4
4-13
4-2A
4-14
15"
15"
15"
30"
30"
21"
21"
30"
15"
15"15"
15"
15"
+91.11
31.75'
+97.91
31.75'
+62.5
5
20.6
2'
+00.00
45.00'
+44.22
52.00'
006
007
009
011
010
005
PR
OP.
R/
W
+50.5
0
30.0
0'
+45.00
44.00'
+30.00
34.00'
+30.00
29.71'
+61.00
30.0
0'
+61.00
32.0
0'
+72.0
0
32.0
0'
+03.00
52.00'
+32.00
49.00'
+09.62
35.03'
+35.77
52.2
2'
2
2
2
2
22
2
21
3
1
1
R=34.75'
4
4
4
D700
D701
+19.00
98.50'
+19.00
70.50'
+70.00
67.00'
+00.25
98.25'
+00.00
52.00'
*
+00.25
51.99' *
+70.00
48.84'
*
* * *5
3
+32.57
48.14'
+11.06
49.55'
+90.56
50.34'
+76.10
52.61'+25.08
55.00'
+18.53
30.00'
+65.04
30.00'
+22.00
31.75'
+22.00
41.00'
+43.00
31.75'
+43.00
41.00'
+90.89
31.75'
+64.9
0
40.4
1'
+65.0
0
40.0
0'
+79.0
0
20.8
2'
+19.00
31.75'
+19.00
47.00'
+39.00
31.75'
+39.00
47.00'
+19.00
41.00'
+39.00
41.00'
+22.00
41.00'
+43.00
41.00'
+92.68
41.00'
3 2
+82.33
41.85'
+51.35
45.86'
+18.00
48.72'
+18.00
41.00'
+47.29
41.00'
+47.29
48.98'
+33.48
44.00'
+35.63
31.78'+21.64
44.00'
109
Denotes Construction Limits in Cuts
Denotes Construction Limits in Fills
C
F
0
SCALE
25' 50'
REFERENCES
( PROFILES, DETAIL & DRAINAGE
DESCRIPTION SHEETS, ETC. )
Matc
h Lin
e Station 22
+00.0
0 Sheet 3
Matc
h Lin
e Station 29+0
0.0
0 Sheet 5
PI = 27+82.20
Curve ALT2-2
T = 214.43'
L = 428.40'
R = 3,800.00'
25+67.78PC =
29+96.18
Note : Figures in brackets and dot - dashed linesdenote Permanent Easements.
Note : Figures in parenthesis and dot - dot - dashedlines denote Temporary Easements.Denotes Full Depth Pavement
Denotes Pavement to be Demolished
Denotes Exist. Pavement to be Milled and Overlayed
4
X-X Radial Offset Identifier& ROSEMARIE B. WEST
JAMES W. WEST JR
DB 368 PG 157
C0050542008
0.46 Ac.
004
ESTATE OF WILLIE FARRARINST. #9900367
C0050544030
(No Recorded Acreage)
012
E = Normal Crown
V = 40 mph
PT =
Proposed Temporary Construction Slope Easement
Proposed Right of Way
And Maintenance Of Proposed Drainage Structures.
Proposed Permanent Easement For The Installation3
2
1
23'
20'
20'
12'
19.5'
19.5'
City of Richmond St'd. Comb. Curb & Gutter
City of Richmond St'd. Curb
Hydraulic Cement Conc. Sidewalk 4" Req'd.
8' Asphalt Path
Median Strip St'd. MS-2 Req'd.
ST'D. CG-12, Type B Ramp and Detectable Warning Surface Req'd.
Median Strip St'd. MS-1A Req'd.
ST'D. CG-12, Type C Ramp and Detectable Warning Surface Req'd
1
2
3
4
5
6
7
10
11
(TBR) Denotes Exist. Drain. Structures To Be Removed
And Maintenance Of Proposed Utilities.
Proposed Permanent Easement For The Installation4
Proposed Temporary Construction Easement for Entrance**5
006
008
ST'D. CG-12, Type A Ramp and Detectable Warning Surface Req'd
4
See Note 1
Gas Station canopy not to be disturbed.
Verizon passes around the canopy.
station canopy and Utility Easement for
for Dominion passes thru the gas
For Parcel 005, Utility Easement
Note 1:
Underdrain
Radial Offset Data
Utility Owners
Pavement Markings
Entrance Profiles
Connection Profiles
Jahnke Road Profile
Sh. 2N(2)
Sh. 1G
Sh. 3
Sh. 13(1)
Sh. 5B
Sh. 4A
Sh. 4A
Drainage Desc. Sh. 2D(1)
R
ICHMONDR
VIRGINIAIMPROVEMENTS
JAHNKE ROADDRAWING NO. O-28396
PLAN VIEW
$FIL
EL
$
Technical
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
Administrative
Capital Project Administrator
Deputy Director for
Transportation / Public Works
Director of Public Works
DEPARTMENT OF PUBLIC WORKS
RICHMOND, VIRGINIA
CIP: 040-291-8949
CH2M HILL. INC.
CH2M HILL, INC.
CH2M HILL, INC.CHECKED BY:
DRAWN BY:
DESIGN BY: REVIEWED BY FIELD NOTES SCALE
HORIZ. 1"=25'
DATE
6/10/11
DRAWING FILE NAME
D38633004.dgn
SHEET NO.
T
CO
MM
O
NW
EAL H OV
RG
N
I
FI
IA
PR
O
E
FSSIONAL EN
G
NI
EE
R
Lic. No. 023201
SUSAN WITH
ENGINEER
Richmond, Virginia
CH2M
GENERAL NOTES
ICHMONDR
VIRGINIA
IMPROVEMENTS
JAHNKE ROAD
$FIL
EL
$
14(1)
R
Technical
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
Administrative
Capital Project Administrator
Deputy Director for
Transportation / Public Works
Director of Public Works
DEPARTMENT OF PUBLIC WORKS
RICHMOND, VIRGINIA
CH2M HILL. INC.
CH2M HILL, INC.
CH2M HILL, INC.CHECKED BY:
DRAWN BY:
DESIGN BY: REVIEWED BY FIELD NOTES SCALE DATE
9/18/2018
DRAWING FILE NAME DRAWING NO.
N.T.S.
SIGNALIZATION GENERAL NOTES
FOREST VIEW SCHOOL DRIVE -
TRAFFIC SIGNAL PLANS - JAHNKE AND
CIP: 040-291-8949
T39633001401.dgn
T
CO
MM
O
NW
EAL H OV
RG
N
I
FI
IA
PR
O
E
FSSIONAL EN
G
NI
EE
R
Lic. No. 023201
SUSAN WITH
ENGINEER
Richmond, Virginia
CH2M
33.
32.
31.
30.
29.
28.
27.
26.
25.
24.
23.
22.
21.
20.
19.
18.
17.
16.
15.
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
THE CITY OF RICHMOND STANDARDS (RUGGEDCOM).
THE FIBER OPTIC CABLE COMMUNICATION SWITCH AND OTHER APPURTENANCES SHALL BE FULLY COMPATIBLE WITH
CONDUCTED BY A CERTIFIED FIBER OPTIC TECHNICIAN (CFOT).
48 HRS. IN ADVANCE OF THE FIBER OPTIC SPLICE. THE SPLICING OF THE FIBER OPTIC CABLE SHALL BE
CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO THE CITY OF RICHMOND TRAFFIC ENGINEERING OFFICE
THE NEW TRAFFIC SIGNAL CABINET TO THE TRUNK FIBER OPTIC CABLE.
CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING AND REINSTALLING THE FIBER OPTIC DROP CABLE FROM
THE SIGNALIZED INTERSECTION SHALL NOT BE OFF-LINE FOR MORE THAN FORTY-EIGHT (48) HOURS.
SEE SHEET 13(8) FOR GENERAL NOTES RELATED TO SIGNING AND PAVEMENT MARKINGS.
SPECIFICATIONS FOR THE VIDEO DETECTION CAMERA ARE INCLUDED IN THE BID PLANS.
ON THE PLAN.
THE CONTRACTOR IS RESPONSIBLE FOR CONNECTING THE POWER FROM IT'S SOURCE TO THE CONTROLLER CABINET AS SHOWN
FOR THE ELECTRICAL SERVICE THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING VIRGINIA POWER 4 WEEKS IN ADVANCE.
THE VIDEO DETECTION CAMERAS AND EQUIPMENT INSTALLED SHALL BE IN COMPLIANCE WITH THE SPECIFICATIONS.
BY THE CITY.
MAINTENANCE OF PERMANENT SIGNALIZATION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR UNTIL FINAL ACCEPTANCE
MAST ARM SIGNS SHALL BE INSTALLED IN ACCORDANCE WITH VDOT ST'D. SMD-2.
ALL CONDUIT RISERS FOR ELECTRICAL SERVICE SHALL BE 2" DIA. MINIMUM.
PEDESTRIAN SIGNAL HEADS SHALL BE MOUNTED IN ACCORDANCE WITH VDOT ST'D. SMB-3 AND PAINTED FLAT BLACK.
PEDESTRIAN SIGNAL HEADS SHALL BE IN ACCORDANCE WITH VDOT ST'D. SP-8 (COUNTDOWN) WITH L.E.D. LAMPS.
A #8 BARE SYSTEM BOND WIRE IS REQUIRED IN ALL NON-METALLIC CONDUIT.
(S) DENOTES CABLE TO BE SHIELDED.
SHALL BE CAPPED IN THE EXISTING JUNCTION BOXES AND MANHOLES.
EXISTING CONDUIT SYSTEMS THAT WILL NOT BE REUSED SHALL BE ABANDONED IN PLACE. CABLE SHALL BE CUT AND CONDUIT
CONDUIT SPACERS SHALL BE USED TO PROVIDE ADEQUATE SEPARATION.
ALL PROPOSED CONDUITS SHALL BE INSTALLED IN A COMMON TRENCH, WHERE FEASIBLE. STANDARD MANUFACTURER'S
ALL UNDERGROUND CONDUIT SHALL BE INSTALLED IN ACCORDANCE WITH VDOT ST'D. ECI-1, ECI-2 OR DIRECTIONALLY BORED.
STRIP AROUND PERIMETER OF BACKPLATE.
TUNNEL VISORS SHALL BE PAINTED YELLOW AND BACKPLATES SHALL BE ALUMINUM BLACK POWDER COATED AND WITH RETRO-REFLECTIVE
AND BACKPLATES.
ALL SIGNAL HEADS SHALL BE MOUNTED IN ACCORDANCE WITH VDOT ST'D SM-3, AND SHALL BE EQUIPPED WITH TUNNEL VISORS
ALL TRAFFIC SIGNAL HEAD SECTIONS SHALL BE 12", PAINTED YELLOW, AND SHALL BE LIGHT EMITTING DIODE (LED).
PLACED ON J-HOOKS.
ALL JUNCTION BOXES SHALL BE VDOT ST'D. JB-S2 UNLESS OTHERWISE NOTED. SPLICES IN ALL JUNCTION BOXES SHALL BE
THE TRAFFIC SIGNAL CABINET SHALL BE P-SIZE NEMA TS-2 OR APPROVED EQUIVALENT CAPABLE OF HANDLING VIDEO DETECTION EQUIPMENT.
COMPONENTS, SHALL MEET ALL REQUIRMENTS AND COMPATIBLE WITH THE NEW CITY OF RICHMOND'S SIGNAL SYSTEM SOFTWARE (CENTRACS).
SYSTEM SOFTWARE (CENTRACS). THE PROPOSED TRAFFIC SIGNAL CONTROLLER PROGRAMMING, FOR HARDWARE AND SOFTWARE
THE PROPOSED TRAFFIC SIGNAL CONTROLLER SHALL BE 100% COMPATIBLE WITH THE NEW CITY OF RICHMOND'S SIGNAL
VDOT ROAD AND BRIDGE SPECIFICATIONS.
THE MATERIALS AND CONSTRUCTION FOR THE CONTROLLER CABINET SHALL BE IN ACCORDANCE WITH SECTION 703 OF THE
THE CENTER OF THE SIGNAL HEAD AND SIGNS.
ALL MEASUREMENTS FOR THE PLACEMENT OF SIGNAL HEADS AND SIGNS ON MAST ARMS SHALL BE TAKEN FROM THE FLANGE TO
CONDUIT LOCATIONS SHALL BE MARKED ON ALL FOUNDATIONS PER THE SPECIFICATION FOR THE CONDUIT INSTALLED.
ALL MP-3 COMBINATION LUMINAIRE MAST ARM POLES SHALL NOT EXCEED 26 FEET.
GREEN (COLOR #14077) IN ACCORDANCE WITH VDOT STANDARDS AND SPECIFICATIONS.
ALL SIGNAL POLES, MAST ARMS, PEDESTAL POLES AND CONTROLLER CABINETS INCLUDING THE UPS CABINET SHALL BE FEDERAL
MAST ARM POLES SHALL BE IN ACCORDANCE WITH VDOT ST'D. MP-3.
FOUNDATIONS.
THE CONTRACTOR SHALL REFER TO VDOT ROAD & BRIDGE SPECIFICATIONS, LATEST EDITION FOR PLACEMENT OF SIGNAL POLE
ALL SIGNAL POLE FOUNDATION FINAL TOP ELEVATION SHALL BE FLUSH TO GRADE AND APPROVED BY THE RESIDENT ENGINEER.
TEST BORE AT EACH FOUNDATION LOCATION TO DETERMINE THE SUBSURFACE CONDITIONS PRIOR TO DESIGNING THE FOUNDATION.
POLE FOUNDATION DESIGNS SHALL BE FURNISHED BY THE CONTRACTOR. THE CONTRACTOR SHALL FURNISH AT LEAST ONE
MAST ARM POLE FOUNDATIONS SHALL BE IN ACCORDANCE WITH VDOT ST'D. PF-8 6-BOLT PATTERN FOUNDATION. SIGNAL
ENRIQUE BURGOS AT (804) 646-6337 FOR VERIFICATION.
OFFICE THE LOCATION OF ALL FIELD EQUIPMENT INCLUDING JUNCTION BOXES AND POLES PRIOR TO DRILLING. CONTACT
THE CONTRACTOR SHALL STAKE THE SIGNAL POLE LOCATION AND VERIFY WITH THE CITY OF RICHMOND TRAFFIC ENGINEERING
ICHMONDR
VIRGINIA
IMPROVEMENTS
JAHNKE ROAD
$FIL
EL
$
R
Technical
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
Administrative
Capital Project Administrator
Deputy Director for
Transportation / Public Works
Director of Public Works
DEPARTMENT OF PUBLIC WORKS
RICHMOND, VIRGINIA
CH2M HILL. INC.
CH2M HILL, INC.
CH2M HILL, INC.CHECKED BY:
DRAWN BY:
DESIGN BY: REVIEWED BY FIELD NOTES SCALE DATE
9/18/2018
DRAWING FILE NAME DRAWING NO.
QUANTITY SUMMARY SHEET
FOREST VIEW SCHOOL DRIVE -
TRAFFIC SIGNAL PLANS - JAHNKE AND
14(2)
L.S. EA.EA. EA. EA. EA. EA. EA. EA. L.S. L.S. EA. S.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. L.F. EA. EA. EA.EA. EA. EA. EA. EA. EA. EA. EA.
803 1071 458 196 415 415 288 125
UNITNO.
SHEET
TOTAL
INTERSECTION
14(3)FORESTVIEW SCHOOL DR
JAHNKE RD AT1 1 1 2 1 4 5 1 1 2 4 9 725 48 40 1 11 1 2 16 51
L.F. L.F.
38100
803 1071 458 196 415 415 288 1251 1 1 2 1 4 5 1 1 2 4 9 725 48 40 1 11 1 2 16 51 38100
SUMMARY NOTES
2. 5.6. 8.9. 3.4.7.7. 7. 7. 7. 7.
N.T.S.
1 1
EA. EA. LF. LF.
JU
NC
TIO
N
BO
X, J
B
S-3
3" P
VC
CO
ND
UIT
CIP: 040-291-8949
T38633001402.dgn
T
CO
MM
O
NW
EAL H OV
RG
N
I
F
IIA
PR
O
E
F
SSIONAL EN
G
NI
EE
R
Lic. No. 023201
SUSAN WITH
ENGINEER
Richmond, Virginia
CH2M
EA.
1
FIB
ER
OP
TIC S
PLIC
E
EA.
1
1
FIBER OPTIC INSTALL QUANTITIES
12 -
Sin
gle
Mode Fib
er Optic Cable
Gator Patc
h
12 -
Sin
gle
Mode Fib
er Optic Cable
55
10.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
LF.
50
TR
EN
CH
EX
CA
VA
TIO
N (S
TD. E
CI-1)
135
1 1 155 50 135
7.
INCLUDED IN THIS PAY ITEM IS THE COST FOR SPLICE TRAYS, PIGTAILS, JUMPERS, CABLE HOOKS, CONNECTOR PANELS AND TESTING.
INCLUDED IN THIS PAY ITEM IS THE LUMINAIRE AND LUMINAIRE ARM.
INCLUDED IN THIS BID ITEM IS THE COST FOR THE 3" CONDUIT.
INCLUDED IN THIS BID ITEM IS THE COST FOR A SAFETY SWITCH/BREAKER BOX
ELECTRICAL SERVICE GROUNDING ELECTRODE SHALL BE CONSIDERED INCIDENTAL TO CONCRETE FOUNDATIONS, JUNCTION BOXES, AND ELECTRICAL SERVICE.
INCLUDED IN THIS BID ITEM IS THE COST FOR A CONFLICT MONITOR, CONTROLLER PROGRAMMING FOR HARDWARE AND SOFTWARE.
INCLUDED IN THIS BID ITEM IS THE INSTALLATION OF THE SIGN, MOUNTING BRACKETS, AND MISCELLANEOUS HARDWARE.
THIS BID ITEM PROVIDES FOR ALL SIGNAL HEADS TO BE LED.
INCLUDED IN THIS BID ITEM ARE TUNNEL VISORS FOR ALL SIGNAL HEAD SECTIONS, BACKPLATES AND RETRO-REFLECTIVE STRIP.
INCLUDED IN THIS BID ITEM IS THE COST FOR THE DESIGN OF THE SIGNAL POLE FOUNDATIONS.
QUANTITIES SHOWN ARE APPROXIMATE ONLY. CONTRACTORS ARE RESPONSIBLE FOR MAKING THEIR OWN TAKE-OFFS AND COMPLETING THE PROJECT TO THE FULL INTENT OF THE PLAN.
CO
MM
UNI C
ATIO
N S
WIT
CH
(2
VID
EO IN
PU
TS)
VID
EO
DE
TE
CTIO
N
CA
ME
RA (F
OR
VID
EO
DE
TE
CTIO
N)
SUP
PL
Y C
ABIN
ET
UNIN
TE
RR
UP
TA
BLE
PO
WE
R
SUP
PL
Y B
AT
TE
RY
UN
NIN
TE
RR
UP
TA
BLE
PO
WE
R
UNIN
TE
RR
UP
TA
BLE
PO
WE
R
SUP
PL
Y
ELE
CT
RIC
AL S
ER
VIC
E (S
TD. S
E-7)
TR
EN
CH
EX
CA
VA
TIO
N (S
TD. E
CI-1)
2"
ME
TA
L C
ON
DUIT
2" P
VC
CO
ND
UIT
3" P
VC
CO
ND
UIT
BO
RE
D
CO
ND
UIT 3"
CA
TE
GO
RY 5e (C
AT 5e)
CA
BLE
#16/3
CO
ND
UC
TO
R
CA
BLE
#14/2
CO
ND
UC
TO
R
CA
BLE (S
HIE
LD
ED)
#14/3
CO
ND
UC
TO
R
CA
BLE
#14/7
CO
ND
UC
TO
R
CA
BLE
#8
CO
ND
UC
TO
R
CA
BLE
#8/2
CO
ND
UC
TO
R
CA
BLE
SIG
N P
AN
EL
AS
SE
MB
LY (S
TD. S
MD-2)
MAS
T
AR
M
SIG
N
MO
UN
TIN
G
(12" LE
D)
TR
AF
FIC SIG
NA
L
HE
AD
SE
CTIO
N
HA
NG
ER
AS
SE
MB
LY (S
TD. S
M-3)
JU
NC
TIO
N
BO
X (S
TD. J
B-S
2)
JU
NC
TIO
N
BO
X (S
TD. J
B-S
1)
(ST
D. S
P-8
LE
D)
PE
DE
ST
RIA
N SIG
NA
L
HE
AD
PE
DE
ST
RIA
N
AC
TU
ATIO
N (S
TD. P
A-2)
PE
DE
ST
AL P
OLE (S
TD. P
F-2)
CO
NC
RE
TE
FO
UN
DA
TIO
N
PE
DE
ST
AL P
OLE (S
TD. P
F-2, 9')
TE
ST
BO
RE
SIG
NA
L P
OLE (S
TD. P
F-8)
CO
NC
RE
TE
FO
UN
DA
TIO
N
SIG
NA
L P
OLE (S
TD. M
P-3, 15'
AR
M)
CO
MB. L
UMIN
AIR
E
SIG
NA
L P
OLE (S
TD. M
P-3, 15'
AR
M)
SIG
NA
L P
OLE (S
TD. M
P-3, 3
8'
AR
M)
CO
NT
RO
LLE
R
FO
UN
DA
TIO
N (S
TD. C
F-1)
CO
NT
RO
LLE
R
AN
D
CA
BIN
ET
RE
MO
VE
EXIS
TIN
G SIG
NA
L E
QUIP
ME
NT
126
126
SEOI
EOI
EOI
GT
GT
GT
T
6" W
// // // //
// // // // //
// // //
XX
// // // // //
// // // // //
// //
// // //
// //
X
// // //
X
X
38+00
39+00
// // // //
//
// // // // // // // // // // // // //
//
// // //
280+0
0
15"15"
15"
18"
15"
18"18"
15"
24"84'
159' 159'
115'
177'
94'
93' triple
x
91' trip
lex
92' d
uplex
X
X
s
44
45
J J
J
J
J
J
6
1
4 4
2
2
P2
P4
P4
P2
C JD
ZO
NE
VID
EO
DE
TE
CTIO
N
ZONEVIDEO DETECTION
3 3J
6
J
J
J
0
SCALE
15' 30'
Jahnke Rd.
02-6
PHASING DIAGRAM
Forestvie
w
School
Dr.
A
B
E
G
R
Y Y Y
R
G
Y
R
G
2, 4, 6, 8
HEADS1
HEADA
B
C
D
E
F
I
J
A
COUNTDOWN LED SIGNAL
VDOT ST'D. SP-8
P2, P4
HEADS
EXISTING SIGNALS
PROPOSED SIGNALS
PROPOSED SIGNS
10
A
POLE LEGEND
CABLE AND CONDUIT RUNS
CONSTRUCTION NOTES
S-1
S-1
S-2
CLEARANCER/W
PHASE
NEXT
1 2
CLEARANCE CHART
2 4
PHASE
6
COMBINATIONS
2-6
FLASHSIGNAL
2
4
6
W
G
G
P-2
P-4
G
G
G A
A
BLANK
BLANKW
DW
DW
DW
DW
W
DW
COLOR SEQUENCE CHART
01-6
1
HEAD
G A R R
G G G G
G DW DWWALK
WALK WALK WALK WALK
R
11
02
02
06
04
01
DW
DW
1-6
1 G G
1
DW
DW
G R A
D
G K
(9" X 15")
S-4
C
11
10
G
L
G G G
G A R
G G
R
R G
R R
G R CABLE AND CONDUIT RUNS
B
C
D
E
F
G
H
I
J
K
L
B
D
E
ICHMONDR
VIRGINIAIMPROVEMENTS
JAHNKE ROAD
$FIL
EL
$
R
Technical
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
Administrative
Capital Project Administrator
Deputy Director for
Transportation / Public Works
Director of Public Works
DEPARTMENT OF PUBLIC WORKS
RICHMOND, VIRGINIA
CIP: 040-291-8949
CH2M HILL. INC.
CH2M HILL, INC.
CH2M HILL, INC.CHECKED BY:
DRAWN BY:
DESIGN BY: REVIEWED BY FIELD NOTES SCALE
HORIZ. 1"=30'
VERT. 1"=30'
DATE
9/18/2018
DRAWING FILE NAME DRAWING NO.
Vehicles
Watch For
START CROSSING
If Started
Finish Crossing
DON'T START
To Finish Crossing
TIME REMAINING
DON'T CROSS
PUSH BUTTON
TO CROSS
STEADY
TIMER
FLASHING
FFoorreessttvviieeww
SScchhooooll DDrr
JJaahhnnkkee RRdd
(78" X 18")
S-2
(78" X 24")
S-1
12
H
S-4
S-4
LIGHTING JUNCTION BOX
14(3)
PLAN SHEET
FOREST VIEW SCHOOL DRIVE -
TRAFFIC SIGNAL PLANS - JAHNKE AND
T36833001403.dgn
T
CO
MM
O
NW
EAL H OV
RG
N
I
F
IIA
PR
O
E
F
SSIONAL EN
G
NI
EE
R
Lic. No. 023201
SUSAN WITH
ENGINEER
Richmond, Virginia
CH2M
03-4
03
EXISTING DRIVEWAY
2, 3, 4, 6
HEADS
VIDEO DETECTION ZONE
G
3
3 R
G
G
3-4
DW
W
Y
R
G
YARROW
FLASHING
DW
W
A*
* DENOTES FLASHING INDICATION
BLANK BOXES DENOTE RED SIGNAL INDICATIONS
G
G
G
RG G G
G A
G A RR
G
G
A*
A*
GG A* YIELD
LEFT TURN
(24" X 30")
S-3
ON FLASHING
YELLOW
ARROW
S-3
M
12
M
12-SINGLE MODE FIBER OPTIC CABLE
1-2" PVC CONDUIT
ELECTRICAL SERVICE
1-8/2C CABLE FOR
1-2" METAL CONDUIT
11
VIDEO DETECTION: 11'
SIGNAL PLACEMENT: 8', 13'
FORESTVIEW SCHOOL DR
15' ARM 97 DEGREES TO
STA. 43+98.00, 47.00' RT
MAST ARM POLE, ST'D MP-3
STA. 44+56.00, 40.50' RT
9' PEDESTAL POLE, ST'D PF-2
SIGN PLACEMENT: 7.8'(S-1)
SIGNAL PLACEMENT: 3', 12.5'
15' ARM 90 DEGREES TO JAHNKE RD
STA. 44+80.00, 25.75' RT
MAST ARM POLE, ST'D MP-3
VIDEO DETECTION: 11'
SIGN PLACEMENT: 4'(S-2)
SIGNAL PLACEMENT: 8.1', 13.1'
DPU TO PROVIDE LUMINAIRE POWER
TO JAHNKE RD
10' LUMINAIRE ARM 90 DEGREES
FORESTVIEW SCHOOL DR
15' ARM 90 DEGREES TO
STA. 44+45.50, 28.00' LT
MAST ARM POLE, ST'D MP-3
COMBINATION LUMINAIRE
SIGN PLACEMENT: 19.7'(S-1), 38' (S-3)
SIGNAL PLACEMENT: 24.9', 35.9'
38' ARM 90 DEGREES TO JAHNKE RD
STA. 44+01.00, 40.25' LT
MAST ARM POLE, ST'D MP-3
C
THE FIBER OPTIC SPLICE SHALL BE WITH THE "TED" FIBER OPTIC CABLE.
LABELED AS "DIT" AND "TED". THE "DIT" FO CABLE SHALL NOT BE DISTURBED.
OPTIC SPLICE ENCLOSURE, THERE ARE TWO EXISTING FIBER OPTIC CABLES
FOR NEW FIBER OPTIC CABLE SPLICE. NOTE: FOR THE EXISTING FIBER
THE SIGNAL CONTROLLER. USE EXISTING FIBER OPTIC SPLICE ENCLOSURE
USED FOR INTERCONNECTING THE NEW FIBER OPTIC DROP CABLE TO
EXISTING JUNCTION BOX WITH FIBER OPTIC SPLICE ENCLOSURE SHALL BE
NOTE: INCLUDE SAFETY SWITCH/BREAKER BOX.
INSTALL VDOT ST'D SE-7 ELECTRICAL SERVICE.
MOUNT DIRECTLY TO THE CONTROLLER CABINET
(UNINTERRUPTABLE POWER SUPPLY/UPS). THE UPS ASSEMBLY SHALL
SHALL INSTALL AN APPROVED BATTERY BACK-UP SYSTEM
INSTALL NEMA TS-2 GROUND-MOUNTED CABINET, THE CONTRACTOR
LIGHTING JUNCTION BOX
O
N
FOR LUMINAIRE POWER
1-3" BORED CONDUIT
FOR LUMINAIRE POWER
1-2" PVC CONDUIT
NN
O
1-#8 AWG EGC
2-14/7C FOR SIGNAL HEADS 1, 6
1-1" PVC CONDUIT (GROUND WIRE)
1-2" PVC CONDUIT
1-#8 AWG EGC
1-16/3C FOR VIDEO DETECTION
1-CAT 5e CABLE FOR VIDEO DETECTION
1-14/3C FOR PED HEAD P2
1-14/7C FOR SIGNAL HEADS 3
1-1" PVC CONDUIT (GROUND WIRE)
1-2" PVC CONDUIT
1-#8 AWG EGC
1-16/3C FOR VIDEO DETECTION
1-CAT 5e CABLE FOR VIDEO DETECTION
1-14/3C FOR PED HEAD P2
1-14/7C FOR SIGNAL HEADS 3
2-3" BORED CONDUIT (INCLUDES SPARE)
1-#8 AWG EGC
1-14/2C(S) FOR PED PUSHBUTTON
2-14/3C FOR PED HEADS P2, P4
1-2" PVC CONDUIT
1-#8 AWG EGC
2-16/3C FOR VIDEO DETECTION
2-CAT 5e CABLE FOR VIDEO DETECTION
1-14/2C(S) FOR PED PUSHBUTTON
2-14/3C FOR PED HEADS P2, P4
5-14/7C FOR SIGNAL HEADS 1, 2, 3, 4, 6
2-3" PVC CONDUIT
1-#8 AWG EGC
1-16/3C FOR VIDEO DETECTION
1-CAT 5e CABLE FOR VIDEO DETECTION
1-14/2C(S) FOR PED PUSHBUTTON
1-14/3C FOR PEAD HEAD P4
4-14/7C FOR SIGNAL HEADS 1, 2, 4, 6
1-3" PVC CONDUIT
1-#8 AWG EGC
1-14/7C FOR SIGNAL HEADS 2
1-1" PVC CONDUIT (GROUND WIRE)
1-2" PVC CONDUIT
1-#8 AWG EGC
1-16/3C FOR VIDEO DETECTION
1-CAT 5e CABLE FOR VIDEO DETECTION
1-14/2C(S) FOR PED PUSHBUTTON
1-14/3C FOR PED HEAD P4
3-14/7C FOR SIGNAL HEADS 1, 4, 6
2-3" BORED CONDUIT (INCLUDES SPARE)
1-#8 AWG EGC
1-16/3C FOR VIDEO DETECTION
1-CAT 5e CABLE FOR VIDEO DETECTION
1-14/2C(S) FOR PED PUSHBUTTON
1-14/3C FOR PED HEAD P4
3-14/7C FOR SIGNAL HEADS 1, 4, 6
1-2" PVC CONDUIT
1-#8 AWG EGC
1-16/3C FOR VIDEO DETECTION
1-CAT 5e CABLE FOR VIDEO DETECTION
1-14/2C(S) FOR PED PUSHBUTTON
1-14/3C FOR PED HEAD P4
1-14/7C FOR SIGNAL HEADS 4
1-1" PVC CONDUIT (GROUND WIRE)
1-2" PVC CONDUIT
1-#8 AWG EGC
2-14/7C FOR SIGNAL HEADS 1, 6
2-3" BORED CONDUIT (INCLUDES SPARE)
ICHMONDR
VIRGINIA
IMPROVEMENTS
JAHNKE ROAD
$FIL
EL
$
R
Technical
Surveys Superintendent
Project Engineer
Maintenance Engineer
City Traffic Engineer
Administrative
Capital Project Administrator
Deputy Director for
Transportation / Public Works
Director of Public Works
DEPARTMENT OF PUBLIC WORKS
RICHMOND, VIRGINIA
CH2M HILL. INC.
CH2M HILL, INC.
CH2M HILL, INC.CHECKED BY:
DRAWN BY:
DESIGN BY: REVIEWED BY FIELD NOTES SCALE DATE
9/18/2018
DRAWING FILE NAME DRAWING NO.
N.T.S.
CIP: 040-291-8949
T38633001406.dgn 14(5)
OPTIC SPLICE DETAIL "A"
FOREST VIEW SCHOOL DRIVE - FIBER
TRAFFIC SIGNAL PLANS - JAHNKE AND