Sl. No Project Components Forest Land Utilization (Ha) Stage I Forest Clearance Reference No.1 Package I( Canal from Tunga river to Bhadra Reservoir) 96.95 F.No.4-KRA 1037/2014-BAN8002 Dt:11.02.2016
2 Package II( Canal from Bhadra Resrvoitr to Ajjampura Tunnel) 110.1 F.No.4-KRA 1036/2014-BAN7710 Dt:12.11.2015
3 Construction of Chitradurga Branch Canal 91.89 F.No.4-KRA 1036/2014-BAN7710 Dt:12.11.2015
4 Construction of Tumkuru Branch Canal 60.1 FDP. No: FP/KA/Canal/37818/201810 0 10 20 30 40 km