40

INDEX [] · Complete major repair of grate cooler, including replacement of compact swing elements, cross beams, removal of all compact swing elements and re-aligning the entire moving

  • Upload
    others

  • View
    10

  • Download
    1

Embed Size (px)

Citation preview

INDEX

1. Chairman’s Message

2. Introduction

3. Company Registration Documents

4. Product Sales Division

a. Messer Eutectic Castolin, Switzerland

b. Dillinger Middle East, Dubai

c. Metrode Products Ltd, UK

d. Rywal- RHC

5. Contracting Division

a. Project Manager’s Profile

b. Work Portfolio

c. Clientele

d. Major Projects Executed

6. Central Warehouse

7. Workshop

8. Field Services

9. Key Contacts

10. CDP Manufacturing, Dubai

Chairman’s Message

We adhere strictly to human values and professional

principles. We are enhancing our area of operations to ensure a

consistent and positive experience for our customers, principals,

suppliers and employees. As a business group we remain

committed to corporate and social responsibility and we strive

to ensure that all economic, environmental and social factors are

taken care of. This approach of respect, rigour and involvement

makes us more responsible and acceptable. Our vision is to be

the best organization in our chosen field of operation.

Dr. Tarek Nasser Al-Akeel

Chairman / CEO

Tarek Nasser Al-Akeel Co. is a leading Saudi owned company

operating in Kingdom of Saudi Arabia, the largest oil producing

country in the world and also the largest Arab country in the

Middle East.

We are in operation since 1982 with a vision to provide technical

innovation and engineering skills to contribute to the growth of

the nation.

The company has very good reputation in its chosen field, built on

a philosophy of providing performance with quality and service

from the initial enquiry to execution of the assignment.

We are flexible in terms of understanding and responding to the

client needs, our entire work portfolio is quite unique which gives

us a competitive edge; we give careful attention to the client

needs and strive hard with continuous improvements in our

performance in terms of quality and competitiveness.

Our growth has been achieved through long lasting business

relations with our esteemed clients, support from Principals and

commitment of “employees and management”. We plan our future

growth through deeper understanding of clients and focus on a

fruitful relation through innovative, quality services and

delivering promised services.

We are equipped with adequate resources and knowhow for the

timely delivery of our products as well projects completion to the

entire satisfaction of our clients.

PROJECT MANAGEMENT

Our basic principle is to provide utmost customer satisfaction

through delivery of prompt services expected by the clients. From

the point of contract award, we ensure the involvement of the

company’s well-experienced staff to provide a professional

service to the client’s satisfaction. We focus on Process Industries,

fully understanding the importance of schedule, quality and

reliability of the services rendered.

We strive to provide the most reasonable standards of

engineering and workmanship, which are achieved by constant

monitoring of every stage of work and by utilizing the latest

available technology and tools.

We have a balanced team with experience and energy,

experienced in large Industrial Projects such as Cement Plants

and Steel Plants as well as infrastructure projects such as Dubai

Motor City and Dubai Maritime City.

LABOUR POLICY

Understanding the fact that the Human Resources is the heart of

the service industry, we employ a mixture of Qualified, trained,

experienced and enthusiastic work force and have an excellent

record in labour Relations. We possess a positive attitude in

ensuring quality and safety while being strict on implementation

of the procedures.

HEALTH AND SAFETY

Throughout the execution of a project, we maintain a strong

commitment to safety at site, aiming at zero accidents, well-being

of the workers and totally discouraging unsafe or unhealthy work

practices.

RME Middle East –FZCO distribute the professional

beveling, drilling, welding and cutting products of

Promotech Company. Promotech is the main

manufacturer of professional power tool and

industrial equipment.

Each product from Most, Gold, Eckert, Promotech

family has been chosen after detail selection process,

starting from market research design, distribution,

pricing and finally marketing. It is the respond to

customers who look for complex offer, good quality

and reasonable prices that is why we find it was a

perfect tool and guide through the whole welding

and cutting assortment.

(B) WORK PORTFOLIO

Tarek Nasser Al-Akeel Co.to remain flexible on the type of

work that the company undertakes and is prepared to

enter new markets and work with clients on new

concepts.

Our recent portfolio falls into the following areas:

Steel Constructions:- Fabrication and erection of

structures, Pipes, Process ducts etc.

Total solutions to Process Industry. We undertake de-

bottlenecking, avoidance of repeated failures,

enhancement of life/ reliability, productivity

improvement etc.

Erection of rotary and static equipment.

Maintenance Support Jobs in Process industry.

Execution of projects, minor/ major.

Execution of major Repairs to Rotary Kilns, mills, Pre-

heaters, grate coolers etc.

Replacement/ modification of Ball Mill internals.

Repair and reconditioning of components.

Emergency repairs to heavy components such as Kiln

Tyre, Supporting roller, Roller press rolls, VRM

Rollers etc.

Thermal spray coating for corrosion protection, wear

protection etc.

(C) CLIENTELE

S. No. Name of the Company Country

01. Saudi Arabian Oil Company (Saudi Aramco) K.S.A

02. Saudi Basic Industries Corporation (Sabic) K.S.A

03. Saudi Electricity Company K.S.A

04. Saline Water Conversion Corporation

(SWCC)

K.S.A

05. Arabian Cement Company K.S.A

06. Yanbu Cement Company K.S.A

07. Southern Province Cement Company K.S.A

08. Tabuk Cement Company K.S.A

09. Qassim Cement Company K.S.A

10. Saudi Cement Company K.S.A

11. Eastern Province Cement Company K.S.A

12. City Cement Company K.S.A

13. Yamama Saudi Cement Company K.S.A

14. Riyadh Cement Company K.S.A

15. MMG K.S.A

16. M. S. Al-Suwaidi K.S.A

17. Nasser Al Hajri Corporation K.S.A

18. Al Rushaid K.S.A

19. CCC (All Projects) K.S.A

20. Al Zamil Steel Heavy Industries K.S.A

(D) MAJOR PROJECTS EXECUTED

S. No. Job Description Client

1

Replacement of Front Mill table, repairs

to the foundation by chipping of and re-

grouting with EPOXY.

HADEED

2 Replacement of Down Coiler 1 and 2

Aprons and repairs to the down coiler. HADEED

3

Replacement of buckets and belts of Belt

bucket elevators, 108m. height and 42m.

height.

CCC

4 Replacement of Chains and buckets of 2

Nos. Raw Mill elevators. CCC

5 Major repairs to Lime stone stacker and

reclaimer Harrow, chain etc. SCC

6

Modification of 5 Nos. belt conveyors

take up structure and Major repairs to

Apron feeder.

SCC

7

Replacement of damaged bags,

straightening and reinforcing tube sheets

of kiln bag house.

NCC

8

Replacement of Raw Mill # 1 & 2 partition

walls (Drying diaphragm) with new

structure fabricated from CDP.

YCC

9

Complete major repair of grate cooler,

including replacement of compact swing

elements, cross beams, removal of all

compact swing elements and re-aligning

the entire moving grates- 2 sets,

replacement of cooler plates,

modification to bull nose cooling etc.

NCC

10.

Complete overhauling of Apron feeder

below Limestone silo, including

modification to inlet chute, fabrication and

replacement of pingates with modified

one.

SCC

11 Replacement of dip tube deflection plates

of 8 cyclones of VRM 1 & 2. SCC

12

Modification to IKN cooler (Clinker

cooler) of Kiln # 8, including extension of

grates, installation of modified plates in

KIDS.

SCC

13

Dismantling, shifting, Modifying and re-

installation of bins and feeders for

feeding limestone to CM 9 & 10.

SCC

14 Supply and installation of various water

piping, storing and pumping systems. SCC

15 Fabrication and supply of solid waste

cyclones lined with CDP 112. CRISTAL.

16.

Kiln supporting roller assembly

replacement, Kiln tyre re-positioning,

aligning and chair pads replacement.

NCC

17.

TA Duct expansion joint replacement,

Repairs to plate work of Kiln hood, TA

Duct and Preheater duct, cyclones, inlet

chamber.

NCC

18. Final alignment and spring plate welding

of kiln # 7 girth gear. SCC.

19.

Replacement of cooler vent duct (5m.

dia.x 22m. long at a height of 30m.) from

cooler outlet to EP, including design and

preparation of modified drawings.

YCC

Kiln # 6 inlet and outlet shells (4.4m. dia.,

4.8m. long, 40mm. thick) replacement

with tip castings and modified sealing

arrangements.

SCC

20. Gas pipeline replacement 12” dia. 300m. SCC

21. Rehabilitation of burnt out limestone

conveyor over Hofuf highway. SCC

22.

Replacement of ducts from Cement mill

outlet to bag filter (1.8m. dia. x 20m.

long)- 2 Nos.

YCC

23.

Replacement of system fan outlet ducts

in Raw Mills. (2.6m. dia. x 15m. long at

+32m. elevation)- 2 Nos.

YCC

24. Kiln # 6 -Cooler ESP, electrodes and GD

Screen replacement. SCC

25.

Cement Mill and drive alignment

checking, slide shoe bearings

replacement and support services for tyre

(Slide Ring) grinding,

YCC

26. Upper bearing replacement for Rotary

stacker for Lime stone. Very special job.

ACC

27.

Replacement of mill outlet duct elbow,

cyclones and cyclone outlet ducts for

Losche Make VRM. (150 Tons of

dismantling and re-erection in a

constrained space, ie. Building with roof,

in 19 days)

ACC

28.

Re-conditioning worn out Raw Mill

classifier fan impeller and dynamic

balancing.

YCC

29.

Inspection, repair, heat treatment and

Ultrasonic testing of Kiln support Roller-

INSITU.

NCC.

30.

Dismantling of Clay drier complete with

support rollers, girth gear & drive station,

chutes and ducts and storage.

Dismantling of lime stone drier complete

with rollers, drive station, chutes, hoppers

etc., shifting and re-erection at clay drier

location and commissioning.

YCC

31.

Fabrication, supply and replacement of

the grit funnel of LOESCHE Mill with

double side cladded CDP plate.

ACC.

32.

Fabrication and supply of 3 Nos.

Seperator Cyclone complete with wear

resistant liners.

YCC.

33.

Fabrication and supply of Lower Cone

and Furnace Middle Cone with 25 thk.

CDP Plate, for HADEED.

GSS Indl. Services.

34.

Fabrication, supply and erection of

complete, including bend Airlift discharge

Pipes from ground to Pre-heater top with

CDP. Total length 180m.

ACC.

35. Fabrication and supply of Pipe Bends, 24

nos. for HADEED. GSS Indl. Services.

36. Repair of Lamellae of 2000 wide Apron

Conveyor, 60 nos. YCC.

37. Repair of cracked Kiln tyre. YCC.

38.

Repair of cracked Kiln tyre. Middle Tyre,

multiple cracks, one of them through

crack.

SPCC.

Bisha Plant

39. Repair of Cracked Trunnion and Mill

head. YCC

We offer In Situ Thermal Spray Coating services for

external & internal coatings of Process equipment,

offshore structures, and pipelines. Etc.

Name of Person Designation

Dr. Tarek N. Al Akeel

Chairman & CEO

Mr. Mohammed Abdul Moid Khan

General Manager Mobile No. +966 50 9391417 E-Mail : [email protected]

Mr. Balachandra Kumar

Project Manager Mobile No. +966 54 8196141 E-mail: [email protected]

Address for Communication

Head Office Post Box – 9906,

Jeddah – 21423, Kingdom of Saudi Arabia

Telephone No’s: +966 12 690 1230 /1232 Fax No: +966 12 690 1231 E-Mail : [email protected] Web site: www.talakeel.com Eastern Region Branch Al-Oleyaa Center – Al Khobar, Al- Akrbeya Dist., Makkah St. 1st Floor, Office No. 109. Tel: +966 13 8652474/ 8895131. Fax: +966 13 8895134.

Workshop 3279, Dallah Industrial Area, P.O. Box: 34542, Dammam 31478, Saudi Arabia. Tel: +966 13 818 0814 Fax: +966 13 818 0814