    J l . D e s a 

    PemukimanPemukiman

         P     T .     J     L     M

    P    T    .  L   i    m   

    a   s   

    Sawah

            P        T

     .        S

         a      m

         s      u      n     g  

            P      r        i      n       t        i      n     g  

             P     a     c        k

    L   a    p   a   n    g   a   n   

    21

    22

    K e t e r a n g a n G a m b a r  

    Gudang Material 1Gudang Material 2 Area Mesin Ribbon Blander & Ball Mill Area Mesin Roll Mill Area Mesin Extruding Area BreezeTunnel Kiln Area Mesin Cutting & Impregnating Area Finishing

    Gudang Produk Jadi Area Dust Collector  Area Persiapan Binder Bengkel / Workshop Area Spesial CarbonOffice / Kantor Loading ShippingUnloading Material Area Mesin CrushingPanel Tunnel KilnGudang Material Ribbon Powder 

    Lapangan BolaIPALKantin & Mushola

    1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.

    21.22.23.

    : Langkah Kegiatan Produksi

    PETA LOKASI SEKITAR

    23

    Pabrik Asbes