Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
i
Table of Contents
1.0 Introduction ..................................................................................................................................................... 1
1.1 Background ................................................................................................................................................ 1
1.2 Legislative Authority ................................................................................................................................... 1
1.3 Enabling Official Plan Policies ................................................................................................................... 2
1.4 Basis of the CIP ......................................................................................................................................... 3
1.5 Purpose of the CIP ..................................................................................................................................... 3
1.6 Companion Urban Design Guidelines ........................................................................................................ 4
2.0 Bolton Community Improvement Strategy ...................................................................................................... 5
2.1 Bolton’s Critical Needs ............................................................................................................................... 5
2.2 Bolton Community Improvement Project Area ........................................................................................... 6
2.3 Goals and Objectives for Community Improvement .................................................................................. 6
2.4 Community Improvement Programs .......................................................................................................... 8
3.0 Municipal Leadership Strategy ....................................................................................................................... 9
3.1 Purpose ...................................................................................................................................................... 9
3.2 Description ................................................................................................................................................. 9
4.0 Financial Incentive Programs ....................................................................................................................... 15
4.1 Purpose .................................................................................................................................................... 15
4.2 Tax Increment-Equivalent Grant Program ............................................................................................... 15
4.3 Development Charge Grant Program ...................................................................................................... 19
4.4 Application and Permit Fee Grant Program ............................................................................................. 20
4.5 Building and Façade Improvement Grant Program ................................................................................. 22
4.6 Mixed-Use Construction/Conversion Grant Program ............................................................................... 25
4.7 Energy Efficiency Retrofit Grant Program ................................................................................................ 27
4.8 Landscape Improvement Grant Program ................................................................................................. 29
4.9 Environmental Study Grant Program ....................................................................................................... 31
5.0 Monitoring Program ...................................................................................................................................... 34
5.1 Purpose .................................................................................................................................................... 34
5.2 Description ............................................................................................................................................... 34
5.3 Reporting ................................................................................................................................................. 39
5.4 Program Adjustments .............................................................................................................................. 39
6.0 Implementation ............................................................................................................................................. 39
6.1 Glossary of Terms .................................................................................................................................... 39
Bolton
ii
6.2 Interpretation ............................................................................................................................................ 40
6.3 Timing ...................................................................................................................................................... 40
6.4 Administration of Municipal Leadership Strategy ..................................................................................... 40
6.5 Administration of the Financial Incentive Programs ................................................................................. 40
6.6 Financial Management of Financial Incentive Programs ......................................................................... 42
6.7 General Eligibility Requirements of the Financial Incentive Programs .................................................... 42
6.8 General Process and Submission Requirements of the Financial Incentive Programs ........................... 45
6.9 Application Process for the Financial Incentive Programs ....................................................................... 46
6.10 Marketing Strategy ................................................................................................................................... 49
7.0 Conclusion .................................................................................................................................................... 51
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
1
1.0 Introduction
This Section does not constitute an operative part of the Community Improvement Plan.
1.1 Background
The Town of Caledon Economic Development Strategy (2008-2012) provides the following mission statement:
“Through community commitment and participation, the Town of Caledon will promote economic
opportunities and secure investment that supports our strategic economic development objectives
and activities in order to enhance community prosperity.”
Community improvement planning is a tool under the Planning Act that can be used by municipalities in order to
advance goals such as these. The Town of Caledon took advantage of this planning tool by organizing the Bolton
Community Improvement Task Force (BCITF), which is comprised of a group of representatives from the Bolton
Improvement Area (BIA), Caledon Chamber of Commerce, the Bolton Merchants Association and the Town of
Caledon. The BCITF completed background work for the redevelopment, revitalization, prosperity, and
beautification Bolton, such as the completion of a Strengths, Weaknesses, Opportunities, and Challenges exercise.
In June 2008, the Town of Caledon retained MMM Group Limited (MMM) and du Toit Allsopp Hillier (DTAH) to build
upon the background work completes and to develop a Community Improvement Plan (CIP) and companion Urban
Design Guidelines (UDG) for the community of Bolton.
While economic decline, vacancy rates, and physical deterioration may only be perceived within Bolton today, there
are present opportunities to enhance the economic vitality and physical appearance of the community and address
a number of key community planning and urban design issues.
The Bolton Community Improvement Plan provides a framework that guides community improvement in Bolton,
through the identification of a Municipal Leadership Strategy and Programs, and Financial Incentive Programs. Its
companion document, the Bolton Urban Design Guidelines, provides additional guidance for community
improvement by identifying design principles and guidelines with respect to built form, facades, streetscape, and
open spaces, for example.
Both the Bolton Community Improvement Plan and the Bolton Urban Design Guidelines are supported by the
Bolton Community Improvement Strategy. Applicants should refer to the Strategy as the basis of and background
to this CIP and its companion UDG.
1.2 Legislative Authority
A thorough discussion of the legislative authority and policy context for community improvement in Bolton is
provided in the supporting and accompanying Bolton Community Improvement Strategy. Sections 1.2 and 1.3 of
this CIP provide a brief summary of the key points of discussion, which will assist applicants in understanding the
basis for community improvement in Bolton.
Bolton
2
Legislative Authority:
Section 106(1) (2), and Section 106(3) of the Municipal Act, 2001, and Section 28 of the Planning Act allows
municipalities to prepare community improvement plans.
Community Improvement defined:
Section 28(1) of the Planning Act defines community improvement as “the planning or replanning, design or
redesign, resubdivision, clearance, development or redevelopment, construction, reconstruction and rehabilitation,
improvement of energy efficiency, or any of them, of a community improvement project area, and the provision of
such residential, commercial, industrial, public, recreational, institutional, religious, charitable or other uses,
buildings, structures, works, improvements or facilities, or spaces therefore, as may be appropriate or necessary”.
Community Improvement Project Area:
Section 28 of the Planning Act establishes and defines the term “community improvement project area” as “a
municipality or an area within a municipality, the community improvement of which in the opinion of the council is
desirable because of age, dilapidation, overcrowding, faulty arrangement, unsuitability of buildings or for any other
environmental, social or community economic development reason” (S. 28(1)). Section 28(2) states that the Town
may, by by-law, designate all or part of the Town as a community improvement project area.
Community Improvement Plans:
Once a community improvement project area has been designated, a community improvement plan can be
prepared for that area (Section 28(4) of the Planning Act) . The Town may use a community improvement plan to:
Acquire, hold, clear, grade or otherwise prepare land (Section 28(3));
Construct, repair, rehabilitate or improve buildings on land acquired or held by the municipality (Section
28(6));
Sell, lease or dispose of any land and buildings acquired or held by the municipality (Section 28(6)); and
Make grants or loans to owners and tenants of land and buildings within the community improvement
project area to help them pay for the cost of rehabilitating their lands or buildings (Section 28(7)).
Eligible costs are those related to environmental site assessment, environmental remediation, development,
redevelopment, construction and reconstruction of lands and buildings for rehabilitation purposes or for the
provision of energy efficient uses, buildings, structures, works, improvements or facilities. (Section 28 (7.1)).
1.3 Enabling Official Plan Policies
Community improvement policies are provided in Section 5.17 of the Town of Caledon Official Plan. As an
objective for community improvement, the Official Plan states that the Town will “identify areas within the Town in
which community improvement is warranted” (5.17.1 b).
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
3
3
3
In order to identify areas in which community improvement is warranted, the policies of the Official Plan further set
out criteria for the selection of Community Improvement Project Areas in Section 5.17.2, which includes, but is not
limited to the following:
deficiencies in roads, traffic circulation or parking, sidewalks or curbs, streetlighting, or road signage;
required improvement in the aesthetics of the area through landscaping, business signage, and building
facades; and
indication of economic decline – declining tax base, declining retail sales, high vacancy rates.
The Bolton Community Improvement Strategy and the Bolton Community Improvement Plan have been prepared in
accordance with the policy context outlined above and the legislative authority described in Section 1.2.
1.4 Basis of the CIP
The basis for this Community Improvement Plan, and its companion Urban Design Guidelines, is as follows:
a) The CIP and UDG are based upon the Bolton Community Improvement Strategy (dated March 2009), and
prepared by MMM and DTAH) which supports the framework for community improvement provided by this
Plan, and the guidelines for urban design and built form provided by the UDG;
b) The CIP and UDG incorporate information obtained as a result of a consultation process that included a
design charrette (as part of Phase I of the Study) and workshop (as part of Phase II of the Study) with local
business owners, members of the Bolton Business Improvement Area, Caledon Chamber of Commerce,
Bolton Merchants Association, Town and Regional Councilors, Town and Regional Staff, and the Toronto
and Region Conservation Authority. The consultation process also included at total of two open houses for
members of the public, undertaken at each phase of the Study; and
c) Town staff, in association with the Town’s CIP Steering Committee, has directed the development of this
CIP, as well as the planning process leading to the preparation of this Plan. Town staff has also provided
technical input throughout the process.
1.5 Purpose of the CIP
Specifically, the purpose of the CIP is to:
a) Work with the companion UDG to implement the Bolton Community Improvement Strategy;
b) Establish a set of goals and objectives for community improvement in Bolton;
c) Identify a Municipal Leadership Strategy and Programs that will contribute to, motivate, and assist in
community improvement;
d) Define a set of Financial Incentive Programs available to eligible property owners in order to stimulate and
leverage private sector investment;
Bolton
4
e) Implement design principles and guidelines with respect to built form, streetscape, and open spaces, for
example, as part of the eligibility criteria to access the CIP’s Financial Incentive Programs; and
f) Provide an Implementation and Monitoring Program for the Bolton CIP.
1.6 Companion Urban Design Guidelines
The Bolton Urban Design Guidelines, which have been prepared as a companion document to this CIP, will be
implemented in connection with the CIP program.
The purpose of the UDG is to:
a) Identify design principles and guidelines with respect to built form, facades, streetscape, and open spaces,
for example;
b) Educate property and business owners as to the Town’s principles and guidelines for design;
c) Provide eligibility criteria for CIP’s Financial Incentive Programs, with respect to design; and
d) Provide the Town with a tool for the review and evaluation of applications for Financial Incentive Programs
and supporting materials.
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
5
2.0 Bolton Community Improvement Strategy
2.1 Bolton’s Critical Needs
As part of the preparation of the Bolton Community Improvement Strategy, a critical needs assessment was
undertaken in order to document the conditions and identify the strengths, weaknesses, opportunities, and threats
in Bolton. The assessment built upon on work that had previously been completed by the Bolton Community
Improvement Task Force. It also took into account the results of the Town’s participation in the First Impressions
Community Exchange, which was held in July of 2008.
In accordance with the priority areas identified by the Town and the BCITF, the critical needs assessment focused
on:
a) The Bolton historic core;
b) The Regional Road 50 Commercial Corridor; and
c) The Industrial Areas of Bolton.
Each of these areas was assessed based on:
a) Several site visits (including a Town staff-led tour of the historic core, commercial corridor, and industrial
areas) which inventoried issues related to built form, infrastructure, parking configuration and availability,
the public realm, pedestrian spaces, and development character;
b) A review of background documents from the Town of Caledon, including Economic Development reports,
Town By-laws, existing Urban Design Guidelines, and meeting minutes and results of a SWOT analysis
undertaken by the BCITF;
c) A review of the planning policy context, as provided by the Town of Caledon Official Plan, including criteria
for the identification of a Community Improvement Project Area;
d) A preliminary investigation into the potential for “brownfield” sites in each of the areas of Bolton; and
e) Input and feedback from the project Steering Committee, stakeholders, and the public.
A detailed summary of the results of the critical needs assessment is provided in Section 5.0 of the Bolton
Community Improvement Strategy.
The results led to the identification of Goals and Objectives for Community Improvement in Bolton, and to the
identification of a Community Improvement Project Area, as introduced in the following Sections. As well, the
results were used to develop the Municipal Leadership Strategy and Programs, and Financial Incentive Programs
available to eligible property owners as part of this CIP in order to stimulate and leverage private sector investment.
Bolton
6
2.2 Bolton Community Improvement Project Area
The Council for the Town of Caledon has designated the Community Improvement Project Area (CIPA) for the
Bolton CIP. The Bolton Community Improvement Plan applies to all lands included within the designated CIPA.
The Bolton CIPA was identified as part of the preparation of the Bolton Community Improvement Strategy and is
consistent with all applicable legislative and policy direction/requirements. The CIPA is based upon the results of
the critical needs assessment and consultation with the Town’s CIP Steering Committee, the BCITF, local
stakeholders, and members of the public.
For a detailed discussion of the identification of the Bolton Community Improvement Project Area, applicants may
wish to refer to the accompanying and supporting Strategy, which includes “checklists” for each of the historic core,
commercial corridor, and industrial study areas, and apply the Town’s criteria for selecting CIPAs (provided by
Section 5.17 of the Town’s Official Plan).
The Bolton Community Improvement Project Area, generally includes:
a) Lands designated “Bolton Core” by Schedules C and C-1 of the Town of Caledon Official Plan;
b) Lands located north of the Bolton Core including the Humber River, in recognition of this area’s role as a
gateway to the Bolton core and potential to serve as a park/public gathering space;
c) Lands located south of the Bolton Core including the Albion Bolton Community Centre and Fairgrounds, in
recognition of this area’s role as a gateway to the Bolton Core and as a public gathering space;
d) Lands designated “Bolton South Hill Commercial Area” and “Bolton Highway 50 Commercial Area” by
Schedule C of the Town of Caledon Official Plan; and
e) Lands designated “Industrial” by Schedule C of the Town of Caledon Official Plan (including the existing,
older industrial lands and excluding the newer, developing industrial lands).
Please note that in order to be eligible for any of the incentive programs available in accordance with Section 4.0 of
this CIP, all projects proposed by eligible applicants must be within the designated Community Improvement Project
Area.
2.3 Goals and Objectives for Community Improvement
Goals of the CIP
The goals of the Bolton Community Improvement Plan have been developed based on the critical needs
assessment of the study areas, identified in Section 2.1. They are consistent with legislation for community
improvement planning and applicable Provincial policy. They build upon the Town’s Official Plan policies,
Economic Development Strategy, and the goals for community improvement as identified by the BCITF.
The goals of this CIP are to promote beautification and prosperity in the Bolton Community Improvement Project
Area by:
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
7
7
7
a) Improving Bolton’s public infrastructure, and social and recreational facilities/services in a coordinated
manner that reflects local issues, the Town’s priorities, and financial resources;
b) Encouraging, supporting, and aiding in the coordination of private sector investment;
c) Promoting the planning or replanning, design or redesign, resubdivision, clearance, development or
redevelopment, construction, reconstruction and rehabilitation, and/or the improvement of energy efficiency
of buildings or properties;
d) Improving the tax assessment base and revenues for the Town and the Province of Ontario;
e) Endorsing the economic development and competitiveness of Bolton in order to create a diverse and
sustainable economic base;
f) Retaining and increasing live/work, shopping, and tourism opportunities within the Bolton historic core and
commercial corridor, and employment opportunities within the older industrial areas;
g) Improving the physical environment and visual qualities of the Bolton historic core, commercial corridor,
and older industrial areas in a manner that is consistent with the Town’s design principles and guidelines
with respect to built form, built form, streetscape, landscape, and architectural detail; and
h) Protecting and enhancing the environmental features, and unique attributes, nature, and identity of Bolton.
Objectives of the CIP
The objectives of the Bolton Community Improvement Plan are identified below and are intended to accomplish the
goals of this Plan.
The objectives of this CIP are to:
a) Use municipal resources to demonstrate leadership in the planning or replanning, design or redesign,
resubdivision, clearance, development or redevelopment, construction, reconstruction and rehabilitation,
and/or the improvement of energy efficiency of buildings, properties, or infrastructure within the designated
Community Improvement Project Area;
b) Provide grants and refunds to eligible property owners in order to encourage the planning or replanning,
design or redesign, resubdivision, clearance, development or redevelopment, construction, reconstruction
and rehabilitation, and/or the improvement of energy efficiency of privately-owned buildings or properties
within the designated Community Improvement Project Area;
c) Increase the number of property and business owners who improve the physical environment and visual
qualities of buildings or properties within the designated Community Improvement Project Area;
d) Implement the environmental goals for the Town of Caledon, as established by the Region of Peel Official
Plan, and the Town of Caledon Official Plan, Environmental Progress Action Plan, and Green Development
Standards, for example; and
e) Monitor the performance of the Bolton Community Improvement Plan on an on-going basis to ensure that
the goals of the Plan are being met.
Bolton
8
2.4 Community Improvement Programs
In addition to identifying the boundaries of the designated CIPA for Bolton, the Bolton Community Improvement
Strategy also outlined some of the actions required in order to achieve redevelopment, revitalization, prosperity,
and beautification of the historic core, commercial corridor, and industrial areas of Bolton.
Generally, the Strategy for community improvement in Bolton identified a need for:
a) Municipal Leadership Strategy and Programs that will apply municipal resources to contribute to, motivate,
and assist in community improvement activities and undertakings; and
b) Financial Incentive Programs that will be available to eligible property owners in order to stimulate and
leverage private sector investment.
Based on consultation with the Town’s CIP Steering Committee, stakeholders, and members of the public, the
Bolton Community Improvement Plan presents a number of specific programs that respond to the findings and
recommendations of the Bolton Community Improvement Strategy. The following sections of the CIP present the
details of these programs.
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
9
3.0 Municipal Leadership Strategy
3.1 Purpose
The Bolton Community Improvement Strategy identified the need for a Municipal Leadership Strategy and
Programs that will contribute to, motivate, and assist in community improvement in Bolton. In response to that
need, this CIP outlines a number of municipally-led initiatives that enable the Town of Caledon to provide proactive
and visible leadership, coordination, and support for the revitalization, redevelopment, and enhancement of Bolton.
The Municipal Leadership Strategy described in the following section represents a short to long-term strategy on
the part of the Town to focus its efforts and financial resources on public sector investments and actions. The
Municipal Leadership Strategy is designed to act as catalysts to further encourage private sector investment in the
designated Bolton Community Improvement Project Area.
The Town may engage in any of the initiatives outlined below as part of the implementation of the CIP, subject to
the Town’s capital budget and the availability of resources. An indication of the anticipated timing, as identified by
the Town or as recommended by the consulting team, is provided as a target for implementation.
3.2 Description
The following table provides an overview of the details of each of the initiatives included as part of the Municipal
Leadership Strategy.
Table 1: Municipal Leadership Strategy Programs
Program Details Anticipated Timing
a) Bolton
Community
Improvement
Plan Review
Panel
i. The Town may establish a Bolton CIP Review Panel,
which will be responsible for all administrative tasks
related to the implementation of the CIP, as indicated in
Sections 6.4 and 6.5 of this Plan.
ii. One member of the Bolton CIP Review Panel may be
designated as the Panel Chair, and will be responsible for
identifying roles/responsibilities for members of the
Review Panel.
iii. Roles and Responsibilities may include reviewing and
evaluating all CIP incentive program applications and
supporting materials against program requirements,
including guidelines for urban design, and presenting
recommendations to Council for approval or refusal.
iv. The Review Panel may be made up of a multi-disciplinary
team of Town staff to ensure that a variety of interests are
Recommended
as a high priority
initiative with
immediate
implementation
in 2009, upon
the adoption of
the CIP.
Bolton
10
Program Details Anticipated Timing
considered when evaluating applications. The team
should include representatives from the Town’s
departments, including Building and By-law Enforcement,
Corporate Services, Economic Development and
Communications, Planning and Development, Public
Works and Engineering, and Recreation and Property
Services.
v. In addition to a Bolton CIP Review Panel, the Town may
also wish to assign a CIP administrator from the
appropriate Town department in order to manage
administrative tasks associated with the implementation of
the CIP. For instance, the administrator may be
responsible for identifying roles/responsibilities for
members of the Review Panel, convening Review Panel
meetings, preparing Recommendation Reports, attending
Council meetings, liaising with applicants, etc. In the
absence of a CIP Administrator, the CIP Review Panel will
be responsible for these tasks.
b) Marketing
Strategy
i. Upon adoption of the Bolton CIP, the Town may promote
the CIP and its incentive programs through a Marketing
Strategy, as described in Section 6.10 of this Plan.
ii. The Strategy may be targeted to local businesses and
organizations within the CIPA in order to educate eligible
property and business owners about the opportunities
available through the Bolton CIP.
Recommended
as a high priority
initiative with
immediate
implementation
in 2009, upon
the adoption of
the CIP.
c) Municipal By-law
Enforcement /
Review
i. The Town may enhance Town By-law enforcement
activities within the CIPA in respect to building
maintenance, signage, and open storage screening in
order to improve the physical and visual qualities of Bolton
ii. In addition, the Town may undertake a review of any
municipal By-law, such as the Town’s Sign By-law, in
order to update requirements so that they are consistent
with the goals and objectives of community improvement,
as identified by this Plan.
Recommended
for on-going
implementation
from 2009 to
2019.
d) Open Space and
Pedestrian and
Cycling Network
i. Section 5.4 of the CIP Strategy identified an open space
and pedestrian and cycling network in Bolton that is
characterized by unlinked open spaces, sidewalks, trails,
Recommended
as a medium
priority, long-
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
11
11
11
Program Details Anticipated Timing
Linkage Program and public washroom facilities.
ii. As a long-term initiative, the Town may invest in the
establishment of new open spaces and the development
of new sidewalks and trails within the CIPA, in order to:
- develop a more complete network that will
improve the potential for cycling, leisure,
recreational, and cultural activities;
- increase public access to the Humber River; and
- encourage pedestrian movement and cycling,
and offer alternatives to the use of automobiles.
iii. Potential linkages that would contribute to completing the
open space and pedestrian and cycling network are
identified in the CIP Strategy, and may guide the Town’s
linkage program.
term initiative,
with
implementation
in 2009 to 2014.
e) Streetscape
Improvements
i. Section 5.4 of the CIP Strategy identified a number of
streetscape improvement opportunities, specific to the
historic core, commercial corridor, and older industrial
areas, in order to:
- improve the physical and visual qualities of
Bolton;
- protect and enhance the unique attributes,
nature, and identity of Bolton; and
- provide amenities that are conducive to a
pleasant pedestrian environment.
ii. The Town may invest in the following improvements within
the CIPA in order to implement the recommendations of
the CIP Strategy:
- develop of a continuous sidewalk network;
- use consistent sidewalk materials and
dimensions;
- implement principles of barrier-free
design/universal access; and
- implement additional street furniture such as
Recommended
as a high
priority, long-
term initiative,
with on-going
implementation
from 2009 to
2019.
Bolton
12
Program Details Anticipated Timing
benches, lighting, street signs, banners, trees
and planters.
iii. With respect to improvement to the Regional Road 50
corridor, this Municipal Leadership Program may be
undertaken in partnership, or with assistance from, the
Regional Municipality of Peel.
f) Roadway,
Crossing, and
Intersection
Improvements
i. Section 5.4 of the CIP Strategy identified a number of
roadway, crossing, and intersections improvement
opportunities in the historic core, commercial corridor, and
older industrial areas in order to create a safe and
comfortable environment for pedestrians.
ii. The Town may invest in the following improvements within
the CIPA in order to implement the recommendations of
the CIP Strategy:
- add bike lanes to the road cross-section;
- reduce lane widths and introduce medians in the
commercial corridor;
- implement marked crossings (painted
walkways/cobblestone); and
- implement crossing signals.
iii. With respect to the Regional Road 50 (RR 50) specifically,
upon completion of the Bolton Arterial Road, the Town
may, in partnership, or with assistance from, the Regional
Municipality of Peel, implement the following
improvements to RR 50:
- coordinate access from RR 50;
- address on-street parking;
- reduce lane widths and introduce medians;
- improve pedestrian amenities; and
- establish a public transit route along RR 50 that
will help to link Bolton to the broader Town and
Region.
Recommended
as a high
priority, long-
term initiative,
with on-going
implementation
from 2009 to
2019.
g) Transit Oriented i. The Town may work with GO Transit and other Inter- Recommended
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
13
13
13
Program Details Anticipated Timing
Development
Strategy
Regional transit operators to develop a service strategy
for both bus and rail services that will best serve the
community of Bolton’s needs.
ii. The strategy may address issues such as station
locations, stop locations, bus and rail routes, frequency,
access to parking, and design integration with the
surrounding buildings and land uses.
iii. The strategy may also address other transit and public
transportation options.
as a low priority
option, with
implementation
in 2013 or
beyond.
h) Update to the
Town Parking /
Intensification
Study
i. The Town may undertake a review of the existing Bolton
Downtown Core Public Parking Study (April 2004), in
order to update the public parking options and associated
improvements in Bolton core.
ii. The Town may wish to combine this study with an
intensification study that explores the development
potential of the core in ways that are respectful of the
existing historic character.
iii. The study may also investigate the potential and feasibility
to relax parking standards within the Bolton core in order
to promote intensification.
iv. The Town may also expand the study to consider public
parking in the commercial corridor.
Recommended
as a medium
priority initiative,
with
implementation
in 2009 to 2014.
i) Municipal
Acquisition of
Land for Road
Reconfiguration
and Open Spaces
i. Section 5.4 of the CIP Strategy identified several
opportunities for municipal land acquisition. For example:
- in the industrial area where the existing road
network is incomplete, the Town may acquire
land in order to reconfigure the roadways and
improve road connections and
truck/car/pedestrian movement; and
- in addition to the Town’s existing plans for the
development of parks and open spaces along the
Humber River, there are opportunities for the
acquisition of land to develop and link public
open spaces.
ii. The Town may undertake municipal land acquisition in
Recommended
as a low priority
option, with
implementation
in 2010 to 2015.
Bolton
14
Program Details Anticipated Timing
accordance with Section 28 of the Planning Act, in order
to reconfigure roadways and increase the number of
public open spaces.
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
15
4.0 Financial Incentive Programs
4.1 Purpose
The Bolton Community Improvement Strategy identifies a need for Financial Incentive Programs that could be
available to eligible property owners in order to stimulate and leverage private sector investment. This CIP outlines
a framework for the Town to offer a variety of incentive programs to eligible applicants that will help achieve the
goals and objectives outlined in Section 2.3 of the Plan. Availability of these programs and incentives will be
evaluated and decided upon by Council on the basis of what will serve the community best at any point in time over
the implementation of the CIP.
This Plan profiles a menu of the following Financial Incentive Programs:
Tax Increment-Equivalent Grant Program;
Development Charge Grant Program;
Application and Permit Fee Grant Program;
Building and Façade Improvement Grant Program;
Mixed-Use Construction/Conversion Grant Program;
Energy Efficiency Retrofit Grant Program;
Landscape Improvement Grant Program; and
Environmental Study Grant Program.
For all of the incentive programs offered, there are General Eligibility Requirements (outlined in Section 6.7) that
must be met in order to be eligible to access the financial incentives for community improvement within the Bolton
Community Improvement Project Area. In addition, for each Financial Incentive Program, there are Program
Specific Eligibility Requirements, which are outlined in the tables provided in the following sections.
As described in Section 6.6 and indicated in the following tables, Council will establish an annual budget for the
implementation of the Bolton Community Improvement Plan, and specifically for the provision of incentives as part
of the Financial Incentive Program based on priority.
In most cases, the Financial Incentive Programs made available through the Bolton Community Improvement Plan
can be used individually or in combination with another CIP Financial Incentive Program (or any other existing
Town incentive program) in accordance with Table 11 in Section 6.7 and as indicated in the following tables.
However, this does not apply to the Tax Increment-Equivalent Grant Program, which cannot be used in combination
with any other incentive program.
4.2 Tax Increment-Equivalent Grant Program
Table 2 provides applicants with the program specific details and requirements of the Tax Increment-Equivalent
Grant Program.
Bolton
16
Table 2: Tax Increment-Equivalent Grant Program Specific Details
Tax Increment-Equivalent Grant Program Specific Details
a) Rationale i. The Tax Increment-Equivalent Grant Program offers grants to eligible applicants
whose Municipal property tax has increased as a result of the development or
redevelopment, construction, reconstruction and rehabilitation, and/or the improvement
of energy efficiency of buildings or properties within the designated Community
Improvement Project Area.
ii. The program will encourage large scale property and building investment by effectively
deferring the full increase in taxation associated with the reassessment through grants
that are equivalent to a portion of the resulting property tax increase.
iii. The program will also encourage the remediation, rehabilitation, and adaptive reuse of
“brownfield” sites, as defined in Section 6.1.
iv. The Town of Caledon will benefit from the property tax increase with each passing
year (as the grant decreases to the expiry of the grant agreement) and for each year
thereafter, in addition to the potential creation of jobs and local economic activity
associated with the community improvement works undertaken.
b) Legislative
Authority
i. (The Municipality may) make grants to registered owners, assessed owners and
tenants of land and buildings within the community improvement project area, to pay
for the whole or any part of the cost of rehabilitating such lands and buildings (Section
28(7) of the Planning Act).
ii. In order encourage the clean up of contaminated lands, municipalities may provide
property tax assistance to eligible properties to offset all or a portion of remediation
costs. Municipalities have the power to cancel or defer the municipal portion of
property taxes on eligible properties (Section 365.1 of the Municipal Act).
c) Details i. The current municipal taxes levied will be determined prior to commencement of the
proposed project. The increase in the municipal portion of real property taxes
(municipal tax increment) will be calculated. The program allows a municipal tax
increment equivalent to the taxes levied on the increased assessment as a result of
undertaking the project as determined by the Municipal Property Assessment
Corporation (MPAC) following project completion. The municipal tax increment will be
used in the calculation of the amount of the grant. The total amount of any tax
increment equivalent shall not exceed 50% of the original total cost of the
improvements or $20,000 annually whichever is lesser.
ii. When an approved project is complete, a grant will be paid annually by the Town to
the eligible applicant following the payment of all property taxes.
iii. Grants are equal to a percentage of the municipal tax increment for a maximum period
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
17
17
17
Tax Increment-Equivalent Grant Program Specific Details
of up to 10 years.
iv. In year one, the grant to the approved applicant may equal 90 percent of the municipal
tax increment.
v. The grant will be phased down by a percentage each year thereafter, for a maximum
of 10 years. Phase down rate as approved by Council.
d) Eligibility
Requirements
i. All of the Town of Caledon Bolton CIP General Eligibility Requirements (outlined in
Section 6.7) apply.
ii. Eligible community improvement projects under this program will include the large
scale development or redevelopment, construction, reconstruction and rehabilitation.
iii. Large scale projects are defined as those which involve 25% or more of the existing
gross floor area. Infrastructure work including the improvement or reconstruction of
existing on-site public infrastructure (water services, sanitary and storm sewers) will
also be considered eligible.
iv. Small scale projects (defined as those that involve less than 25% of the existing gross
floor area) will not be considered eligible under this program, but may be eligible under
(an) alternative Bolton CIP incentive program(s).
v. Eligible community improvement projects will also include the remediation,
rehabilitation, and adaptive reuse of “brownfield” sites.
vi. It is intended that the Tax Increment-Equivalent Grant program be a “stand alone”
incentive program and that the owners of property not accumulate incentives both
under the Tax Increment-Equivalent Grant program and under other incentive
programs or initiatives available in the Town of Caledon. The property owner will be
responsible for the entire cost of the project.
vii. For all eligible projects, the Town may require the applicant to submit a Business Plan,
which will be prepared to the satisfaction of the Town of Caledon.
viii. For all eligible projects, the property shall be improved such that the amount of work
undertaken is sufficient to at minimum result in an increase in the assessed value of
the property.
ix. For “brownfield” projects only, any of the following activities may be undertaken prior to
the increase in taxation and could be considered eligible:
1. the completion of Environmental Studies (such as Phase II and III ESAs, and
Risk Assessment Plans;
2. environmental remediation, including the cost of preparing a Record of Site
Bolton
18
Tax Increment-Equivalent Grant Program Specific Details
Condition (RSC);
3. placing clean fill and grading;
4. installing environmental and/or engineering controls/works, as specified in the
Phase III ESA and/or Risk Assessment Plan;
5. monitoring, maintaining and operating environmental and engineering
controls/works, as specified in the Phase III ESA and/or Risk Assessment
Plan;
6. demolishing buildings;
7. building rehabilitation and retrofit works;
8. upgrading on-site infrastructure, including water services, sanitary sewers, and
stormwater management facilities; and
9. constructing/upgrading off-site infrastructure, including water services, sanitary
sewers, stormwater management facilities, electrical and gas utilities.
x. For “brownfield” projects only, an application must be accompanied by a Phase II ESA,
Phase III ESA, or Risk Assessment Plan prepared by a “qualified person” (as defined
in Section 6.1 and by Ontario Regulation 153/04 as amended by Ontario Regulation
66/08) that contains:
1. an estimate of the cost of actions that will be required to reduce the
concentration of contaminants on, in, or under the property to permit a RSC to
be filed in the Environmental Site Registry under Section 168.4 of the
Environmental Protection Act; and
2. a work plan and budget for said environmental remediation, and/or risk
management actions;
OR
3. the application must be accompanied by proof that an RSC for the proposed
use of the property has been acknowledged by the Ministry of the
Environment.
xi. In order to determine the suitability of the Tax Increment-Equivalent Grant, prior to
submitting an application for the program, eligible applicants should attempt to
estimate the total potential value of the rebate, based on current assessment values
and anticipated investment. Upon completing the approved community improvement
works, to the satisfaction of the Town, and upon reassessment of the property, should
the total value of the rebate be significantly less than the applicant’s estimated value,
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
19
19
19
Tax Increment-Equivalent Grant Program Specific Details
the applicant may then have the opportunity to withdraw application for the Tax
Increment-Equivalent Grant Program, and submit an application for one or more of the
additional incentive programs offered through the Bolton CIP.
xii. Should an eligible applicant be approved for the Tax Increment-Equivalent Grant
Program, and if the subject property is sold, in whole or in part, before the original
grant period lapses, the original owner is not entitled to receive the remaining grant
payments under the program agreement.
e) Duration i. Grants will be provided upon successful completion of the approved work, and
payment of the full reassessed value of the municipal taxes.
ii. Tax increment grants are provided to property owners for up to a maximum of 10
years.
f) Allocated
Program
Budget
i. Incentives offered as part of the Tax Increment-Equivalent Grant Program (as
described in Section 4.3) are included within Town’s annual tax supported budget.
4.3 Development Charge Grant Program
Table 3 provides applicants with the program specific details and requirements of the Development Charge Grant
Program.
Table 3: Development Charge Grant Program Specific Details
Development Charge Grant Program Specific Details
a) Rationale i. The Development Charge Grant Program offers grants to eligible applicants to cover
the cost of Town development charges related to the development or redevelopment,
construction, or reconstruction of buildings or properties within the designated
Community Improvement Project Area.
ii. The program provides assistance to eligible applicants by reducing property
improvement costs through the granting of Town development charges.
iii. The Town of Caledon will benefit from the tax increase on the property as a result of
the property improvement, in addition to the potential creation of jobs and local
economic activity associated with the community improvement works undertaken.
b) Legislative
Authority
i. According to Section 28(7) of the Planning Act, grants may be provided to owners,
registered owners, assessed owners and tenants of land and buildings within the
community improvement project area, to offset the payment of development charges.
Bolton
20
Development Charge Grant Program Specific Details
c) Details i. Where an eligible applicant is undertaking an approved project in accordance with
the purpose of the Bolton CIP, the Town may provide a grant that is equivalent to a
portion of the cost of development charges required for the project by the Town.
ii. All grants may be equal to up to 50% of the development charges paid by the
applicant, to a maximum of $15,000. The total value of grants will be determined by
the Town at its sole discretion at the time of approval of an application.
iii. Additional incentives may be available through Regional Participation in this
Program. Grants that are the equivalent of a portion of the Regional Development
Charge could also be provided to eligible applicants by the Regional Municipality of
Peel.
d) Eligibility
Requirements
i. All of the Town of Caledon Bolton CIP General Eligibility Requirements (outlined in
Section 6.7) apply.
ii. Eligible community improvement projects under this program will include the large or
small scale development or redevelopment, construction, reconstruction and
rehabilitation, and/or the improvement of energy efficiency of buildings or properties.
iii. Applicants must pay for all development charges prior to undertaking the approved
work. A grant for a portion of the development charges will be provided to the
applicant once the approved work is complete to the Town’s satisfaction.
iv. As indicated in Table 11 (Figure 6.7), applicants receiving the Development Charge
Grant may also be eligible for additional incentive programs offered through the
Bolton CIP but are not eligible for the exemptions provided through the Town’s
development charges by-laws.
e) Duration i. Grants will be provided upon successful completion of the approved work, to the
satisfaction of the Town.
ii. Town development charges grants are provided on a one-time basis.
f) Allocated
Program
Budget
i. On an annual basis, Council may allocate a portion of the Town’s Bolton CIP tax
supported budget to this program based on need and priority.
4.4 Application and Permit Fee Grant Program
Table 4 provides applicants with the program specific details and requirements of the Application and Permit Fee
Grant Program.
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
21
21
21
Table 4: Application and Permit Fee Grant Program Specific Details
Application and Permit Fee Grant Program Specific Details
a) Rationale i. The Application and Permit Fee Grant Program offers grants to eligible applicants for
Town planning application and/or building permit fees related to the development or
redevelopment, construction, reconstruction and rehabilitation, and/or the
improvement of energy efficiency of buildings or properties within the designated
Community Improvement Project Area.
ii. The program provides assistance to eligible applicants by reducing property
improvement costs through the provision of grants equal to the cost of Town planning
application and/or building permit fees.
iii. The Town of Caledon will benefit from the tax increase on the property as a result of
the property improvement, in addition to the potential creation of jobs and local
economic activity associated with the community improvement works undertaken.
b) Legislative
Authority
i. According to Section 69(2) of the Planning Act, despite a tariff of fees established
under subsection (1), the council of a municipality, a planning board, a committee of
adjustment or a land division committee in processing an application may reduce the
amount of or waive the requirement for the payment of a fee in respect of the
application where the council, planning board or committee is satisfied that it would be
unreasonable to require payment in accordance with the tariff.
c) Details i. Where an eligible applicant is undertaking an approved project in accordance with the
purpose of the Bolton CIP, the Town may provide a grant that is equivalent to the
applicable cost of normal planning application/building permit fees.
ii. Planning application fee grants may be made available for Minor Variances, and/or
Site Plan Applications to a maximum of $10,000.
iii. Building permit fee grants may be made available for Building Permit fees and/or
Demolition Permit fees to a maximum of $10,000.
iv. All grants may be equal to up to 100% of the application fees paid by the applicant.
The total value of grants will be determined by the Town at its sole discretion at the
time of approval of an application.
v. Additional incentives may be available through Regional Participation in this Program.
Grants equal to the cost of Regional application and permit fees could also be
provided to eligible applicants by the Regional Municipality of Peel.
d) Eligibility
Requirements
i. All of the Town of Caledon Bolton CIP General Eligibility Requirements (outlined in
Section 6.7) apply.
ii. Eligible community improvement projects under this program will include the large or
Bolton
22
Application and Permit Fee Grant Program Specific Details
small scale development or redevelopment, construction, reconstruction and
rehabilitation, and/or the improvement of energy efficiency of buildings or properties.
iii. Applicants must pay for all application and permit fees prior to undertaking the
approved work. A grant for the amount of the application and permit fees will be
provided to the applicant once the approved work is complete, to the Town’s
satisfaction.
iv. As indicated in Table 11 (Figure 6.7), applicants receiving the Application and Permit
Fee Grant may also be eligible for additional incentive programs offered through the
Bolton CIP or by the Town.
e) Duration i. Grants will be provided upon successful completion of the approved work, to the
satisfaction of the Town.
ii. Town planning application and/or building permit fees grants are provided on a one-
time basis.
f) Allocated
Program
Budget
i. On an annual basis, Council may allocate a portion of the Town’s Bolton CIP tax
supported budget to this program based on need and priority.
4.5 Building and Façade Improvement Grant Program
Table 5 provides applicants with the program specific details and requirements of the Building and Façade
Improvement Grant Program.
Table 5: Building and Façade Improvement Grant Program
Building and Façade Improvement Grant Program Specific Details
a) Rationale i. The Building and Façade Improvement Grant Program offers grants to eligible
commercial, mixed-use, or industrial property owners for façade improvements, the
improvement or restoration of building signage, and/or other exterior improvements to
buildings that are within the designated Community Improvement Project Area.
ii. The program will promote aesthetic improvements to buildings by property owners that
otherwise may not occur due to cost premiums associated with these improvements.
iii. The Town of Caledon will benefit from aesthetic improvements to buildings in a
manner that is consistent with the purpose of the Bolton CIP, the Bolton UDG, and the
Town’s vision for community of Bolton, in addition to the potential creation of jobs and
local economic activity associated with the community improvement works
undertaken.
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
23
23
23
Building and Façade Improvement Grant Program Specific Details
b) Legislative
Authority
i. (The municipality may) make grants to registered owners, assessed owners and
tenants of land and buildings within the Community Improvement Project Area, to pay
for the whole or any part of the cost of rehabilitating such lands and buildings (Section
28(7) of the Planning Act).
c) Details i. Grants for front, rear, or sidewall façade improvements, and other improvements to a
commercial, mixed-use, or industrial building, may be provided to eligible applicants
for a total of 50% of the construction costs to a maximum of $12,500.
ii. Grants for improvements to/restoration of building signage may be provided to eligible
applicants for 50% of the construction costs to a maximum of $5,000.
iii. The maximum amount of the façade or building improvement grant may be increased
to $17,500.00 or 50% of the eligible costs, whichever is lesser, for corner lots, or lots
with more than one façade directly adjacent to the public realm, provided that the
proposed improvements will apply to both façades.
iv. The maximum amount of a grant for professional architectural services shall not
exceed 15% of the grant that is calculated for eligible construction costs.
v. The maximum amount of the grant for accessibility improvements shall not exceed
25% of the total grant amount that is calculated for the building, façade and signage
improvement grant.
vi. Additional incentives may be available through Regional Participation in this Program.
The Regional Municipality of Peel could provide additional grants to eligible applicants
for building and façade improvements, in accordance with the Region’s intent to
promote proper design and effective use of the built environment in Bolton (Section
5.4.3.1.1 of the Regional Municipality of Peel Official Plan).
d) Eligibility
Requirements
i. All of the Town of Caledon Bolton CIP General Eligibility Requirements (outlined in
Section 6.7) apply.
ii. Eligible improvement projects under this program will include front, rear, or sidewall
façade, signage, or additional building improvements when the building and/or
façade/signage being improved fronts a street or is visible from a street within the
Community Improvement Project Area.
iii. The following types of building and façade improvements are considered eligible:
1. repair/replacement of storefront/rear/side, including repair or replacement of
storefront/ rear/side. doors and windows;
2. repair/replacement of façade masonry and brickwork;
Bolton
24
Building and Façade Improvement Grant Program Specific Details
3. repair/replacement of architectural details;
4. repair/replacement of awnings or canopies;
5. Painting cleaning or other similar treatments to improve facades or enhance
their durability over the long term provided that these activities are:
a) Part of a larger improvement project ie associated with other eligible
projects listed in this program, and/or
b) Considered to be essential to the restoration of a building designated
under the Ontario Heritage Act or listed by the Town of Caledon as being
of historical interest in accordance with the Ontario Heritage Act.
6. Painting or installation of murals or similar wall art.
7. addition of sidewalk cafes;
8. Universal accessibility improvements to the building or property, such as
automatic doors, wheelchair access ramps, entryway widening, leveling or
repairs to pathways/accesses, provided the improvements are made in
association with a broader façade/building improvement, and provided the
improvements are above and beyond any legislated requirements for building
accessibility.
9. architectural/design fees required for eligible works (to a maximum of 15% of
the grant amount).
10. other similar repairs/improvements to a building as may be approved.
iv. Eligible improvements to/restoration of building signage will include the
installation/improvement of signage as permitted by the Town’s existing Sign By-law.
v. As indicated in Table 11 (Figure 6.7), applicants receiving the Building and Façade
Improvement Grant may also be eligible for additional incentive programs offered
through the Bolton CIP or by the Town.
vi. Prior to approval by the Town, properties which are designated under the Ontario
Heritage Act are subject to review by Heritage Caledon. Properties which are listed on
the heritage register or identified on the Built Heritage Resources Inventory are subject
to review by the Town’s Heritage Resource Officer.
e) Duration i. Grants will be provided upon successful completion of the approved work, to the
satisfaction of the Town.
ii. Grants are provided on a one-time basis to each eligible applicant for each approved
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
25
25
25
Building and Façade Improvement Grant Program Specific Details
project.
f) Allocated
Program
Budget
i. On an annual basis, Council may allocate a portion of the Town’s Bolton CIP tax
supported budget to this program based on need and priority.
4.6 Mixed-Use Construction/Conversion Grant Program
Table 6 provides applicants with the program specific details and requirements of the Mixed-Use
Construction/Conversion Grant Program.
Table 6: Mixed-Use Construction/Conversion Grant Program
Mixed-Use Construction/Conversion Grant Program Specific Details
a) Rationale i. The Mixed-Use Construction/Conversion Grant Program offers grants to eligible
applicants for the large or small scale development, redevelopment, construction or
reconstruction of a low to mid-rise mixed-use buildings, which include a commercial
main floor (with retail, personal service, or office frontage) and residential upper
storeys, as permitted by Official Plan policies and zoning standards within the
designated Community Improvement Project Area.
ii. The Mixed-Use Construction/Conversion Grant Program also offers grants to eligible
applicants for the conversion of the upper storey non-residential space above a
commercial main floor to residential units as permitted by Official Plan policies and
zoning standards within the designated Community Improvement Project Area.
iii. The program will provide assistance to eligible applicants in securing financing for
property development and rehabilitation/functional improvements to existing residential
space that otherwise may not occur due to cost premiums associated with these
improvements.
iv. The program will promote re-use of buildings as permitted by Official Plan policies and
zoning standards.
v. The Town of Caledon will benefit from an increase in the number of mixed-use
buildings and affordable housing units within Bolton.
vi. The Town of Caledon will also benefit from the tax increase on the property as a result
of the property improvement, in addition to the potential creation of jobs and local
economic activity associated with the community improvement works undertaken.
b) Legislative
Authority
i. (The municipality may) make grants to registered owners, assessed owners and
tenants of land and buildings within the Community Improvement Project Area, to pay
Bolton
26
Mixed-Use Construction/Conversion Grant Program Specific Details
for the whole or any part of the cost of rehabilitating such lands and buildings (Section
28(7) of the Planning Act).
c) Details i. Grants for the development, redevelopment, construction or reconstruction of a low to
mid-rise mixed-use buildings may be made available to eligible applicants. Grants may
be equal to 15% of the construction cost to a maximum of $5,000 per residential unit.
ii. Grants for the conversion of upper storey non-residential space above a commercial
main floor to residential units may be made available to eligible applicants. Grants may
be equal to 15% of the construction cost to a maximum of $5,000 per residential unit.
iii. Additional incentives may be available through Regional Participation in this Program.
The Regional Municipality of Peel could provide additional grants to eligible applicants
for mixed-use construction/conversion, in accordance with the Region’s intent to
provide within Rural Service Centres opportunities for a wide range of goods and
services for those living and working in the Rural System (Section 5.4.3.1.4 of the
Regional Municipality of Peel Official Plan).
d) Eligibility
Requirements
i. All of the Town of Caledon Bolton CIP General Eligibility Requirements (outlined in
Section 6.7) apply.
ii. Eligible community improvement projects under this program will include the
development, redevelopment, construction or reconstruction of a low to mid-rise mixed-
use buildings (with commercial uses on the ground floor/at grade and residential units
occupying the upper storeys) in permitted areas.
iii. Eligible projects will also include the conversion of non-residential space to residential
space in existing buildings, or for the rehabilitation of existing residential space.
iv. Existing or proposed ground floor/at grade residential space with frontage on a public
road within the designated Community Improvement Project Area will not be eligible for
the Mixed-Use Construction/Conversion Grant Program.
v. Priority eligibility may be given to applicants who propose rehabilitation of/conversion to
rental apartment units.
vi. As indicated in Table 11 (Figure 6.7), applicants receiving the Mixed-Use
Construction/Conversion Grant may also be eligible for additional incentive programs
offered through the Bolton CIP or by the Town.
e) Duration i. Grants will be provided upon successful completion of the approved work, to the
satisfaction of the Town.
ii. Grants are provided on a one-time basis to the eligible applicant for an approved
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
27
27
27
Mixed-Use Construction/Conversion Grant Program Specific Details
project.
f) Allocated
Program
Budget
i. On an annual basis, Council may allocate a portion of the Town’s Bolton CIP tax
supported budget to this program based on need and priority.
4.7 Energy Efficiency Retrofit Grant Program
Table 7 provides applicants with the program specific details and requirements of the Energy Efficiency Retrofit
Grant Program.
Table 7: Energy Efficiency Retrofit Grant Program
Energy Efficiency Retrofit Grant Program Specific Details
a) Rationale i. The Energy Efficiency Retrofit Grant Program offers grants to eligible commercial,
mixed-use, or industrial property owners for retrofits that improve the overall energy
efficiency of buildings that are within the designated Community Improvement Project
Area.
ii. The program will promote energy efficiency retrofits to buildings by property owners
and annual energy savings that otherwise may not occur due to cost premiums
associated with these improvements.
iii. The Town of Caledon will benefit from a reduction of energy use, water use, and waste
production by buildings in a manner that is consistent with the Town’s overall
sustainability goals, in addition to the potential creation of jobs and local economic
activity associated with the community improvement works undertaken.
b) Legislative
Authority
i. The eligible costs of a community improvement plan may include costs related to the
provision of energy efficient uses, buildings, structures, works, improvements or
facilities (Section 28(7.1) of the Planning Act).
c) Details i. Grants for energy efficiency retrofits to commercial or mixed-use buildings may be
provided to eligible applicants for a total of 25% of the retrofit costs to a maximum of
$7,500.
ii. Grants for energy efficiency retrofits to industrial buildings may be provided to eligible
applicants for 25% of the construction costs to a maximum of $15,000.
iii. Additional incentives may be available through Regional Participation in this Program.
The Regional Municipality of Peel could provide additional grants to eligible applicants
for energy efficiency retrofits, in accordance with the Region’s intent to promote proper
design and effective use of the built environment in Bolton (Section 5.4.3.1.1 of the
Bolton
28
Energy Efficiency Retrofit Grant Program Specific Details
Regional Municipality of Peel Official Plan).
d) Eligibility
Requirements
i. All of the Town of Caledon Bolton CIP General Eligibility Requirements (outlined in
Section 6.7) apply.
ii. The following types of energy efficiency retrofit projects are considered eligible for
commercial or mixed-use buildings:
1. Interior or exterior renovations that result in a third-party certification or meet a third
party energy efficiency standard which exceeds the requirements of the Ontario
Building Code, and demonstrably increases energy efficiency including:
a. Interior or exterior renovations that result in any level of LEED certification
as determined by the Canada Green Building Council (inclusive of
certification through LEED for Commercial Interiors, LEED for New
Construction as it relates to major renovations, LEED for Core and Shell
renovations, and LEED for Existing Buildings);
b. Interior or exterior renovations that result in compliance with
ASHRAE/ISNAE Standard 90.1-1999 or newer (i.e., energy performance
standards for buildings except low-rise residential buildings), as certified by
a professional engineer or professional architect (refer to ashrae.org);
2. Addition of a green roof to an existing building;
3. Installation of appropriate on-site thermal renewable energy projects, such as solar
hot water, geothermal, air source heat pumps or solar walls;
4. Installation of Energy STAR certified heating/cooling/ventilation products and
features, including:
a. Central air conditioners;
b. Heat pumps;
c. Gas furnaces and gas boilers;
d. Ventilation fans; and
e. Doors and Windows,
but not including home appliances and small appliances such as refrigerators,
clothes washers/dryers, televisions, ceiling fans, etc.
5. Installation of energy-efficient lighting to the exterior of the building, walkways or
parking areas, including replacement of incandescent lighting with high-efficiency
LED lighting, as well as installation of lighting controls such as automatic timers,
photocells or motion sensors;
6. Fees of a professional architect or engineer for the design or services related to the
above-noted eligible projects; and
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
29
29
29
Energy Efficiency Retrofit Grant Program Specific Details
7. Any combination of the above.
iii. Prior to approval by the Town, commercial or mixed-use applications for the Energy
Efficiency Retrofit Grant Program will require documentation to verify that any of the
original equipment listed above will be replaced by higher efficiency equipment.
Applications will be subject to review by the Town’s Building Department.
iv. The following types of energy efficiency retrofit projects are considered eligible for
industrial buildings:
1. improvements to a building envelope (such as insulation upgrades,
weatherization, and window and door replacement);
2. replacement of inefficient equipment;
3. installation of energy efficient lighting systems;
4. improvements to HVAC systems;
5. improvements to compressed air systems;
6. improvements to fans, blowers and pumps;
7. improvements to motor and drive systems;
8. improvements to water heating systems;
9. improvements to chillers, cooling, and refrigeration systems;
10. improvements to boiler plant systems;
11. improvements to combustion systems;
12. improvements to process dryers, furnaces, and kilns;
13. implementation of a green roof; and
14. other improvements as may be approved.
v. Prior to approval by the Town, industrial applications for the Energy Efficiency Retrofit
Grant Program will require documentation to verify that the result of the retrofits will
result in a measurable and verifiable reduction in energy use. Applications will be
subject to review by a commissioning consultant (at the expense of the applicant)
and/or review by the Town’s Building Section.
vi. For all commercial, mixed-use, and industrial applications, the Town of Caledon
reserves the right to reject any proposed retrofit activity that cannot be supported by a
credible scientific explanation or whose effectiveness in reducing energy use cannot be
Bolton
30
Energy Efficiency Retrofit Grant Program Specific Details
verified.
vii. As indicated in Table 11 (Figure 6.7), applicants receiving the Energy Efficiency Retrofit
Grant may also be eligible for additional incentive programs offered through the Bolton
CIP or by the Town.
e) Duration i. Grants will be provided upon successful completion of the approved work as measured
and verified at the expense of the applicant, to the satisfaction of the Town.
ii. Grants are provided on a one-time basis to each eligible applicant for each approved
project.
f) Allocated
Program
Budget
iii. On an annual basis, Council may allocate a portion of the Town’s Bolton CIP tax
supported budget to this program based on need and priority.
4.8 Landscape Improvement Grant Program
Table 8 provides applicants with the program specific details and requirements of the Landscape Improvement
Grant Program.
Table 8: Landscape Improvement Grant Program
Landscape Improvement Grant Program Specific Details
a) Rationale i. The Landscape Improvement Grant Program offers grants to eligible owners for
improvements to the existing landscape of properties that are within the designated
Community Improvement Project Area.
ii. The program will promote aesthetic improvements to properties by owners that
otherwise may not occur due to cost premiums associated with these improvements.
iii. Town of Caledon will benefit from aesthetic improvements to properties in a manner
that is consistent with the purpose of the Bolton CIP, the Bolton UDG, and the Town’s
vision for community of Bolton, in addition to the potential creation of jobs and local
economic activity associated with the community improvement works undertaken.
b) Legislative
Authority
i. (The municipality may) make grants to registered owners, assessed owners and
tenants of land and buildings within the Community Improvement Project Area, to pay
for the whole or any part of the cost of rehabilitating such lands and buildings (Section
28(7) of the Planning Act).
c) Details i. Grants for landscape improvements may be provided to eligible applicants for a total of
50% of the landscaping costs to a maximum of $7,500.
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
31
31
31
Landscape Improvement Grant Program Specific Details
ii. The maximum amount of the grant may be increased to $10,000.00 or 50% of the
eligible costs, whichever is lesser, for corner lots or lots that have frontage on more
than one street, provided that the proposed improvements will apply to both street-
facing yards.
d) Eligibility
Requirements
i. All of the Town of Caledon Bolton CIP General Eligibility Requirements (outlined in
Section 6.7) apply.
ii. Commercial or industrial properties that are visible from the public realm and that
contribute to the streetscape will be considered eligible for Landscape Improvement
Grant Program.
iii. The following types of landscape improvements are considered eligible:
1. replacement of sod with new sod or alternative ground cover treatments such
as water efficient/native plant species, provided it is a component of a larger
landscaping improvement project (i.e., associated with other eligible projects
in this program);
2. planting of trees, shrubs, plants/beds;
3. naturalization of parking areas;
4. repair or construction of fencing or retaining walls;
5. implementation of benches and permanent planters;
6. addition of bicycle parking;
7. repair or construction of driveways, walkways, and rockwork;
8. water efficiency improvements to irrigation systems;
9. implementation of innovative stormwater management technologies, such as
bioswales, and rainwater harvesting and reuse systems, for example; and
10. other similar repairs/improvements as may be approved.
iv. Prior to approval by the Town, applications for the Landscape Improvement Grant
Program will be subject to review and input from the Town’s Public Works and
Engineering Department.
v. As indicated in Table 11 (Figure 6.7), applicants receiving Landscape Improvement
Grant may also be eligible for additional incentive programs offered through the Bolton
CIP or by the Town.
e) Duration i. Grants will be provided upon successful completion of the approved work, to the
Bolton
32
Landscape Improvement Grant Program Specific Details
satisfaction of the Town.
ii. Grants are provided on a one-time basis to each eligible applicant for each approved
project.
f) Allocated
Program
Budget
i. On an annual basis, Council may allocate a portion of the Town’s Bolton CIP tax
supported budget to this program based on need and priority.
4.9 Environmental Study Grant Program
Table 9 provides applicants with the program specific details and requirements of the Environmental Study Grant
Program.
Table 9: Environmental Study Grant Program
Environmental Study Grant Program Specific Details
a) Rationale i. The Environmental Study Grant Program offers grants to eligible property owners for
the completion of a Phase II Environmental Site Assessment (ESA), a Phase III ESA,
Remedial Work Plan, and/or a Risk Assessment Plan for properties that are within the
designated Community Improvement Project Area.
ii. The program will promote the completion of studies with respect to environmental
conditions of properties by owners that otherwise may not occur due to cost premiums
associated with these assessments.
iii. Town of Caledon will benefit from the undertaking of environmental studies so that
more and better information is available with respect to the type of contamination and
potential remediation costs on potential “brownfield” properties within the Town.
b) Legislative
Authority
i. (The municipality may) make grants to registered owners, assessed owners and
tenants of land and buildings within the Community Improvement Project Area, to pay
for the whole or any part of the cost of rehabilitating such lands and buildings (Section
28(7) of the Planning Act).
c) Details i. Grants for the completion of a Phase II Environmental Site Assessment (ESA), a Phase
III ESA, Remedial Work Plan, and/or a Risk Assessment Plan may be provided to
eligible applicants for a total of 50% of the cost to complete the study (studies) to a
maximum of $10,000 per property.
ii. Additional incentives may be available through Regional Participation in this Program.
The Regional Municipality of Peel could provide additional grants to eligible applicants
for the completion of ESAs, in accordance with the Region’s intent to promote safe and
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
33
33
33
Environmental Study Grant Program Specific Details
secure communities (Section 5.4.3.1.1 of the Regional Municipality of Peel Official
Plan).
d) Eligibility
Requirements
i. All of the Town of Caledon Bolton CIP General Eligibility Requirements (outlined in
Section 6.7) apply.
ii. To be eligible for the Environmental Study Grant Program, a Phase I ESA must be
completed and submitted to the Town in order to demonstrate that site contamination is
likely.
iii. The following studies may be considered eligible under the Environmental Study Grant
Program:
1. studies to confirm and describe contamination on the site; or
2. studies to develop a plan to remove, treat, or otherwise manage
contamination found on the site (Phase III ESA/Remedial Work Plan/Risk
Assessment Plan).
iv. All environmental studies must be completed by a “qualified person” as defined in
Section 6.1.
v. As indicated in Table 11 (Figure 6.7), applicants receiving Environmental Study Grant
may also be eligible for additional incentive programs offered through the Bolton CIP or
by the Town.
e) Duration i. Grants will be provided to the property owner following the submission of the final
completed study to the Town for review.
ii. Grants are provided on a one-time basis to each eligible applicant for each approved
project.
f) Allocated
Program
Budget
i. On an annual basis, Council may allocate a portion of the Town’s Bolton CIP tax
supported budget to this program based on need and priority.
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
34
5.0 Monitoring Program
5.1 Purpose
The Town will conduct periodic reviews of the Community Improvement Plan in order to determine its effectiveness.
Specifically, the purpose of the Monitoring Program is to determine if:
a) the programs are achieving the goals and objectives set out by the CIP; and/or
b) program adjustments are required.
The Bolton Community Improvement Task Force will also contribute to the monitoring of the CIP on an annual basis
by advising the Town on the effectiveness of the Municipal Leadership and Financial Incentive Programs.
5.2 Description
In order to successfully monitor the CIP, the Town of Caledon’s CIP Review Panel and/or Administrator will
undertake the collection of statistical data in order to determine baseline information upon the adoption of the CIP.
The collection of baseline data will allow the Town to compare results and to determine if the program is achieving
the goals and objectives set out by the CIP or if program adjustments are required.
Baseline statistical data could include:
a) commercial vacancy rates;
b) total residential property/unit numbers;
c) total mixed-use building numbers;
d) commercial parking space counts;
e) total number of parks, gathering spaces, and trails, and extent of urban tree canopy, for example.
On a regular and on-going basis, a database or commercial property management software will be used by the CIP
Review Panel and/or Administrator in order to track the details, progress, and results of Financial Incentive Program
applications for statistical and monitoring purposes. Guidelines for the use of property management software,
specifically in regard to required fields and frequency of updating, are provided as a Technical Appendix to this
Plan.
In addition, the Bolton CIP Review Panel and/or Administrator will be responsible for monitoring the performance
and impact of the Financial Incentive Programs. Table 10 presents a list of the variables that will be monitored on
an individual application/project basis for the Financial Incentive Programs.
The CIP Review Panel and/or Administrator may also, at their discretion, obtain feedback received from successful
or unsuccessful applicants of the Financial Incentive Program, and this feedback will be considered as part of the
Monitoring Program.
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
35
35
35
Table 10: Variables to be Monitored
Financial Incentive Program
Variables to be Monitored
a) Tax Increment-
Equivalent Grant
Program
i. Number of successful and unsuccessful applications by type;
ii. Project details as proposed by application;
iii. Municipal assessment and taxes prior to commencement of approved project;
iv. Project details as completed;
v. Number of residential units by type and square footage of residential space
converted, rehabilitated or constructed;
vi. Square footage of habitable floor space created;
vii. Square footage of industrial or commercial space rehabilitated or constructed;
viii. Acreage of land remediated and/or redeveloped; and
ix. Total dollar amount value of project;
x. Increase in assessed value of property and municipal property taxes upon
completion of project;
xi. Total dollar amount granted by tax increment per year; and
xii. Number of program defaults.
b) Development
Charge Grant
Program
i. Number of successful and unsuccessful applications by type;
ii. Project details as proposed by application;
iii. Other incentives applied for by applicant;
iv. Project details as completed;
v. Number of residential units by type and square footage of residential space
converted, rehabilitated or constructed;
vi. Square footage of habitable floor space created;
vii. Square footage of commercial space rehabilitated or constructed;
viii. Total dollar amount value of construction;
ix. Total dollar amount value of project;
x. Total dollar amount and percentage of development charges refunded;
Bolton
36
Financial Incentive Program
Variables to be Monitored
xi. Additional incentives received by applicant;
xii. Increase in assessed value of property and municipal property taxes upon
completion of project; and
xiii. Number of program defaults.
c) Application and
Permit Fee Grant
Program
i. Number of successful and unsuccessful applications by type;
ii. Project details as proposed by application;
iii. Other incentives applied for by applicant;
iv. Project details as completed;
v. Number of residential units by type and square footage of residential space
converted, rehabilitated or constructed;
vi. Square footage of habitable floor space created;
vii. Square footage of commercial space rehabilitated or constructed;
viii. Total dollar amount value of construction;
ix. Total dollar amount value of project;
x. Total dollar amount and percentage of application/permit fees refunded;
xi. Additional incentives received by applicant;
xii. Increase in assessed value of property and municipal property taxes upon
completion of project; and
xiii. Number of program defaults.
d) Building and
Façade
Improvement
Grant Program
i. Number of successful and unsuccessful applications by type;
ii. Project details as proposed by application;
iii. Other incentives applied for by applicant;
iv. Project details as completed;
v. Type and total cost of façade improvements;
vi. Type and total cost of other exterior building improvements;
vii. Total cost of building signage;
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
37
37
37
Financial Incentive Program
Variables to be Monitored
viii. Total dollar amount of grant;
ix. Additional incentives received by applicant;
x. Increase in assessed value of property and municipal property taxes upon
completion of project; and
xi. Number of program defaults.
e) Mixed-Use
Construction/Co
nversion Grant
Program
i. Number of successful and unsuccessful applications by type;
ii. Project details as proposed by application;
iii. Other incentives applied for by applicant;
iv. Project details as completed;
v. Square footage of habitable floor space created;
vi. Number of units created by type (rental, ownership, 1 bedroom, 2 bedroom, 2+
bedroom);
vii. Square footage of commercial floor space created;
viii. Total dollar amount value of construction;
ix. Total dollar amount of grant;
x. Additional incentives received by applicant;
xi. Increase in assessed value of property and municipal property taxes upon
completion of project; and
xii. Number of program defaults.
f) Energy
Efficiency
Retrofit Grant
Program
i. Number of successful and unsuccessful applications by type;
ii. Project details as proposed by application;
iii. Other incentives applied for by applicant;
iv. Energy savings anticipated by application;
v. Project details as completed;
vi. Energy savings measured upon completion;
vii. Building type;
Bolton
38
Financial Incentive Program
Variables to be Monitored
viii. Total dollar amount value of construction;
ix. Total dollar amount of grant; and
x. Additional incentives received by applicant;
xi. Number of program defaults.
g) Landscape
Improvement
Grant Program
i. Number of successful and unsuccessful applications by type;
ii. Project details as proposed by application;
iii. Other incentives applied for by applicant;
iv. Project details as completed, such as number/amount of trees/vegetation, and
stormwater management/rainwater harvesting and reuse methods;
v. Building type;
vi. Total dollar amount value of construction;
vii. Total dollar amount of grant;
viii. Additional incentives received by applicant;
ix. Increase in assessed value of property and municipal property taxes upon
completion of project;
x. Measured water savings; and
xi. Number of program defaults.
h) Environmental
Study Grant
Program
i. Number of successful and unsuccessful applications by type;
ii. Type of study/studies as proposed by application;
iii. Other incentives applied for by applicant;
iv. Type of study/studies as completed;
v. Summary of study outcome (contaminated/not contaminated/work required for
remediation/etc.);
vi. Total cost of studies;
vii. Total dollar amount of grant;
viii. Additional incentives received by applicant;
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
39
39
39
Financial Incentive Program
Variables to be Monitored
ix. Additional studies/work undertaken upon completion of study; and
x. Number of program defaults.
5.3 Reporting
Based on the information obtained through the regular and on-going tracking of Financial Incentive Program
applications, the monitoring of variables, and from applicant feedback, the CIP Review Panel and/or Administrator
will prepare a brief annual report in order to provide an overview of the feedback from monitoring to Council, the
business community, and other local stakeholders and interested parties.
The overview of the results will be provided annually by the CIP Review Panel and/or Administrator to Council, and
will be used to recommend any adjustments that should be made to the terms and requirements of the Community
Improvement Plan in order to improve the programs offered through this Plan.
5.4 Program Adjustments
The feedback from monitoring of the CIP will allow the CIP Review Panel and/or Administrator to determine if
adjustments may be required to the Community Improvement Plan. The CIP Review Panel and/or Administrator
may periodically review and adjust the terms, requirements, and funding of any of the programs contained in this
Plan, or discontinue any of the programs contained in this Plan.
An amendment to the Bolton Community Improvement Plan will not be required in order to discontinue any of the
programs contained in this Plan. However, the addition of any new programs, or the addition of any new criteria
related to any of the programs offered by this Plan, will require a formal amendment in accordance with Section 28
of the Planning Act.
Should the Town wish to expand any of the Community Improvement Project Area of the Bolton CIP, or make any
other changes to the Bolton CIPA as appropriate, an amendment to the Town’s implementing Community
Improvement By-law will be required.
Any change to the funding levels provided by the Town for the Municipal Leadership Strategy and the Financial
Incentives Programs of this CIP will be made at the sole discretion of Town Council, without an amendment to this
Plan. The Town may adjust the funding on an annual basis to any percentage of the total variable CIP budget.
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
40
6.0 Implementation
6.1 Glossary of Terms
The following defines the terms used in this CIP:
“Applicant”, unless otherwise specified, means a registered owner, assessed owner or tenant of lands and
buildings within the community improvement project area, and any person to whom a registered owner, assessed
owner or tenant of lands and buildings within the community improvement project area has assigned the right to
receive a grant or loan. Applicants may also be referred to as “building owners” or “property owners” throughout
this Plan.
“Bioswale” means a landscape element that, as a result of its design and use of vegetation, removes pollutants
and silt from surface water runoff prior to being released to the sewer system.
“Brownfield” as defined by the 2005 Provincial Policy Statement is an undeveloped or previously developed
property that may be contaminated. Brownfields are usually, but not exclusively, former industrial or commercial
properties that may be underutilized, derelict or vacant.
“Community Improvement”, unless otherwise specified, is as defined in accordance with its definition under
Section 28 of the Planning Act.
“Community Improvement Plan”, unless otherwise specified, is as defined in accordance with its meaning under
Section 28 of the Planning Act.
“Community Improvement Project Area”, unless otherwise specified, is as defined in accordance with its
meaning under Section 28 of the Planning Act.
“Eligible Applicant” means an applicant (as defined above) who meets all of the general and program specific
requirements of the Financial Incentive Programs, and prepares and submits an application for community
improvement works that is in accordance with the definition of the Planning Act and the program specific
requirements, as outlined in this Plan. The CIP Review Panel and/or Administrator reserves the right to determine
whether or not an applicant is eligible for the CIP Financial Incentive Programs. Eligible Applicants may also be
referred to as “eligible building owners” or “eligible property owners” throughout this Plan.
“Green Roof” is a roofing system that is partially or completely covered with vegetation in order to absorb
rainwater and to provide insulation.
“Qualified Person” is a person as defined by Section 168.1 of the Environmental Protection Act Ontario
Regulation 153/04 (as amended by Ontario Regulation 66/08) who meets the qualifications to be a qualified person
for the purposes of:
(a) conducting or supervising a phase one environmental site assessment;
(b) conducting or supervising a phase two environmental site assessment; and
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
41
41
41
(c) completing the certifications that must be completed by a qualified person in a record of site condition in respect
of a property.
AND meets the qualifications to be a qualified person for the purposes of subsection (1) if:
(a) the person holds a license, limited license or temporary license under the Professional Engineers Act; or
(b) the person holds a certificate of registration under the Professional Geoscientists Act, 2000 and is a practicing
member, temporary member or limited member of the Association of Professional Geoscientists of Ontario.
“Town” means Town of Caledon.
6.2 Interpretation
The Town of Caledon Bolton Community Improvement Plan must be read and interpreted in totality, and in
conjunction with the Planning Act, and all other municipal planning documents.
In addition, the CIP will be interpreted at the sole discretion of the Town of Caledon Council in consultation with, or
based on advice from, Town of Caledon staff.
6.3 Timing
It is anticipated that the CIP will be implemented over a 10-year period. Council may elect to extend the
implementation period as it deems appropriate or necessary, subject to funding, as approved by Council.
6.4 Administration of Municipal Leadership Strategy
The Municipal Leadership Strategy offered through the Bolton Community Improvement Plan will be administered
by Town of Caledon. Specifically, the Town, with input from the CIP Review Panel and/or Administrator, will identify
a lead department that will be primarily responsible for administering and coordinating the implementation of each
of the Municipal Leadership Strategy outlined in Table 1.
Administration and coordination of each initiative will be undertaken by lead departments in accordance with the
anticipated timing, as outlined in Table 1, where possible.
Implementation of the Municipal Leadership Strategy will be dependent on the commitment of the Town to
contribute to, motivate, and assist in community improvement activities and undertakings, in addition to available
budget, and Council approval. Council will establish an annual budget related the Municipal Leadership Strategy.
6.5 Administration of the Financial Incentive Programs
The Financial Incentive Programs offered through the Bolton Community Improvement Plan will be administered by
Town of Caledon.
Specifically, as part of the Financial Incentive Programs (as discussed in Table 1), the Town will establish a Bolton
Community Improvement Plan Review Panel, which may be responsible for evaluating incentive applications
Bolton
42
against program eligibility requirements. The responsibilities of the Review Panel are further identified in Section
6.7 and 6.8. A CIP Administrator position may also be established by the Town, who will be responsible for any
administrative tasks related to the implementation of the CIP.
Final decisions on complete applications and Financial Incentive Program Agreements will be made by Council.
However, should an application be refused, all applicants will be given an opportunity to request Council to
reconsider its decision, or to reconsider the recommendation of the CIP Review Panel and/or Administrator.
An application tracking system will be used as part of the on-going administration of the Financial Incentive
Programs.
6.6 Financial Management of Financial Incentive Programs
Similar to the Municipal Leadership Strategy, Council may establish an annual budget each year over the 10 year
implementation period related to the following Financial Incentive Programs:
Tax Increment-Equivalent Grant Program;
Development Charge Grant Program;
Application and Permit Fee Grant Program;
Building and Façade Improvement Grant Program;
Mixed-Use Construction/Conversion Grant Program;
Energy Efficiency Retrofit Grant Program;
Landscape Improvement Grant Program; and
Environmental Study Grant Program.
Applications will be received on a first-come, first-served basis. If and when the allocated budget has been
expended on successful applications, and if required based on additional applications, the CIP Review Panel and/or
Administrator will bring the matter forward to Council for consideration on a case by case basis.
In accordance with the Monitoring Strategy in Section 5.0, Council will determine if changes in the funding and
incentive levels are necessary or warranted to ensure that the CIP functions properly in light of the Town’s financial
circumstances.
Any change to the funding levels provided for the Financial Incentives Programs of this CIP will be made at the sole
discretion of Town Council, without an amendment to this Plan.
6.7 General Eligibility Requirements of the Financial Incentive
Programs
The following General Eligibility Requirements are applicable to all incentive programs, and must be met in order for
an application to participate in any of the Financial Incentive Programs to be approved.
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
43
43
43
The General Eligibility Requirements must be read by the applicant in association with Program Specific Eligibility
Requirements and program details, as identified within the detailed incentive program tables presented in Section
4.0.
General Eligibility Requirements include:
a) In order to be eligible for any incentive program offered by the Bolton Community Improvement Plan, a
Financial Incentive Program application must be submitted to the Town prior to commencing any
community improvement works. Complete applications must be submitted and approved prior to
application for planning approval and/or building permit and prior to commencing community improvement
works.
b) In order to be eligible, all incentive program applications must include completed application forms and
supporting materials such as detailed work plans, cost estimates and contracts, applicable reports, and any
additional information as required by the Town’s CIP Review Panel and/or Administrator.
c) Eligible applicants must be either the owner of the property, an agent for the owner of the property, or the
tenant of a property to whom the owner has provided written consent for the application.
d) In order to be eligible for any incentive program, all proposed projects must be within the designated
Community Improvement Project Area, as presented in the Town’s By-law No. 2008-XXX.
e) All proposed projects must also be consistent with the goals and objectives for community improvement in
Bolton, as presented in the Bolton CIP.
f) All proposed community improvement works (such as the exterior design of buildings, including signage)
associated with applications for Financial Incentive Programs available through this Plan must be
consistent with the Town’s principles and guidelines for design and built form as presented by the CIP’s
companion Urban Design Guidelines. The Town’s CIP Review Panel and/or Administrator will consider
details of exterior design proposed by each application when determining eligibility for incentive programs
of the CIP.
g) Community improvement works associated with an incentive program application must be undertaken
pursuant to application for planning approval and/or building permit, and any additional required permits,
and in accordance with the Ontario Building Code, Provincial standards for barrier-free design, and all
applicable Provincial and Town planning policies and standards.
h) Existing and proposed land uses must be in conformity with the policies and standards provided by the
Town’s Official Plan, Zoning By-law, and all other planning documents.
i) Community improvement works associated with an incentive program application must be in accordance
with all Town by-laws, policies, procedures, standards, and guidelines in order to be approved, including
but not limited to the Town’s Parking Study and Sign By-law.
j) The property owner must not be in arrears in regard to tax payments and accounts receivable with the
Town of Caledon and must be in good standing with regard to taxation and all other financial matters at the
Bolton
44
time of application and throughout the duration of the incentive benefit period, as identified within
applicable incentive program table in Section 4.0.
k) Community improvement works undertaken and completed that are associated with an approved incentive
program application must be consistent with the project description contained in the application form and
supporting materials, and with the program agreement. Should the undertaken or completed works not be
consistent with the original project description, to the satisfaction of the Town, the Town may delay, reduce,
or cancel the approved incentive program benefits, and may require repayment of any of the incentive
program benefits, at the discretion of the Town.
l) In most cases, the Financial Incentive Programs made available through the Bolton Community
Improvement Plan can be used individually or in combination with another CIP Financial Incentive Program
(or any other existing Town incentive program) in accordance with Table 11 below. However, this does not
apply to the Tax Increment-Equivalent Grant Program, which cannot be used in combination with any other
incentive program.
m) The total of all incentive benefits (including grants and refunds) provided to each applicant for each
community improvement proposal for a building or lands within the CIPA must not exceed the project’s
costs related to the planning or replanning, design or redesign, resubdivision, clearance, development or
redevelopment, and/or reconstruction and rehabilitation associated with an application.
n) The Town may not approve grants that total less than $1,500 even where the application meets all other
eligibility criteria.
o) All projects must represent an improvement to the property or building, and not represent a life cycl
replacement of existing materials, paving or structures.
Table 11: Potential to Combine Financial Incentive Programs
Tax In
cre
men
t -
Eq
uiv
ale
nt
Gra
nt
Pro
gra
m
Develo
pm
en
t C
harg
e
Gra
nt
Pro
gra
m
Ap
plicati
on
an
d P
erm
it
Fee G
ran
t P
rog
ram
Bu
ild
ing
an
d
Façad
e
Imp
rov
em
en
t G
ran
t
Pro
gra
m
Mix
ed
-Use
Co
nstr
ucti
on
/Co
nvers
ion
Gra
nt
Pro
gra
m
En
erg
y E
ffic
ien
t R
etr
ofi
t
Gra
nt
Pro
gra
m
Lan
dsca
pe Im
pro
vem
en
t
Gra
nt
Pro
gra
m
En
vir
on
me
nta
l S
tud
y
Gra
nt
Pro
gra
m
Gre
en
Develo
pm
en
t
Pro
gra
m
Tax Increment-Equivalent Grant Program
x x x x x x x x
Development Charge Grant Program
x x x x
Application and Permit Fee Grant Program
x x x
Building and Façade Improvement Grant Program
x x x x
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
45
45
45
Tax In
cre
men
t -
Eq
uiv
ale
nt
Gra
nt
Pro
gra
m
Develo
pm
en
t C
harg
e
Gra
nt
Pro
gra
m
Ap
plicati
on
an
d P
erm
it
Fee G
ran
t P
rog
ram
Bu
ild
ing
an
d
Façad
e
Imp
rov
em
en
t G
ran
t
Pro
gra
m
Mix
ed
-Use
Co
nstr
ucti
on
/Co
nvers
ion
Gra
nt
Pro
gra
m
En
erg
y E
ffic
ien
t R
etr
ofi
t
Gra
nt
Pro
gra
m
Lan
dsca
pe Im
pro
vem
en
t
Gra
nt
Pro
gra
m
En
vir
on
me
nta
l S
tud
y
Gra
nt
Pro
gra
m
Gre
en
Develo
pm
en
t
Pro
gra
m
Mixed-Use Construction/Conversion Grant Program
x x
Energy Efficient Retrofit Grant Program
x x x x
Landscape Improvement Grant Program
x x x
Environmental Study Grant Program
x x x x x
– indicates programs may be combined, subject to availability.
X – indicates programs may not be combined.
6.8 General Process and Submission Requirements of the Financial
Incentive Programs
In order to be eligible for any of the incentive programs, applicants must submit a complete application in
accordance with the General Process and Submission Requirements outlined below.
A complete application will include:
a) Completed application forms; and
b) Supporting materials such as plans, cost estimates and contracts, applicable reports, and any additional
information required by the Town.
General Process and Submission Requirements include:
a) The Town is not responsible for the costs associated with a CIP application, costs related to the
anticipation of an incentive program, or any other costs incurred in relation to any of the programs,
including pro-forma financial information, a third party financial review (contracted by the Town), audits,
etc.
b) An application must be submitted to the Town prior to commencing any community improvement works.
Should an application be submitted following the commencement of community improvement works, the
application will be rejected upon receipt.
Bolton
46
c) All sources of additional funding/incentives must be declared at the time of application submission. The
Bolton CIP Review Panel and/or Administrator is entitled to make recommendations for incentive
reductions based upon any declared funding/incentive.
d) The Bolton CIP Review Panel and/or Administrator will evaluate all applications and supporting materials.
Based on the panel’s evaluation, a recommendation will be made to the Town’s Treasurer. The Treasurer
will approve CIP grant applications upon the unanimous recommendation of the Bolton CIP Review Panel.
e) Should the application be approved, a Financial Incentive Program Agreement will be required, which will
outline the terms, duration, default, and any other provisions of the incentive program.
f) Should the CIP Review Panel and/or Administrator, require additional information, plans, studies, or any
additional works related to the proposed project and incentive program application, the requested
information and/or works must be adequately provided and/or undertaken prior to approval of the
application, at the applicant’s expense.
g) Upon approval and/or completion of community improvement works, the Town reserves the right to audit
the costs associated with any of the works described by the approved CIP application. Audits will be
undertaken at the expense of the applicant.
h) Upon approval and/or completion of community improvement works, the Town reserves the right to inspect
any properties/buildings that are associated with an incentive program application offered within this CIP.
i) Should the applicant fall into default of any of the General Eligibility Requirements, or fail to meet the
detailed requirements of each of the incentive programs or any other requirements of the Town, the Town
may delay, reduce, or cancel the approved incentive program benefits, and may require repayment of any
of the incentive program benefits, at the discretion of the Town.
j) All Bolton CIP Incentive programs will be monitored for effectiveness on an annual basis with a detailed
review in year 5 of the program to determine whether the program has effectively met the goals and
objectives of the Bolton CIP. Based upon the results of either the annual review or the 5-year detailed
review, the Town may decide to modify, continue, or discontinue any or all of the incentive programs at its
discretion.
k) The Town may discontinue any of the CIP incentive programs at any time; however, all applicants with
approved incentive program benefits will continue to receive the benefits in accordance with the terms
outlined in the CIP, subject to fulfilling any requirements and agreements and subject to available funding
as approved by Council.
l) Any program commitments may be cancelled if work does not commence within six months of approval of
an application, or in accordance with an agreement with the Town.
6.9 Application Process for the Financial Incentive Programs
Table 12 provides a detailed outline of the steps involved in the application process for the Financial Incentive
Programs. The table must be read in association with the General Process and Submission Requirements of the
Financial Incentive Programs, as presented in Section 6.8.
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
47
47
47
Table 12: Application Process for the Financial Incentive Programs
STEP 1: APPLICATION SUBMISSION
a) Applicants are required to arrange and participate in a pre-application consultation meeting with one or more
members of the Bolton CIP Review Panel and/or Administrator, in order to discuss and confirm application
requirements, program eligibility, proposed scope of work, project timing, supporting documentation
requirements, etc.
b) The applicant will be required to submit a complete application, which will include all of the required
application forms, in addition to any supporting documentation, required by the CIP Review Panel and/or
Administrator, which may include but is not limited to:
i. photographs of the existing building condition;
ii. historical photographs and/or drawings;
iii. a site plan and/or professional design study/architectural drawings;
iv. a landscape plan
v. specification of the proposed works, including a work plan for the improvements and
construction drawings;
vi. any additional requirements as outlined in the Program Specific Eligibility Requirement tables
in Section 4.0; and
vii. two cost estimate(s) for eligible work provided by licensed contractors.
c) Once all of the required forms and supporting materials are received, the CIP Review Panel and/or
Administrator will undertake a preliminary screen of the proposal and application.
d) Based on the application and proposal, and the results of the preliminary screening, the CIP Review Panel
and/or Administrator may perform an initial site visit and inspection of the building/property (as necessary).
e) If the application clearly does not meet the program requirements, the application will not be accepted.
f) If the application meets the program requirements, the application will be accepted.
g) By accepting an application for any of the Financial Incentive Programs, the CIP Review Panel and/or
Administrator does not guarantee program approval.
STEP 2: APPLICATION REVIEW & EVALUATION
a) Once an application has been accepted by the CIP Review Panel and/or Administrator, information related
to the applicant, application, and proposal information will be entered into the Town’s database system in
order to track the application details, progress and results. This will be an on-going task throughout the
remainder of the application process.
Bolton
48
b) Applications and supporting documentation will be considered by the CIP Review Panel and/or
Administrator against the incentive program eligibility requirements (including both general and specific
requirements).
c) Based on the proposal, application, and fulfillment of eligibility requirements, the CIP Review Panel and/or
Administrator will determine if the proposal and application will be considered eligible.
d) Based on eligibility, the CIP Review Panel and/or Administrator will recommend approval or not. The
recommendation will be forwarded to the Treasurer.
e) Should the CIP Review Panel and/or Administrator recommend approval of the application, a Financial
Incentive Program Agreement will be prepared by Legal staff.
f) If applicable, the Financial Incentive Program Agreement will be forwarded to the applicant to be dated and
signed.
g) Once the Agreement has been signed and returned to the Town, work may begin on the project.
h) Should an agreement be forwarded by the CIP Review Panel and/or Administrator to the applicant for
signature, the CIP Review Panel and/or Administrator does not guarantee program approval.
STEP 3: APPLICATION APPROVAL
a) If the CIP Review Panel and/or Administrator has recommended that the application be refused, notification
in writing will be sent to the applicant.
b) Approval authority for grant applications is delegated to the Town’s Treasurer (By-Law 2011-038). The
Treasurer will only approve applications that have been unanimously recommended by the Review Panel.
c) Alternatively, if the CIP Review Panel has not unanimously recommended approval a report with the
application details will be forwarded to Council who will determine if approval will be granted.
d) If Council or the Treasurer approves an application, the Agreement will be executed by the signing and
dating of the agreement by Town officials and the applicant.
e) A copy of the signed and dated Financial Incentive Program Agreement will be provided to the applicant.
STEP 4: PAYMENT
a) Once an application has been approved, and the agreement signed and dated, and once all of the required
approvals and permits for the work are secured, the applicant may commence community improvement
works.
b) Payment of the financial incentive, in accordance with the Financial Incentive Program Agreement, will be
provided upon successful completion of the approved work, to the satisfaction of the Town.
c) Prior to issuance of the financial incentive, the applicant may be required to provide the CIP Review Panel
and/or Administrator with final supporting documentation, which may include but is not limited to:
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
49
49
49
i. photographic evidence of the completed works satisfactory to the Town;
ii. other documentation proving successful completion of the project according to Program
Specific Eligibility Requirements as described in Section 4.0;
iii. original invoices for all eligible work done, indicating the total amount paid for eligible works
(excluding all taxes); and
iv. proof of payment to contractors in full (original cancelled cheques).
d) The CIP Review Panel and/or Administrator may perform final site visit and inspection of the
building/property (as necessary) in order to ensure that the project has been completed in accordance with
the Financial Incentive Program Agreement.
e) Prior to issuance of the financial incentive payment, the CIP Review Panel and/or Administrator will ensure
that all program requirements and details of the agreement have been met.
f) The CIP Review Panel and/or Administrator will take appropriate remedies as specified in the agreement if
the applicant defaults on the agreement.
g) If all program requirements and Financial Incentive Program Agreement requirements have been met to the
CIP Review Panel and/or Administrator’s satisfaction, the CIP Review Panel and/or Administrator will issue
payment of the approved grant in accordance with the general and specific program eligibility requirements,
and the agreement.
6.10 Marketing Strategy
In order to achieve the goals and objectives identified by this CIP, the Town must successfully market the possible
incentive options available under the CIP to property owners and other interested parties.
The following identifies specific activities that will be undertaken by the Town, as appropriate, upon adoption of the
CIP in order to market the opportunities available through this Plan.
Information/Communication:
a) Upon initiation and completion of an initiative that is part of the Municipal Leadership Strategy, the Town of
Caledon may advertise the initiative in association with the Bolton CIP, in order to raise awareness to the
goals, objectives, and opportunities available as part of the CIP.
b) The Town may prepare educational newsletters and/or brochures that will provide an overview of the
Bolton CIP, and the possible incentive options available. Brochures and newsletters may be delivered to
all property owners, tenants, and other interested parties within the designated Community Improvement
Project Area. Brochures and newsletters may also be displayed by the Town at its municipal office, and on
the Town’s website.
Bolton
50
c) The Town may also prepare a promotional display that will provide an overview of the Bolton CIP, and the
possible incentive options available. The Town may use the display at local community or economic
development events that the Town has sponsored and/or in which it is participating.
d) The Town may hold a series of informational workshops upon adoption of the CIP and at the beginning of
every year to educate property owners, tenants, and other interested parties within the designated
Community Improvement Project Area with respect to the Financial Incentive Programs available and the
annual priorities/levels of funding.
e) The CIP Review Panel and/or CIP Administrator will be available on an on-going basis to answer questions
from potential applicants with respect to the CIP programs. As well, the Review Panel and/or CIP
Administrator will participate in pre-application consultation meetings prior and site visits to discuss the
merits of a potential application with property owners, tenants, and other interested parties.
f) Information obtained as a result of the monitoring program, including progress on implementation and the
statistical results of the Financial Incentive Programs may also be made available through newsletters and
information sheets to promote the successes of the CIP.
g) The Bolton Community Improvement Task Force, Bolton Business Improvement Areas, Bolton Merchants
Association, and Chamber of Commerce may also play a role in ensuring that information related to the
Bolton CIP is displayed and shared with property owners, tenants, and other interested parties. These
organizations may circulate newsletters/brochures, hold workshops, and liaise with potential applicants.
h) The Town may organize and participate in other appropriate activities to encourage participation by
property owners, tenants, and other interested parties in the CIP programs.
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
51
51
51
Bolton
Bolton Community Improvement Plan | Town of Caledon Adopted by Caledon Council, April 2009 | Rev. 2, April 2011 | Rev. 3, January 2014
52
7.0 Conclusion
The Town of Caledon Bolton Community Improvement Plan provides a framework that guides community
improvement in the Town, and is based upon the Strategy (March 2009) that was developed as part of the CIP
Study.
In order to implement the strategy, this CIP provides a set of goals and objectives for community improvement of
Bolton, Municipal Leadership Strategy and a set of incentive programs available to eligible property owners in order
to stimulate and leverage private sector investment. Implementation and monitoring of the program will be
undertaken by the Town and its CIP Review Panel and/or Administrator.
It is anticipated that the CIP will be implemented over a 10-year period. Implementation of this Plan will promote
beautification and prosperity in the Bolton Community Improvement Project Area by:
a) Improving Bolton’s public infrastructure and social and recreational facilities/services in a coordinated
manner, reflecting localized issues, the Town’s priorities, and financial resources;
b) Encouraging, supporting, and aiding in the coordination of private sector investment;
c) Promoting the planning or replanning, design or redesign, resubdivision, clearance, development or
redevelopment, construction, reconstruction and rehabilitation, and/or the improvement of energy efficiency
of buildings or properties;
d) Improving the tax assessment base and revenues for the Town and the Province of Ontario;
e) Endorsing the economic development and competitiveness of Bolton in order to create a diverse and
sustainable economic base;
f) Retaining and increasing employment, live/work, shopping, and tourism opportunities within the Bolton
historic core, commercial corridor, and older industrial areas;
g) Improving the physical environment and visual qualities of the Bolton historic core, commercial corridor,
and older industrial areas in a manner that is consistent with the Town’s design principles and guidelines
with respect to built form; and
h) Protecting and enhancing the environmental features, and unique attributes, nature, and identity of Bolton.